CN102536269A - 井下注浆堵水工艺 - Google Patents

井下注浆堵水工艺 Download PDF

Info

Publication number
CN102536269A
CN102536269A CN2010105883879A CN201010588387A CN102536269A CN 102536269 A CN102536269 A CN 102536269A CN 2010105883879 A CN2010105883879 A CN 2010105883879A CN 201010588387 A CN201010588387 A CN 201010588387A CN 102536269 A CN102536269 A CN 102536269A
Authority
CN
China
Prior art keywords
water
grouting
hole
cement
biliquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105883879A
Other languages
English (en)
Inventor
修国林
王善飞
齐兆军
李威
曲伟勋
陆敬义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SANSHANDAO GOLD MINE SHANDONG GOLD MINING (LAIZHOU) CO Ltd
Original Assignee
SANSHANDAO GOLD MINE SHANDONG GOLD MINING (LAIZHOU) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SANSHANDAO GOLD MINE SHANDONG GOLD MINING (LAIZHOU) CO Ltd filed Critical SANSHANDAO GOLD MINE SHANDONG GOLD MINING (LAIZHOU) CO Ltd
Priority to CN2010105883879A priority Critical patent/CN102536269A/zh
Publication of CN102536269A publication Critical patent/CN102536269A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及一种井下注浆堵水的新工艺,本发明的井下注浆堵水工艺采用单双液同时注浆,有效地保证了浆液的扩散半径和扩散范围,减少了水泥的用量和工人的劳动强度,包括以下步骤:1)、注浆孔钻进;2)、钻孔涌水后的压水及洗孔;3)、浆液制造;4)、注浆堵水作业;5)、注浆孔钻进;其中的步骤4)中注浆堵水作业采用单液水泥浆和双液水泥-水玻璃浆协作注入。

Description

井下注浆堵水工艺
技术领域
本发明涉及一种井下注浆堵水的新工艺。
背景技术
众所周知,突水是地下开采矿山所面临的重大危害,除采用疏干矿床地下水的方式进行地下水的防治外,矿山一般采用预注浆的方式封堵巷道前方的构造裂隙水,特别是在井巷工程开拓的过程中普遍采用此种方法,以保证矿山安全,结合图1,传统注浆工艺流程如下:
第一步:注浆孔钻进
在预测施工巷道前方有水的情况下,采用钻机进行注浆孔的钻进或凿孔工作,同时安装好注浆用孔口管,准备涌水后的注浆堵水作业。钻孔钻进到导水或储水构造后,发生涌水,当涌水量大于一定数值后(一般为10m3/h),需进行注浆堵水作业。
第二步:钻孔涌水后的压水及洗孔。
钻孔发生涌水后,在孔口管上安装阀门,用注浆泵向钻孔内压入清水,了解裂隙的进水情况,确定浆液参数,并冲洗出水裂隙,保证注浆质量,能够允许较长时间的放水,钻孔内又没有塌孔现象时,可不进行压水作业。
第三步:浆液制造
根据确定的浆液比例,配制好注浆浆液(注单液水泥浆时配制水泥浆液,注水泥——水玻璃双液浆时,需同时调配好水泥浆及水玻璃浆。
第四步:注浆堵水作业
及时了解钻孔进浆情况,采用单液水泥浆泵或水泥——水玻璃双液泵向孔内注入水泥浆或水泥——水玻璃双液浆,达到设计注浆压力后,结束注浆作业并养护3——6小时。
第五步:注浆孔钻进:
单次注浆作业结束后,透孔(把钻孔内注入的水泥用钻机取出)并继续钻进直至再次发生涌水。
如此反复操作直至达到设计孔深,满足注浆效果后,重新进行下一个注浆孔的作业。
以上的工艺中,第四步采用水泥或者水泥-水玻璃双液浆进行注入,而采用单液水泥泵(BW-250型,进浆量较大,可达到250升/分)进行单液水泥浆的灌注时,当钻孔揭露的涌水构造联通性较好,空间较大时,采用单液水泥浆,注浆量较大,有时达到上百吨,导致工人劳动强度大,难以做到连续注浆(注浆要求进行连续注浆,直至达到设计终压),注浆质量难以保证。
采用双液注浆泵(2TGZ-60/120型,进浆量较小,最大60,一般19-36升/分)进行水泥——水玻璃浆的灌注时,井下咸水或盐卤水,对水玻璃起到速凝作用,难以保证浆液的充分扩散,影响注浆质量。
发明内容
为解决上述问题,本发明提供一种采用单双液同时注浆,有效地保证了浆液的扩散半径和扩散范围,减少了水泥的用量和工人的劳动强度的井下注浆堵水工艺。
本发明的井下注浆堵水工艺,其中,包括以下步骤:
1)、注浆孔钻进;
2)、钻孔涌水后的压水及洗孔;
3)、浆液制造;
4)、注浆堵水作业;
5)、注浆孔钻进;
步骤4)中注浆堵水作业采用单液水泥浆和双液水泥-水玻璃浆协作注入。
本发明的井下注浆堵水工艺,其中,包括三通管,三通管中的一侧管与注浆孔孔口管连接,三通管的另外两侧管分别于单液水泥浆泵和双液水泥-水玻璃浆泵连接在一起。
本发明的井下注浆堵水工艺,其中,三通管中与单液水泥浆泵和双液水泥-水玻璃浆泵连接在一起的侧管上分别设置有第一控制阀和第二控制阀。
本发明井下注浆堵水工艺的有益效果为:采用单液水泥浆和双液水泥-水玻璃浆协作注入的方式,此种工艺先注单液水泥浆10吨,有效地保证了水泥浆的扩散半径,后注水泥——水玻璃双液浆,起到速凝的作用,有效地控制了浆液的扩散范围,减少了水泥的用量(采用此种方法后,单个出水点的水泥用量不超过30吨)和工人的劳动强度。在注入10吨水泥的过程中,如果压力稳步上升,则继续注入单液水泥浆,直至达到注浆结束标准。两台注浆泵的有效配合,满足了各种条件下的注浆技术要求,保证了注浆质量。
附图说明
图1是现有技术的工艺流程图;
图2是本发明井下注浆堵水工艺的工艺流程图;
图3是本发明井下注浆堵水工艺中单双液泵与三通连接的结构示意图。
具体实施方式
下面结合说明书附图对本发明作进一步说明。
参见图2和图3,本发明的井下注浆堵水工艺,包括以下步骤:
第一步:注浆孔钻进
在预测施工巷道前方有水的情况下,采用钻机进行注浆孔的钻进或凿孔工作,同时安装好注浆用孔口管,准备涌水后的注浆堵水作业。钻孔钻进到导水或储水构造后,发生涌水,当涌水量大于一定数值后(一般为10m3/h),需进行注浆堵水作业。
第二步:钻孔涌水后的压水及洗孔。
钻孔发生涌水后,在孔口管上安装阀门,用注浆泵向钻孔内压入清水,了解裂隙的进水情况,确定浆液参数,并冲洗出水裂隙,保证注浆质量,能够允许较长时间的放水,钻孔内又没有塌孔现象时,可不进行压水作业。
第三步:浆液制造
根据确定的浆液比例,同时调配好水泥浆及水玻璃浆。
第四步:注浆堵水作业
采用单液水泥浆和双液水泥-水玻璃浆协作注入,同时采用两台注浆泵(单液及双液注浆泵各一台)进行注浆作业,设计三通管1,三通管1中的一侧管与注浆孔孔口管连接,三通管1的另外两侧管分别于单液水泥浆泵2和双液水泥-水玻璃浆泵3连接在一起,并且单液泵采用BW-250型注水泥浆,双液泵采用2TGZ-60/120注水玻璃,三通管中与单液水泥浆泵和双液水泥-水玻璃浆泵连接在一起的侧管上分别设置有第一控制阀4和第二控制阀5,控制两台注浆泵的的开启或关闭。注浆开始后,先按设计的注浆比例注单液水泥浆,注10吨水泥后,在注浆压力没有明显升高的情况下,开启双液泵注入水玻璃,形成向钻孔内注入水泥——水玻璃双液浆的局面,达到快速凝固的作用;如果压力上升较快或稳步上升,还是按照单液水泥浆的注入要求继续注入水泥浆。
第五步:注浆孔钻进:
单次注浆作业结束后,透孔(把钻孔内注入的水泥用钻机取出)并继续钻进直至再次发生涌水。
以上的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通工程技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明的权利要求书确定的保护范围内。

Claims (3)

1.一种井下注浆堵水工艺,包括以下步骤:
1)、注浆孔钻进;
2)、钻孔涌水后的压水及洗孔;
3)、浆液制造;
4)、注浆堵水作业;
5)、注浆孔钻进;
其特征在于:步骤4)中注浆堵水作业采用单液水泥浆和双液水泥-水玻璃浆协作注入。
2.根据权利要求1所述的井下注浆堵水工艺,其特征在于:包括三通管,三通管中的一侧管与注浆孔孔口管连接,三通管的另外两侧管分别于单液水泥浆泵和双液水泥-水玻璃浆泵连接在一起。
3.根据权利要求2所述的井下注浆堵水工艺,其特征在于:三通管中与单液水泥浆泵和双液水泥-水玻璃浆泵连接在一起的侧管上分别设置有第一控制阀和第二控制阀。
CN2010105883879A 2010-12-15 2010-12-15 井下注浆堵水工艺 Pending CN102536269A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105883879A CN102536269A (zh) 2010-12-15 2010-12-15 井下注浆堵水工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105883879A CN102536269A (zh) 2010-12-15 2010-12-15 井下注浆堵水工艺

Publications (1)

Publication Number Publication Date
CN102536269A true CN102536269A (zh) 2012-07-04

Family

ID=46344142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105883879A Pending CN102536269A (zh) 2010-12-15 2010-12-15 井下注浆堵水工艺

Country Status (1)

Country Link
CN (1) CN102536269A (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061349A (zh) * 2013-01-28 2013-04-24 浙江华东建设工程有限公司 一种基坑管涌的处理方法
CN104060964A (zh) * 2014-05-30 2014-09-24 丁涛 一种用于保护地下水环境的矿井注浆堵水方法
CN104500108A (zh) * 2014-12-11 2015-04-08 中铁十九局集团有限公司 隧道基底返水点处理方法
CN105201448A (zh) * 2015-09-24 2015-12-30 山东大学 一种高压大流量涌水通道内阻水注浆封堵方法
CN105780781A (zh) * 2016-04-28 2016-07-20 中国水电基础局有限公司 深基坑快速堵漏方法
CN106052494A (zh) * 2016-07-18 2016-10-26 河北钢铁集团矿业有限公司 大水矿山井巷掘进的炮孔设置方法及爆破方法
CN106437790A (zh) * 2016-12-02 2017-02-22 淮北矿业股份有限公司 难采煤层底板薄层灰岩高压强含水层岩溶裂隙注浆方法
CN107558948A (zh) * 2017-10-31 2018-01-09 平煤神马建工集团有限公司 一种通过收水管对含水层内的裂隙进行注浆封堵的方法及利用其开挖立井井筒的方法
CN107905815A (zh) * 2017-10-26 2018-04-13 济南城建集团有限公司 一种双液注浆加固隧道土质中岩柱施工方法
CN108439934A (zh) * 2018-04-26 2018-08-24 石家庄铁道大学 一种富水隧洞注浆浆液及注浆工艺
CN108915690A (zh) * 2018-07-06 2018-11-30 中钢集团马鞍山矿山研究院有限公司 竖井含水层掘进中预防竖井井壁涌水的新方法
CN109403914A (zh) * 2018-10-15 2019-03-01 山东交通学院 一种矿井井下超深钻孔内水柱止浆双液注浆方法
CN112052505A (zh) * 2020-09-07 2020-12-08 中南大学 水泥-水玻璃双液浆注浆孔距的设计方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06248895A (ja) * 1993-02-26 1994-09-06 Itsuki Kogyo Kk グラウト及びグラウト工法
CN101251017A (zh) * 2008-04-14 2008-08-27 中铁隧道集团有限公司 孔口止浆钻杆分段后退式注浆方法
CN101255698A (zh) * 2008-01-23 2008-09-03 湖南省建筑工程集团总公司 流砂层及砂砾层动水双液高压注浆堵水施工方法
CN101691842A (zh) * 2009-07-15 2010-04-07 中铁隧道股份有限公司 三臂液压凿岩台车及隧道钻孔注浆施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06248895A (ja) * 1993-02-26 1994-09-06 Itsuki Kogyo Kk グラウト及びグラウト工法
CN101255698A (zh) * 2008-01-23 2008-09-03 湖南省建筑工程集团总公司 流砂层及砂砾层动水双液高压注浆堵水施工方法
CN101251017A (zh) * 2008-04-14 2008-08-27 中铁隧道集团有限公司 孔口止浆钻杆分段后退式注浆方法
CN101691842A (zh) * 2009-07-15 2010-04-07 中铁隧道股份有限公司 三臂液压凿岩台车及隧道钻孔注浆施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李凤君等: "梁宝寺矿主井工作面打钻探水、断层及预注浆综合施工技术", 《煤炭技术》, vol. 24, no. 2, 28 February 2005 (2005-02-28), pages 87 *
钟放平等: "预注浆堵水技术在青山岗隧道施工中的应用", 《中南公路工程》, vol. 32, no. 2, 30 April 2007 (2007-04-30), pages 122 - 123 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061349A (zh) * 2013-01-28 2013-04-24 浙江华东建设工程有限公司 一种基坑管涌的处理方法
CN104060964A (zh) * 2014-05-30 2014-09-24 丁涛 一种用于保护地下水环境的矿井注浆堵水方法
CN104500108A (zh) * 2014-12-11 2015-04-08 中铁十九局集团有限公司 隧道基底返水点处理方法
CN105201448B (zh) * 2015-09-24 2017-09-05 山东大学 一种高压大流量涌水通道内阻水注浆封堵方法
CN105201448A (zh) * 2015-09-24 2015-12-30 山东大学 一种高压大流量涌水通道内阻水注浆封堵方法
CN105780781A (zh) * 2016-04-28 2016-07-20 中国水电基础局有限公司 深基坑快速堵漏方法
CN106052494A (zh) * 2016-07-18 2016-10-26 河北钢铁集团矿业有限公司 大水矿山井巷掘进的炮孔设置方法及爆破方法
CN106437790B (zh) * 2016-12-02 2018-12-25 淮北矿业股份有限公司 难采煤层底板薄层灰岩高压强含水层岩溶裂隙注浆方法
CN106437790A (zh) * 2016-12-02 2017-02-22 淮北矿业股份有限公司 难采煤层底板薄层灰岩高压强含水层岩溶裂隙注浆方法
CN107905815A (zh) * 2017-10-26 2018-04-13 济南城建集团有限公司 一种双液注浆加固隧道土质中岩柱施工方法
CN107558948A (zh) * 2017-10-31 2018-01-09 平煤神马建工集团有限公司 一种通过收水管对含水层内的裂隙进行注浆封堵的方法及利用其开挖立井井筒的方法
CN107558948B (zh) * 2017-10-31 2019-12-31 平煤神马建工集团有限公司 一种通过收水管对含水层内的裂隙进行注浆封堵的方法及利用其开挖立井井筒的方法
CN108439934A (zh) * 2018-04-26 2018-08-24 石家庄铁道大学 一种富水隧洞注浆浆液及注浆工艺
CN108439934B (zh) * 2018-04-26 2021-01-15 石家庄铁道大学 一种富水隧洞注浆浆液及注浆工艺
CN108915690A (zh) * 2018-07-06 2018-11-30 中钢集团马鞍山矿山研究院有限公司 竖井含水层掘进中预防竖井井壁涌水的新方法
CN109403914A (zh) * 2018-10-15 2019-03-01 山东交通学院 一种矿井井下超深钻孔内水柱止浆双液注浆方法
CN112052505A (zh) * 2020-09-07 2020-12-08 中南大学 水泥-水玻璃双液浆注浆孔距的设计方法

Similar Documents

Publication Publication Date Title
CN102536269A (zh) 井下注浆堵水工艺
CN101666234B (zh) 破碎岩体无止浆墙复合式注浆施工方法
CN105952475B (zh) 一种煤矿残采区冒落废巷注浆加固工艺与方法
CN103277120B (zh) 一种非全深冻结立井解冻后的涌水防治方法
CN104747075B (zh) 松软煤层喷浆防塌钻进方法
CN102926770A (zh) 薄基岩、厚松散砂层富水区域井下疏水注浆工艺
CN105351001B (zh) 一种基于沿空留巷区域加固瓦斯抽采的方法
CN103089276B (zh) 深浅孔与高低压耦合注浆工艺
CN102561950B (zh) 一种对地层空洞内填充的骨料进行注浆固结的工艺及喷射钻头
CN107725056A (zh) 一种穿越淤泥质地层隧道全环超前快速注浆施工方法
CN104533452A (zh) 一种煤矿井下破碎煤体分段式注浆加固方法
CN102278130A (zh) 隧道高压富水溶腔加筋注浆工艺方法
CN111075478A (zh) 采掘工作面构造破碎带地面施工预注浆加固工艺
CN103835651A (zh) 一种单孔定向钻进局部注浆反井钻井工艺
CN108797621A (zh) 一种在富水深卵砾漂石地层超前预注浆的止水结构及其施工方法
CN103031847B (zh) 变径搭接组合式孔口管灌浆法
CN205918368U (zh) 钻注一体后退式注浆钻杆
CN101929343B (zh) Smw工法型钢拔除注浆方法
CN104929565A (zh) 一种双层注浆导管
CN105134069B (zh) 一种涉及瓦斯立井穿越强富水岩层反井法施工工艺
CN105134125B (zh) 瓦斯立井壁后环空底端封堵施工工艺
CN109184565B (zh) 一种灰岩放水钻孔封孔固管方法
CN105781580A (zh) 隧洞裂缝修补的方法
CN114233374B (zh) 用于突泥涌水后斜井井筒塌腔区加固的地面注浆施工方法
CN202531098U (zh) 破碎煤岩体注浆系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120704