CN111411792A - 一种用于扩展地下空间的新建基础上下柱连接结构及方法 - Google Patents

一种用于扩展地下空间的新建基础上下柱连接结构及方法 Download PDF

Info

Publication number
CN111411792A
CN111411792A CN202010070760.5A CN202010070760A CN111411792A CN 111411792 A CN111411792 A CN 111411792A CN 202010070760 A CN202010070760 A CN 202010070760A CN 111411792 A CN111411792 A CN 111411792A
Authority
CN
China
Prior art keywords
column
newly
steel
basement
concrete column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010070760.5A
Other languages
English (en)
Inventor
高作平
周剑波
廖杰洪
张畅
吴博
卢凌岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuda Jucheng Structure Co ltd
Original Assignee
Wuda Jucheng Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuda Jucheng Structure Co ltd filed Critical Wuda Jucheng Structure Co ltd
Priority to CN202010070760.5A priority Critical patent/CN111411792A/zh
Publication of CN111411792A publication Critical patent/CN111411792A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

一种用于扩展地下空间的新建基础上下柱连接结构及方法,连接结构包括相对设置的上部结构柱(1)和新增的地下室钢管混凝土柱(2),上部结构柱(1)和地下室钢管混凝土柱(2)四周预埋有首尾相接的四块钢板(3),该四块钢板(3)围成的空间内部浇筑有高强无机灌浆料(4),且地下室钢管混凝土柱(2)与四块钢板(3)焊接成整体;连接方法包括:在上部结构柱(1)对应于将新增的地下室钢管混凝土柱(2)位置四周预埋首尾相接的四块钢板(3);浇筑新增桩基承台(4),在四块板钢(3)围成的空间内部浇筑高强无机灌浆料(5);将地下室钢管混凝土柱(2)与四块钢板(3)焊接成整体。保证上下柱之间的连接传力可靠。

Description

一种用于扩展地下空间的新建基础上下柱连接结构及方法
技术领域
本发明涉及一种连接结构,更具体的说涉及一种用于扩展地下空间的新建基础上下柱连接结构及方法。
背景技术
随着建筑事业的发展壮大,在现代社会里建筑物的增层设计理念已经成为行业人士较为普遍关注的话题。由于房屋增层具有不占地、投资少、见效快、可迅速解决缺房问题等优点,特别适合我国国情,因此,近年来我国进行了大量旧房增层改造,取得了很好的经济效益和成功的。
目前,在以桩基础托换为主进行扩展建筑物地下空间的施工过程中,上部结构柱与新增地下室柱之间的连接往往是施工技术的难点。同时,由于是关键节点,若按照一般的植筋连接方法,不仅在基础底部难以施工,而且存在较大的安全隐患。
发明内容
本发明的目的在于针对现有技术中存在的上述问题,提供一种用于扩展地下空间的新建基础上下柱连接结构及方法。
为实现上述目的,本发明的技术解决方案是:一种用于扩展地下空间的新建基础上下柱连接结构,包括相对设置的上部结构柱新增的地下室钢管混凝土柱,所述上部结构柱下部和新增的地下室钢管混凝土柱上部四周预埋有首尾相接的四块钢板,该四块钢板围成的空间内部浇筑有高强无机灌浆料,且地下室钢管混凝土柱与四块钢板焊接成整体。
一种用于扩展地下空间的新建基础上下柱连接方法,包括下面的步骤:步骤一,在上部结构柱对应于将新增的地下室钢管混凝土柱位置四周预埋首尾相接的四块钢板;步骤二,浇筑新增桩基承台,并使钢板穿过新增桩基承台,然后在四块板钢围成的空间内部浇筑高强无机灌浆料;步骤三,完成桩基础施工后,浇筑地下室钢管混凝土柱时,将地下室钢管混凝土柱与四块钢板焊接成整体,使上部结构柱与地下室钢管混凝土柱之间形成整体受力。
与现有技术相比较,本发明的有益效果是:
本发明解决了以桩基础托换为主进行扩展建筑物地下空间的施工过程中新建基础的上部结构柱与新增的地下室钢管混凝土柱之间的连接问题;且既便于实施,也能保证上下柱之间的连接传力可靠。
附图说明
图1是本发明中新建基础桩基托换时上下柱连接结构图。
图2是本发明中地下室梁板浇筑完成后上下柱结构图。
图3是本发明中地下室钢管混凝土柱截面图。
图中,上部结构柱1,地下室钢管混凝土柱2,钢板3,新增桩基承台4,高强无机灌浆料5。
具体实施方式
以下结合附图说明和具体实施方式对本发明作进一步的详细描述。
参见图1至图3,一种用于扩展地下空间的新建基础上下柱连接结构,此结构用于在扩展建筑物地下空间施工过程中,桩基础托换完成,并浇筑了地下室钢管混凝土柱2以后,上部结构柱1与地下室钢管混凝土柱2之间的连接;其包括相对设置的上部结构柱1和新增的地下室钢管混凝土柱2,所述上部结构柱1下部和新增的地下室钢管混凝土柱2上部四周预埋有首尾相接的四块钢板3,该四块钢板3围成的空间内部浇筑有高强无机灌浆料4,且地下室钢管混凝土柱2与四块钢板3焊接成整体。
参见图1至图3,一种用于扩展地下空间的新建基础上下柱连接方法,包括下面的步骤:
步骤一,先在浇筑新增桩基承台4之前,在上部结构柱1对应于将新增的地下室钢管混凝土柱2位置四周预埋首尾相接的四块钢板3.
步骤二,浇筑新增桩基承台4,并使钢板3穿过新增桩基承台4,然后在四块板钢3围成的空间内部浇筑高强无机灌浆料5。
步骤三,完成桩基础施工后,浇筑地下室钢管混凝土柱2时,将地下室钢管混凝土柱2与四块钢板3焊接成整体,使上部结构柱1与地下室钢管混凝土柱2之间形成整体受力。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,上述结构都应当视为属于本发明的保护范围。

Claims (2)

1.一种用于扩展地下空间的新建基础上下柱连接结构,其特征在于:包括相对设置的上部结构柱(1)和新增的地下室钢管混凝土柱(2),所述上部结构柱(1)下部和新增的地下室钢管混凝土柱(2)上部四周预埋有首尾相接的四块钢板(3),该四块钢板(3)围成的空间内部浇筑有高强无机灌浆料(4),且地下室钢管混凝土柱(2)与四块钢板(3)焊接成整体。
2.一种用于扩展地下空间的新建基础上下柱连接方法,其特征在于,包括下面的步骤:
步骤一,在上部结构柱(1)对应于将新增的地下室钢管混凝土柱(2)位置四周预埋首尾相接的四块钢板(3);
步骤二,浇筑新增桩基承台(4),并使钢板(3)穿过新增桩基承台(4),然后在四块板钢(3)围成的空间内部浇筑高强无机灌浆料(5);
步骤三,完成桩基础施工后,浇筑地下室钢管混凝土柱(2)时,将地下室钢管混凝土柱(2)与四块钢板(3)焊接成整体,使上部结构柱(1)与地下室钢管混凝土柱(2)之间形成整体受力。
CN202010070760.5A 2020-01-21 2020-01-21 一种用于扩展地下空间的新建基础上下柱连接结构及方法 Pending CN111411792A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010070760.5A CN111411792A (zh) 2020-01-21 2020-01-21 一种用于扩展地下空间的新建基础上下柱连接结构及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010070760.5A CN111411792A (zh) 2020-01-21 2020-01-21 一种用于扩展地下空间的新建基础上下柱连接结构及方法

Publications (1)

Publication Number Publication Date
CN111411792A true CN111411792A (zh) 2020-07-14

Family

ID=71489016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010070760.5A Pending CN111411792A (zh) 2020-01-21 2020-01-21 一种用于扩展地下空间的新建基础上下柱连接结构及方法

Country Status (1)

Country Link
CN (1) CN111411792A (zh)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002021096A (ja) * 2000-07-04 2002-01-23 Shimizu Corp 建物およびその構築方法
JP2009287172A (ja) * 2008-05-27 2009-12-10 Takenaka Komuten Co Ltd 逆打ち工法による免震建物の構築方法
CN202672770U (zh) * 2012-07-05 2013-01-16 中国海诚工程科技股份有限公司 一种钢管柱或钢管砼柱的纠偏处理结构
JP2014181545A (ja) * 2013-03-21 2014-09-29 Shimizu Corp 建物の地下構造
CN205604749U (zh) * 2016-03-25 2016-09-28 浙江省建筑设计研究院 用于控制后增结构柱竖向变形的结构
CN207794658U (zh) * 2017-12-28 2018-08-31 长兴陆氏钢结构有限公司 一种钢筋混凝土柱上接钢柱的连接结构
CN109610874A (zh) * 2019-01-18 2019-04-12 央固工程科技(上海)有限公司 既有厂房内部增建的地下室及其建筑方法
CN110067400A (zh) * 2019-03-21 2019-07-30 武大巨成结构股份有限公司 一种用于扩展建筑物地下空间的施工方法
CN209723690U (zh) * 2019-03-27 2019-12-03 中建一局集团第二建筑有限公司 一种连接新增混凝土柱与原有混凝土柱的节点
CN209924485U (zh) * 2019-01-18 2020-01-10 央固工程科技(上海)有限公司 既有厂房内部增建的地下室
CN209958820U (zh) * 2019-03-21 2020-01-17 武大巨成结构股份有限公司 一种用于顶升的钢管混凝土柱与混凝土梁连接的结构
CN212317544U (zh) * 2020-01-21 2021-01-08 武大巨成结构股份有限公司 一种用于扩展地下空间的新建基础上下柱连接结构

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002021096A (ja) * 2000-07-04 2002-01-23 Shimizu Corp 建物およびその構築方法
JP2009287172A (ja) * 2008-05-27 2009-12-10 Takenaka Komuten Co Ltd 逆打ち工法による免震建物の構築方法
CN202672770U (zh) * 2012-07-05 2013-01-16 中国海诚工程科技股份有限公司 一种钢管柱或钢管砼柱的纠偏处理结构
JP2014181545A (ja) * 2013-03-21 2014-09-29 Shimizu Corp 建物の地下構造
CN205604749U (zh) * 2016-03-25 2016-09-28 浙江省建筑设计研究院 用于控制后增结构柱竖向变形的结构
CN207794658U (zh) * 2017-12-28 2018-08-31 长兴陆氏钢结构有限公司 一种钢筋混凝土柱上接钢柱的连接结构
CN109610874A (zh) * 2019-01-18 2019-04-12 央固工程科技(上海)有限公司 既有厂房内部增建的地下室及其建筑方法
CN209924485U (zh) * 2019-01-18 2020-01-10 央固工程科技(上海)有限公司 既有厂房内部增建的地下室
CN110067400A (zh) * 2019-03-21 2019-07-30 武大巨成结构股份有限公司 一种用于扩展建筑物地下空间的施工方法
CN209958820U (zh) * 2019-03-21 2020-01-17 武大巨成结构股份有限公司 一种用于顶升的钢管混凝土柱与混凝土梁连接的结构
CN209723690U (zh) * 2019-03-27 2019-12-03 中建一局集团第二建筑有限公司 一种连接新增混凝土柱与原有混凝土柱的节点
CN212317544U (zh) * 2020-01-21 2021-01-08 武大巨成结构股份有限公司 一种用于扩展地下空间的新建基础上下柱连接结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
袁震;廉俊;鲍迪;王晓春;吴光华;: "地下室钢筋混凝土防水墙劲性壁柱防水施工技术", 建筑施工, no. 11, 25 November 2015 (2015-11-25) *

Similar Documents

Publication Publication Date Title
CN103669866B (zh) 地下室钢筋混凝土柱节点连接结构的施工方法
CN101457548A (zh) 圆钢管混凝土柱与钢筋混凝土楼盖连接的节点及制作方法
CN110259184A (zh) 基于托梁拔柱组合支撑顶升系统的拔除柱施工方法
CN104746892B (zh) 托梁拆墙装置及托梁拆墙施工方法
CN102071747A (zh) 方钢管混凝土柱与钢筋混凝土楼盖连接的节点及制作方法
CN212317544U (zh) 一种用于扩展地下空间的新建基础上下柱连接结构
CN201406767Y (zh) 用于圆钢管混凝土柱与钢筋混凝土楼盖连接的节点
CN103122691A (zh) 塔吊标准节支承高空支模钢平台结构及施工方法
CN114045940A (zh) 预制混凝土管桩柱与空心楼盖或无梁楼盖的型钢连接节点
CN101492918B (zh) 一种用于逆作法基坑工程的梁柱节点
CN112879026A (zh) 一种矩形顶管施工临时后靠支座结构及其施工方法
CN214994078U (zh) 一种用于逆作法工程的大直径桩柱结构
CN206616602U (zh) 一种室外施工电梯基础加固装置
CN116479897A (zh) 一种深度小于10m的浅基坑坍塌快速加固支护方法
CN203603176U (zh) 一种古建筑基础整体托盘隔震加固结构
CN111411792A (zh) 一种用于扩展地下空间的新建基础上下柱连接结构及方法
CN113684852B (zh) 组合桩基础的施工方法及组合桩基础
CN201598734U (zh) 一种用于逆作法基坑工程的钢管混凝土柱环梁连接节点
CN212317545U (zh) 一种用于扩展地下空间的已有基础上下柱连接结构
CN212294679U (zh) 一种组合式格构柱-混凝土预制桩的斜支撑结构
CN110080314B (zh) 一种减小桩基侧摩阻力的方法
CN114319329A (zh) 一种锚杆静压模管装置及灌注桩施工方法
CN208685617U (zh) 一种老旧砖基础建筑的基础托换系统
CN207392221U (zh) 一种钢板屋的地基结构
CN102226343A (zh) 锚杆静压组合桩

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 430223 Jucheng building, No.4, 1st Road, Wuda Science Park, Donghu New Technology Development Zone, Wuhan City, Hubei Province

Applicant after: Wuhan Jucheng Structure Group Co.,Ltd.

Address before: 430223 Jucheng building, No.4, 1st Road, Wuda Science Park, Donghu New Technology Development Zone, Wuhan City, Hubei Province

Applicant before: WUDA JUCHENG STRUCTURE Co.,Ltd.

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Gao Zuoping

Inventor after: Tan Xingzhou

Inventor after: Liao Jiehong

Inventor after: Zhang Chang

Inventor after: Wu Bo

Inventor after: Lu Lingyue

Inventor before: Gao Zuoping

Inventor before: Zhou Jianbo

Inventor before: Liao Jiehong

Inventor before: Zhang Chang

Inventor before: Wu Bo

Inventor before: Lu Lingyue