CN111461675A - Building construction measurement system based on mobile internet and relevant smart machine - Google Patents
Building construction measurement system based on mobile internet and relevant smart machine Download PDFInfo
- Publication number
- CN111461675A CN111461675A CN202010309477.3A CN202010309477A CN111461675A CN 111461675 A CN111461675 A CN 111461675A CN 202010309477 A CN202010309477 A CN 202010309477A CN 111461675 A CN111461675 A CN 111461675A
- Authority
- CN
- China
- Prior art keywords
- construction
- team
- record
- app
- project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 10
- 238000005259 measurement Methods 0.000 title claims description 3
- 238000010276 construction Methods 0.000 claims abstract description 65
- 238000007689 inspection Methods 0.000 claims abstract description 34
- 238000011156 evaluation Methods 0.000 claims abstract description 24
- 238000000034 method Methods 0.000 claims abstract description 11
- 238000012790 confirmation Methods 0.000 claims abstract description 6
- 238000012937 correction Methods 0.000 claims abstract description 6
- 238000005304 joining Methods 0.000 claims description 3
- 238000009826 distribution Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/1093—Calendar-based scheduling for persons or groups
- G06Q10/1097—Task assignment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a building construction metering system based on a mobile internet and related intelligent equipment, which comprises the following steps: a work order system; the work order recording system comprises a team leader mobile phone APP end, a worker mobile phone APP end, a platform server, a construction unit APP end and construction unit Web management, and the system records the whole construction process and comprises the following steps: the system comprises a correction record, a team self-inspection record, a work leader acceptance record and evaluation, a quality inspection acceptance record and evaluation, a check batch acceptance record and evaluation and a project manager confirmation record.
Description
Technical Field
The invention relates to the field of building engineering, in particular to a building construction metering system based on a mobile internet and related intelligent equipment.
Background
With the continuous development of information technology, the informatization level of enterprise management corresponding to the building construction industry is gradually improved, and particularly after the engineering money and the wage management system of modern enterprises are reformed, urgent requirements are put forward on the management informatization of corresponding enterprises.
However, in the construction industry at the present stage, forms such as paper request forms and wage forms are generally used for settlement of project money of labor teams and construction workers and for wage distribution of the construction workers as settlement bases, and the forms have the problems of low information transmission efficiency, difficulty in retrieving of filed data, incapability of tracing construction operators and construction quality problems, insufficient accuracy of project money/wage accounting and the like, and particularly the problem of a large amount of labor disputes caused by the traditional construction metering (labor recording) mode.
Disclosure of Invention
Therefore, in order to solve the above disadvantages, the present invention provides a building construction metering system based on mobile internet and related intelligent devices; the work order recording system comprises a team leader mobile phone APP end, a worker mobile phone APP end, a platform server, a construction unit APP end and construction unit Web management, and the system records the whole construction process and comprises the following steps: the system comprises a correction record, a team self-inspection record, a work leader acceptance record and evaluation, a quality inspection acceptance record and evaluation, a check batch acceptance record and evaluation and a project manager confirmation record.
The invention is realized by constructing a building construction metering system based on the mobile internet and related intelligent equipment, which comprises the following steps: the method is characterized in that: the work order recording system comprises a team leader mobile phone APP end, a worker mobile phone APP end, a platform server, a construction unit APP end and construction unit Web management, and the system records the whole construction process and comprises the following steps: the method comprises the following steps of modifying records, team self-checking records, chief deputy acceptance records and evaluations, quality inspection acceptance records and evaluations, inspection batch acceptance records and evaluations and project manager confirmation records; the system is implemented as follows:
1) adding the team leader into the corresponding engineering project through a team APP;
2) after the team leader joins in the project, inviting workers with the team leader one by one, accepting the invitation by the workers through the APP at the worker end, and joining in the project after successful acceptance;
3) a project manager creates a subsection project record in a Web management end of a construction unit;
4) a project manager distributes construction tasks for each labor team based on project projects in a Web management end of a construction unit, wherein the construction tasks comprise specific completion deadline;
5) the team leader receives the tasks distributed by the project manager through the team APP, and after the tasks are successfully received, specific workers are arranged to enter the field for construction according to the time and the area limited by the tasks;
6) a worker receives a task schedule from a team leader through a worker APP;
7) after the worker confirms the construction task list, the construction record is started by recording the work list;
8) after the worker finishes the construction task, performing task completion marking through the worker APP;
9) according to specific conditions, the team leader selects the construction results of a plurality of workers through the team leader APP and submits the construction results to the superior inspection in a unified way; the recording sheet records the inspection data, including the correction record and the evaluation;
10) a project manager receives an inspection application from a team leader through a mobile phone APP of a construction unit, and performs special inspection in the aspects of construction quality and the like according to actual conditions; the work order will record inspection data, such as by recording, rework recording, and related evaluations.
The invention has the following advantages: the invention discloses a building construction metering system based on a mobile internet and related intelligent equipment, which comprises the following steps: and 5, a recording sheet system. The work order recording system comprises a team leader mobile phone APP end, a worker mobile phone APP end, a platform server, a construction unit APP end and construction unit Web management, and the system records the whole construction process and comprises the following steps: the system comprises a correction record, a team self-inspection record, a work leader acceptance record and evaluation, a quality inspection acceptance record and evaluation, a check batch acceptance record and evaluation and a project manager confirmation record. The system is implemented as follows:
(1) a main pipe (project manager/production manager) creates a regional distribution project and associates sub-package units;
(2) budget/quality inspector creates project sub-projects, configures total project amount of each project sub-project and allocates project length;
(3) the professional captain defines an area for the project, configures the total amount of the area project and allocates groups;
(4) the team leader confirms the construction area, configures the operation worker group, configures the construction part of the worker, and configures the unit price and the engineering quantity
(5) The worker confirms the task order and the work order starts to record the relevant data;
(6) after the worker finishes the construction, the work order system automatically reminds the team leader of self-checking and records the self-checking result of the team leader;
(7) and when the team leader passes the self-checking result, the work order recording system automatically reminds the worker leader of checking after merging the construction items. The work order recording system records the work leader checking result; if the team leader does not pass the self-checking result, arranging workers to start rectification, and recording a work order system to generate a rectification record;
(8) the professional chief worker passes the inspection, combines a plurality of construction items, fills in inspection contents and submits quality supervision inspection;
(9) the quality inspector completes the quality inspection and records the quality monitoring result;
(10) and the supervision terminal receives the inspection and acceptance notifications of the inspection batches, generates an acceptance record table after the acceptance is passed, sends the acceptance record table to the budget/quality inspection terminal for auditing, finely adjusts the engineering quantity, and checks and confirms with workers.
Drawings
FIG. 1 is a block diagram of the system architecture of the present invention.
Detailed Description
The present invention will be described in detail with reference to fig. 1, and the technical solutions in the embodiments of the present invention will be clearly and completely described, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a building construction metering system based on a mobile internet and related intelligent equipment through improvement, which comprises the following steps: as shown in fig. 1; the work order recording system comprises a team leader mobile phone APP end, a worker mobile phone APP end, a platform server, a construction unit APP end and construction unit Web management, and the system records the whole construction process and comprises the following steps: the method comprises the following steps of modifying records, team self-checking records, chief deputy acceptance records and evaluations, quality inspection acceptance records and evaluations, inspection batch acceptance records and evaluations and project manager confirmation records; the system is implemented as follows:
1) adding the team leader into the corresponding engineering project through a team APP;
2) after the team leader joins in the project, inviting workers with the team leader one by one, accepting the invitation by the workers through the APP at the worker end, and joining in the project after successful acceptance;
3) a project manager creates a subsection project record in a Web management end of a construction unit;
4) a project manager distributes construction tasks for each labor team based on project projects in a Web management end of a construction unit, wherein the construction tasks comprise specific completion deadline;
5) the team leader receives the tasks distributed by the project manager through the team APP, and after the tasks are successfully received, specific workers are arranged to enter the field for construction according to the time and the area limited by the tasks;
6) a worker receives a task schedule from a team leader through a worker APP;
7) after the worker confirms the construction task list, the construction record is started by recording the work list;
8) after the worker finishes the construction task, performing task completion marking through the worker APP;
9) according to specific conditions, the team leader selects the construction results of a plurality of workers through the team leader APP and submits the construction results to the superior inspection in a unified way; the recording sheet records the inspection data, including the correction record and the evaluation;
10) a project manager receives an inspection application from a team leader through a mobile phone APP of a construction unit, and performs special inspection in the aspects of construction quality and the like according to actual conditions; the work order will record inspection data, such as by recording, rework recording, and related evaluations.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (1)
1. A building construction measurement system based on mobile internet and relevant smart machine: the method is characterized in that: the work order recording system comprises a team leader mobile phone APP end, a worker mobile phone APP end, a platform server, a construction unit APP end and construction unit Web management, and the system records the whole construction process and comprises the following steps: the method comprises the following steps of modifying records, team self-checking records, chief deputy acceptance records and evaluations, quality inspection acceptance records and evaluations, inspection batch acceptance records and evaluations and project manager confirmation records; the system is implemented as follows:
1) adding the team leader into the corresponding engineering project through a team APP;
2) after the team leader joins in the project, inviting workers with the team leader one by one, accepting the invitation by the workers through the APP at the worker end, and joining in the project after successful acceptance;
3) a project manager creates a subsection project record in a Web management end of a construction unit;
4) a project manager distributes construction tasks for each labor team based on project projects in a Web management end of a construction unit, wherein the construction tasks comprise specific completion deadline;
5) the team leader receives the tasks distributed by the project manager through the team APP, and after the tasks are successfully received, specific workers are arranged to enter the field for construction according to the time and the area limited by the tasks;
6) a worker receives a task schedule from a team leader through a worker APP;
7) after the worker confirms the construction task list, the construction record is started by recording the work list;
8) after the worker finishes the construction task, performing task completion marking through the worker APP;
9) according to specific conditions, the team leader selects the construction results of a plurality of workers through the team leader APP and submits the construction results to the superior inspection in a unified way;
the recording sheet records the inspection data, including the correction record and the evaluation;
10) a project manager receives an inspection application from a team leader through a mobile phone APP of a construction unit, and performs special inspection in the aspects of construction quality and the like according to actual conditions; the work order will record inspection data, such as by recording, rework recording, and related evaluations.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010309477.3A CN111461675A (en) | 2020-04-20 | 2020-04-20 | Building construction measurement system based on mobile internet and relevant smart machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010309477.3A CN111461675A (en) | 2020-04-20 | 2020-04-20 | Building construction measurement system based on mobile internet and relevant smart machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111461675A true CN111461675A (en) | 2020-07-28 |
Family
ID=71684633
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010309477.3A Pending CN111461675A (en) | 2020-04-20 | 2020-04-20 | Building construction measurement system based on mobile internet and relevant smart machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111461675A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113052434A (en) * | 2021-02-26 | 2021-06-29 | 一智科技(成都)有限公司 | Construction object portrait labeling method and system |
CN114037262A (en) * | 2021-09-10 | 2022-02-11 | 一智科技(成都)有限公司 | Construction task order dispatching method and system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106779380A (en) * | 2016-12-06 | 2017-05-31 | 山西省交通科学研究院 | A kind of intelligent construction safety checks evaluation system and method |
CN107292593A (en) * | 2017-07-24 | 2017-10-24 | 广东玉扳手科技有限公司 | A kind of construction project contracting management system |
CN110288242A (en) * | 2019-06-28 | 2019-09-27 | 杭州恋家网络科技有限公司 | A kind of finishing business management system for section chief |
KR102065507B1 (en) * | 2018-12-28 | 2020-01-13 | 이지연 | Realtime construction work management apparatus |
-
2020
- 2020-04-20 CN CN202010309477.3A patent/CN111461675A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106779380A (en) * | 2016-12-06 | 2017-05-31 | 山西省交通科学研究院 | A kind of intelligent construction safety checks evaluation system and method |
CN107292593A (en) * | 2017-07-24 | 2017-10-24 | 广东玉扳手科技有限公司 | A kind of construction project contracting management system |
KR102065507B1 (en) * | 2018-12-28 | 2020-01-13 | 이지연 | Realtime construction work management apparatus |
CN110288242A (en) * | 2019-06-28 | 2019-09-27 | 杭州恋家网络科技有限公司 | A kind of finishing business management system for section chief |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113052434A (en) * | 2021-02-26 | 2021-06-29 | 一智科技(成都)有限公司 | Construction object portrait labeling method and system |
CN114037262A (en) * | 2021-09-10 | 2022-02-11 | 一智科技(成都)有限公司 | Construction task order dispatching method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9031990B2 (en) | Data processing system for manufacturing quality inspection management system | |
CN110766528A (en) | Client credit self-evaluation factory real-time intelligent analysis management system | |
CN111898853A (en) | Engineering construction fine management system | |
US11210075B2 (en) | Software automation deployment and performance tracking | |
CN111461570A (en) | Building construction evaluation system based on mobile internet and related intelligent equipment | |
CN111898962A (en) | Automatic engineering project management system | |
CN110428176B (en) | Project progress auditing method and system | |
CN115375146A (en) | Digital construction integrated platform | |
CN114462969A (en) | Project progress real-time monitoring method and device, electronic equipment and storage medium | |
CN111461675A (en) | Building construction measurement system based on mobile internet and relevant smart machine | |
CN113656505B (en) | Digitization of distributed project management system and method for synchronizing data thereof | |
CN111353787A (en) | Equipment comprehensive guarantee system based on cloud platform | |
Ballan | A value map for communication systems in construction | |
CN115099791A (en) | Intelligent contract delivery platform based on block chain and operation method thereof | |
CN116051055A (en) | Digital project management system | |
CN114462816A (en) | Enterprise ERP (enterprise resource planning) integrated management system based on Internet of things | |
US20100205225A1 (en) | Method and Apparatus for Transforming a Process | |
CN111461674A (en) | Building engineering acceptance and wage approval system based on Saas cloud service | |
CN113065737A (en) | DevOps-based efficiency measurement method and system | |
CN117035716A (en) | Method, device, equipment and medium for managing working hours of clinical research project | |
CN110826926A (en) | Intelligent manufacturing execution system for surface assembly production line | |
CN114971582A (en) | Material demand tracking system based on supply chain management system | |
CN114723381A (en) | Construction project management system | |
CN112016841A (en) | ERP mine production control management system | |
CN114066383B (en) | Bid management system based on mobile internet technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |