CN111609210A - 一种顶管施工触变泥浆置换施工方法 - Google Patents
一种顶管施工触变泥浆置换施工方法 Download PDFInfo
- Publication number
- CN111609210A CN111609210A CN202010428552.8A CN202010428552A CN111609210A CN 111609210 A CN111609210 A CN 111609210A CN 202010428552 A CN202010428552 A CN 202010428552A CN 111609210 A CN111609210 A CN 111609210A
- Authority
- CN
- China
- Prior art keywords
- slurry
- pipe
- grouting hole
- hole
- thixotropic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
- F16L1/036—Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本发明专利属于基础设施工程技术领域,涉及一种顶管施工触变泥浆置换施工方法。为保证润滑泥浆和水泥浆注浆达到较好的效果,在每节管材端头布置注浆孔6个。由于注浆孔内设置止回阀,故润滑泥浆无法通过注浆孔排出,需在每根管材打一个5cm泄浆孔,以利于泥浆排出。泄浆孔位于两根管材注浆孔的中间,每根管材泄浆孔左右错开布置出。本工程水泥浆液配比为0.5:1,注浆压力控制在0.5MPa,本发明总结了触变泥浆置换施工关键技术;施工工过程通过对触变泥浆置换施工方面研究,保证触变泥浆的置换率,加快了触变泥浆置换施工进度,并减少了顶管穿越现有构筑物后期所产生的沉降,高效率、高质量的完成触变泥浆置换的施工任务。
Description
技术领域
本发明专利属于基础设施工程技术领域,涉及一种顶管施工触变泥浆置换施工方法。
背景技术
顶管润滑泥浆中如膨润土的含量足够多,则颗粒之间的电键使分散系形成一种机械结构,膨润土水溶液呈固体状态,一经触动(摇晃、搅拌、振动或通过超声波、电流)、颗粒之间的电键即遭到破坏,膨润土水溶液就随之变为流体状态。如果外界因素停止作用,水溶液又变作固体状态。故在顶管顶进结束后,必须及时将触变泥浆置换,以减少后期顶管穿越现有构筑物而产生的沉降。
顶管管节顶进施工完成后,进行触变泥浆置换时,触变泥浆置换方法的不同,置换率也不尽相同,置换质量也存在残次不齐。
发明内容
为解决现有技术的问题,本发明提供了一种顶管施工触变泥浆置换施工方法,本发明总结了触变泥浆置换施工关键技术;施工工过程通过对触变泥浆置换施工方面研究,保证触变泥浆的置换率,加快了触变泥浆置换施工进度,并减少了顶管穿越现有构筑物后期所产生的沉降,高效率、高质量的完成触变泥浆置换的施工任务。
为了达到上述目的,本发明采用以下技术方案:一种顶管施工触变泥浆置换施工方法,包括如下步骤:
(1)在每根管材端部均匀设置注浆孔一、注浆孔二、注浆孔三、注浆孔四、注浆孔五、注浆孔六,用于保证注入和置换触变泥浆质量和效率,该注浆孔一、注浆孔二、注浆孔三、注浆孔四、注浆孔五、注浆孔六用于作为顶管施工中的触变泥浆注浆孔,又用于作为顶管顶进完成后触变泥浆置换的注浆孔;
(2)注浆孔一、注浆孔二、注浆孔三、注浆孔四、注浆孔五、注浆孔六内设置止回阀,用于防止泥浆外溢;
(2)在顶进过程中,注意顶管管节的布置,要求布置的注浆孔一、注浆孔二、注浆孔三、注浆孔四、注浆孔五、注浆孔六均匀对称的布置在顶管线路轴线两侧,用于控制顶管轴线,防止触变泥浆置换后出现轴线偏移;
(3)在每根管材设置一个泄浆孔,用于触变泥浆排出,泄浆孔位于两根管材注浆孔的中间,每根管材泄浆孔左右错开布置出,用于保证触变泥浆顺利置换;
(4)将打好的泄浆孔,用木塞和土工布将打好的泄浆孔封堵,用于防止触变泥浆外溢,造成土体沉降;
(5)采用水泥浆液置换触变泥浆,水泥浆液配比为0.5:1,用于利于管节周边土体稳定;
(6)触变泥浆置换时,注浆孔的开启顺序不同,用于防止泥浆置换过程中出现整条管线轴线偏移,并通过记录注入的水泥浆液量来判断触变泥浆置换情况,用于以保证触变泥浆置换质量;
(7)触变泥浆置换完成后,用比管材的混凝土强度高一等级的微膨胀细石混凝土封堵泄浆孔,用于保证泄浆孔封堵质量。
与现有技术相比,发明的有益效果是:
(1)高效的完成了触变泥浆的置换。
(2)有效控制触变泥浆在置换时管线的偏移。
(3)有效的控制顶管上部构筑物的沉降。
(4)掌握了水泥浆液置换触变泥浆时的配比和注浆压力。
附图说明
通过阅读参照以下附图对非限制性实施例所作的详细描述,本发明的其它特征、目的和优点将会变得更明显。
图1为本发明实施例中顶进完成后奇数管材注浆孔及泄浆孔位置示意图。
图2为本发明实施例中顶进完成后偶数管材注浆孔及泄浆孔位置示意图。
图中标注为:1、注浆孔一;2、注浆孔二;3、注浆孔三;4、注浆孔四;5、注浆孔五;6、注浆孔六;7、泄浆孔。
具体实施方式
下面通过实施例对本发明做进一步详细说明,实施例仅用来说明本发明,并不限制本发明的范围。
请参阅图1-2所示的一种顶管施工触变泥浆置换施工方法,包括如下步骤:
(1)在每根管材10端部均匀设置注浆孔一1、注浆孔二2、注浆孔三3、注浆孔四4、注浆孔五5、注浆孔六6,用于保证注入和置换触变泥浆质量和效率,该注浆孔一1、注浆孔二2、注浆孔三3、注浆孔四4、注浆孔五5、注浆孔六6用于作为顶管施工中的触变泥浆注浆孔,又用于作为顶管顶进完成后触变泥浆置换的注浆孔;
(2)注浆孔一1、注浆孔二2、注浆孔三3、注浆孔四4、注浆孔五5、注浆孔六6内设置止回阀,用于防止泥浆外溢;
(2)在顶进过程中,注意顶管管节的布置,要求布置的注浆孔一1、注浆孔二2、注浆孔三3、注浆孔四4、注浆孔五5、注浆孔六6均匀对称的布置在顶管线路轴线两侧,用于控制顶管轴线,防止触变泥浆置换后出现轴线偏移;
(3)在每根管材10设置一个泄浆孔7,用于触变泥浆排出,泄浆孔7位于两根管材10注浆孔的中间,每根管材10泄浆孔左右错开布置出,用于保证触变泥浆顺利置换;
(4)将打好的泄浆孔7,用木塞和土工布将打好的泄浆孔7封堵,用于防止触变泥浆外溢,造成土体沉降;
(5)采用水泥浆液置换触变泥浆,水泥浆液配比为0.5:1,用于利于管节周边土体稳定;
(6)触变泥浆置换时,注浆孔的开启顺序不同,用于防止泥浆置换过程中出现整条管线轴线偏移,并通过记录注入的水泥浆液量来判断触变泥浆置换情况,用于以保证触变泥浆置换质量;
(7)触变泥浆置换完成后,用比管材10的混凝土强度高一等级的微膨胀细石混凝土封堵泄浆孔,用于保证泄浆孔封堵质量。
同时考虑触变泥浆置换时的压力造成管道位移,下面结合附图1-2,对本发明作进一步的说明。
为保证润滑泥浆和水泥浆注浆达到较好的效果,在每节管材端头布置注浆孔6个。由于注浆孔内设置止回阀,故润滑泥浆无法通过注浆孔排出,需在每根管材打一个5cm泄浆孔,以利于泥浆排出。泄浆孔位于两根管材注浆孔的中间,每根管材泄浆孔左右错开布置出。本工程水泥浆液配比为0.5:1,注浆压力控制在0.5MPa,具体泥浆置换操作方法如下:
步骤1、顶管管材顶进完成后,用水钻在事先规定的位置打一个5cm的泄浆孔7。
步骤2、将打好的泄浆孔7,用木塞和土工布将打好的泄浆孔7封堵,防止浆液外溢,造成土体沉降。
步骤3、开始第一根管材范围内的水泥浆置换工作,安装第一根和第二根管材水泥浆注浆管,打开第一节管材的泄浆孔7。
步骤4、同时打开第一根和第二根材注浆孔一1,注入水泥浆液量达到注浆孔三3的位置时,打开注浆孔二2开始注浆。注入水泥浆液量达到注浆孔四4的位置后打开注浆孔三3开始注浆,注入水泥浆达到注浆孔五5的位置后打开注浆孔四4开始注浆,泄浆孔开始出水泥浆后,打开注浆孔五5和注浆孔六6开始注浆,冒出纯水泥浆后,用木塞加土工布封堵泄浆孔,然后继续注1分钟水泥浆液,结束第一根管材的泥浆置换工作。
步骤5、开始第二根管材范围内的水泥浆置换工作,安装第三根管材水泥浆注浆管,打开第二节管材的泄浆孔。
步骤6、同时打开第二根和第三根管材注浆孔六6,注入水泥浆液量达到注浆孔四4的位置时,打开注浆孔五5开始注浆。注入水泥浆液量达到注浆孔三3的位置后打开注浆孔四4开始注浆,注入水泥浆达到注浆孔二2的位置后打开注浆孔三3开始注浆,泄浆孔开始出水泥浆后,打开注浆孔二2和注浆孔一1开始注浆,冒出纯水泥浆后,用木塞加土工布封堵泄浆孔,然后继续注1分钟水泥浆液,结束第二根管材的泥浆置换工作。
步骤7、其它管材的泥浆置换按照步骤3、4、5、6的顺序进行,直至触变泥浆置换完成,最后用比管材混凝土强度高一等级的微膨胀细石混凝土封堵泄浆孔。
以上所述,仅是本发明的较佳实施例而已,并非是对本发明作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例。但是凡是未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与改型,仍属于本发明技术方案的保护范围。
Claims (1)
1.一种顶管施工触变泥浆置换施工方法,其特征在于,包括如下步骤:
(1)在每根管材端部均匀设置注浆孔一、注浆孔二、注浆孔三、注浆孔四、注浆孔五、注浆孔六,用于保证注入和置换触变泥浆质量和效率,该注浆孔一、注浆孔二、注浆孔三、注浆孔四、注浆孔五、注浆孔六用于作为顶管施工中的触变泥浆注浆孔,又用于作为顶管顶进完成后触变泥浆置换的注浆孔;
(2)注浆孔一、注浆孔二、注浆孔三、注浆孔四、注浆孔五、注浆孔六内设置止回阀,用于防止泥浆外溢;
(2)在顶进过程中,注意顶管管节的布置,要求布置的注浆孔一、注浆孔二、注浆孔三、注浆孔四、注浆孔五、注浆孔六均匀对称的布置在顶管线路轴线两侧,用于控制顶管轴线,防止触变泥浆置换后出现轴线偏移;
(3)在每根管材设置一个泄浆孔,用于触变泥浆排出,泄浆孔位于两根管材注浆孔的中间,每根管材泄浆孔左右错开布置出,用于保证触变泥浆顺利置换;
(4)将打好的泄浆孔,用木塞和土工布将打好的泄浆孔封堵,用于防止触变泥浆外溢,造成土体沉降;
(5)采用水泥浆液置换触变泥浆,水泥浆液配比为0.5:1,用于利于管节周边土体稳定;
(6)触变泥浆置换时,注浆孔的开启顺序不同,用于防止泥浆置换过程中出现整条管线轴线偏移,并通过记录注入的水泥浆液量来判断触变泥浆置换情况,用于以保证触变泥浆置换质量;
(7)触变泥浆置换完成后,用比管材的混凝土强度高一等级的微膨胀细石混凝土封堵泄浆孔,用于保证泄浆孔封堵质量。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010428552.8A CN111609210B (zh) | 2020-05-20 | 2020-05-20 | 一种顶管施工触变泥浆置换施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010428552.8A CN111609210B (zh) | 2020-05-20 | 2020-05-20 | 一种顶管施工触变泥浆置换施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111609210A true CN111609210A (zh) | 2020-09-01 |
CN111609210B CN111609210B (zh) | 2022-03-11 |
Family
ID=72194940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010428552.8A Active CN111609210B (zh) | 2020-05-20 | 2020-05-20 | 一种顶管施工触变泥浆置换施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111609210B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113586090A (zh) * | 2021-08-13 | 2021-11-02 | 郑州亚欧交通职业学院 | 一种地铁顶管施工中触变泥浆置换装置 |
CN114321497A (zh) * | 2021-12-30 | 2022-04-12 | 上海市机械施工集团有限公司 | 一种顶管施工的纠偏方法 |
CN114645981A (zh) * | 2022-03-23 | 2022-06-21 | 中国五冶集团有限公司 | 触变泥浆管管节连接装置 |
WO2024082589A1 (zh) * | 2022-10-18 | 2024-04-25 | 中国水利水电第五工程局有限公司 | 一种低温环境下顶管施工方法、抗冻触变泥浆及制备方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0217284A (ja) * | 1988-07-06 | 1990-01-22 | Haneda Fume Can Kk | 推進管の滑材注入配管方法 |
EP0750096A1 (en) * | 1993-03-03 | 1996-12-27 | Tokyo Gas Co., Ltd. | A method for injecting back-filling material into a space between the outside of double-wall pipes and the ground in the pipe-jacking method |
JPH09166242A (ja) * | 1995-12-15 | 1997-06-24 | Sekisui Chem Co Ltd | 管渠の築造方法 |
KR100964397B1 (ko) * | 2009-11-26 | 2010-06-17 | (주)지맥스래피드 | 추진관의 그라우팅 공법 |
CN103397845A (zh) * | 2013-07-24 | 2013-11-20 | 国家电网公司 | 一种通过浆液置换控制顶管穿越建筑物引起的沉降的方法 |
CN104343455A (zh) * | 2013-08-05 | 2015-02-11 | 中铁十八局集团第一工程有限公司 | 长距离曲线顶管及管幕施工工艺 |
CN206111200U (zh) * | 2016-10-30 | 2017-04-19 | 成都建工路桥建设有限公司 | 矩形盾构顶掘管节 |
JP2017110687A (ja) * | 2015-12-14 | 2017-06-22 | 積水化学工業株式会社 | 逆止弁装置及び既設管の更生方法 |
CN109441474A (zh) * | 2018-12-28 | 2019-03-08 | 中铁隧道集团三处有限公司 | 一种顶管施工过程中的管节结构及其施工方法 |
-
2020
- 2020-05-20 CN CN202010428552.8A patent/CN111609210B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0217284A (ja) * | 1988-07-06 | 1990-01-22 | Haneda Fume Can Kk | 推進管の滑材注入配管方法 |
EP0750096A1 (en) * | 1993-03-03 | 1996-12-27 | Tokyo Gas Co., Ltd. | A method for injecting back-filling material into a space between the outside of double-wall pipes and the ground in the pipe-jacking method |
JPH09166242A (ja) * | 1995-12-15 | 1997-06-24 | Sekisui Chem Co Ltd | 管渠の築造方法 |
KR100964397B1 (ko) * | 2009-11-26 | 2010-06-17 | (주)지맥스래피드 | 추진관의 그라우팅 공법 |
CN103397845A (zh) * | 2013-07-24 | 2013-11-20 | 国家电网公司 | 一种通过浆液置换控制顶管穿越建筑物引起的沉降的方法 |
CN104343455A (zh) * | 2013-08-05 | 2015-02-11 | 中铁十八局集团第一工程有限公司 | 长距离曲线顶管及管幕施工工艺 |
JP2017110687A (ja) * | 2015-12-14 | 2017-06-22 | 積水化学工業株式会社 | 逆止弁装置及び既設管の更生方法 |
CN206111200U (zh) * | 2016-10-30 | 2017-04-19 | 成都建工路桥建设有限公司 | 矩形盾构顶掘管节 |
CN109441474A (zh) * | 2018-12-28 | 2019-03-08 | 中铁隧道集团三处有限公司 | 一种顶管施工过程中的管节结构及其施工方法 |
Non-Patent Citations (1)
Title |
---|
夏天: "《大口径长距离顶管在穿越重要地下管线时的关键技术措施》", 《城市道桥与防洪》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113586090A (zh) * | 2021-08-13 | 2021-11-02 | 郑州亚欧交通职业学院 | 一种地铁顶管施工中触变泥浆置换装置 |
CN113586090B (zh) * | 2021-08-13 | 2024-03-05 | 郑州亚欧交通职业学院 | 一种地铁顶管施工中触变泥浆置换装置 |
CN114321497A (zh) * | 2021-12-30 | 2022-04-12 | 上海市机械施工集团有限公司 | 一种顶管施工的纠偏方法 |
CN114321497B (zh) * | 2021-12-30 | 2024-04-23 | 上海市机械施工集团有限公司 | 一种顶管施工的纠偏方法 |
CN114645981A (zh) * | 2022-03-23 | 2022-06-21 | 中国五冶集团有限公司 | 触变泥浆管管节连接装置 |
WO2024082589A1 (zh) * | 2022-10-18 | 2024-04-25 | 中国水利水电第五工程局有限公司 | 一种低温环境下顶管施工方法、抗冻触变泥浆及制备方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111609210B (zh) | 2022-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111609210B (zh) | 一种顶管施工触变泥浆置换施工方法 | |
CN105952475B (zh) | 一种煤矿残采区冒落废巷注浆加固工艺与方法 | |
CN101761345A (zh) | 一种隧道顶部土层的加固装置及其施工方法 | |
CN101235632B (zh) | 灌浆堵漏工艺 | |
CN105201448A (zh) | 一种高压大流量涌水通道内阻水注浆封堵方法 | |
CN104612134A (zh) | 一种用于浇筑施工的钻孔灌注桩后注浆施工方法 | |
CN101812843B (zh) | 中心灌注后压浆桩施工方法及其使用的灌注器和注浆器 | |
CN103089274B (zh) | 一种可重复注浆加固巷道围岩的方法 | |
CN103485345A (zh) | 一种覆盖层孔口封闭高压帷幕灌浆施工方法 | |
CN102536269A (zh) | 井下注浆堵水工艺 | |
CN108166535A (zh) | 一种囊式堵漏的施工方法 | |
CN111519618A (zh) | 一种预应力管桩后注浆装置及其施工方法 | |
CN101509264A (zh) | 一次成孔、分段高压水泥灌浆施工方法 | |
CN102182481B (zh) | 锚索止浆塞 | |
CN105134069B (zh) | 一种涉及瓦斯立井穿越强富水岩层反井法施工工艺 | |
CN103147707A (zh) | 桩底沉渣成套处理方法 | |
CN110130325B (zh) | 一种岩石钻孔灌注的施工方法 | |
CN105781580A (zh) | 隧洞裂缝修补的方法 | |
CN210857202U (zh) | 一种钻孔灌注桩断桩接桩结构 | |
CN210288356U (zh) | 一种桩底沉渣超高压置换喷浆结构 | |
CN107044270B (zh) | 煤矿探放水套管止水方法及止水套管 | |
CN110700243A (zh) | 一种处理混凝土灌注桩桩底沉渣的方法 | |
CN206736895U (zh) | 一种插筋修复型cfg桩 | |
CN105156113B (zh) | 瓦斯立井壁后环空充填注浆施工工艺 | |
CN115234193B (zh) | 钻孔突水的动水固管封堵装置的封堵方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |