CN202705936U CN2012201460282U CN201220146028U CN202705936U CN 202705936 U CN202705936 U CN 202705936U CN 2012201460282 U CN2012201460282 U CN 2012201460282U CN 201220146028 U CN201220146028 U CN 201220146028U CN 202705936 U CN202705936 U CN 202705936U
Authority
CN
China
Prior art keywords
windproof
prefabricated part
connection
prefabricated
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201460282U
Other languages
Chinese (zh)
Inventor
张洪涛
魏金生
王祥
王勇
第五亚东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of CTCE Group filed Critical Fifth Engineering Co Ltd of CTCE Group
Priority to CN2012201460282U priority Critical patent/CN202705936U/en
Application granted granted Critical
Publication of CN202705936U publication Critical patent/CN202705936U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

Provided is a windproof prefabricated part assembly and connection device. The windproof prefabricated part assembly and connection device comprises a windproof prefabricated part embedded steel plate, a connection structural steel, flange steel plates and connection bolts, wherein one end of the connection structural steel is connected with the flange steel plates in welding mode, the other end of the connection structural steel is connected with the windproof prefabricated part embedded steel plate, and the flange steel plates are connected through the connection bolts. The windproof prefabricated part assembly and connection device simplifies windproof prefabricated part assembly and connection process and has the advantages of being simple in installation process and effectively improving assembly accuracy and efficiency of large-scale prefabricated parts.

Description

A kind of windproof splicing prefabricated components linkage
Technical field
The utility model relates to a kind of windproof splicing prefabricated components linkage.
Background technology
Certain railway the second double line engineering is through the strong wind district, and strong wind mostly is the Gobi desert in the district, and natural conditions are abominable, and are meagrely-populated, and wind speed is high, the wind phase is long, and the speed that blows is fast, and especially Bai Lifeng district, three Shi Lifeng districts are one of the most powerful areas of landlocked wind-force.
Resist the harm that cause in the strong wind area for the windproof open cut tunnel engineering of above domestic the first of background China's autonomous Design, my company carries out the first windproof open cut tunnel test section construction in the Bai Lifeng district.Windproof open cut tunnel engineering and ordinary crossing engineering More different, at first the aperture is much larger than common two-wire railway tunnel, secondly windproof open cut tunnel adopts prefabricated pipe section to be assembled into ring, adopts first reinforcing bar to connect the mode that is rigidly connected of concreting between the section of jurisdiction again, and construction technology far is different from ordinary crossing.
The hoop assembly unit is adopted in windproof open cut tunnel prefabricated units design, and seam adopts first reinforcing bar directly to connect the concrete mode that is rigidly connected of after-pouring, and the problem that this kind form exists is:
1, the prefabricated precision of prefabricated units is low, of poor quality in the existing windproof open cut tunnel test section work progress; There is the small-size concrete piece to drop when section of jurisdiction ring is with loop contacts in the assembly unit process, in case have the phenomenon that drops, the disease that can cause then that assembly unit is of poor quality, efficient is low etc. and can't renovate.
2, windproof prefabricated units are designed with five kinds of different connection form, and secondly reinforcing bar is indenting in the assembly unit process, interfere with each other, and the aligning accuracy requirement is high, constructional difficulties, and the installation work consuming is consuming time, and the application life and the driving that affect windproof prefabricated units of later stage are steady.
3, four angle points of windproof open cut tunnel pipe sheet assembling are very difficult consistent with a upper anchor ring, cause the stressed and sedimentation and deformation of windproof open cut tunnel section of jurisdiction inhomogeneous, and entire effect substructure and profile are not attractive in appearance.
4, wet seam connecting reinforcement welding needs assembly unit equipment to cooperate with concreting, and the equipment turnover rate is low.
The utility model content
Its purpose of the utility model just is to provide a kind of windproof splicing prefabricated components linkage, has the simple characteristics of installation process, and Effective Raise splicing accuracy and the efficient of assembly unit Large Precast Members.
The technical scheme that realizes above-mentioned purpose and take, comprise windproof prefabricated units pre-embedded steel slab, also comprise and connect shaped steel, flange steel plate and connecting bolt, described connection shaped steel one end and flange Plate Welding, the other end is connected with windproof prefabricated units pre-embedded steel slab, is connected and fixes with connecting bolt between the flange steel plate.
Compared with prior art, the utility model has the advantage of, by comparing with design assembly unit connected mode, the practical operation proof adopts the windproof prefabricated units of the interim connected mode assembly unit of shaped steel, can effectively solve the problem of assembly unit quality, have good looking appearance, whole stressed, the characteristics that work progress is simple, safety is controlled, and can greatly improve the turnover rate of splicing prefabricated components equipment.
Description of drawings
Below in conjunction with accompanying drawing this practicality newly is described in further detail.
Fig. 1 is this apparatus structure schematic diagram.
Fig. 2 is A-A sectional view among Fig. 1.
The specific embodiment
This device comprises windproof prefabricated units pre-embedded steel slab 4, as depicted in figs. 1 and 2, also comprise and connect shaped steel 5, flange steel plate 7 and connecting bolt 6, described connection shaped steel 5 one ends and 7 welding of flange steel plate, the other end is connected with windproof prefabricated units pre-embedded steel slab 4, and it is fixing with connecting bolt 6 between the flange steel plate 7 to be connected.
Described connection shaped steel 5 is the I25b i iron, and described connecting bolt 6 is the M24 bolt.
Described windproof prefabricated units pre-embedded steel slab 4 connects main muscle 2 and anchor bar 3.
Described windproof prefabricated units pre-embedded steel slab 4 is arranged in the prefabricated reinforced concrete structure 1.
The interim connection of Large Precast Members assembly unit is that windproof prefabricated units are provided with to connect shaped steel 5 and connect the after-pouring rigid concrete for the prefabricated units hoop.Be connected to windproof prefabricated units to the structure design size by connecting shaped steel 5 connection design sizes.Connecting shaped steel 5 connections is to be made of I25b i iron and flange steel plate 7, M24 connecting bolt 6 supporting nut designs.Described I25b i iron one termination and 7 welding of flange steel plate, and the other end of I25b i iron is connected with windproof prefabricated units pre-embedded steel slab 4; Be used for large-scale windproof prefabricated units hoop is laterally connected at described flange steel plate 7, M24 connecting bolt 6 supporting nuts.
The interim connected mode characteristics of the new Large Precast Members (windproof open cut tunnel section of jurisdiction) of this practicality also are:
Described I25b shaped steel is set to pre-bending shaped steel, and the pre-bending direction of described I25b shaped steel is the circular arc direction of Large Precast Members.
Described flange shaped steel connects can be firmly, work progress is simple, splicing accuracy is high, to connect four angle points be a face in the section of jurisdiction and be assembled into an anchor ring and become whole and substructure is affected very little, can prolong section of jurisdiction application life and construction safety.

Claims (3)

1. windproof splicing prefabricated components linkage, comprise windproof prefabricated units pre-embedded steel slab (4), it is characterized in that, also comprise and connect shaped steel (5), flange steel plate (7) and connecting bolt (6), described connection shaped steel (5) one ends and flange steel plate (7) welding, the other end is connected with windproof prefabricated units pre-embedded steel slab (4), and it is fixing with connecting bolt (6) between the flange steel plate (7) to be connected.
2. root a tree name a kind of windproof splicing prefabricated components linkage claimed in claim 1 is characterized in that described connection shaped steel (5) is the I25b i iron, and described connecting bolt (6) is the M24 bolt.
3. root a tree name a kind of windproof splicing prefabricated components linkage claimed in claim 1 is characterized in that described windproof prefabricated units pre-embedded steel slab (4) connects main muscle (2) and anchor bar (3).
CN2012201460282U 2012-04-10 2012-04-10 Windproof prefabricated part assembly and connection device Expired - Fee Related CN202705936U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201460282U CN202705936U (en) 2012-04-10 2012-04-10 Windproof prefabricated part assembly and connection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201460282U CN202705936U (en) 2012-04-10 2012-04-10 Windproof prefabricated part assembly and connection device

Publications (1)

Publication Number Publication Date
CN202705936U true CN202705936U (en) 2013-01-30

Family

ID=47586254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201460282U Expired - Fee Related CN202705936U (en) 2012-04-10 2012-04-10 Windproof prefabricated part assembly and connection device

Country Status (1)

Country Link
CN (1) CN202705936U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456759A (en) * 2020-01-23 2020-07-28 中铁二院工程集团有限责任公司 Assembled tunnel lining structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456759A (en) * 2020-01-23 2020-07-28 中铁二院工程集团有限责任公司 Assembled tunnel lining structure

Similar Documents

Publication Publication Date Title
CN103867019B (en) Assembling external prestressing RPC wind power tower
CN204024928U (en) One can assemble self-erecting type wind power generating set prestressed concrete steel combination pylon
CN203755778U (en) Assembly external pre-stress reactive powder concrete wind power tower
CN102102643A (en) Lattice hollow-concrete-filled steel tube tower for wind generating set
CN103195668B (en) Novel wind power generation precast concrete tower component seaming structure and method
CN203878753U (en) High-strength bolt shear key structure
CN203856069U (en) High-rise building steel structure
CN202705936U (en) Windproof prefabricated part assembly and connection device
CN202913338U (en) Steel truss full-welded truss piece
CN204435675U (en) A kind of lattice salomonica structure
CN203846660U (en) Prefabricated assembled type open-web net rack for reinforced concrete
CN202401384U (en) Ballasting structure of steel-truss cable-stayed bridge
CN202108299U (en) Segmented assembled water tank tower with adjustable height
CN202108296U (en) Assembled segmental water tank tower
CN214364316U (en) Assembled concrete floor mosaic structure
CN104153630A (en) Transition connection method of hybrid wind power towers
CN103882840A (en) Surge shaft cast-in-place concrete mountable formwork support and mounting method thereof
CN109594718B (en) Prefabricated standard splicing piece and assembled reinforced concrete column using same
CN202117390U (en) Segmentally spliced water tank tower
CN203361631U (en) Variable-diameter fabricated sliding mode platform of sliding mode system
CN203440827U (en) Bay bolt positioning mold for steel pipe support of overhead contact system of electric railway
CN202131678U (en) Connection node of energy-saving fireproof beam column
CN201730107U (en) Pile foundation of electric steel tube tower
CN108277918B (en) Assembled type toothed joint edge-punched steel sheet ribbed floor
CN112922207A (en) Concrete one-way laminated slab with exposed slab net frame at bottom

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130130

Termination date: 20150410