CN111527930B - Garden green land reconstruction construction method - Google Patents

Garden green land reconstruction construction method Download PDF

Info

Publication number
CN111527930B
CN111527930B CN202010461653.5A CN202010461653A CN111527930B CN 111527930 B CN111527930 B CN 111527930B CN 202010461653 A CN202010461653 A CN 202010461653A CN 111527930 B CN111527930 B CN 111527930B
Authority
CN
China
Prior art keywords
planting
frame
plate
strip
positioning bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010461653.5A
Other languages
Chinese (zh)
Other versions
CN111527930A (en
Inventor
周磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Guangsha (Fujian) Construction Co.,Ltd.
Original Assignee
Cscec Guangsha Fujian Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cscec Guangsha Fujian Construction Co ltd filed Critical Cscec Guangsha Fujian Construction Co ltd
Priority to CN202010461653.5A priority Critical patent/CN111527930B/en
Publication of CN111527930A publication Critical patent/CN111527930A/en
Application granted granted Critical
Publication of CN111527930B publication Critical patent/CN111527930B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/023Multi-tiered planters
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G27/00Self-acting watering devices, e.g. for flower-pots

Abstract

The invention provides a garden green land reconstruction construction method, which belongs to the field of garden construction and comprises the following steps: excavating a foundation pit: excavating a foundation pit in a region to be constructed; setting a base frame: the base frame comprises a frame, a planting tray and a water net component; fixedly connecting a frame in the foundation pit, arranging a water net component in the frame, and enabling the planting plate to be positioned above the water net component; greening and planting: placing a pot plant in each planting hole, and enabling the bottom of the pot plant to be communicated with a spray head; burying: soil is filled outside the frame. The construction method can be used for carrying out greening transformation construction in a construction area quickly, is very convenient to maintain in the using process after transformation is finished, is low in maintenance cost, good in using effect and convenient to view, and can be popularized to various gardens for use.

Description

Garden green land reconstruction construction method
Technical Field
The invention relates to the field of garden construction, in particular to a garden greenbelt reconstruction construction method.
Background
At present, when the garden green land is constructed, a flower planting mode is adopted in some areas, and various flower green plants in different styles are planted on the ground to form the green landscape quickly. Although the green plants and the planting mode thereof are good in appearance and quick in construction, frequent maintenance is needed in the later period, frequent watering is mainly needed, manpower is consumed during watering, water pipes are needed to squat on the ground, the ornamental effect of tourists is affected, the water quantity is difficult to master, water flows in gardens are caused to the ground, and the ornamental experience is affected.
Disclosure of Invention
The invention provides a garden green land reconstruction construction method, which aims to solve the problems in the prior art.
The invention is realized by the following steps:
a garden green land reconstruction construction method comprises the following steps:
excavating a foundation pit: excavating a foundation pit in the area to be constructed, wherein the depth of the foundation pit is more than 10 cm and less than 20 cm;
setting a base frame: the base frame comprises a frame, a planting disc and a water net component; fixedly connecting the frame in the foundation pit; the water net component comprises a connecting valve and a plurality of water outlet pipes, the water outlet pipes are arranged in parallel at intervals, a plurality of spray heads are uniformly arranged on the water outlet pipes at intervals, and the water outlet pipes are all communicated with the connecting valve; the water net component is arranged in the frame; a plurality of planting holes are distributed in the rectangular array on the planting plate, the planting plate is placed in the frame and is positioned above the water net component, and one spray head corresponds to one planting hole;
greening and planting: placing a pot plant in each planting hole, and enabling the bottom of the pot plant to be communicated with the spray head;
burying: and burying soil outside the frame.
Furthermore, the frame is of a rectangular structure, a horizontal bottom plate is connected to the bottom of the inner side of the frame, fixing holes are formed in the bottom plate, and the bottom plate is fixed in the foundation pit.
Furthermore, the planting tray comprises an outer frame and a planting plate, the outer frame is of a rectangular structure, the planting plate is horizontally connected in the outer frame, and a plurality of planting holes are formed in the planting plate; the outer side of the outer frame is attached to the inner side of the frame.
Furthermore, the frame comprises two side plates which are oppositely arranged, and an adjusting mechanism is connected between each side plate and the outer frame;
the adjusting mechanism comprises an adjusting plate, a first positioning bolt and a second positioning bolt, the first positioning bolt is connected to the inner side of the side plate, the second positioning bolt is connected to the outer side of the outer frame, and the adjusting plate is located between the side plate and the outer frame; the adjusting plate is provided with a first strip-shaped hole and a second strip-shaped hole along the length direction, the first strip-shaped hole, the second strip-shaped hole and the first strip-shaped hole are arranged at intervals, the first positioning bolt penetrates through the first strip-shaped hole and can slide along the first strip-shaped hole, and the second positioning bolt penetrates through the second strip-shaped hole and can slide along the second strip-shaped hole; the first positioning bolt is positioned above the second positioning bolt, and the adjusting plate is obliquely arranged;
the slope upwards stimulates the regulating plate can make first location is tied and is slided along first bar hole, makes second location tie slide along second bar hole, and the pressure moves downwards the regulating plate can drive the perpendicular upward movement of planting dish.
Furthermore, the adjusting mechanism further comprises a fixing bolt, the fixing bolt is connected to the inner side of the side plate, and the fixing bolt is located below the first positioning bolt; the bottom of the adjusting plate is provided with a positioning hole which is of an L-shaped structure, the positioning hole comprises an inlet part and an extension part which are connected, the length of the extension part is greater than that of the inlet part, the length of the extension part is consistent with the length direction of the adjusting plate, and the end part of the inlet part is communicated with the side part of the adjusting plate;
the adjusting plate is pulled obliquely upward, then the adjusting plate is pressed downward to enable the fixing bolt to be inserted into the entering part, and then the adjusting plate is pulled obliquely upward to enable the fixing bolt to enter the extending part.
Furthermore, a horizontal turning plate is connected to the top of the adjusting plate, and the turning plate is horizontally placed above the frame.
Furthermore, an annular sliding groove is formed in the outer side of the second positioning bolt, and the edge of the second strip-shaped hole is connected to the sliding groove.
Furthermore, a connecting groove is vertically formed in the outer side of the outer frame, the bottom end of the connecting groove is communicated with the bottom of the outer frame, and one end of the second positioning bolt is inserted into the connecting groove; the second positioning bolt can be separated from the connecting groove by pulling the planting disc upwards.
The garden green land reconstruction construction method provided by the invention can rapidly perform green reconstruction construction in a construction area, is very convenient to maintain in the use process after reconstruction is completed, has lower maintenance cost and better use effect, is more convenient to view and admire, and can be popularized to various gardens for use.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts. The above and other objects, features and advantages of the present invention will become more apparent from the accompanying drawings. Like reference numerals refer to like parts throughout the drawings. The drawings are not necessarily to scale, emphasis instead being placed upon illustrating the principles of the invention.
FIG. 1 is a schematic view of a garden green space modification construction method provided by an embodiment of the invention;
FIG. 2 is a schematic top view of a frame and a water net assembly in the garden green space modification construction method according to the embodiment of the invention;
FIG. 3 is a schematic top view of the base frame in the garden green space modification construction method according to the embodiment of the present invention;
FIG. 4 is a schematic cross-sectional structural view of a planting tray in the garden green space modification construction method provided by the embodiment of the invention;
FIG. 5 is a schematic structural diagram of the connection between the frame and the adjusting mechanism in the garden green space modification construction method provided by the embodiment of the invention;
FIG. 6 is a schematic structural diagram of an adjusting mechanism in the garden green space modification construction method provided by the embodiment of the invention;
FIG. 7 is a schematic structural view of the garden green space modification construction method provided by the embodiment of the invention, wherein the frame is connected with the adjusting mechanism, and the adjusting plate is pulled upwards in an inclined manner;
FIG. 8 is a schematic view of a partial structure of a positioning hole and a fixing bolt in the garden green space modification construction method according to the embodiment of the present invention;
FIG. 9 is a schematic side view of a planting tray in the garden green space modification construction method according to the embodiment of the invention;
FIG. 10 is a schematic structural view of a second positioning bolt in the garden green space modification construction method according to the embodiment of the present invention;
fig. 11 is a schematic structural view of connection between an adjusting mechanism and a planting tray in the garden green space modification construction method provided by the embodiment of the invention.
Summary of reference numerals: digging a foundation pit 11, arranging a pedestal 12, planting greens 13, landfill 14, a frame 21, a planting tray 22, a water network component 23, a connecting valve 24, a water outlet pipe 25, a spray head 26, planting holes 27, a side plate 28, a bottom plate 29, a fixing hole 30, an outer frame 31, a planting plate 32, an adjusting mechanism 33, an adjusting plate 34, a first positioning bolt 35, a second positioning bolt 36, a first strip-shaped hole 37, a second strip-shaped hole 38, a fixing bolt 39, a positioning hole 40, an entering part 41, an extending part 42, a turning plate 43, a sliding groove 44 and a connecting groove 45.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
Furthermore, the terms "first," "second," and the like are used merely to distinguish one description from another, and are not to be construed as indicating or implying relative importance.
The embodiment provides a garden greenbelt reconstruction construction method, which can rapidly perform greening reconstruction construction in a construction area, and is very convenient to maintain in a use process after reconstruction is completed, low in maintenance cost, good in use effect, more convenient to view and popularize in various gardens.
As shown in fig. 1 to 11, the garden green space reconstruction construction method comprises the following steps:
excavating a foundation pit 11: excavating a foundation pit in the area to be constructed, wherein the depth of the foundation pit is more than 10 cm and less than 20 cm;
arranging a pedestal 12: the pedestal comprises a frame 21, a planting tray 22 and a water net component 23; fixedly connecting the frame 21 in the foundation pit; the water net component 23 comprises a connecting valve 24 and a plurality of water outlet pipes 25, the water outlet pipes 25 are arranged in parallel at intervals, a plurality of spray heads 26 are uniformly arranged on the water outlet pipes 25 at intervals, and the water outlet pipes 25 are all communicated with the connecting valve 24; the water net assembly 23 is arranged in the frame 21; a plurality of planting holes 27 are distributed on the planting plate 22 in a rectangular array, the planting plate 22 is placed in the frame 21, the planting plate 22 is positioned above the water net component 23, and one spray head 26 corresponds to one planting hole 27;
greening and planting 13: placing a potted plant in each planting hole 27, and enabling the bottom of the potted plant to be communicated with a spray head 26;
and (3) landfill 14: soil is buried 14 outside the frame 21.
The construction method is used for construction in the area to be constructed in the garden, and the area to be constructed can be green lands on two sides of a road or green lands below trees.
Firstly, excavation foundation pit 11, excavation the foundation pit for burying the base frame underground with manual work or machinery in the area waiting to be constructed, design the whole height of base frame according to the green plants or flowers that need to plant to design the degree of depth of foundation pit according to the height of base frame, make its top and foundation pit top parallel and level after the base frame sets up in the foundation pit.
The bed frame includes frame 21, plants dish 22 and water net subassembly 23, and frame 21 is used for injecing the region of planting dish 22 and water net subassembly 23, and when a plurality of bed frames cooperate the use, two adjacent frames 21 are laminated mutually. The planter plate 22 is used to position a pot and the water net assembly 23 is used to water the pot. Planting dish 22 has a plurality of planting holes 27 that the rectangular array distributes, and all can place the potted plant in each planting hole 27, and the potted plant chooses for use the potted plant that preliminary cultivation was accomplished, specifically speaking, is filled with soil and plants green in a little plastic basin and plants, and the plastic basin is the toper structure, and its bottom is provided with the aperture (its design is original in order to make unnecessary water flow from aperture department when watering from the top to the plastic basin, in order to submerge the root of plant). The potted plant is placed at the planting hole 27 such that a portion of the plastic pot is positioned below the planting hole 27 and another portion of the plastic pot and the green plant are positioned above the planting hole 27.
The water network component 23 is provided with a connecting valve 24, the connecting valve 24 is used for connecting with a municipal water network, a plurality of water outlet pipes 25 are provided with spray heads 26, the spray heads 26 are arranged upwards, and each spray head 26 corresponds to one planting hole 27. During construction, the water net assembly 23 is constructed, and then the planting tray 22 is installed, so that the spray heads 26 correspond to the planting holes 27 one by one.
In the case of planting the green plants 13, when the potted plant is placed in the planting hole 27, the top of the spray head 26 is inserted into the small hole at the bottom of the potted plant, so that the spray head 26 is communicated with the potted plant. And then performing landfill 14, and performing landfill 14 on the periphery of the base frame by using soil so that the height of the construction area is matched with the height of the surrounding environment.
By the mode, beautiful and uniform greening landscapes can be formed quickly, and the potted plants placed in the planting holes 27 can be designed and matched, for example, large flowers of the same type can be used, and various small flowers of different types can be matched to form a landscape with disorder. During later maintenance, only need open the control valve in the gardens, can lead to water net subassembly 23, rivers are injected into each inside cultivated in a pot by each shower nozzle 26, just can close the control valve after injecting into a ration water, make the work of watering very convenient through such mode, it is swift, the operation of watering of whole gardens can be controlled to a workman, and do not need the workman to manually carry out the operation of watering with longer plastic hose, can no longer see plastic hose dish and lie ground, influence vegetation, influence pleasing to the eye situation, because the accurate control of control valve, also can not make the volume of watering too much, can not lead to on the gardens road, the condition of rivers all over the country takes place on the greenery patches, afforestation facility maintenance efficiency has been promoted by a wide margin, the maintenance cost (mainly the cost of labor is very low), landscape aesthetic feeling has been promoted.
In addition, traditional greenery patches is after laying cultivated in a pot, construction, and when later stage need be changed cultivated in a pot, need the manual work to dig away cultivated in a pot to dig the hole once more and carry out the operation of laying of new cultivated in a pot, efficiency is very low, and the cost is very high, and in construction cycle the inside very dirty in the garden in disorder, is unfavorable for the construction and the maintenance of gardens. After the method provided by the embodiment is adopted for construction, when the potted plant needs to be replaced in the later period, the potted plant only needs to be taken out of the planting hole 27, the pit digging operation is not needed, and the method is very quick; and then, the new potted plant is placed in the planting hole 27, so that the construction can be quickly completed, the efficiency is high, the cost is low, the construction period is short, and the greening landscape of the garden can be effectively maintained.
As shown in fig. 2 and 3, the frame 21 has a rectangular structure, a horizontal bottom plate 29 is connected to the bottom of the inner side of the frame 21, a fixing hole 30 is formed in the bottom plate 29, and the bottom plate 29 is fixed in the foundation pit. The frame 21 structure of rectangle structure makes things convenient for a plurality of bed frames to use mutually in coordination, can install the construction to the construction area of large scale fast. The frame 21 inboard sets up narrower bottom plate 29, makes frame 21 can connect in ground fast and stable on the one hand, and on the other hand makes frame 21 structure simpler, and occupation space is less, makes things convenient for the setting of water net subassembly 23.
Four or more positioning holes 40 can be arranged on the bottom plate 29, and four or more positioning parts can be arranged on the water net component 23, so that the positioning parts of the water net component 23 are matched with the positioning holes 40 when the water net component is installed, the water net component 23 is conveniently, quickly and accurately positioned, and the water net component 23 and the planting tray 22 can be accurately matched after construction.
As shown in fig. 3 and 4, the planting tray 22 includes an outer frame 31 and a planting plate 32, the outer frame 31 is a rectangular structure, the planting plate 32 is horizontally connected in the outer frame 31, and a plurality of planting holes 27 are opened on the planting plate 32; the outer side of the outer frame 31 is fitted to the inner side of the frame 21. The planting tray 22 has an outer frame 31 structure, so that the outer frame 31 can be matched with the frame 21, and the planting tray 22 is conveniently positioned. The outer frame 31 has a certain height, the planting plates 32 are thin plate-shaped structures, and the planting plates 32 are arranged at the middle height position of the outer frame 31 or have a certain deviation with the middle height of the outer frame 31, so that the potted plants can be conveniently placed.
As shown in fig. 2 and 5, the frame 21 includes two side plates 28 disposed opposite to each other, and an adjusting mechanism 33 is connected between each side plate 28 and the outer frame 31;
the adjusting mechanism 33 comprises an adjusting plate 34, a first positioning bolt 35 and a second positioning bolt 36, the first positioning bolt 35 is connected to the inner side of the side plate 28, the second positioning bolt 36 is connected to the outer side of the outer frame 31, and the adjusting plate 34 is located between the side plate 28 and the outer frame 31; a first strip-shaped hole 37 and a second strip-shaped hole 38 are formed in the adjusting plate 34 along the length direction of the adjusting plate, the first strip-shaped hole 37, the second strip-shaped hole 38 and the first strip-shaped hole 38 are arranged at intervals, the first positioning bolt 35 penetrates through the first strip-shaped hole 37, the first positioning bolt 35 can slide along the first strip-shaped hole 37, and the second positioning bolt 36 penetrates through the second strip-shaped hole 38, and the second positioning bolt 36 can slide along the second strip-shaped hole 38; the first positioning bolt 35 is positioned above the second positioning bolt 36, and the adjusting plate 34 is obliquely arranged;
the adjusting plate 34 is pulled obliquely upwards to enable the first positioning bolt 35 to slide along the first strip-shaped hole 37 and the second positioning bolt 36 to slide along the second strip-shaped hole 38, and the adjusting plate 34 is pressed downwards to drive the planting tray 22 to move vertically upwards.
The adjustment mechanism 33 is arranged to allow the planting tray 22 to be conveniently taken out from the frame 21 after installation, so that the replacement of the potted plant or the replacement or maintenance of the planting tray 22 is facilitated.
The side plates 28 are two opposite plate structures on the frame 21, the side plates 28 are connected with the outer frame 31 through the adjusting mechanism 33, and the up-and-down movement of the planting tray 22 can be realized through the adjusting mechanism 33.
The first positioning bolt 35 is fixedly connected to the inner side of the side plate 28, and the first positioning bolt 35 cannot move or rotate; the second positioning pin 36 is connected to the outside of the outer frame 31. The adjusting plate 34 is provided with a first strip-shaped hole 37 and a second strip-shaped hole 38 which are both in a strip-shaped structure, and the length directions of the two strip-shaped holes are basically consistent with the length direction of the adjusting plate 34.
After the planting tray 22 is set, the adjusting plate 34 is in an inclined state, the top end of the adjusting plate 34 is at a lower position, the first positioning bolt 35 is located at the top end position of the first strip-shaped hole 37, and the second positioning bolt 36 is located at the top end position of the second strip-shaped hole 38, so that the adjusting plate 34 cannot move downwards continuously.
After the potted plants are placed in the planting holes 27, the top ends of the adjusting plates 34 can be covered by the branches, leaves or flowers of the green plants, and the green plants of the adjacent potted plants can be connected to form a whole green landscape.
When the adjusting mechanism 33 is needed, the adjusting plate 34 can be obliquely and upwardly pulled, so that the first positioning bolt 35 moves in the first strip-shaped hole 37, the second positioning bolt 36 moves in the second strip-shaped hole 38, and the top end of the adjusting plate 34 moves upwards by a certain range. Then, the end of the adjusting plate 34 can be pressed downwards, so that the adjusting plate 34 rotates around the first positioning bolt 35, the second positioning bolt 36 is lifted upwards, and the planting tray 22 can be lifted vertically upwards under the action of the second positioning bolt 36.
In the process of pressing the adjusting plate 34, the movement track of the end of the adjusting plate 34 is arc-shaped, and the second strip-shaped hole 38 is long-strip-shaped, so that the second positioning bolt 36 can move slightly in the second strip-shaped hole 38 in the process, and the planting tray 22 can move vertically upwards.
By the mode, the planting tray 22 can be quickly lifted to a higher position, the bottoms of all potted plants in the planting tray 22 are quickly separated from the spray head 26, the old potted plants can be conveniently taken out and the new potted plants can be conveniently installed, the planting tray 22 can be conveniently taken out of the frame 21, and therefore maintenance operation can be carried out on the planting tray 22 or the water net assembly 23 below the planting tray 22.
As shown in fig. 5 and 8, the adjusting mechanism 33 further includes a fixing bolt 39, the fixing bolt 39 is connected to the inner side of the side plate 28, and the fixing bolt 39 is located below the first positioning bolt 35; the bottom of the adjusting plate 34 is provided with a positioning hole 40, the positioning hole 40 is of an L-shaped structure, the positioning hole 40 comprises an entering part 41 and an extending part 42 which are connected, the length of the extending part 42 is greater than that of the entering part 41, the length of the extending part 42 is consistent with the length direction of the adjusting plate 34, and the end part of the entering part 41 is communicated with the side part of the adjusting plate 34;
pulling the adjustment plate 34 obliquely upward then presses the adjustment plate 34 downward to insert the securing latch 39 into the entry portion 41, and pulling the adjustment plate 34 obliquely upward to insert the securing latch 39 into the extension portion 42.
Through the arrangement of the fixing bolts 39, the planting tray 22 can be quickly and stably fixed at a certain height position after being lifted up, so that the potted plant can be conveniently taken and placed.
The securing latch 39 is a cylindrical structure secured to the inside of the side plate 28, below the first locating latch 35. The positioning hole 40 formed on the adjusting plate 34 is used to cooperate with the fixing bolt 39, the positioning hole 40 is an L-shaped structure and has an entering portion 41 and an extending portion 42, the entering portion 41 communicates with the side portion of the adjusting plate 34, so that the fixing bolt 39 can enter from the entering portion 41 and can move to the position of the extending portion 42.
When the adjusting plate 34 is pulled out obliquely upwards, the positioning hole 40 can be close to the fixing bolt 39, the fixing bolt 39 can enter from the entering part 41 after the adjusting plate 34 is pressed downwards, then the adjusting plate 34 is pulled upwards to enable the fixing bolt 39 to enter the deeper position of the extending part 42, and then the adjusting plate 34 is loosened, so that the adjusting plate 34 and the planting tray 22 can be in a stable state.
After adjusting plate 34 is loosened. The planting plate 22 has downward pressure on the second positioning pin 36 and the bottom end of the adjusting plate 34, so that the top end of the adjusting plate 34 has a tendency to move upward, and a tight pressure and friction force are generated between the bottom of the extending part 42 and the fixing pin 39, under which the adjusting plate 34 and the planting plate 22 can be kept stable. Under this state, the potted plant can be taken out and placed conveniently.
When the planting tray 22 needs to be put down, the adjusting plate 34 is held by hand and the adjusting plate 34 is pushed obliquely downwards to enable the fixing bolt 39 to slide out of the extending part 42, then the top end of the adjusting plate 34 is lifted downwards to enable the fixing bolt 39 to be completely separated from the positioning hole 40, then the adjusting plate 34 is loosened slowly to enable the planting tray 22 to move downwards to the lowest position, and finally the adjusting plate 34 is pushed downwards to enable the adjusting plate 34 to be restored to the original position.
As shown in fig. 6, a horizontal flap 43 is attached to the top of adjustment plate 34, flap 43 lying above frame 21. The turning plate 43 is positioned at the top end of the adjusting plate 34, so that the position of the adjusting plate 34 is conveniently limited, and the adjusting plate 34 is conveniently held by hands.
As shown in fig. 10, an annular sliding groove 44 is formed on the outer side of the second positioning pin 36, and the edge of the second strip-shaped hole 38 is connected to the sliding groove 44. A connecting groove 45 is vertically formed in the outer side of the outer frame 31, the bottom end of the connecting groove 45 is communicated with the bottom of the outer frame 31, and one end of the second positioning bolt 36 is inserted into the connecting groove 45; pulling the planting plate 22 upward separates the second securing latch 36 from the connecting slot 45.
The structure of the sliding groove 44 of the second positioning pin 36 is such that it can slide smoothly in the second elongated hole 38, and the second positioning pin 36 does not separate from the second elongated hole 38. The second positioning bolt 36 and the outer frame 31 are in a separable connection structure, and after the planting tray 22 moves upwards to a higher position, the planting tray 22 can be held by hand to be completely taken out of the frame 21, so that the second positioning bolt 36 is separated from the outer frame 31. When the potted plant needs to be replaced, the planting tray 22 is moved upwards through the adjusting plate 34, then the planting tray 22 is taken out of the frame 21, the potted plant in the planting tray 22 can be taken out at one time by turning over the planting tray 22, and the pot culture is very quick and convenient. The empty tray 22 is then returned to the frame 21 with the second alignment pins 36 reattached to the attachment slots 45.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (5)

1. A garden green land reconstruction construction method is characterized by comprising the following steps:
excavating a foundation pit: excavating a foundation pit in the area to be constructed, wherein the depth of the foundation pit is more than 10 cm and less than 20 cm;
setting a base frame: the base frame comprises a frame, a planting disc and a water net component; fixedly connecting the frame in the foundation pit; the water net component comprises a connecting valve and a plurality of water outlet pipes, the water outlet pipes are arranged in parallel at intervals, a plurality of spray heads are uniformly arranged on the water outlet pipes at intervals, and the water outlet pipes are all communicated with the connecting valve; the water net component is arranged in the frame; a plurality of planting holes are distributed in the rectangular array on the planting plate, the planting plate is placed in the frame and is positioned above the water net component, and one spray head corresponds to one planting hole;
greening and planting: placing a pot plant in each planting hole, and enabling the bottom of the pot plant to be communicated with the spray head;
burying: burying soil outside the frame;
the frame is of a rectangular structure, the bottom of the inner side of the frame is connected with a horizontal bottom plate, a fixing hole is formed in the bottom plate, and the bottom plate is fixed in the foundation pit;
the planting tray comprises an outer frame and a planting plate, the outer frame is of a rectangular structure, the planting plate is horizontally connected in the outer frame, and a plurality of planting holes are formed in the planting plate; the outer side of the outer frame is attached to the inner side of the frame;
the frame comprises two side plates which are oppositely arranged, and an adjusting mechanism is connected between each side plate and the outer frame;
the adjusting mechanism comprises an adjusting plate, a first positioning bolt and a second positioning bolt, the first positioning bolt is connected to the inner side of the side plate, the second positioning bolt is connected to the outer side of the outer frame, and the adjusting plate is located between the side plate and the outer frame; the adjusting plate is provided with a first strip-shaped hole and a second strip-shaped hole along the length direction, the first strip-shaped hole, the second strip-shaped hole and the first strip-shaped hole are arranged at intervals, the first positioning bolt penetrates through the first strip-shaped hole and can slide along the first strip-shaped hole, and the second positioning bolt penetrates through the second strip-shaped hole and can slide along the second strip-shaped hole; the first positioning bolt is positioned above the second positioning bolt, and the adjusting plate is obliquely arranged;
the slope upwards stimulates the regulating plate can make first location is tied and is slided along first bar hole, makes second location tie slide along second bar hole, and the pressure moves downwards the regulating plate can drive the perpendicular upward movement of planting dish.
2. The garden green space modification construction method according to claim 1, wherein the adjustment mechanism further comprises a fixing bolt connected to an inner side of the side plate, the fixing bolt being positioned below the first positioning bolt; the bottom of the adjusting plate is provided with a positioning hole which is of an L-shaped structure, the positioning hole comprises an inlet part and an extension part which are connected, the length of the extension part is greater than that of the inlet part, the length of the extension part is consistent with the length direction of the adjusting plate, and the end part of the inlet part is communicated with the side part of the adjusting plate;
the adjusting plate is pulled obliquely upward, then the adjusting plate is pressed downward to enable the fixing bolt to be inserted into the entering part, and then the adjusting plate is pulled obliquely upward to enable the fixing bolt to enter the extending part.
3. The garden green space modification construction method according to claim 2, wherein a horizontal turning plate is connected to the top of the adjusting plate, and the turning plate is horizontally placed above the frame.
4. The garden green space reconstruction construction method according to claim 2, wherein an annular sliding groove is formed in the outer side of the second positioning bolt, and the edge of the second strip-shaped hole is connected to the sliding groove.
5. The garden green space reconstruction construction method according to claim 4, wherein a connecting groove is vertically formed in the outer side of the outer frame, the bottom end of the connecting groove is communicated with the bottom of the outer frame, and one end of the second positioning bolt is inserted into the connecting groove; the second positioning bolt can be separated from the connecting groove by pulling the planting disc upwards.
CN202010461653.5A 2020-05-27 2020-05-27 Garden green land reconstruction construction method Active CN111527930B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010461653.5A CN111527930B (en) 2020-05-27 2020-05-27 Garden green land reconstruction construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010461653.5A CN111527930B (en) 2020-05-27 2020-05-27 Garden green land reconstruction construction method

Publications (2)

Publication Number Publication Date
CN111527930A CN111527930A (en) 2020-08-14
CN111527930B true CN111527930B (en) 2021-12-07

Family

ID=71968942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010461653.5A Active CN111527930B (en) 2020-05-27 2020-05-27 Garden green land reconstruction construction method

Country Status (1)

Country Link
CN (1) CN111527930B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2080445U (en) * 1990-09-19 1991-07-10 河北建筑工程学院 Drawer
KR20100005980A (en) * 2008-07-08 2010-01-18 성 무 김 Construction method of roof top greenization and structure thereof
CN204571505U (en) * 2015-04-15 2015-08-19 宏洋金属(昆山)有限公司 Adjusting door lock side strip
JP2017169550A (en) * 2016-03-23 2017-09-28 陽介 岡田 Garden system and garden construction method
CN107509546A (en) * 2017-09-16 2017-12-26 李红星 A kind of roadside greening device
CN107574775A (en) * 2017-09-16 2018-01-12 李红星 A kind of roadside greening construction method
CN206909037U (en) * 2017-06-16 2018-01-23 刘志鹏 A kind of gardens loosing soil device for being easy to regulation
CN207008230U (en) * 2017-07-07 2018-02-13 湖北优利迪显示科技股份有限公司 A kind of anti-wear bracket of glass display screen
CN207919299U (en) * 2018-01-03 2018-09-28 广州普邦园林股份有限公司 A kind of road tooth installation ancillary equipment
CN109156306A (en) * 2018-08-17 2019-01-08 濮阳职业技术学院 A kind of Chinese garden planting device and method
CN110714648A (en) * 2019-11-18 2020-01-21 成都清妙创意设计有限公司 Construction method of garden comprehensive type greening facility

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0893232A (en) * 1994-09-26 1996-04-09 Penta Ocean Constr Co Ltd Pillar erection method of structure and device therefor
CN207855766U (en) * 2017-08-22 2018-09-14 上海循医信息科技有限公司 A kind of bone fracture plate conveniently taking nail
CN110747708B (en) * 2019-11-04 2021-09-07 湖南东方星园林建筑有限公司 Three-dimensional landscaping construction method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2080445U (en) * 1990-09-19 1991-07-10 河北建筑工程学院 Drawer
KR20100005980A (en) * 2008-07-08 2010-01-18 성 무 김 Construction method of roof top greenization and structure thereof
CN204571505U (en) * 2015-04-15 2015-08-19 宏洋金属(昆山)有限公司 Adjusting door lock side strip
JP2017169550A (en) * 2016-03-23 2017-09-28 陽介 岡田 Garden system and garden construction method
CN206909037U (en) * 2017-06-16 2018-01-23 刘志鹏 A kind of gardens loosing soil device for being easy to regulation
CN207008230U (en) * 2017-07-07 2018-02-13 湖北优利迪显示科技股份有限公司 A kind of anti-wear bracket of glass display screen
CN107509546A (en) * 2017-09-16 2017-12-26 李红星 A kind of roadside greening device
CN107574775A (en) * 2017-09-16 2018-01-12 李红星 A kind of roadside greening construction method
CN207919299U (en) * 2018-01-03 2018-09-28 广州普邦园林股份有限公司 A kind of road tooth installation ancillary equipment
CN109156306A (en) * 2018-08-17 2019-01-08 濮阳职业技术学院 A kind of Chinese garden planting device and method
CN110714648A (en) * 2019-11-18 2020-01-21 成都清妙创意设计有限公司 Construction method of garden comprehensive type greening facility

Also Published As

Publication number Publication date
CN111527930A (en) 2020-08-14

Similar Documents

Publication Publication Date Title
CN103988649A (en) Rapid propagation seedling growing method for large leaf tea tree
CN210017112U (en) Environment-friendly water-saving type landscaping seedling raising device
CN110463555A (en) A kind of construction and construction method being carved into scape flower hedge
CN214801029U (en) Strawberry planting frame convenient to dismouting
CN111527930B (en) Garden green land reconstruction construction method
CN205454763U (en) Turf artificial containers
KR101594419B1 (en) Gabion type planting structure
CN110506534A (en) A kind of nursery planting structure and its use technique
CN205611384U (en) Can realize vegetable greenhouse of three -dimensional cultivation of multilayer
CN108522122A (en) A kind of plant of Lagerstroemia L formulas fan ring body single plant trunk design cultural method
CN201509478U (en) Spray type solid cultivation system for hemispheric solid planting body
CN211406954U (en) Water-retaining and waterlogging-draining potted plant planter
CN113475291A (en) Tree form management method for maintaining light and simplified production of persimmons
CN103120090B (en) A kind of Dry-cultivated nursery plant two-phase cultivation molding
CN206423217U (en) A kind of nested type flowerpot
CN206149941U (en) Modularization arrangement of plants maintenance system
WO2012043720A1 (en) Rock-like planter
CN110150007A (en) A kind of plant of Lagerstroemia L formula geometry annular solid single plant trunk design cultural method
CN220298189U (en) Decorative sculpture structure
CN114208552B (en) Chickpea seedling raising system and chickpea seedling raising method
CN205511108U (en) Green brick of planting
CN108522049A (en) A kind of plant of Lagerstroemia L formulas triangle body annular single plant trunk design cultural method
CN218851417U (en) Organic vegetable cultivation device
CN209170984U (en) Spend case in gardens
CN2598314Y (en) Paddy rice industrial grow seedling special sprout cultivator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20211118

Address after: 351100 room 2705, building B, Jiulong community office building, No. 999, lihuadong Avenue, Xialin street, Chengxiang District, Putian City, Fujian Province

Applicant after: CSCEC Guangsha (Fujian) Construction Co.,Ltd.

Address before: 467500 No. 247, yard 15, Dongying Village, Linru Town, Ruzhou City, Pingdingshan City, Henan Province

Applicant before: Zhou Lei

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant