CN101251017A - 孔口止浆钻杆分段后退式注浆方法 - Google Patents

孔口止浆钻杆分段后退式注浆方法 Download PDF

Info

Publication number
CN101251017A
CN101251017A CNA2008100495263A CN200810049526A CN101251017A CN 101251017 A CN101251017 A CN 101251017A CN A2008100495263 A CNA2008100495263 A CN A2008100495263A CN 200810049526 A CN200810049526 A CN 200810049526A CN 101251017 A CN101251017 A CN 101251017A
Authority
CN
China
Prior art keywords
grouting
drilling rod
hole
stop
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100495263A
Other languages
English (en)
Other versions
CN101251017B (zh
Inventor
李治国
徐海廷
王全胜
孙国庆
牟松
陈飞
葛寨辉
刘坤昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN 200810049526 priority Critical patent/CN101251017B/zh
Publication of CN101251017A publication Critical patent/CN101251017A/zh
Application granted granted Critical
Publication of CN101251017B publication Critical patent/CN101251017B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明提出的孔口止浆钻杆分段后退式注浆方法其操作步骤为:先用钻机在止浆墙上钻出浅孔,退出钻杆(7),将孔口管(13)一端用钻机顶入钻孔中并用锚固剂(14)固定在孔口壁上,孔口管位于钻孔(16)外的一端联接排水装置(12)、防突水装置(11);将进浆管(1)和进水管(3)通过注浆三通连接在钻杆(7)尾部,通过防突水装置、排水装置和孔口管钻孔,钻至设计孔深;拆除防突水装置,在钻杆上套置中空压盘(8)和止浆塞(10),注浆至注浆压力和注浆量达到要求后,使止浆塞放松,后退钻杆一段距离,再次使止浆塞封紧进行下一段注浆,如此注浆一段,后退一段,再注浆一段,实现钻杆分段后退逐段注浆,将地层从孔底至孔口逐段进行加固,至钻杆全部退出。

Description

孔口止浆钻杆分段后退式注浆方法
技术领域
本发明属于隧道和地下工程软弱围岩的加固和堵水技术,主要提出了一种孔口止浆钻杆分段后退式注浆方法。
背景技术
在软弱破碎含水地层中进行隧道和地下工程施工,最容易出现的问题是围岩大变形和坍塌以及开挖面涌水、突泥,危及人员、设备安全,造成伤亡事故,严重时引起地表坍塌,地下水位下降,影响居民正常生活,对地面环境造成破坏。为了保证施工安全,目前国内外常用的地层加固和堵水方法为注浆法,注浆法就是通过一定的压力把一定量的胶凝性材料注入岩层或土体,使其在岩层裂缝或土体空隙中流动、扩散、充填、固结,形成有一定强度和低透水性的胶结体,加固地层,封堵地下水,从而提高围岩的自稳定时间,为支护结构的施工赢得时间、创造条件。一次性钻孔、孔内安装注浆管的后退式注浆为国内外比较常用的注浆方法之一。其方法为一次性钻孔,退出钻杆,孔内下注浆管(注浆管上具有多排沿圆周分布的出浆孔,并对应出浆孔部位套置有橡胶止浆环);注浆管内安装注浆芯管并接通注浆管路,注浆芯管的出浆段上具有多排沿圆周分布的出浆孔,并在出浆段两端套置有碗形止浆塞;注浆时向后逐段退出注浆芯管,利用注浆压力将注浆管上套置的橡胶止浆环顶开,浆液从注浆管上的出浆孔流出进入孔壁底层。该方法存在的缺陷是操作工艺比较复杂,注浆管留置钻孔内不能重复利用,成本较高,钻孔较深时,注浆芯管(多节连接)后退时易造成卡塞;近孔口段时若土质软弱破碎,注浆管无法顺利装入钻孔内,造成无法注浆,一般适应孔深<15米的水平注浆。
发明内容
本发明的目的即是提出一种孔口止浆钻杆分段后退式注浆方法,使其可满足钻孔较深的注浆要求并可保证注浆效果。
本发明方法的工作步骤为:先用钻机在止浆墙上钻出浅孔,退出钻杆,将孔口管一端用钻机顶入钻孔中并用锚固剂固定在孔口壁上,孔口管位于钻孔外的一端联接排水装置、防突水装置;将进浆管和进水管通过注浆三通连接在钻杆尾部,通过防突水装置、排水装置和孔口管开始钻孔同时开启供水阀门通过钻杆供水将钻孔内泥砂和岩粉排出,钻至设计孔深;将位于孔口管外端的一节钻杆从钻机上拆开,拆除防突水装置,在钻杆上套置中空压盘和止浆塞,并使中空锥台结构的止浆塞其小径端位于排水装置管内,使中空压盘位于止浆塞后端并通过螺栓与排水装置的法兰连接;使锥台形止浆塞向前封紧钻杆与排水装置内壁之间的间隙,开启注浆管路通过钻杆注浆使浆液进入孔底并沿着钻杆与孔壁之间的空隙返至孔口,被止浆塞封堵向地层中扩散,注浆压力和注浆量达到要求后,使止浆塞放松,后退钻杆一段距离,并拆除孔外多余的钻杆,再次使止浆塞封紧进行下一段注浆,如此注浆一段,后退一段,再注浆一段,实现钻杆分段后退逐段注浆,将地层从孔底至孔口逐段进行加固,至钻杆全部退出,完成该孔注浆。
本发明所提出的孔口止浆钻杆分段后退式注浆方法适用性强,操作简便,可适宜>15米孔深的分段后退式注浆并使压力可控,达到较好的注浆效果,具有较好的推广应用价值。
附图说明
图1-图6为本发明工艺方法操作步骤的示意图。
图中,1、进浆管,2、进浆单向阀,3、进水管,4、进水单向阀,5、泄压阀,6、钻机,7、钻杆,8、中空压盘,9、快速接头,10、止浆塞,11、防突水装置,12、排水装置,13、孔口管,14、锚固剂,15、止浆墙,16、钻孔,17、钻头,18、浆液,19、加固土层,20、水泥砂浆。
具体实施方式
结合附图对本发明实施例加以说明:
如图1所示,步骤(1)钻浅孔。钻机6就位后,按照设计的开孔位置及钻孔参数调整钻机角度满足设计钻孔要求后,钻孔1.8m。
如图2所示,步骤(2)退出钻杆7,安装孔口管13。孔口管13采用无缝钢管加工制作,一端焊接快速接头9,另一端用水泥砂浆20封堵20cm。安装前在孔口管距快速接头端部30cm处开始缠绕麻丝成纺锤形,并将锚固剂14放入孔口内。采用钻机6将孔口管13顶入钻孔中,孔口管13外留20cm;快速接头9为现有隧道及地下施工中常用的连接部件。
如图3所示,步骤(3)钻孔。将孔口管13位于孔外的一端通过快速接头9联接排水装置12、防突水装置11;把进浆管1和进水管3通过注浆三通连接在钻杆尾部上,关闭进浆单向阀2,打开进水单向阀4(往钻杆内供水,以冲出留在钻孔内的泥砂和岩粉),通过防突水装置11、排水装置12和孔口管13开始钻孔,钻至设计注浆孔底。防突水装置11、排水装置12为现有隧道及地下施工中常用的部件。
如图4所示,步骤(4)安装止浆塞10和中空压盘8。把位于孔口管外端的一节钻杆从钻机上拆开,在钻杆上套置中空压盘8和止浆塞10,并使中空锥台结构的止浆塞10其小径端位于排水装置12管内,使中空压盘8位于止浆塞10后端并通过螺栓与排水装置12的法兰连接;上紧法兰盘螺栓使中空压盘8向前推紧止浆塞10,使其膨胀封紧钻杆7与排水装置12内壁之间的间隙。
如图5所示,步骤(5)注浆。关闭钻杆尾部的进水单向阀4,打开进浆单向阀2开始注浆,浆液通过钻杆送至孔底,并沿着钻杆与孔壁之间的空隙返至孔口,被止浆塞封堵,而后浆液开始向地层中扩散。
如图6所示,步骤(6)后退钻杆注浆。当注浆压力和注浆量达到设计要求时,反转法兰盘螺栓使中空压盘8脱离止浆塞10,使止浆塞10放松钻杆,后退钻杆至下一位置,并拆除孔外多余钻杆,继续注浆,如此反复后退,反复注浆,直至所有钻杆都退出钻孔;完成该孔注浆。

Claims (1)

1、一种孔口止浆钻杆分段后退式注浆方法,其特征是:先用钻机在止浆墙上钻出浅孔,退出钻杆(7),将孔口管(13)一端用钻机顶入钻孔中并用锚固剂(14)固定在孔口壁上,孔口管(13)位于钻孔(16)外的一端联接排水装置(12)、防突水装置(11);将进浆管(1)和进水管(3)通过注浆三通连接在钻杆(7)尾部,通过防突水装置(11)、排水装置(12)和孔口管(13)开始钻孔同时开启供水阀门通过钻杆供水将钻孔内泥砂和岩粉排出,钻至设计孔深;将位于孔口管(13)外端的一节钻杆从钻机上拆开,拆除防突水装置(11),在钻杆(7)上套置中空压盘(8)和止浆塞(10),并使中空锥台结构的止浆塞(10)其小径端位于排水装置管内,使中空压盘(8)位于止浆塞(10)后端并通过螺栓与排水装置(12)的法兰连接;使锥台形止浆塞(10)向前封紧钻杆与排水装置(12)内壁之间的间隙,开启注浆管路通过钻杆注浆使浆液进入孔底并沿着钻杆与孔壁之间的空隙返至孔口,被止浆塞封堵向地层中扩散,注浆压力和注浆量达到要求后,使止浆塞(10)放松,后退钻杆一段距离,并拆除孔外多余的钻杆,再次使止浆塞封紧进行下一段注浆,如此注浆一段,后退一段,再注浆一段,实现钻杆分段后退逐段注浆,将地层从孔底至孔口逐段进行加固,至钻杆全部退出,完成该孔注浆。
CN 200810049526 2008-04-14 2008-04-14 孔口止浆钻杆分段后退式注浆方法 Active CN101251017B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200810049526 CN101251017B (zh) 2008-04-14 2008-04-14 孔口止浆钻杆分段后退式注浆方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810049526 CN101251017B (zh) 2008-04-14 2008-04-14 孔口止浆钻杆分段后退式注浆方法

Publications (2)

Publication Number Publication Date
CN101251017A true CN101251017A (zh) 2008-08-27
CN101251017B CN101251017B (zh) 2011-03-23

Family

ID=39954591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810049526 Active CN101251017B (zh) 2008-04-14 2008-04-14 孔口止浆钻杆分段后退式注浆方法

Country Status (1)

Country Link
CN (1) CN101251017B (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101624910B (zh) * 2009-07-31 2011-05-18 广州市建筑机械施工有限公司 一种暗挖隧道的加固方法
CN101705788B (zh) * 2009-08-31 2011-09-21 上海强劲地基工程股份有限公司 一种防喷塞掩护斜向钻孔的施工方法
CN102536269A (zh) * 2010-12-15 2012-07-04 山东黄金矿业(莱州)有限公司三山岛金矿 井下注浆堵水工艺
CN102561992A (zh) * 2012-01-29 2012-07-11 山东大学 一种变形止水器及采用该变形止水器的注浆封堵工艺
CN102926770A (zh) * 2012-11-08 2013-02-13 中国神华能源股份有限公司 薄基岩、厚松散砂层富水区域井下疏水注浆工艺
CN102926771A (zh) * 2012-09-13 2013-02-13 山东能源集团有限公司 一种深长非线性钻孔孔内远距离封孔分段注浆系统及工艺
CN103437340A (zh) * 2013-08-21 2013-12-11 国家电网公司 一种高压旋喷注浆加固软土地基的方法
CN104141468A (zh) * 2014-01-09 2014-11-12 成都绿迪科技有限公司 堵水装置
CN105970965A (zh) * 2016-05-27 2016-09-28 青岛林川工程技术咨询有限公司 一种从路基边坡打孔注浆设备
CN107013223A (zh) * 2017-06-06 2017-08-04 马钢(集团)控股有限公司 一种浅孔注浆装置及其注浆方法
CN108729934A (zh) * 2018-07-06 2018-11-02 广州轨道交通建设监理有限公司 一种用于地下空间被钻穿突水的应急封水胶套
CN110259383A (zh) * 2019-07-04 2019-09-20 山东大学 一种前进式钻注一体装置及使用方法
CN112030964A (zh) * 2020-08-28 2020-12-04 浙大城市学院 一种适用于工程渗透破坏防治的定位注浆锚杆及其施工方法
CN112985999A (zh) * 2021-02-09 2021-06-18 中铁隧道局集团有限公司 一种用于多场环境耦合作用下的注浆模型试验装置及方法
CN113006733A (zh) * 2021-03-08 2021-06-22 中铁十八局集团第一工程有限公司 一种地表深层注浆工艺

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19813765A1 (de) * 1997-03-28 1998-10-22 Ishikawajima Harima Heavy Ind Verfahren zum Betonspritzen und Spritzmaschine
CN101058980B (zh) * 2006-04-21 2010-05-12 李宪奎 一种自进式锚杆的施工方法
CN100570128C (zh) * 2007-03-28 2009-12-16 中国京冶工程技术有限公司 带孔口止浆器的全方位高压喷射注浆施工方法

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101624910B (zh) * 2009-07-31 2011-05-18 广州市建筑机械施工有限公司 一种暗挖隧道的加固方法
CN101705788B (zh) * 2009-08-31 2011-09-21 上海强劲地基工程股份有限公司 一种防喷塞掩护斜向钻孔的施工方法
CN102536269A (zh) * 2010-12-15 2012-07-04 山东黄金矿业(莱州)有限公司三山岛金矿 井下注浆堵水工艺
CN102561992B (zh) * 2012-01-29 2013-11-06 山东大学 一种采用变形止水器的注浆封堵工艺
CN102561992A (zh) * 2012-01-29 2012-07-11 山东大学 一种变形止水器及采用该变形止水器的注浆封堵工艺
CN102926771B (zh) * 2012-09-13 2016-08-31 山东能源集团有限公司 深长非线性钻孔孔内远距离封孔分段注浆系统及工艺
CN102926771A (zh) * 2012-09-13 2013-02-13 山东能源集团有限公司 一种深长非线性钻孔孔内远距离封孔分段注浆系统及工艺
CN102926770B (zh) * 2012-11-08 2015-01-07 中国神华能源股份有限公司 薄基岩、厚松散砂层富水区域井下疏水注浆工艺
CN102926770A (zh) * 2012-11-08 2013-02-13 中国神华能源股份有限公司 薄基岩、厚松散砂层富水区域井下疏水注浆工艺
CN103437340A (zh) * 2013-08-21 2013-12-11 国家电网公司 一种高压旋喷注浆加固软土地基的方法
CN104141468A (zh) * 2014-01-09 2014-11-12 成都绿迪科技有限公司 堵水装置
CN104141468B (zh) * 2014-01-09 2016-09-21 成都绿迪科技有限公司 堵水装置
CN105970965B (zh) * 2016-05-27 2019-01-04 山东省交通科学研究院 一种从路基边坡打孔注浆设备
CN105970965A (zh) * 2016-05-27 2016-09-28 青岛林川工程技术咨询有限公司 一种从路基边坡打孔注浆设备
CN107013223A (zh) * 2017-06-06 2017-08-04 马钢(集团)控股有限公司 一种浅孔注浆装置及其注浆方法
CN108729934A (zh) * 2018-07-06 2018-11-02 广州轨道交通建设监理有限公司 一种用于地下空间被钻穿突水的应急封水胶套
CN108729934B (zh) * 2018-07-06 2023-10-03 广州轨道交通建设监理有限公司 一种用于地下空间被钻穿突水的应急封水胶套
CN110259383A (zh) * 2019-07-04 2019-09-20 山东大学 一种前进式钻注一体装置及使用方法
CN110259383B (zh) * 2019-07-04 2020-05-26 山东大学 一种前进式钻注一体装置及使用方法
CN112030964A (zh) * 2020-08-28 2020-12-04 浙大城市学院 一种适用于工程渗透破坏防治的定位注浆锚杆及其施工方法
US11459723B2 (en) 2020-08-28 2022-10-04 Zhejiang University City College Anchor rod for positioned grouting suitable for prevention and control of engineering seepage damage and construction method thereof
CN112985999A (zh) * 2021-02-09 2021-06-18 中铁隧道局集团有限公司 一种用于多场环境耦合作用下的注浆模型试验装置及方法
CN113006733A (zh) * 2021-03-08 2021-06-22 中铁十八局集团第一工程有限公司 一种地表深层注浆工艺

Also Published As

Publication number Publication date
CN101251017B (zh) 2011-03-23

Similar Documents

Publication Publication Date Title
CN101251017B (zh) 孔口止浆钻杆分段后退式注浆方法
CN101251019B (zh) 孔口止浆管内混合双管分段后退式注浆方法
CN101251018B (zh) 孔口止浆管外混合双管分段后退式注浆方法
CN101624910B (zh) 一种暗挖隧道的加固方法
CN101666234B (zh) 破碎岩体无止浆墙复合式注浆施工方法
CN201133248Y (zh) 孔口密封双管后退式注浆装置
US20190024460A1 (en) Anti-collapse jet grouting drill bit with bi-directional rib wings, grouting consolidation system and method
CN103334770B (zh) 一种长大反坡隧道超高水压富水破碎带施工方法
CN104747075B (zh) 松软煤层喷浆防塌钻进方法
CN102561992B (zh) 一种采用变形止水器的注浆封堵工艺
CN105507940B (zh) 一种割封压一体化强化瓦斯抽采装置及方法
CN107605498A (zh) 富水砂卵石地层盾构隧道端头水平注浆加固结构施工方法
CN108678772A (zh) 一种用于富水砂砾层巷道的多级层次支护装置及其施工方法
CN201129184Y (zh) 小导管外阀单向式分段后退注浆装置
CN201129177Y (zh) 钻杆后退分段注浆装置
CN105134127B (zh) 一种防坍塌注浆固结装置及其使用方法
CN110344784A (zh) 一种矿井近水平定向钻孔的突水治理装置
CN105041218B (zh) 一种防坍塌双向肋翼喷射注浆钻头及其使用方法
CN201129183Y (zh) 小导管分段反复注浆装置
CN203702071U (zh) 竖井探水注浆施工的防突水顶钻装置
CN105201447B (zh) 一种速凝浆液注浆固结系统及其使用方法
CN101705788B (zh) 一种防喷塞掩护斜向钻孔的施工方法
CN101251020A (zh) 分段钻孔反复注浆方法
CN101876238A (zh) 一种长距离水平钻孔防喷接驳器
CN207406345U (zh) 富水砂卵石地层盾构隧道端头水平注浆加固结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant