CN207974233U - Super plane concrete structure based on multi-level network format post-cast strip - Google Patents

Super plane concrete structure based on multi-level network format post-cast strip Download PDF

Info

Publication number
CN207974233U
CN207974233U CN201820353742.6U CN201820353742U CN207974233U CN 207974233 U CN207974233 U CN 207974233U CN 201820353742 U CN201820353742 U CN 201820353742U CN 207974233 U CN207974233 U CN 207974233U
Authority
CN
China
Prior art keywords
cast strip
concrete structure
post
level network
network format
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820353742.6U
Other languages
Chinese (zh)
Inventor
刘云飞
雷素素
段先军
黄维爱
谢文东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Group Co Ltd
Original Assignee
Beijing Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Group Co Ltd filed Critical Beijing Urban Construction Group Co Ltd
Priority to CN201820353742.6U priority Critical patent/CN207974233U/en
Application granted granted Critical
Publication of CN207974233U publication Critical patent/CN207974233U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model is related to big flat concrete technical field of structures, disclose a kind of super plane concrete structure based on multi-level network format post-cast strip.The utility model includes reinforced concrete structure and Construction Later Casting Zone, crisscross Construction Later Casting Zone is in net distribution, every Construction Later Casting Zone is arranged along the length or width direction of concrete structure, uniform intervals, it further include structure post-cast strip, the crisscross structure post-cast strip is in net distribution, every structure post-cast strip is arranged along the length or width direction of concrete structure, uniform intervals, and the distance between adjacent structure post-cast strip is 130 160m.The utility model makes the contraction or expansion of concrete structure deform adequately to be discharged, effectively avoid the deformation crack of super plane concrete structure.

Description

Super plane concrete structure based on multi-level network format post-cast strip
Technical field
The utility model is related to big flat concrete technical field of structures, more particularly to one kind based on after multi-level network format Pour the super plane concrete structure of band.
Background technology
The type of distress in concrete mainly has:Settlement crack, deformation crack, comprehensive crack, expansion fissure and motional inertia Crack.Wherein incidence of the concrete deformation crack in engineering reaches 80% or more, is the main original that concrete generates crack Cause.And the producing cause of deformation crack is mainly that the deformation of concrete autogenous shrinkage, variation of ambient temperature and concrete itself are swollen Bulging deformation is mainly the curing temperature for controlling concrete for the settling mode in crack is generated because of temperature change;And it is directed to coagulation Crack caused by native self-deformation, settling mode mainly take Crack Resistance from material, change form of construction work, increase reinforcing bar Dosage or setting post-cast strip.
According to existing concrete design specification, concrete structure is to avoid contraction fissure, needs that permanent expansion joint is arranged And Construction Later Casting Zone, Construction Later Casting Zone are a kind of temporary construction seams, are the improving technologies at permanent expansion joint, are to prevent overlength from building Build the effective measures for being deformed crack.Reinforcing bar at existing conventional rear pouring tape construction method post-cast strip is all continuous, and is mixed The contraction distortion of Xtah Crude Clay structure cannot freely be discharged, when the length or width of concrete structure are more than certain size, Deformation crack is inevitable, and therefore, the size of concrete structure nevertheless suffers from larger limitation.
Utility model content
The utility model provide it is a kind of the contraction or expansion of concrete structure can be made to deform adequately discharged, effectively Avoid the super plane concrete structure based on multi-level network format post-cast strip of the deformation crack of concrete structure.
The technical issues of solution is:Existing routine post empiricism is only capable of improving to a certain extent because concrete itself becomes Distress in concrete caused by shape, since the reinforcing bar at post-cast strip is continual, the contraction distortion of concrete structure cannot obtain It freely discharges, significantly limits the size of concrete structure.
In order to solve the above technical problems, the utility model adopts the following technical solution:
Super plane concrete structure of the utility model based on multi-level network format post-cast strip, including reinforced concrete structure And Construction Later Casting Zone, crisscross Construction Later Casting Zone is in net distribution, length of the every Construction Later Casting Zone along reinforced concrete structure Degree or width direction, uniform intervals setting, it is characterised in that:Further include structure post-cast strip, the structure post-cast strip is crisscross In net distribution, every structure post-cast strip is arranged along the length or width direction of reinforced concrete structure, uniform intervals, adjacent bonds The distance between structure post-cast strip is 130-160m.
Super plane concrete structure of the utility model based on multi-level network format post-cast strip, it is further, adjacent described The distance between Construction Later Casting Zone is 30-50m, and the width of Construction Later Casting Zone is 0.8-1m.
Super plane concrete structure of the utility model based on multi-level network format post-cast strip, further, the structure The width of post-cast strip is 4-6m.
Super plane concrete structure of the utility model based on multi-level network format post-cast strip, further, the construction Reinforcing bar inside the reinforced concrete structure of post-cast strip side passes perpendicularly through the armored concrete that Construction Later Casting Zone stretches into the other side Inside configuration, it is continuous uninterrupted.
Super plane concrete structure of the utility model based on multi-level network format post-cast strip, further, the construction Steel plate water stopper and/or external labeling type waterstop are provided between two side elevation of post-cast strip and adjacent reinforced concrete structure.
Super plane concrete structure of the utility model based on multi-level network format post-cast strip, further, the structure Post-cast strip interior laminate layer is provided with connection reinforcing bar, and connection reinforcing bar both ends are corresponding with the reinforced concrete structure of both sides respectively Reserved connector connection.
Super plane concrete structure of the utility model based on multi-level network format post-cast strip, further, every layer of reinforcing bar Corresponding reserved connector is respectively bar dowel connector and long splice, and the length of bar dowel connector is not less than 500mm.
Super plane concrete structure of the utility model based on multi-level network format post-cast strip, further, per side steel Bar dowel connector and long splice on tendon concrete structure is staggered in the vertical direction, every connection reinforcing bar both ends point It is not connect with bar dowel connector and long splice.
Super plane concrete structure of the utility model based on multi-level network format post-cast strip, further, the structure Be provided between two side elevations and adjacent reinforced concrete structure of post-cast strip steel plate water stopper, external labeling type waterstop and/or In set waterstop.
Super plane concrete structure of the utility model based on multi-level network format post-cast strip compared with prior art, has Following advantageous effect:
Super plane concrete structure of the utility model based on multi-level network format post-cast strip is after the conventional construction of setting It is outer to pour band, the structure post-cast strip in net distribution is also provided with, it is not necessary that deformation joint is arranged, after super plane concrete structure It pours belt construction and is divided into 2 steps progress, the first order is the Construction Later Casting Zone of routine, and the second level is structure post-cast strip, mixed in reinforcing bar The spacing of the closing that Xtah Crude Clay structure construction no less than carries out after 90 days, adjacent structure post-cast strip is 130-180m, can fully be released The contraction distortion for putting reinforced concrete structure effectively reduces the contraction fissure of concrete, prevents super plane building structure from generating Deformation crack.
Framework of steel reinforcement in the utility model structure post-cast strip is to disconnect, by connecting reinforcing bar and both sides armored concrete Reserved connector in structure connects the framework of steel reinforcement to be formed in structure post-cast strip, this makes the concrete in structure post-cast strip The contraction distortion of Work sectors can freely discharge, after controlling post-cast strip closing, the generation of distress in concrete.
The construction method sequence of construction of super plane concrete structure of the utility model based on multi-level network format post-cast strip It is more flexible, without the 7-10 days time intervals that the adjacent concrete region construction as jumping storehouse method needs, by post-cast strip point The cycle request at the construction area of the reinforced concrete structure made of, sequence of construction and adjacent construction area interval does not have Strict requirements, the utility model construction method can more quickly finish the integral construction of reinforced concrete structure, for knot The cross construction of structure provides work surface, improves construction efficiency.
The super plane concrete structure based on multi-level network format post-cast strip of the utility model is made below in conjunction with the accompanying drawings It further illustrates.
Description of the drawings
Fig. 1 is the structural schematic diagram of super plane concrete structure of the utility model based on multi-level network format post-cast strip;
Fig. 2 is the schematic cross-section of the Construction Later Casting Zone of bottom plate;
Fig. 3 is the schematic cross-section of the structure post-cast strip of bottom plate.
Reference numeral:
1- reinforced concrete structures;2- Construction Later Casting Zones;3- structures post-cast strip;41- steel plate water stoppers;42- external labeling types stop Water band;43- additional waterproof coiled materials;5- bar dowel connectors;6- long splices;7- connection reinforcing bars;Waterstop is set in 8-.
Specific implementation mode
As shown in Figure 1 to Figure 3, super plane concrete structure of the utility model based on multi-level network format post-cast strip includes Reinforced concrete structure 1, Construction Later Casting Zone 2 and structure post-cast strip 3;Suitable for floor structure, external wall structure, floor structure beam with And the construction of the multiple types building structure such as base coupling beam, it is illustrated by taking bottom plate as an example in the present embodiment.
Crisscross Construction Later Casting Zone 2 is in net distribution, length of the every Construction Later Casting Zone 2 along reinforced concrete structure 1 Or the setting of width direction, uniform intervals, the distance between adjacent Construction Later Casting Zone 2 are 30-50m, the width of Construction Later Casting Zone 2 is 0.8-1m;Reinforcing bar inside the reinforced concrete structure 1 of 2 side of Construction Later Casting Zone pass perpendicularly through Construction Later Casting Zone 2 stretch into it is another It is continuous uninterrupted inside the reinforced concrete structure 1 of side;2 liang of side elevations of Construction Later Casting Zone and adjacent reinforced concrete structure 1 Between be provided with steel plate water stopper 41 and/or external labeling type waterstop 42, the width of steel plate water stopper 41 is not less than 30mm, with reinforcing bar The distance between 1 bottom surface of concrete structure is not less than the 1/2 of 1 thickness of reinforced concrete structure;The setting of external labeling type waterstop 42 exists At the bottom surface of reinforced concrete structure 1,42 lower section of external labeling type waterstop can also additionally be laid with one section of additional waterproof coiled material 43, attached The width of waterproof roll 43 is added to be not less than 1.5 times of 2 width of Construction Later Casting Zone.
Crisscross structure post-cast strip 3 is in net distribution, length of the every structure post-cast strip 3 along reinforced concrete structure 1 Or the setting of width direction, uniform intervals, the distance between adjacent structure post-cast strip 3 are 130-180m, the width of structure post-cast strip 3 For 4-6m;7 storied placement of connection reinforcing bar in structure post-cast strip 3, both ends respectively with it is pre- in the reinforced concrete structure of both sides 1 Connector is stayed to connect, the opposite reserved connector of every layer of reinforcing bar is respectively bar dowel connector 5 and long splice 6, is mixed per side reinforcing bar Bar dowel connector 5 and long splice 6 on Xtah Crude Clay structure 1 is staggered in the vertical direction, connection reinforcing bar 7 both ends respectively with Bar dowel connector 5 and long splice 6 connect, and the connector for connecting reinforcing bar 7 opens connection, specific connection type or logical according to 50% Cross sleeve straight screw connection, or welding, or overlap joint setting, selection and bar diameter and the bar dowel connector of specific connection type 5 is related with the length of long splice 6, and the length of bar dowel connector 5 is not less than 500mm;3 liang of structure post-cast strip side elevation and phase Be provided between adjacent reinforced concrete structure 1 steel plate water stopper 41, external labeling type waterstop 42 and/or in set waterstop 8.
The construction method of super plane concrete structure of the utility model based on multi-level network format post-cast strip, including it is following Step:
Step 1: according to detail design demand, reinforcing bar binding is carried out, and reserved Construction Later Casting Zone 2 and structure post-cast strip 3 Construction location;
Step 2(a), install formwork for placing, and the respective sides for pouring band 2 and structure post-cast strip 3 after construction install mould Plate;
Step 2(b), in the lower section of reserved Construction Later Casting Zone 2 and the junction of adjacent reinforced concrete structure 1, and Reserved structure post-cast strip 3 is respectively arranged below waterproof construction with the junction of adjacent reinforced concrete structure 1;
Waterproof construction is steel plate water stopper 41 and/external labeling type waterstop 42, is fixedly connected with reinforcing bar;
Step 3: according to from bottom to top, by the sequence at center to surrounding, pouring reinforcement concrete structure 1, according to《Coagulation Soil structure engineering construction specification》(GB50666-2011)It is required that carrying out concrete curing;
Step 4: after reinforced concrete structure 1 is poured and finished not less than 45 days, level-one higher than former casting concrete is used Slightly expanded concrete pouring construction post-cast strip 2, sequence of construction according to from bottom to top, by center to surrounding sequence carry out, so Water storing conservation afterwards;
The concrete construction method of Construction Later Casting Zone 2, includes the following steps:
A, it clears up:The construction area of Construction Later Casting Zone 2 is cleared up, and to both sides adjacent reinforced concrete structure 1 Side elevation carries out picking chisel;
B, supporting module:Install the construction formwork of Construction Later Casting Zone 2;
C, reinforcing bar adjusts:It is derusted to the reinforcing bar of Construction Later Casting Zone 2, straightening and banding fixed;
D, preparation is poured:The sundries in 2 template of Construction Later Casting Zone is cleared up, and fully wetting of spraying water;
E, casting concrete:Casting concrete once pours and smashes completion;
F, it conserves:According to《Concrete structure engineering job specfication》(GB50666-2011)It is required that concrete curing is carried out, Curing time is no less than 14 days, and water-tight concrete curing time is no less than 28 days;
Step 5: after reinforced concrete structure 1 is poured and finished not less than 90 days, the connection in setting structure post-cast strip 3 It is fixedly connected by reinforcing bar 7 with the reserved connector in both sides reinforced concrete structure 1;
Step 6: using slightly expanded concrete pouring structure more higher leveled than former casting concrete post-cast strip 3, sequence of construction According to from bottom to top, carried out by the sequence at center to surrounding, then water storing conservation;
The concrete construction method of structure post-cast strip 3, includes the following steps:
A, it clears up:The construction area of structure post-cast strip 3 is cleared up, and to both sides adjacent reinforced concrete structure 1 Side elevation carries out picking chisel;
B, supporting module:Install the construction formwork of structure post-cast strip 3;
C, reinforcing bar adjusts:It is derusted to the reserved connector of the reinforcing bar of structure post-cast strip 3, straightening, and connection reinforcing bar is set 7, banding fixed;
D, preparation is poured:The sundries in 3 template of structure post-cast strip is cleared up, and fully wetting of spraying water;
E, casting concrete:Casting concrete once pours and smashes completion;
F, it conserves:According to《Concrete structure engineering job specfication》(GB50666-2011)It is required that concrete curing is carried out, Curing time is no less than 14 days, and water-tight concrete curing time is no less than 28 days.
Embodiment described above is only that preferred embodiments of the present invention are described, not to this practicality Novel range is defined, and under the premise of not departing from the spirit of the design of the utility model, those of ordinary skill in the art are to this The various modifications and improvement that the technical solution of utility model is made should all fall into the protection of the utility model claims book determination In range.

Claims (9)

1. based on the super plane concrete structure of multi-level network format post-cast strip, including reinforced concrete structure(1)After construction Pour band(2), Construction Later Casting Zone(2)Crisscross is in net distribution, every Construction Later Casting Zone(2)Along reinforced concrete structure(1) Length or width direction, uniform intervals setting, it is characterised in that:It further include structure post-cast strip(3), the structure post-cast strip (3)Crisscross is in net distribution, every structure post-cast strip(3)Along reinforced concrete structure(1)Length or width direction, Even interval setting, adjacent structure post-cast strip(3)The distance between be 130-160m.
2. the super plane concrete structure according to claim 1 based on multi-level network format post-cast strip, it is characterised in that: The adjacent Construction Later Casting Zone(2)The distance between be 30-50m, Construction Later Casting Zone(2)Width be 0.8-1m.
3. the super plane concrete structure according to claim 1 based on multi-level network format post-cast strip, it is characterised in that: The structure post-cast strip(3)Width be 4-6m.
4. the super plane concrete structure according to claim 1 based on multi-level network format post-cast strip, it is characterised in that: The Construction Later Casting Zone(2)The reinforced concrete structure of side(1)Internal reinforcing bar passes perpendicularly through Construction Later Casting Zone(2)It stretches into another The reinforced concrete structure of side(1)Inside, it is continuous uninterrupted.
5. the super plane concrete structure according to claim 1 based on multi-level network format post-cast strip, it is characterised in that: The Construction Later Casting Zone(2)Two side elevations and adjacent reinforced concrete structure(1)Between be provided with steel plate water stopper(41)With/ Or external labeling type waterstop(42).
6. the super plane concrete structure according to claim 1 based on multi-level network format post-cast strip, it is characterised in that: The structure post-cast strip(3)Interior laminate layer is provided with connection reinforcing bar(7), connect reinforcing bar(7)Both ends are mixed with the reinforcing bar of both sides respectively Xtah Crude Clay structure(1)In corresponding reserved connector connection.
7. the super plane concrete structure according to claim 6 based on multi-level network format post-cast strip, it is characterised in that: The corresponding reserved connector of every layer of reinforcing bar is respectively bar dowel connector(5)With long splice(6), bar dowel connector(5)Length Degree is not less than 500mm.
8. the super plane concrete structure according to claim 7 based on multi-level network format post-cast strip, it is characterised in that: Per side reinforced concrete structure(1)On bar dowel connector(5)With long splice(6)It is staggered in the vertical direction, Every connection reinforcing bar(7)Both ends respectively with bar dowel connector(5)With long splice(6)Connection.
9. the super plane concrete structure according to claim 1 based on multi-level network format post-cast strip, it is characterised in that: The structure post-cast strip(3)Two side elevations and adjacent reinforced concrete structure(1)Between be provided with steel plate water stopper(41)、 External labeling type waterstop(42)Waterstop is set in and/or(8).
CN201820353742.6U 2018-03-15 2018-03-15 Super plane concrete structure based on multi-level network format post-cast strip Active CN207974233U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820353742.6U CN207974233U (en) 2018-03-15 2018-03-15 Super plane concrete structure based on multi-level network format post-cast strip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820353742.6U CN207974233U (en) 2018-03-15 2018-03-15 Super plane concrete structure based on multi-level network format post-cast strip

Publications (1)

Publication Number Publication Date
CN207974233U true CN207974233U (en) 2018-10-16

Family

ID=63765477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820353742.6U Active CN207974233U (en) 2018-03-15 2018-03-15 Super plane concrete structure based on multi-level network format post-cast strip

Country Status (1)

Country Link
CN (1) CN207974233U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108240038A (en) * 2018-03-15 2018-07-03 北京城建集团有限责任公司 Super plane concrete structure and construction method based on multi-level network form post-cast strip
CN110685424A (en) * 2019-09-05 2020-01-14 东莞市鲁班装饰工程有限公司 Building floor leveling anti-cracking construction method and building floor leveling anti-cracking structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108240038A (en) * 2018-03-15 2018-07-03 北京城建集团有限责任公司 Super plane concrete structure and construction method based on multi-level network form post-cast strip
CN108240038B (en) * 2018-03-15 2023-09-08 北京城建集团有限责任公司 Ultra-large plane concrete structure based on multistage grid type post-cast strip and construction method
CN110685424A (en) * 2019-09-05 2020-01-14 东莞市鲁班装饰工程有限公司 Building floor leveling anti-cracking construction method and building floor leveling anti-cracking structure

Similar Documents

Publication Publication Date Title
CN105220808B (en) Large-span prestressed arch bar in-situ precast construction method of installation
CN108240038A (en) Super plane concrete structure and construction method based on multi-level network form post-cast strip
CN105134009B (en) Sill coping concrete structure of frame structure infilled wall and construction method
CN108678258A (en) Large span hemispherical armored concrete dome structure and its construction method
CN105544873B (en) A kind of construction method of the hollow roofing of waveform
CN208455910U (en) Large span hemispherical armored concrete dome structure and its template system
CN114658219B (en) Construction method for single-side assembled formwork support
CN207974233U (en) Super plane concrete structure based on multi-level network format post-cast strip
CN207314655U (en) Fill concrete wallboard in a kind of prefabricated thermal insulation
CN111188459B (en) Construction process for bonding prestressed reinforced concrete beam
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN205444590U (en) Cast -in -place compound incubation concrete shear force wall
CN110409900A (en) Hybrid connection precast prestressed concrete circle warehouse structure
CN207960000U (en) A kind of reinforcing floor construction
CN206245730U (en) A kind of cast-in-place pitched roof double template structure
CN103835401B (en) Covered with Angles silk screen Mortar Plates cross-frame foamed concrete bearing wall and the practice
CN204940652U (en) Large-span prestressed site prefabrication arch bar
CN108560861A (en) A kind of connection structure and its construction method of cast-in-place concrete and decoration of exterior wall wall
CN208122041U (en) A kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system
CN207469550U (en) A kind of across wall balcony slab of assembled
CN207092299U (en) A kind of cast-in-place hollow armored concrete filling wall
CN206205144U (en) Node is poured after the secondary external permanent aluminium sheet external mold of framework
CN211622120U (en) Improve constructional column structure of top quality of pouring
CN108716188A (en) A kind of guardrail grouting connection prefabricated assembling type reinforced concrete side crashproof guardrail
CN107152083A (en) Concrete-filled steel tube truss building and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant