CN111456759A CN202010076656.7A CN202010076656A CN111456759A CN 111456759 A CN111456759 A CN 111456759A CN 202010076656 A CN202010076656 A CN 202010076656A CN 111456759 A CN111456759 A CN 111456759A
Authority
CN
China
Prior art keywords
lining
secondary lining
arch
side wall
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010076656.7A
Other languages
Chinese (zh)
Inventor
熊国兴
卿伟宸
杨昌宇
王嵩
谢运来
张慧玲
宁远思
旷文涛
杨宝
曹林卫
王聚山
杨光华
陈磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN202010076656.7A priority Critical patent/CN111456759A/en
Publication of CN111456759A publication Critical patent/CN111456759A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides an assembled tunnel lining structure to when improving the industrialization degree and the efficiency of construction of mine method tunnel construction, effectively guarantee the quality of hunch portion lining cutting, overcome the lining cutting hunch portion quality defect that leads to because the cast-in-place control difficulty, ensure the safety of tunnel operation, reduce the input of operation phase renovation. Including the primary support structure, prevent drainage system and the secondary lining structure that from interior to exterior set up, the secondary lining structure includes invert, side wall secondary lining and hunch portion secondary lining. And two ends of the inverted arch are fixedly connected with the bottom end of the secondary lining of the side wall, and the inverted arch is formed by continuous casting in sections along the extending direction of the tunnel. The secondary lining of the arch part is of a prefabricated structure and is formed by longitudinally assembling reinforced concrete prefabricated building block units, and the two ends of the annular part and the secondary lining of the side wall on the same side form lap joints through a connecting structure or form fixed connection through a connecting component and a post-pouring joint.

Description

Assembled tunnel lining structure
Technical Field
The invention relates to a tunnel lining structure, in particular to an assembled tunnel lining structure with an arch part adopting prefabricated components.
Background
In recent years, the railway construction of China is rapidly developed, and particularly the construction of high-speed railways enters an explosive growth stage. With the rapid increase of railway operation mileage and the increase of tunnel ratio caused by the improvement of line standards, the number and scale of railway tunnels also tend to increase rapidly, and particularly in southwest mountainous areas, the occupation ratio of the tunnels in railway infrastructure projects is extremely high.
In the current mine method tunnel construction process, due to various process qualities and other factors, quality defects of primary support or lining back void, insufficient thickness of secondary lining, cracks, water leakage, construction joint dislocation, uneven or insufficient concrete strength and the like exist in partial sections, and the quality problems are particularly prominent in tunnel arch parts and bring great hidden danger to railway operation safety. In recent years, a plurality of opened high-speed railways have a plurality of diseases caused by tunnel lining quality defects during operation, so that accidents of speed reduction operation and even line interruption are caused, high attention is paid to all parties, and huge manpower and material resources are invested for renovation.
The tunnel lining constructed by the traditional mine method generally adopts a cast-in-place structure form with a curved wall and an inverted arch. When in construction, reinforcing steel bars are bound at the inverted arch part and concrete is poured, side wall joint reinforcing steel bars are reserved at two sides when the inverted arch is poured, after the inverted arch is constructed by a certain step distance towards the tunnel face, the side wall and the arch part are bound by using a lining template trolley and the concrete is poured integrally, and side wall feet are connected with the inverted arch through the joint reinforcing steel bars at the two sides of the inverted arch to form a whole, so that the whole lining is formed by pouring in situ. The biggest defects of the traditional tunnel lining construction are as follows: because the lining is integrally cast on site, the casting process is of great importance to the lining quality, however, in actual construction, because the binding of structural steel bars is not in place, the construction process problems of mould entering, vibration, concrete pouring difficulty and the like are easily caused, the concrete lining is easy to crack or even peel off and fall blocks in the operation process due to the conditions of honeycombs, pitted surfaces, insufficient thickness, non-compact casting vibration and the like, the driving safety of the line is threatened to a great extent, and the conditions are particularly serious at the arch part of the lining, and the threat to the driving safety is also the greatest.
Therefore, the tunnel lining structure constructed by the traditional mining method is optimized, the problem of quality defect of the arch part of the tunnel lining is fundamentally solved, the tunnel engineering quality is improved, and the driving safety in the tunnel is fully ensured to become the urgent need of tunnel construction.
Disclosure of Invention
The invention aims to provide an assembled tunnel lining structure, which can effectively ensure the quality of lining of an arch part while improving the industrialization degree and the construction efficiency of the mine tunnel construction, overcome the quality defect of the lining arch part caused by difficult cast-in-place control, ensure the safety of tunnel operation and reduce the investment of renovation in the operation period.
The technical scheme adopted by the invention for solving the technical problems is as follows:
The invention discloses an assembled tunnel lining structure, which comprises a primary supporting structure, a waterproof and drainage system and a secondary lining structure which are arranged from inside to outside, wherein the secondary lining structure comprises an inverted arch, a side wall secondary lining and an arch secondary lining, and is characterized in that: two ends of the inverted arch are fixedly connected with the bottom end of the secondary lining of the side wall, and the inverted arch is formed by subsection continuous pouring along the extending direction of the tunnel; the arch part secondary lining is of a prefabricated structure and formed by longitudinally assembling reinforced concrete prefabricated building block units, and the two ends of the arch part secondary lining and the secondary lining of the side wall on the same side form lap joints through a connecting structure or form fixed connection through a connecting component and a post-pouring joint.
The invention has the advantages that under the advantage of fully exerting the flexibility of the tunnel construction by the mine method, the secondary lining of the arch part adopts a prefabricated assembly structure, the reinforced concrete prefabricated building block units can be produced in batches in a factory and then transported to the site to be assembled mechanically, so that the site labor condition is improved, the material is saved, and the mechanization level and the labor efficiency of the tunnel construction are improved; because the arch lining is prefabricated in a factory, the structure quality can be effectively guaranteed, the quality defect of the arch lining caused by the cast-in-place process problem is avoided, the arch lining damage in the operation process is avoided, and the driving safety is guaranteed.
Drawings
The specification includes the following fifteen figures:
FIG. 1 is a cross-sectional view of an assembled tunnel lining structure of the present invention;
FIGS. 2 to 9 are schematic views showing the connection between the secondary lining of the side wall and the secondary lining of the arch in the fabricated tunnel lining structure according to the present invention;
FIG. 10 is a cross-sectional view taken along line B-B of FIG. 9;
FIG. 11 is a cross-sectional view taken along line C-C of FIG. 9;
FIGS. 12 and 13 are schematic diagrams illustrating how to assemble the secondary lining of the arch part in the fabricated tunnel lining structure according to the present invention;
FIGS. 14 and 15 are schematic views illustrating how to assemble the secondary lining of the arch part in the fabricated tunnel lining structure according to the present invention;
The figures show the parts, components and corresponding references: the primary support structure 10, the waterproof and drainage system 20, the side wall secondary lining 30, the inverted arch 31, the inverted arch filling layer 31a, the arch secondary lining 32, the circumferential connecting bolt 41, the circumferential sealing ring 42, the circumferential waterproof sealing gasket 43, the first steel structural member 51, the second steel structural member 52, the connecting steel 53, the connecting steel bar 54, the post-cast concrete 55, the longitudinal waterproof sealing gasket 60, the longitudinal connecting bolt 70 and the prestressed steel bar 71.
Detailed Description
The invention is further illustrated with reference to the following figures and examples.
Referring to fig. 1, the fabricated tunnel lining structure of the present invention includes a primary supporting structure 10, a waterproof and drainage system 20, and a secondary lining structure, which are arranged from inside to outside, and the secondary lining structure includes an inverted arch 31, a side wall secondary lining 30, and an arch secondary lining 32. The two ends of the inverted arch 31 are fixedly connected with the bottom end of the side wall secondary lining 30 and are formed by continuous casting in sections along the extending direction of the tunnel, namely the inverted arch 31 and the side wall secondary lining 30 are formed by adopting on-site vertical die casting. The arch secondary lining 32 is a prefabricated structure and is formed by longitudinally assembling reinforced concrete prefabricated building block units, and the two circumferential ends of the arch secondary lining and the secondary lining 30 of the side wall on the same side form lap joints through a connecting structure or form fixed connection through connecting components. Under the advantage of giving full play to the flexible tunnel construction of mine method, the secondary lining 32 of hunch portion adopts the prefabricated structure of assembling, and its reinforced concrete prefabricated block unit can be batch production in the mill, then transports to the scene and adopts mechanized assembly, improves the on-the-spot working condition, and material saving has improved the mechanized level and the labor efficiency of tunnel construction. Because the reinforced concrete prefabricated building block unit is prefabricated in an industrial mode, the structural quality can be effectively guaranteed, the arch lining quality defect caused by the cast-in-place process problem is avoided, the arch lining defect in the operation process is avoided, and the driving safety is guaranteed.
referring to fig. 6 and 7, the contact surfaces of the secondary lining 30 of the side wall and the secondary lining 32 of the arch part are in a corresponding L shape or a concave-convex shape, the connection structure is an L-shaped joggle structure or a concave-convex joggle structure formed by the contact surfaces, and a circumferential waterproof sealing gasket 43 extending longitudinally is arranged on the contact surfaces, so that the secondary lining 32 of the arch part is directly placed on the secondary lining 30 of the side wall during construction.
Referring to fig. 2 to 5, the contact surfaces of the side wall secondary lining 30 and the arch secondary lining 32 are corresponding planes or arc surfaces, the connecting member is a circumferential connecting bolt 41 which passes through the connecting hole at the end of the side wall secondary lining 30 and the arch secondary lining 32, and a longitudinally extending circumferential waterproof gasket 43 is arranged on the contact surface. The circumferential connecting bolt 41 may be an arc bolt or an obliquely arranged straight bolt.
Referring to fig. 10 and 11, the post-cast joint forming fixed connection is composed of a first section steel member 51, a second section steel member 52, a connection section steel 53, a stub bar 54, and post-cast concrete 55, which extend circumferentially. The first section steel member 51 is buried in the side wall secondary lining 30, the second section steel member 52 is buried in the arch secondary lining 32, and two ends of the connecting section steel 53 are respectively connected with the extending ends of the first section steel member 51 and the second section steel member 52 in a welding mode. The stubbled steel bars 54 are arranged outside the first section steel member 51 and the second section steel member 52, and the post-cast concrete 55 is poured between the circumferential end faces of the side wall secondary lining 30 and the arch secondary lining 32.
The arch secondary lining 32 is a prefabricated structure and is formed by longitudinally assembling reinforced concrete prefabricated building block units. Referring to fig. 12 and 13, two adjacent reinforced concrete precast block units in the arch secondary lining 32 are integrally connected by longitudinal connection bolts 70 passing through the longitudinal connection holes. Referring to fig. 14 and 15, adjacent pluralities of reinforced concrete precast block units in the arch secondary lining 32 are connected as one group by longitudinally extending prestressed reinforcements 71, and the adjacent groups are integrally connected by longitudinal connecting bolts 70 passing through the longitudinal connecting holes. To ensure the waterproof performance of the arch secondary lining 32, a circumferentially extending longitudinal waterproof gasket 60 is provided between the longitudinal contact surfaces of two adjacent reinforced concrete prefabricated block units in the arch secondary lining 32. The longitudinal coupling bolt 70 may be an arc bolt or an obliquely arranged straight bolt.
The foregoing merely illustrates some of the principles of the present invention as a fabricated tunnel lining structure and is not intended to limit the invention to the exact construction and operation shown and described, and accordingly all modifications and equivalents that may be employed fall within the scope of the claims.

Claims (8)

1. The utility model provides an assembled tunnel lining structure, includes by interior and outer primary support structure (10) that set up, waterproof drainage system (20) and secondary lining structure, and the secondary lining structure includes invert (31), side wall secondary lining (30) and hunch portion secondary lining (32), characterized by: two ends of the inverted arch (31) are fixedly connected with the bottom end of the side wall secondary lining (30) and are formed by subsection continuous pouring along the extending direction of the tunnel; the arch part secondary lining (32) is of a prefabricated structure and formed by longitudinally assembling reinforced concrete prefabricated building block units, and the two annular ends of the arch part secondary lining and the secondary lining (30) of the side wall on the same side form lap joints through a connecting structure or form fixed connection through a connecting component and a post-pouring joint.
2. the assembled tunnel lining structure as claimed in claim 1, wherein the contact surfaces of the secondary side wall lining (30) and the secondary arch lining (32) are correspondingly L-shaped or concave-convex, and the connecting structure is an L-shaped joggle structure or a concave-convex joggle structure formed by the contact surfaces.
3. A fabricated tunnel lining structure as claimed in claim 1, wherein: the contact surfaces of the secondary side wall lining (30) and the secondary arch lining (32) are corresponding planes or arc surfaces, and the connecting component is a circumferential connecting bolt (41) penetrating through the connecting holes at the ends of the secondary side wall lining (30) and the secondary arch lining (32).
4. A fabricated tunnel lining structure as claimed in claim 2 or 3, wherein: and the contact surface is provided with a circumferential waterproof sealing gasket (43) which extends longitudinally.
5. A fabricated tunnel lining structure as claimed in claim 1, wherein: the post-pouring joint comprises a first steel structural member (51) extending annularly, a second steel structural member (52), connecting steel bars (53), connecting steel bars (54) and post-pouring concrete (55); the first section steel component (51) is buried in the side wall secondary lining (30), the second section steel component (52) is buried in the arch secondary lining (32), and two ends of the connecting section steel (53) are respectively welded and connected with the extending ends of the first section steel component (51) and the second section steel component (52); the stubbled steel bars (54) are arranged outside the steel member (51) and the second steel member (52), and post-cast concrete (55) is poured between the circumferential end faces of the secondary lining (30) of the side wall and the secondary lining (32) of the arch part.
6. A fabricated tunnel lining structure as claimed in claim 1, wherein: two adjacent reinforced concrete prefabricated building block units in the arch secondary lining (32) are connected into a whole by a longitudinal connecting bolt (70) penetrating through a longitudinal connecting hole.
7. A fabricated tunnel lining structure as claimed in claim 1, wherein: a plurality of adjacent reinforced concrete prefabricated building block units in the arch part secondary lining (32) are connected into a group by longitudinally extending prestressed reinforcements (71), and the adjacent groups are connected into a whole by longitudinal connecting bolts (70) penetrating through longitudinal connecting holes.
8. A fabricated tunnel lining structure as claimed in claim 6 or 7, wherein: and a longitudinal waterproof sealing gasket (60) which extends in the circumferential direction is arranged between the longitudinal contact surfaces of two adjacent reinforced concrete prefabricated building block units in the arch part secondary lining (32).
CN202010076656.7A 2020-01-23 2020-01-23 Assembled tunnel lining structure Pending CN111456759A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010076656.7A CN111456759A (en) 2020-01-23 2020-01-23 Assembled tunnel lining structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010076656.7A CN111456759A (en) 2020-01-23 2020-01-23 Assembled tunnel lining structure

Publications (1)

Publication Number Publication Date
CN111456759A true CN111456759A (en) 2020-07-28

Family

ID=71683198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010076656.7A Pending CN111456759A (en) 2020-01-23 2020-01-23 Assembled tunnel lining structure

Country Status (1)

Country Link
CN (1) CN111456759A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112879037A (en) * 2021-04-22 2021-06-01 黄河交通学院 Safe construction method for mine tunnel
CN113417668A (en) * 2021-07-29 2021-09-21 中铁隧道集团一处有限公司 Pouring construction method for high cantilever tunnel side wall
CN113417669A (en) * 2021-07-29 2021-09-21 中铁隧道集团一处有限公司 Lining construction method for side wall cast-in-place and arch prefabricated segment spherical joint assembly
CN113565539A (en) * 2021-07-29 2021-10-29 中铁隧道集团一处有限公司 Construction method for preventing initial support side from rebounding of cantilever type cast-in-place side wall of tunnel
CN113790065A (en) * 2021-09-29 2021-12-14 中铁隧道局集团有限公司 Auxiliary kit for in-situ repair of large-volume defects of tunnel lining by UHPC material and construction method
CN114753860A (en) * 2022-05-17 2022-07-15 中铁第一勘察设计院集团有限公司 Prefabricated and cast-in-place combined drilling and blasting tunnel lining structure and construction method thereof

Citations (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101429869A (en) * 2008-11-21 2009-05-13 兰州南特数码科技股份有限公司 Double-bending tunnel
CN201261916Y (en) * 2008-09-09 2009-06-24 贵阳铝镁设计研究院 Late poured band structure adopting profiled bar short beam to improve shear force
CN102251481A (en) * 2011-05-06 2011-11-23 中铁七局集团第一工程有限公司 Railway pier layered construction method and construction device
CN102444089A (en) * 2012-01-05 2012-05-09 中铁第一勘察设计院集团有限公司 Prefabricated part assembled windproof open cut tunnel in gale region and joint assembling and connecting method thereof
CN202705936U (en) * 2012-04-10 2013-01-30 中铁四局集团第五工程有限公司 Windproof prefabricated part assembly and connection device
CN102995660A (en) * 2012-12-21 2013-03-27 张双里 Multifunctional arched combined prestress underground pipe gallery for cisty and preparation process thereof
CN103306685A (en) * 2013-06-24 2013-09-18 上海市城市建设设计研究总院 Shield segment structure and shield tunnel
CN103939110A (en) * 2014-05-07 2014-07-23 中铁第一勘察设计院集团有限公司 Strengthening system for slight cracking of existing tunnel arch portion lining
CN105134252A (en) * 2015-09-24 2015-12-09 济南轨道交通集团有限公司 Longitudinal prestress strengthening structure for shield tunnel segments and construction method
CN105133726A (en) * 2015-09-25 2015-12-09 郑州大学 Assembled monolithic concrete frame structure system and frame shear structure system formed by assembled monolithic concrete frame structure system
CN105862990A (en) * 2016-03-24 2016-08-17 上海市机械施工集团有限公司 Prefabricated assembly well wall structure and construction method thereof
CN106930777A (en) * 2017-04-14 2017-07-07 中铁六局集团有限公司 The construction method of the lining of Bored Section of Metro main track assembled two
CN107060816A (en) * 2017-05-23 2017-08-18 中铁第四勘察设计院集团有限公司 A kind of attachment structure suitable for tunnel duct piece longitudinal joint
CN107476812A (en) * 2017-09-27 2017-12-15 贵州省公路工程集团有限公司 A kind of assembled inverted arch and preparation method thereof
CN207673349U (en) * 2017-11-06 2018-07-31 山东建筑大学 A kind of assembled supporting construction of chessboard distribution anchor cable and concrete slab
CN108979690A (en) * 2018-09-30 2018-12-11 西南石油大学 A kind of shield tunnel anti-floating control structure and application method
CN108979662A (en) * 2018-08-01 2018-12-11 中铁第勘察设计院集团有限公司 Tunnel prefabrication and assembly construction lining cutting splicing structure and its method
CN109458192A (en) * 2018-12-30 2019-03-12 中铁十四局集团有限公司 Prefabricated film connection component and inverted arch structure with it
CN109469204A (en) * 2018-10-22 2019-03-15 中建五局第三建设有限公司 Assembled steel reinforced concrete combination frame structure and construction method based on composite beam
CN109505624A (en) * 2018-09-27 2019-03-22 中铁隧道局集团有限公司 A kind of section of jurisdiction mortise and tenon formula shield tunnel construction
CN109538238A (en) * 2018-12-07 2019-03-29 中铁四局集团有限公司 A kind of tunnel arch prefabricated pipe section constructing device and control method
CN109736841A (en) * 2018-12-30 2019-05-10 中铁隧道局集团有限公司 Precast lining abutment wall overlap joint cannelure seam in tunnel pours end mould and device
CN109763838A (en) * 2019-03-13 2019-05-17 中铁第一勘察设计院集团有限公司 Assembled inverted arch structure and its assembling method suitable for drill+blast tunnel
CN109779010A (en) * 2018-12-19 2019-05-21 北京交通大学 A kind of assembly concrete bean column node of replaceable dissipative member
CN110219667A (en) * 2019-07-05 2019-09-10 甘肃省交通规划勘察设计院股份有限公司 Tunnel inverted arch and inverted arch filled layer substitution steel-concrete combined structure and construction technology
CN110486040A (en) * 2019-07-08 2019-11-22 重庆交通大学 A kind of prefbricated tunnel lining structure for vcehicular tunnel
CN211648183U (en) * 2020-01-23 2020-10-09 中铁二院工程集团有限责任公司 Assembled tunnel lining structure

Patent Citations (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201261916Y (en) * 2008-09-09 2009-06-24 贵阳铝镁设计研究院 Late poured band structure adopting profiled bar short beam to improve shear force
CN101429869A (en) * 2008-11-21 2009-05-13 兰州南特数码科技股份有限公司 Double-bending tunnel
CN102251481A (en) * 2011-05-06 2011-11-23 中铁七局集团第一工程有限公司 Railway pier layered construction method and construction device
CN102444089A (en) * 2012-01-05 2012-05-09 中铁第一勘察设计院集团有限公司 Prefabricated part assembled windproof open cut tunnel in gale region and joint assembling and connecting method thereof
CN202705936U (en) * 2012-04-10 2013-01-30 中铁四局集团第五工程有限公司 Windproof prefabricated part assembly and connection device
CN102995660A (en) * 2012-12-21 2013-03-27 张双里 Multifunctional arched combined prestress underground pipe gallery for cisty and preparation process thereof
CN103306685A (en) * 2013-06-24 2013-09-18 上海市城市建设设计研究总院 Shield segment structure and shield tunnel
CN103939110A (en) * 2014-05-07 2014-07-23 中铁第一勘察设计院集团有限公司 Strengthening system for slight cracking of existing tunnel arch portion lining
CN105134252A (en) * 2015-09-24 2015-12-09 济南轨道交通集团有限公司 Longitudinal prestress strengthening structure for shield tunnel segments and construction method
CN105133726A (en) * 2015-09-25 2015-12-09 郑州大学 Assembled monolithic concrete frame structure system and frame shear structure system formed by assembled monolithic concrete frame structure system
CN105862990A (en) * 2016-03-24 2016-08-17 上海市机械施工集团有限公司 Prefabricated assembly well wall structure and construction method thereof
CN106930777A (en) * 2017-04-14 2017-07-07 中铁六局集团有限公司 The construction method of the lining of Bored Section of Metro main track assembled two
CN107060816A (en) * 2017-05-23 2017-08-18 中铁第四勘察设计院集团有限公司 A kind of attachment structure suitable for tunnel duct piece longitudinal joint
CN107476812A (en) * 2017-09-27 2017-12-15 贵州省公路工程集团有限公司 A kind of assembled inverted arch and preparation method thereof
CN207673349U (en) * 2017-11-06 2018-07-31 山东建筑大学 A kind of assembled supporting construction of chessboard distribution anchor cable and concrete slab
CN108979662A (en) * 2018-08-01 2018-12-11 中铁第勘察设计院集团有限公司 Tunnel prefabrication and assembly construction lining cutting splicing structure and its method
CN109505624A (en) * 2018-09-27 2019-03-22 中铁隧道局集团有限公司 A kind of section of jurisdiction mortise and tenon formula shield tunnel construction
CN108979690A (en) * 2018-09-30 2018-12-11 西南石油大学 A kind of shield tunnel anti-floating control structure and application method
CN109469204A (en) * 2018-10-22 2019-03-15 中建五局第三建设有限公司 Assembled steel reinforced concrete combination frame structure and construction method based on composite beam
CN109538238A (en) * 2018-12-07 2019-03-29 中铁四局集团有限公司 A kind of tunnel arch prefabricated pipe section constructing device and control method
CN109779010A (en) * 2018-12-19 2019-05-21 北京交通大学 A kind of assembly concrete bean column node of replaceable dissipative member
CN109458192A (en) * 2018-12-30 2019-03-12 中铁十四局集团有限公司 Prefabricated film connection component and inverted arch structure with it
CN109736841A (en) * 2018-12-30 2019-05-10 中铁隧道局集团有限公司 Precast lining abutment wall overlap joint cannelure seam in tunnel pours end mould and device
CN109763838A (en) * 2019-03-13 2019-05-17 中铁第一勘察设计院集团有限公司 Assembled inverted arch structure and its assembling method suitable for drill+blast tunnel
CN110219667A (en) * 2019-07-05 2019-09-10 甘肃省交通规划勘察设计院股份有限公司 Tunnel inverted arch and inverted arch filled layer substitution steel-concrete combined structure and construction technology
CN110486040A (en) * 2019-07-08 2019-11-22 重庆交通大学 A kind of prefbricated tunnel lining structure for vcehicular tunnel
CN211648183U (en) * 2020-01-23 2020-10-09 中铁二院工程集团有限责任公司 Assembled tunnel lining structure

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112879037A (en) * 2021-04-22 2021-06-01 黄河交通学院 Safe construction method for mine tunnel
CN113417668A (en) * 2021-07-29 2021-09-21 中铁隧道集团一处有限公司 Pouring construction method for high cantilever tunnel side wall
CN113417669A (en) * 2021-07-29 2021-09-21 中铁隧道集团一处有限公司 Lining construction method for side wall cast-in-place and arch prefabricated segment spherical joint assembly
CN113565539A (en) * 2021-07-29 2021-10-29 中铁隧道集团一处有限公司 Construction method for preventing initial support side from rebounding of cantilever type cast-in-place side wall of tunnel
CN113417668B (en) * 2021-07-29 2023-12-15 中铁隧道集团一处有限公司 Pouring construction method of high cantilever tunnel side wall
CN113417669B (en) * 2021-07-29 2023-12-15 中铁隧道集团一处有限公司 Lining construction method for cast-in-situ side wall and assembling arch prefabricated segment spherical joint
CN113565539B (en) * 2021-07-29 2023-12-15 中铁隧道集团一处有限公司 Construction method for preventing primary support side rebound of tunnel cantilever type cast-in-situ side wall
CN113790065A (en) * 2021-09-29 2021-12-14 中铁隧道局集团有限公司 Auxiliary kit for in-situ repair of large-volume defects of tunnel lining by UHPC material and construction method
CN114753860A (en) * 2022-05-17 2022-07-15 中铁第一勘察设计院集团有限公司 Prefabricated and cast-in-place combined drilling and blasting tunnel lining structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN111456759A (en) Assembled tunnel lining structure
CN111271087B (en) Construction method for arch prefabricated lining structure with post-cast strip connection
CN211648183U (en) Assembled tunnel lining structure
CN111305869A (en) Prefabricated lining structure of arch wall and construction method
CN109763838B (en) Assembled inverted arch structure suitable for tunnel by drilling and blasting method and assembling method thereof
CN110792164B (en) Transverse assembling device and method for assembled shear wall
CN106639093A (en) Close splicing seam-type laminated slab
CN111236965A (en) In-situ jacking and assembling construction method for fabricated tunnel lining structure
CN106014456A (en) Double-layer lining special quasi-circular sectional mining method tunnel structure and construction method thereof
CN111271078B (en) Construction method for assembling sectional longitudinal translation in prefabricated tunnel lining structure tunnel
CN208633847U (en) A kind of corrugated steel supporting construction suitable for circular arch stalk formula tunnel full-section excavation
CN212454439U (en) Prefabricated lining structure of arch wall
CN107724427B (en) A kind of connection method of sinking tunnel section connector
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN209799982U (en) Assembled inverted arch structure suitable for drilling and blasting method tunnel
CN110424573B (en) Prefabricated assembled type reinforced-free concrete shear wall and construction method thereof
CN111424697A (en) Construction method for prefabricating deep and large open caisson by slicing
CN113294171B (en) Corrugated steel plate and UHPC combined assembled tunnel lining structure and construction method thereof
CN113153351A (en) Full-longitudinal translation splicing construction method in prefabricated tunnel lining structure tunnel
CN113153361A (en) Full-longitudinal translation splicing construction method outside prefabricated tunnel lining structure tunnel
CN210317326U (en) Tunnel inverted arch and inverted arch filling layer replacing steel-concrete composite structure
CN209875166U (en) Hollow assembled tunnel inverted arch structure
CN211598677U (en) External hoop internal injection type rectangular assembly lining for underground engineering
CN112281646A (en) Back-mounted cantilever top plate wet joint structure of disassembly-free template for backbone beam bridge
CN216006602U (en) Template-free construction flange structure system for longitudinal wet joint of concrete box girder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination