CN111379900A - Method for installing indoor horizontal large flue of large sintering plant - Google Patents

Method for installing indoor horizontal large flue of large sintering plant Download PDF

Info

Publication number
CN111379900A
CN111379900A CN202010240960.0A CN202010240960A CN111379900A CN 111379900 A CN111379900 A CN 111379900A CN 202010240960 A CN202010240960 A CN 202010240960A CN 111379900 A CN111379900 A CN 111379900A
Authority
CN
China
Prior art keywords
flue
platform
steel
support
ash bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010240960.0A
Other languages
Chinese (zh)
Other versions
CN111379900B (en
Inventor
吴长德
邢衍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202010240960.0A priority Critical patent/CN111379900B/en
Publication of CN111379900A publication Critical patent/CN111379900A/en
Application granted granted Critical
Publication of CN111379900B publication Critical patent/CN111379900B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/0243Laying or reclaiming pipes on land, e.g. above the ground above ground
    • F16L1/0246Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground

Abstract

The invention provides a method for installing a large indoor horizontal flue of a large sintering plant, which comprises the following steps of 1) presetting bolt holes and hoisting holes on an upper concrete frame beam of a flue; 2) a temporary transfer platform for transferring components such as a large flue, a support and the like is erected on a platform where the flue is located; 3) installing a hoisting tool on the basis of the upper platform of the flue to install the monorail beam, wherein two ends of the joist steel of the monorail beam are provided with a vehicle stop, a towing steel wire rope, a towing pulley and corresponding accessories; 4) hoisting the electric hoist to a temporary platform; 5) the flue ash bucket is hoisted to the temporary transfer platform by a crane, the flue ash bucket is hoisted to a terrace at a corresponding installation position before the flue is installed by an electric hoist, and the ash bucket is hoisted to be installed after a large flue is installed in place; 6) hoisting and installing a flue sliding support and a fixed support; 7) the large flue is arranged from the machine head to the machine tail; 8) determining the installation position on the installed flue, slowly pulling the flue ash hopper to the position below the flue, and adjusting the position to weld and fix; 9) and (5) dismantling the monorail girder and the electric hoist.

Description

Method for installing indoor horizontal large flue of large sintering plant
Technical Field
The invention relates to an indoor horizontal large flue installation method for a large sintering plant.
Background
The indoor flue of the large-scale sintering plant has the characteristics of large diameter and thin pipe wall, is installed in a concrete frame, and is small in installation space. The installation method of the hoisting machine is an installation method for hoisting the flue short pipe to the frame in place and assembling by using the hoisting machine at two sides of a factory building, when the method is used for installation, because the space in the frame is small, if the flue support is installed firstly, when the short pipe is hoisted from the outer side of the frame to the frame, the flue support at the hoisting position is easy to block a hoisting component, if the flue support is installed firstly and then the flue support is installed, the difficulty is increased, time and labor are wasted, and the method uses the hoisting machine more and has relatively higher cost and is not economical.
Disclosure of Invention
Aiming at the problem that the large indoor flue of the factory building in the prior art is inconvenient to install, the invention provides an installation method which is simpler and more convenient to operate and lower in construction difficulty.
Specifically, to achieve the above object, the present invention provides the following technical solutions:
a method for installing a large horizontal flue in a large sintering plant comprises the following steps:
first, preset bolt hole and hoisting hole of flue upper concrete frame beam
When a platform on the upper layer of a flue is constructed, firstly, bolt holes and three phi 100 reserved holes for hoisting monorail beams are preset in a platform concrete beam according to the installation requirement of the monorail beams; and hanging ribs are arranged in the beam body of the part of the platform concrete beam with the preset bolt holes.
Second, install interim transport platform
The temporary transferring platform for transporting the components such as the large flue and the support is erected on the platform where the flue is located, the square frame is assembled on the concrete frame beam by adopting H-shaped steel, the section steel secondary beam is arranged in the square frame, the 12mm steel plate is laid on the surface of the platform, the platform is fixed by adopting a mode that the concrete frame column is embraced by angle steel, and the temporary transferring platform is provided with a safety rope and a railing.
III, mounting I-shaped steel monorail beam
Installing a machine head part monorail beam: i-steel of a single-rail beam is fed into a frame of a main plant and placed on a 7m platform frame beam, the I-steel beam at the machine head part is hung to a frame beam of a platform where a flue is located from the joint position of a machine head and the main plant, the steel hanging beam is dragged to the installation position by a winch and a chain block, and the chain block is installed on the basis of a platform concrete beam of the platform on the upper layer of the flue to lift the steel hanging beam in place.
Installing a monorail beam of a main plant: hanging steel hanging beams of a main workshop part into a frame beam of a platform where a flue is located from two sides, then installing an I-shaped steel track below a concrete frame beam on the upper layer of the flue by using a crown block, a chain block and the like on the main workshop, fixing the I-shaped steel by using bolts to penetrate through connecting pieces on the I-shaped steel and preset bolt holes, unloading a lifting appliance after the bolts are all installed and fastened, welding the machine head part of a single rail beam and the connecting position of the main workshop part by using a Z-shaped interface, and polishing a flange plate of the lower flange of the I-shaped steel smoothly to prevent a wheel from being clamped; and vehicle stoppers, towing steel wire ropes, towing pulley wheels and corresponding accessories are arranged at two ends of the I-shaped steel beam.
Fourthly, mounting the electric hoist
Assembling all parts of the electric hoist on the ground; adjusting the quantity of the gaskets on the connection screw shaft of the walking trolley and the hoist according to the standard requirement, so that the clearance between the walking edge of the electric hoist and the steel hanging beam is within the range of 3-5 mm; hoisting the electric hoist to the temporary platform by using a truck crane; preparing two steel wire ropes with the length of 12m, hanging the steel wire ropes on the head of the overhead crane, and respectively putting down the two steel wire ropes from two sides of a steel hanging beam to bind the electric hoist so as to keep the electric hoist in a working posture; slowly lifting the steel wire rope to the position below the steel hanging beam, clamping the steel hanging beam by the two walking wheels, and slowly lifting the steel hanging beam to the mounting elevation; and after the bolt below the fastening travelling wheel adjusts the clearance, the hook head falls down to disassemble the steel wire rope to complete the installation.
Fifth, the lifting flue ash bucket
The flue dust hopper is hung to the temporary transfer platform by a crane, the flue dust hopper is hung to a terrace at a corresponding installation position before the flue is installed by an electric hoist, and the dust hopper is lifted to be installed after the large flue is installed in place.
Sixth, the handling installs the flue support
The large flue support has two forms of a sliding support and a fixed support; one single component of the fixed support can be directly installed after entering the field; the sliding support comprises a pipe support, two rolling shafts and two bottom plates, wherein the pipe support is welded with the flue, the bottom plates are welded with embedded parts on the beam, the rolling shafts roll left and right between the pipe support and the bottom plates, angle steel is needed to be adopted to be in temporary support welding connection before the support is installed, otherwise, the upper pipe support cannot be fixed before the flue is not installed, and the temporary support is removed after the flue is installed and is welded with the pipe support to be qualified.
During installation, the support is firstly transported to the temporary transport platform by a truck crane, then the electric hoist is used for transporting the support to a concrete beam where the flue is located, the position and the elevation are adjusted, the support is welded and fixed with the embedded part according to drawing requirements, the support at the position of the temporary transport platform is installed after the temporary platform is dismantled, and the installation error between each support and the support meets the standard requirements, otherwise, the installation speed and the quality of the flue are influenced.
Seventh, lifting installation flue
The large flue is installed from the machine head to the machine tail, each short pipe is 4.4m long, two hoisting noses are welded at 1/4 positions on two sides of each flue, the ladder stand and three safety rope stand columns are installed simultaneously, and safety ropes need to be tied on the steel wire rope stand columns.
During hoisting, the installation position and direction of the flue are confirmed according to the typesetting drawing, so that errors in position and direction are avoided; the flue is hung to the interim platform of transporting after and is put steadily and make anti-roll measure, and the operation personnel carry out the couple through the cat ladder, unload the hook.
During lifting, a certain safety distance is reserved between the flue and the flue support, and the flue advancing process is kept constant and stable in the lifting process; and when the flue gas is conveyed to the mounting position, the speed is reduced in advance, the stable component slowly advances, and slowly falls on the flue support to be paired by mounting personnel.
Eighthly, mounting flue ash bucket
The flue ash bucket is positioned below the flue, the mounting position of the flue ash bucket is determined on the mounted flue, the flue ash bucket is slowly pulled to the position below the flue by 4 blocks of 5t chain blocks, two 15mm seams are formed in the lower portion of the flue, the positions of the seams correspond to the flue ash bucket, the flue ash bucket is lifted, vertical plates on two sides of the ash bucket are inserted into the two seams, the flue ash bucket is welded and fixed after being adjusted, and after welding is completed, gas cutting is conducted on the flue wall corresponding to the flue ash bucket of the flue.
Nine, demolish monorail roof beam and electric block
Utilize the shaped steel maintenance platform of big flue top of electric block installation to overhaul the platform and carry out dismantling of electric block for the construction face, lift off electric block with the overhead traveling crane of main building earlier, dismantle the steel hanging beam section by section again, accomplish the installation of the big flue of sintering indoor level so far.
The temporary transfer platform is arranged at the tail side or at the head part close to the side column, and when the temporary transfer platform is arranged at the tail side, the flue is arranged from the head to the tail; when the temporary transfer platform is arranged at the head, the flue is arranged from the tail to the head.
The hoisting structure for hoisting the head part of the monorail beam in place is as follows: a steel pipe is used as a cross beam, a steel wire rope buckle is hung on the steel pipe, the rope buckle penetrates through a phi 100 preformed hole pre-buried in a platform concrete beam of an upper platform of a flue, and a chain block is hung below the steel wire rope.
When the ash bucket is in a double-groove U-shaped structure, 8 lifting points are arranged on the ash bucket, 4 lifting points are arranged inside and 4 lifting points are arranged outside the ash bucket, the inner lifting points are used for lifting the ash bucket by an electric hoist, and the outer lifting points are used for lifting the ash bucket by a chain block.
Drawings
FIG. 1 is a schematic view of a flue installation;
FIG. 2 is a drawing showing the arrangement of steel hanging beam hanging bars;
FIG. 3 is a monorail beam installation diagram;
FIG. 4 is a cross-sectional view of the monorail girder installation head;
FIG. 5 is a view showing the arrangement of the hanging points of the ash bucket;
FIG. 6 is a schematic view of the installation of a flue ash hopper;
FIG. 7 is a schematic view of a flue interim setting.
In the drawings, the main parts are illustrated by symbols:
1. an electric hoist; 1': a chain block; 2. a monorail beam; 3. a flue; 4. a platform where the flue is located; 5. a flue support; 6. an ash hopper; 7. a platform concrete beam; 8. a wire rope; 9. hoisting points; 10. climbing a ladder; 11. a column; 12. a safety rope.
Detailed Description
The technical scheme of the invention is explained in detail in the following with reference to the accompanying drawings and specific embodiments:
first, preset bolt hole and hoisting hole of flue upper concrete frame beam
A19.8 m platform in a factory building, namely a phi 100 reserved hole for presetting a bolt hole and three hoisting monorail beams 2 in a platform concrete beam 7 according to the installation requirement of the monorail beams and executing the preset bolt hole specification and the position according to the requirement concentrated by a TJ16 diagram during the construction of an upper layer platform of a flue, wherein a lifting rib is arranged in the platform concrete beam to strengthen the part provided with the preset bolt hole, the lifting rib is arranged according to the TJ16 diagram set, and the details are shown in attached figures 2 and 3.
Second, install interim transport platform
A temporary transfer platform is required to be built on the platform where the flue is located for transferring components such as the flue 3 and the support 5. The temporary transfer platform is characterized in that a square frame is assembled on a concrete frame beam by using H-shaped steel, a section steel secondary beam is arranged in the square frame, and then a 12mm steel plate is paved on the square frame. And fixing the temporary platform by adopting a mode that angle steel embraces the concrete frame column, and making protective measures such as safety ropes, railings and the like on the temporary platform. The position of the temporary transfer platform is selected to be arranged on the frame with the largest distance between the main workshop parts. The temporary transfer platform can be arranged at the tail side or at the head part close to the side column, and when the temporary transfer platform is arranged at one side of the tail, the flue is arranged from the head to the tail; when the temporary transfer platform is arranged at the head, the flue is arranged from the tail to the head. In the example shown in fig. 1, the temporary transfer platform is installed at the tail side, and the flue is installed from 1 line to 19 lines.
III, mounting I-shaped steel monorail beam
Referring to fig. 4, the monorail girder 2 installation is divided into a machine head section and a main plant section. Mounting of the machine head part: i-steel of the monorail beam is fed into a frame of a main workshop by an automobile crane and is placed on a 7m platform frame beam, the I-steel at the machine head part is hung to the frame beam where a flue is located from the joint position of the machine head and the main workshop by the automobile crane, the monorail beam is dragged to the installation position by a winch and a chain block 1 ', a steel pipe is used as a cross beam to hang a steel wire rope 8, a steel wire rope buckle penetrates through the phi 100 reserved hole, and the monorail beam is lifted to be in place by a chain block 1' hung downwards, as shown in figure 4. Installing a monorail girder main workshop part: hoisting the single-rail beam 2 into a frame beam on which the flue 3 is positioned from two sides by using an automobile crane, installing an I-shaped steel track below the concrete frame beam on the upper layer of the flue by using an overhead traveling crane, a chain block 1' and the like on a main factory building, penetrating a bolt through a connecting piece to be connected and fixed with a reserved bolt hole of the frame beam, and detaching the chain block and the like after all the bolts are installed and fastened; the joint part between the steel hanging beams is welded by adopting a Z-shaped interface, and the I-shaped steel lower flange plate is polished smoothly to prevent wheels from being clamped; because the stability of the cantilever beam is poor, the cantilever beam is not arranged at the two ends of the steel hanging beam; and accessories such as a vehicle stop, a towing cable steel wire rope, a towing cable pulley and the like are arranged at two ends of the steel hanging beam according to the requirements of a standard drawing set.
Fourthly, mounting the electric hoist
The electric hoist 1 should select the synchronous even single track electric hoist of axle of double lifting hook for use, need select the single track electric hoist of same producer, the same model, the same specification when adopting two electric hoists 1 to guarantee that two electric hoists 1 can walk in step when going to work.
Assembling all parts of the electric hoist on the ground according to an electric hoist installation drawing, and adjusting the number of gaskets on a connection screw shaft of the electric hoist and the walking trolley according to a standard requirement to ensure that the clearance between the walking edge of the electric hoist 1 and the monorail beam 2 is within a range of 3-5mm so as to prevent the trolley from derailing; hoisting an electric hoist 1 onto a temporary platform by using an automobile crane, preparing two steel wire ropes 8 with the length of 12m, hanging the steel wire ropes on a top-and-bottom hook head, respectively putting down the two steel wire ropes 8 from two sides of a monorail beam to trap the electric hoist 1, keeping the electric hoist in a working posture, slowly lifting the steel wire ropes to be below a steel hanging beam, clamping the steel hanging beam by using two travelling wheels, slowly lifting to an installation elevation, fastening bolts below the travelling wheels to adjust gaps, dropping the hook head to disassemble the steel wire ropes after meeting the standard requirements, and completing installation; and subsequently, the work of wiring, motor spindle movement amount, fire-breaking limiter adjustment, trial hoisting and the like is required to be done.
Fifth, the lifting flue ash bucket
Hoisting a flue ash bucket to a terrace corresponding to the installation position before the flue is installed by using an electric hoist, protecting the terrace by using a wood board and the like, and lifting the ash bucket to install after a large flue is installed in place; the ash bucket is the U type structure of double flute mostly, for preventing that the hoist and mount warp sets up 8 hoisting points 9 altogether, the ash bucket is inside 4, and outside 4, inside hoisting point 9 is used for electric block handling ash bucket 6 (see fig. 5), and outside hoisting point 9 is used for chain block 1' to promote the ash bucket (see fig. 6).
Sixth, the handling installs the flue support
The flue support 5 has two forms of a sliding support and a fixed support, and one single body component of the fixed support can be directly installed after entering a field. The sliding support comprises a pipe support, two rolling shafts and two bottom plates, wherein the pipe support is welded with the flue 3, the bottom plates are welded with embedded parts on the beam, the rolling shafts roll left and right between the pipe support and the bottom plates, angle steel is needed to be adopted to be in temporary support welding connection before the support is installed, otherwise, the upper pipe support cannot be fixed before the flue is not installed, and the temporary support is removed after the flue 3 is installed and is welded with the pipe support to be qualified.
The installation is transported to the interim platform with the truck crane earlier, and reuse electric block 1 transports flue support 5 to 3 place concrete beam in flues on, adjustment position and elevation, according to the drawing requirement with bury the piece and carry out welded fastening, the flue support at interim transport platform position waits to install after interim transport platform demolishs, and the erection error between each support and support should satisfy the standard requirement, otherwise will influence flue installation speed and quality.
Seventh, lifting installation flue
The large-scale flue is arranged from the machine head to the machine tail, each section of short pipe is 4.4m long, two hoisting noses are welded at 1/4 positions on two sides of each section of flue, a ladder stand 10 and three safety rope stand columns 11 are arranged at the same time, the design and the installation of the hoisting noses need to meet the strength requirement, and a safety rope 12 needs to be fastened on a steel wire rope stand column; the ladder stand 10 is preferably arranged at one side close to the line 19, so that the ladder stand is arranged on the flue at the fixed end every time, and the personnel operation is relatively safe; in order to be convenient to put and lift, the length of the ladder stand used before assembly should not exceed the bottom surface of the flue (see figure 7).
The outer sides of the flues are different in reinforcement position, and the installation position and direction of the flues are required to be confirmed according to the typesetting drawing during hoisting, so that errors in position and direction are avoided; after the flue is hung to the temporary platform, the flue is stably placed, anti-rolling measures are taken, and operators can hook and unload hooks through the crawling ladder.
During lifting, the flue 3 is not suitable to be lifted too high, a certain safety distance is reserved between the flue 3 and the flue support 5, the electric hoist 1 is operated by a special person and uniformly commanded by the special person during lifting, and the moving process is uniform and stable; when the flue gas is conveyed to the mounting position, the speed should be reduced in advance, the stable component slowly moves forward, and the stable component slowly falls on the flue support to be paired by mounting personnel.
Eighthly, mounting flue ash bucket
The large flue ash bucket 6 is positioned below the large flue and can be installed along with the flue 3, the installation position is firstly determined on the flue 3, the large flue ash bucket is slowly pulled to the position below the flue 3 by 4 tables of 5t chain blocks (see attached figure 6), two 15mm seams are formed in the lower portion of the flue 3, the seams correspond to the flue ash bucket, the flue ash bucket 6 is lifted, vertical plates on two sides of the ash bucket 6 are inserted into the two seams and are welded and fixed after being adjusted, the flue wall of the flue corresponding to the ash bucket is subjected to gas cutting to form small blocks with the width not exceeding the lower opening of the ash bucket after welding is completed, the small blocks are cut out from the lower opening of the ash bucket, the opening of the small blocks is preferably performed after the ash bucket is installed, and otherwise, the large flue ash bucket is not beneficial to.
Nine, demolish monorail roof beam and electric block
Before the electric hoist 1 is dismantled, the section steel maintenance platform above the flue is installed by the electric hoist, so that the advantages of the electric hoist can be exerted, and an operation platform can be provided for dismantling the electric hoist. The electric hoist is dismantled after the maintenance platform above the flue is installed. When the electric hoist is disassembled, the electric hoist is disassembled by using a crown block of a main workshop, and then the steel hanging beams are disassembled section by section, so that the installation of the horizontal large flue in the sintering chamber is completed.
The invention has the beneficial effects that:
the method can solve the problem of the flue pipe which is transported in the frame and is installed, has strong operability, simple construction, safety and reliability, can greatly improve the working efficiency, and can save a large amount of manpower and hoisting machinery.

Claims (4)

1. An indoor horizontal large flue installation method for a large sintering plant comprises the following steps:
first, preset bolt hole and hoisting hole of flue upper concrete frame beam
When a platform on the upper layer of a flue is constructed, firstly, bolt holes and three phi 100 reserved holes for hoisting monorail beams are preset in a platform concrete beam according to the installation requirement of the monorail beams; hanging ribs are arranged in the beam body of the part of the platform concrete beam with the preset bolt holes;
second, install interim transport platform
A temporary transfer platform for transferring components such as a large flue, a support and the like is erected on a platform where the flue is located, a square frame is assembled on a concrete frame beam by adopting H-shaped steel, a profile steel secondary beam is arranged in the square frame, a 12mm steel plate is laid on the surface of the platform, the platform is fixed in a mode of embracing a concrete frame column by adopting angle steel, and a safety rope and a railing are arranged on the temporary transfer platform;
III, mounting I-shaped steel monorail beam
Installing a machine head part monorail beam: i-steel of a single-rail beam is fed into a frame of a main plant and placed on a 7m platform frame beam, the I-steel beam at the machine head part is hung on the frame beam of a platform where a flue is located from the joint position of a machine head and the main plant, a winch and a chain block are used for dragging the steel hanging beam to an installation position, and the chain block is installed on the basis of a platform concrete beam of an upper platform of the flue to lift the steel hanging beam in place;
installing a monorail beam of a main plant: hanging steel hanging beams of a main workshop part into a frame beam of a platform where a flue is located from two sides, then installing an I-shaped steel track below a concrete frame beam on the upper layer of the flue by using a crown block, a chain block and the like on the main workshop, fixing the I-shaped steel by using bolts to penetrate through connecting pieces on the I-shaped steel and preset bolt holes, unloading a lifting appliance after the bolts are all installed and fastened, welding the machine head part of a single rail beam and the connecting position of the main workshop part by using a Z-shaped interface, and polishing a flange plate of the lower flange of the I-shaped steel smoothly to prevent a wheel from being clamped; two ends of the I-shaped steel beam are provided with a vehicle stop, a towing cable steel wire rope, a towing cable pulley and corresponding accessories;
fourthly, mounting the electric hoist
Assembling all parts of the electric hoist on the ground; adjusting the quantity of the gaskets on the connection screw shaft of the walking trolley and the hoist according to the standard requirement, so that the clearance between the walking edge of the electric hoist and the steel hanging beam is within the range of 3-5 mm; hoisting the electric hoist to the temporary platform by using a truck crane; preparing two steel wire ropes with the length of 12m, hanging the steel wire ropes on the head of the overhead crane, and respectively putting down the two steel wire ropes from two sides of a steel hanging beam to bind the electric hoist so as to keep the electric hoist in a working posture; slowly lifting the steel wire rope to the position below the steel hanging beam, clamping the steel hanging beam by the two walking wheels, and slowly lifting the steel hanging beam to the mounting elevation; after the bolt under the fixed travelling wheel is fastened to adjust the clearance, the hook head falls down to disassemble the steel wire rope to complete the installation;
fifth, the lifting flue ash bucket
The flue ash bucket is hoisted to the temporary transfer platform by a crane, the flue ash bucket is hoisted to a terrace at a corresponding installation position before the flue is installed by an electric hoist, and the ash bucket is hoisted to be installed after a large flue is installed in place;
sixth, the handling installs the flue support
The large flue support has two forms of a sliding support and a fixed support; one single component of the fixed support can be directly installed after entering the field; the sliding support comprises a pipe support, two rolling shafts and two bottom plates, wherein the pipe support is welded with the flue, the bottom plates are welded with embedded parts on the beam, the rolling shafts roll left and right between the pipe support and the bottom plates, angle steel is needed to be adopted to be in temporary support welding connection before the support is installed, otherwise, the upper pipe support cannot be fixed before the flue is not installed, and the temporary support is removed after the flue is installed and is welded with the pipe support to be qualified.
During installation, the support is firstly transported on a temporary transport platform by a truck crane, then an electric hoist is used for transporting the support to a concrete beam where a flue is located, the position and the elevation are adjusted, the support is welded and fixed with an embedded part according to drawing requirements, the support at the position of the temporary transport platform is installed after the temporary platform is dismantled, installation errors among the supports and the support meet the standard requirements, otherwise, the installation speed and the quality of the flue are influenced;
seventh, lifting installation flue
The large flue is arranged from the machine head to the machine tail, each short pipe is 4.4m long, two hoisting noses are welded at 1/4 positions on two sides of each flue, a ladder stand and three safety rope stand columns are arranged at the same time, and safety ropes need to be tied on the steel wire rope stand columns;
during hoisting, the installation position and direction of the flue are confirmed according to the typesetting drawing, so that errors in position and direction are avoided; after the flue is hung to the temporary transfer platform, the flue is stably placed and anti-rolling measures are taken, and operators hook and unload hooks through the crawling ladder;
during lifting, a certain safety distance is reserved between the flue and the flue support, and the flue advancing process is kept constant and stable in the lifting process; the speed is reduced in advance when the flue is transported to the installation position, the stable component slowly moves forward, and slowly falls on the flue support to be paired by installation personnel;
eighthly, mounting flue ash bucket
The method comprises the following steps that a flue ash bucket is located below a flue, the installation position of the flue ash bucket is determined on the installed flue, the flue ash bucket is slowly pulled to the position below the flue by 4 blocks of 5t chain blocks, two 15mm seams are formed in the lower portion of the flue, the positions of the seams correspond to the flue ash bucket, the flue ash bucket is lifted, vertical plates on two sides of the ash bucket are inserted into the two seams, the flue ash bucket is welded and fixed after being adjusted, and after welding is completed, the flue wall corresponding to the flue ash bucket of the flue is subjected to gas cutting and hole forming;
nine, demolish monorail roof beam and electric block
Utilize the shaped steel maintenance platform of big flue top of electric block installation to overhaul the platform and carry out dismantling of electric block for the construction face, lift off electric block with the overhead traveling crane of main building earlier, dismantle the steel hanging beam section by section again, accomplish the installation of the big flue of sintering indoor level so far.
2. The mesh reinforcement binding formwork of claim 1, wherein: the temporary transfer platform is arranged at the tail side or at the head part close to the side column, and when the temporary transfer platform is arranged at the tail side, the flue is arranged from the head to the tail; when the temporary transfer platform is arranged at the head, the flue is arranged from the tail to the head.
3. The mesh reinforcement binding formwork of claim 1, wherein: the hoisting of the monorail beam machine head part in position is as follows: a steel pipe is used as a cross beam, a steel wire rope is hung on the steel pipe, a rope fastener penetrates through a phi 100 preformed hole pre-buried in a platform concrete beam of an upper platform of a flue, and a chain block is hung below the steel wire rope.
4. The mesh reinforcement binding formwork of claim 1, wherein: when the ash bucket is the U type structure of double flute, set up 8 hoisting points on the ash bucket, the ash bucket is inside 4, and outside 4, inside hoisting point is used for electric block handling ash bucket, and the outside hoisting point is used for chain block promotion ash bucket.
CN202010240960.0A 2020-03-31 2020-03-31 Method for installing indoor horizontal large flue of large sintering plant Active CN111379900B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010240960.0A CN111379900B (en) 2020-03-31 2020-03-31 Method for installing indoor horizontal large flue of large sintering plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010240960.0A CN111379900B (en) 2020-03-31 2020-03-31 Method for installing indoor horizontal large flue of large sintering plant

Publications (2)

Publication Number Publication Date
CN111379900A true CN111379900A (en) 2020-07-07
CN111379900B CN111379900B (en) 2022-02-08

Family

ID=71217342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010240960.0A Active CN111379900B (en) 2020-03-31 2020-03-31 Method for installing indoor horizontal large flue of large sintering plant

Country Status (1)

Country Link
CN (1) CN111379900B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008108891A1 (en) * 2007-03-02 2008-09-12 Saturn Machine & Welding Co., Inc. Method of and apparatus for replacing coke oven wall
CN101482372A (en) * 2009-01-22 2009-07-15 中冶建工有限公司 Construction process for smoke canal swinging assembly of sintering device
CN102494536A (en) * 2011-12-05 2012-06-13 中冶天工集团有限公司 Construction method for dust-fall pipe of sintering chamber
CN104016089A (en) * 2014-06-25 2014-09-03 中国五冶集团有限公司 Slipping installation method of big flue of sintering machine and rail installation mechanism thereof
CN104418240A (en) * 2013-08-27 2015-03-18 中国五冶集团有限公司 Large flue lifting and assembly method
CN106121248A (en) * 2016-06-21 2016-11-16 北京首钢建设集团有限公司 The installation method of sintering large flue in a kind of restricted area
CN110127520A (en) * 2019-05-10 2019-08-16 上海二十冶建设有限公司 The small lattice funnel of large-type sinterer and dust-fall pipe installation method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008108891A1 (en) * 2007-03-02 2008-09-12 Saturn Machine & Welding Co., Inc. Method of and apparatus for replacing coke oven wall
CN101482372A (en) * 2009-01-22 2009-07-15 中冶建工有限公司 Construction process for smoke canal swinging assembly of sintering device
CN102494536A (en) * 2011-12-05 2012-06-13 中冶天工集团有限公司 Construction method for dust-fall pipe of sintering chamber
CN104418240A (en) * 2013-08-27 2015-03-18 中国五冶集团有限公司 Large flue lifting and assembly method
CN104016089A (en) * 2014-06-25 2014-09-03 中国五冶集团有限公司 Slipping installation method of big flue of sintering machine and rail installation mechanism thereof
CN106121248A (en) * 2016-06-21 2016-11-16 北京首钢建设集团有限公司 The installation method of sintering large flue in a kind of restricted area
CN110127520A (en) * 2019-05-10 2019-08-16 上海二十冶建设有限公司 The small lattice funnel of large-type sinterer and dust-fall pipe installation method

Also Published As

Publication number Publication date
CN111379900B (en) 2022-02-08

Similar Documents

Publication Publication Date Title
CN101514586B (en) Hanger rail type electric hanging boat and construction method thereof
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN201411900Y (en) Hydraulic die lifter for chimneys
CN110562868B (en) Hoisting construction method for unit type glass curtain wall of super high-rise building
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN107165401A (en) Cantilever Beams bottom wall construction method
CN101566005A (en) Chimney hydraulic mould lifting device
CN110159057B (en) Mounting and construction method for smoke pipe of technically improved factory building
CN108396749B (en) Installation system and installation method of steel support in foundation pit
CN111379900B (en) Method for installing indoor horizontal large flue of large sintering plant
CN210460016U (en) Integrated form single power lift material platform
CN209907972U (en) Conversion frame for longitudinal and transverse conversion of precast concrete exterior wall cladding
CN110316662B (en) Installation and construction method of large-span portal crane
CN105776092A (en) Stretching type basket device and construction method thereof
CN203486787U (en) Integral lifting device for cabinet top of Wiggins coal gas cabinet
CN206346500U (en) Compact simplified arm extending type straddle truck
CN206616185U (en) The loss flue dust dust gathering arrester of coke oven installs chassis
CN1696043A (en) Construction technique for hoisting steel made coal hopper on-site
CN211037771U (en) Hanging basket device for outer slope construction
JPH0754491A (en) Erecting device for exterior curtain wall of building
CN113137052A (en) Self-climbing safety hard protection and curtain wall circular rail hoisting integrated platform
CN202249006U (en) Self-moving type steel structure workshop
CN214733990U (en) Hoisting device of program-controlled high-pressure diaphragm filter press
CN113957805B (en) Installation device and method for bridge under-hanging water supply and drainage pipeline
CN216377189U (en) Hoisting and transporting trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant