CN111335352A CN202010133322.9A CN202010133322A CN111335352A CN 111335352 A CN111335352 A CN 111335352A CN 202010133322 A CN202010133322 A CN 202010133322A CN 111335352 A CN111335352 A CN 111335352A
Authority
CN
China
Prior art keywords
buttress
layer
waterproof
roof
solar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010133322.9A
Other languages
Chinese (zh)
Other versions
CN111335352B (en
Inventor
常彦妮
刘勇庆
高瑜睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shanxi Sijian Group Co Ltd
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CN202010133322.9A priority Critical patent/CN111335352B/en
Publication of CN111335352A publication Critical patent/CN111335352A/en
Application granted granted Critical
Publication of CN111335352B publication Critical patent/CN111335352B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/16Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24SSOLAR HEAT COLLECTORS; SOLAR HEAT SYSTEMS
    • F24S25/00Arrangement of stationary mountings or supports for solar heat collector modules
    • F24S25/60Fixation means, e.g. fasteners, specially adapted for supporting solar heat collector modules
    • F24S25/61Fixation means, e.g. fasteners, specially adapted for supporting solar heat collector modules for fixing to the ground or to building structures
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/20Solar thermal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/40Solar thermal energy, e.g. solar towers
    • Y02E10/47Mountings or tracking

Abstract

The invention relates to a construction method of a building roof, in particular to a positioning and waterproof integrated construction method of a solar foundation buttress of the roof. The technical problem of the fixed installation of large-scale solar equipment on the roof is solved, and the method comprises the following steps: the method comprises the steps of before top floor concrete pouring in engineering construction, pre-burying solar buttress steel bars at buttress positions, dividing a designed solar foundation buttress into a buttress base at the lower part and a support at the upper part along a waterproof layer for construction, pouring the buttress base at the lower part, constructing a heat preservation layer, a slope finding layer and a leveling layer by layer, paving a waterproof coiled material on the whole roof to form a waterproof coiled material layer, pouring a waterproof protective layer, constructing the support at the upper part, and completing the construction of the whole solar buttress. The waterproof layer is orderly arranged on the roof, so that the appearance problem of the roof is solved, the waterproof layer is integrally paved, the construction method is simple, and the operability is strong; meanwhile, the solar buttress is prevented from damaging a roof waterproof layer and a roof surface layer brick.

Description

Positioning and waterproof integrated construction method for roof solar foundation buttress
Technical Field
The invention relates to a construction method of a building roof, in particular to a positioning and waterproof integrated construction method of a solar foundation buttress of the roof.
Background
In recent years, roof solar water heaters are used in many areas and projects, the solar water heaters have complicated structures, dozens of users share one solar water heater, a large-area solar heat collecting and absorbing plate and other devices are needed, and the solar water heaters need to be fixed at special positions and overhead so as to absorb solar energy conveniently. Because the solar water heater is large in size and needs to be strictly fixed, the solar water heater needs to have a firmer foundation for preventing the solar water heater from being swayed and falling off by wind and preventing thermal expansion and cold contraction deformation. In order to fix the bracket, the buttress and the like, bolts need to be embedded in the roof or foundation bolts need to be constructed later. Not only is easy to fall off and is not beautiful, but also destroys the waterproof layer of the roof and brings great hidden trouble of water leakage to users.
For example, application No.: 200510044876.7A combined individual household support for solar water heater on loft slope roof, which is characterized by that the fixing support can be pre-embedded during roof construction, or installed on the roof by expansion bolts, and a waterproof layer is covered on the roof of the fixing support. This kind of structure just has the problem of destroying original roof waterproof layer, and waterproof layer once destroys, is difficult for the later stage to recover completely. And the mode of using the pre-buried bracket only adapts to the solar water heater with small volume and small mass used by a single user. Nowadays, buildings are higher and higher, and the specifications of solar water heaters are more and more increased. The problem of fixing a large-area solar water heater with the square meters of tens of meters is frequently encountered. The mode in the scheme is not suitable, for example, the support is easy to shake in a windy day, so that the deformation of the support influences the loosening of the embedded foundation, and a powerful supporting system is needed.
Disclosure of Invention
The invention provides a positioning and waterproof integrated construction method for a solar foundation buttress of a roof, aiming at solving the technical problem of fixed installation of large solar equipment on a roof.
The technical scheme for realizing the invention is that the positioning and waterproof integrated construction method of the solar foundation buttress of the roof comprises the following steps:
1. before top floor concrete is poured in the engineering construction, according to the BIM planning result, a buttress position line is released on the roof, solar buttress steel bars are embedded in the buttress position, the embedded steel bars are 4 HRB 400-grade phi 8 steel bars, and then the top floor concrete is poured to form a top plate concrete layer.
2. Paying off again before roofing engineering construction on roof concrete layer, confirm the concrete position of solar energy basis buttress, the solar energy basis buttress that designs divide into the buttress base of lower part and the construction of the support two parts on upper portion along the waterproof layer, pour the buttress base of lower part earlier, the elevation line control is under the waterproof roll material layer, the buttress base concrete placement of lower part accomplishes the back, the heat preservation of the whole roofing of successive layer construction, look for the slope layer, the screed-coat, guarantee lower part buttress base upper surface and screed-coat upper surface parallel and level, lay for the waterproof roll material layer and paste and provide the advantage.
3. Before the waterproof roll material layer of the roof is paved and pasted, firstly, the upper surface of the buttress base at the lower part is subjected to waterproof treatment, a cement crystal waterproof material is brushed within the range of 300mm outside the edge of the buttress base at the lower part to form a waterproof layer, after 24 hours, the waterproof roll material layer is paved and pasted on the whole roof to form the waterproof roll material layer, when the waterproof roll material is paved and pasted, firstly, the waterproof roll material layer is cut and rolled for standby according to the paving length and the elastic line size, the end heads of the roll material layer are aligned to the starting point of paving, and according to the elastic line, the two ends of a pipe center are held forward and slowly rolled and paved. The coiled material is paved and attached to the position of the reinforcing steel bar, the coiled material is cut off along the outer edge of the reinforcing steel bar, and then the paving and the attaching of the original coiled material are continued, so that the waterproof integrity is ensured. And after the waterproof paving of the coiled material is finished, sleeving a rubber water stop ring on 4 HRB 400-grade phi 8 steel bars, wherein the distance from the bottom surface is 20mm, and finally pouring a waterproof protective layer.
4. After the waterproof roll material layer and the waterproof protective layer are completed, firstly paving and pasting the roof tile according to BIM typesetting, reserving a buttress empty area at the buttress, reserving the thickness of the surface layer according to the size of the outer vertical surface of the buttress, pouring upper buttress concrete on the upper portion of the buttress foundation to form a support with the size of 260mm × 260mm, and finally paving and pasting the upper buttress tile on the outer surface of the support to complete the construction of the whole solar buttress.
Compared with the prior art, the waterproof integrated structure of the solar foundation buttress of the roof, which is obtained by the process construction, is constructed by dividing a large number of buttresses into an upper part and a lower part, so that the accuracy of the forming position is ensured, the integral attractiveness of the roof is ensured, and the waterproof coiled material is integrally paved at the buttresses and is not turned upwards and fixed. Buttress quantity is many among the roofing solar energy system, almost is covered with whole roofing, and application BIM technique confirms on the whole roofing that solar energy and some other structures and the whole of equipment arrange on the roofing itself, confirms the position of solar energy basis buttress, guarantees the whole pleasing to the eye optimal arrangement of roofing, under the prerequisite of guaranteeing service function, the roofing impression is effectual. The buttress is constructed in a layering mode, the waterproof coiled material is integrally paved and attached, the waterproof layer is fixed without being turned upwards, a bevel is not formed, the integral horizontal paving and attaching are achieved at the solar foundation buttress, construction is convenient, and the waterproof effect is easy to guarantee. Simple process, convenient operation, economy, applicability and good effect. The buttress base of solar energy basis buttress lower part is integrative to be poured into a mould the preparation and is connected with the support on upper portion through pre-buried reinforcing bar, and intensity is high, has strengthened solar rack's firm degree.
By applying the waterproof integrated construction method of the solar foundation buttress of the roof, the solar foundation buttress is orderly arranged on the roof, the appearance problem of the roof is solved, the waterproof is integrally paved, the construction method is simple, and the operability is strong; meanwhile, the solar buttress is prevented from damaging a roof waterproof layer and a roof surface layer brick.
Drawings
FIG. 1 is a schematic structural view after the process of the present invention is completed
In the figure: 1-top plate concrete layer, 2-heat preservation layer, 3-slope finding layer, 4-leveling layer, 5-waterproof coil layer, 6-waterproof protection layer, 7-roof tile, 8-waterproof layer, 9-buttress tile, 10-support, 11-rubber water stop ring, 12-sealant, 13-buttress base and 14-solar buttress steel bar.
Detailed Description
A roof solar foundation buttress positioning and waterproof integrated construction method comprises the following steps:
1. before top floor concrete is poured in the engineering construction, according to the BIM planning result, a buttress position line is released on the roof, solar buttress steel bars 14 are embedded in the buttress position, the embedded steel bars are 4 HRB 400-grade phi 8 steel bars, and then the top floor concrete is poured to form a top plate concrete layer 1.
2. Paying off again before roofing engineering construction on roof concrete layer 1, confirm the concrete position of solar energy basis buttress, the solar energy basis buttress that designs divide into buttress base 13 of lower part and the construction of support 10 two parts on upper portion along waterproof layer 8, pour lower part buttress base 13 earlier, the elevation line control is under waterproof coil stock layer 5, 13 concrete placement of lower part buttress base is after accomplishing, the heat preservation 2 of the whole roofing of successive layer construction, look for slope layer 3, screed-coat 4, guarantee 13 upper surface of lower part buttress base and 4 upper surface parallel and level of screed-coat, it provides the advantage to pave for waterproof coil stock layer 5.
3. Before the roof waterproof roll material layer 5 is paved and pasted, firstly, the upper surface of a lower buttress base 13 is subjected to waterproof treatment, cement crystal waterproof materials are brushed within the range of 300mm outside the edge of the lower buttress base to form a waterproof layer 8, after 24 hours, the whole roof is paved and pasted with the waterproof roll material layer 5, when the roll material is paved and pasted, firstly, the roll material is cut according to the paving length and the elastic line size and is rolled for later use, the ends of the roll material are aligned to the starting point of paving, and according to the elastic line, the two ends of a hand pipe are gradually rolled and paved forwards, so that the roll material is paved on a base layer. The coiled material is paved and attached to the position of the reinforcing steel bar, the coiled material is cut off along the outer edge of the reinforcing steel bar, and then the paving and the attaching of the original coiled material are continued, so that the waterproof integrity is ensured. And after the waterproof paving of the coiled material is finished, sleeving a rubber water stop ring 11 on 4 HRB 400-grade phi 8 embedded steel bars, keeping the distance from the bottom surface by 20mm, and finally pouring a waterproof protective layer 6.
4. After waterproof roll material layer 5, waterproof layer 6 accomplished, according to BIM typesetting, spread earlier and paste roofing tile (150mm × 150mm), leave buttress dead zone in buttress department, according to buttress facade size, leave surface course thickness, pour upper portion buttress concrete on buttress basis upper portion at last and form support 10, the cross section size is 260mm × 260mm, solar buttress reinforcing bar 14 concatenate roof concrete layer 1, buttress base 13 and support 10, last support 10 surface spread and paste upper portion buttress tile, accomplish the construction of whole solar buttress.
The waterproof layer 8 is formed by cement-based capillary crystalline waterproof coating for 2 times, and the brushing directions of two adjacent layers are vertical; ensuring that the waterproof coating does not leak any point.
And sealant 12 is arranged at the joint of the surface layer of the brick jar on the support and the brick jar on the roof. Finally, the structure illustrated in the figure 1 is formed, and then the solar equipment is installed on the support.

Claims (3)

1. A roof solar foundation buttress positioning and waterproof integrated construction method is characterized by comprising the following steps: the method comprises the following steps:
(1) before top floor concrete is poured in the engineering construction, according to BIM planning results, a buttress position line is released on the roof, solar buttress steel bars are embedded in the buttress position, the embedded steel bars are 4 HRB 400-grade phi 8 steel bars, then top floor concrete is poured to form a top plate concrete layer,
(2) the method comprises the following steps of paying off again before roof engineering construction on a top plate concrete layer, determining the specific position of a solar foundation buttress, dividing the designed solar foundation buttress into a buttress base at the lower part and a support at the upper part along a waterproof layer for construction, pouring the buttress base at the lower part, controlling the elevation line under a waterproof coil layer, after pouring of the buttress base concrete at the lower part, constructing a heat preservation layer, a slope layer and a leveling layer of the whole roof layer by layer, ensuring that the upper surface of the buttress base at the lower part is flush with the upper surface of the leveling layer, and providing favorable conditions for paving and pasting the waterproof coil layer,
(3) before the waterproof roll material layer of the roof is paved and pasted, firstly, the upper surface of the buttress base at the lower part is subjected to waterproof treatment, cement crystal waterproof materials are brushed within the range of 300mm outside the edge of the buttress base at the lower part to form a waterproof layer, after 24 hours, the waterproof roll material layer is paved and pasted on the whole roof to form the waterproof roll material layer, when the roll material is paved and pasted, firstly, the roll material layer is cut according to the paving length and the elastic line size and is rolled for standby application, the end heads of the roll material are aligned with the starting point of paving, according to the elastic line, the two ends of a pipe center are held by hands and slowly rolled forwards to be paved, so that the roll material is paved on a base layer, the roll material is paved and pasted to the reinforcing steel bar,
after the waterproof paving of the coiled material is finished, sleeving a rubber water-stopping ring on 4 HRB 400-grade phi 8 steel bars, keeping the distance from the bottom surface by 20mm, finally pouring a waterproof protective layer,
(4) after waterproof roll material layer, waterproof layer accomplished, according to the BIM typesetting, spread earlier and paste roofing jar brick to leave the buttress dead zone in buttress department, according to the outer facade size of buttress, leave surface course thickness, pour upper portion buttress concrete on buttress basis upper portion and form the support, solar buttress reinforcing bar concatenate roof concrete layer, buttress base and support, the size is 260mm × 260mm, last support surface spread and paste upper portion buttress jar brick, accomplish the construction of whole solar buttress.
2. The roofing solar foundation buttress positioning waterproof integrated construction method according to claim 1, characterized in that: the waterproof layer is made of cement-based permeable crystallization type waterproof paint, and the painting directions of two adjacent layers are vertical.
3. The roofing solar foundation buttress positioning waterproof integrated construction method according to claim 1, characterized in that: and sealant is arranged at the joint of the surface layer of the brick jar on the support and the brick jar on the roof.
CN202010133322.9A 2020-03-01 2020-03-01 Positioning and waterproof integrated construction method for roof solar foundation buttress Active CN111335352B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010133322.9A CN111335352B (en) 2020-03-01 2020-03-01 Positioning and waterproof integrated construction method for roof solar foundation buttress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010133322.9A CN111335352B (en) 2020-03-01 2020-03-01 Positioning and waterproof integrated construction method for roof solar foundation buttress

Publications (2)

Publication Number Publication Date
CN111335352A true CN111335352A (en) 2020-06-26
CN111335352B CN111335352B (en) 2021-12-14

Family

ID=71179796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010133322.9A Active CN111335352B (en) 2020-03-01 2020-03-01 Positioning and waterproof integrated construction method for roof solar foundation buttress

Country Status (1)

Country Link
CN (1) CN111335352B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023040479A1 (en) * 2021-09-17 2023-03-23 江苏凯伦建材股份有限公司 Construction method for waterproof photovoltaic integrated roof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201753481U (en) * 2010-07-30 2011-03-02 北京泰豪太阳能电源技术有限公司 Positioning steel-bar supporting base point system
CN205242876U (en) * 2015-12-14 2016-05-18 山西四建集团有限公司 Roofing structure with hidden exhaust passage
JP6027458B2 (en) * 2013-02-12 2016-11-16 積水化学工業株式会社 Waterproof support structure and support anchor
CN206360228U (en) * 2017-01-02 2017-07-28 南京国电南自新能源工程技术有限公司 A kind of reinforced concrete roof waterproof photovoltaic power generation apparatus
CN211949246U (en) * 2019-12-27 2020-11-17 山西五建集团有限公司 Roof with waterproof integrated solar buttress

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201753481U (en) * 2010-07-30 2011-03-02 北京泰豪太阳能电源技术有限公司 Positioning steel-bar supporting base point system
JP6027458B2 (en) * 2013-02-12 2016-11-16 積水化学工業株式会社 Waterproof support structure and support anchor
CN205242876U (en) * 2015-12-14 2016-05-18 山西四建集团有限公司 Roofing structure with hidden exhaust passage
CN206360228U (en) * 2017-01-02 2017-07-28 南京国电南自新能源工程技术有限公司 A kind of reinforced concrete roof waterproof photovoltaic power generation apparatus
CN211949246U (en) * 2019-12-27 2020-11-17 山西五建集团有限公司 Roof with waterproof integrated solar buttress

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴志红,陈娟玲,张会主编: "《建筑施工技术》", 30 June 2016 *
沈春林主编: "《建筑防水技术系列丛书 建筑防水工程施工技术》", 31 May 2019 *
程慧琴,张峰: "SBS改性沥青防水卷材施工质量控制", 《现代农业科技》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023040479A1 (en) * 2021-09-17 2023-03-23 江苏凯伦建材股份有限公司 Construction method for waterproof photovoltaic integrated roof

Also Published As

Publication number Publication date
CN111335352B (en) 2021-12-14

Similar Documents

Publication Publication Date Title
CN105113671A (en) Construction method of large conchoidal hyperbolic curtain wall
CN101845857B (en) Metal mesh built-in insulating outer wall and construction method thereof
CN106284425A (en) Basement in high rise building roof deformation seam water proof structure construction method
CN110080530A (en) Severe cold area glazed tiles pitched roof pastes anchor construction method
CN110821023A (en) Villa flat tile large-gradient inclined roof construction method
CN111335352B (en) Positioning and waterproof integrated construction method for roof solar foundation buttress
CN106996165B (en) Planting roof waterproof heat-preservation exhaust system with exhaust device and construction method
CN108240038A (en) Super plane concrete structure and construction method based on multi-level network form post-cast strip
CN110778034A (en) Roof parapet internal corner structure and construction method thereof
CN215630742U (en) Deformation joint waterproof construction is striden to roofing height
CN112726898B (en) Water-proof heat-insulating system for exposed brick exterior wall and construction method
CN108442617A (en) A kind of ceramic tile fixing means
CN112281886A (en) Waterproof and structure integration construction structure of two-in-one interior lining wall
CN2926365Y (en) Embedded brick with built-in fitting and externally thermal-insulating structure of external wall
CN107747362B (en) Foam glass roof heat insulation insulation system and its construction method
CN109577565B (en) Slope roof construction method adopting large-span hyperbolic high-wave profiled steel sheet
CN207974233U (en) Super plane concrete structure based on multi-level network format post-cast strip
CN113653272B (en) Archaized eave of steel structure of high-rise building and construction method thereof
CN212897232U (en) Roofing pipeline, equipment support antiseep node structure
CN109339355A (en) The construction method of the aluminium sheet roofing waterproofing node of structural slab is done using ALC plate
CN113882562A (en) Construction method of special-shaped double-sided wood grain fair-faced concrete wall
CN213268735U (en) Heat-preservation plinth structure for decorating external wall
CN108086520A (en) A kind of construction method of steel structure wave net laminated concrete face integral quakeproof wall
CN210482788U (en) Roof expansion joint structure
CN212317328U (en) Sloping roof tile hanging structure with solar panel support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant