CN208122041U - A kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system - Google Patents
A kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system Download PDFInfo
- Publication number
- CN208122041U CN208122041U CN201820561475.1U CN201820561475U CN208122041U CN 208122041 U CN208122041 U CN 208122041U CN 201820561475 U CN201820561475 U CN 201820561475U CN 208122041 U CN208122041 U CN 208122041U
- Authority
- CN
- China
- Prior art keywords
- ips
- concrete layer
- concrete
- cast
- self
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system systems, including the second concrete layer, the side of second concrete layer is equipped with attachment device, the side of the attachment device is fixed with casing, and one end of casing through the second concrete layer and extends to the second concrete layer other side, the side of second concrete layer is equipped with the first screed-coat, the side of described sleeve pipe is equipped with groove, threaded rod is fixed on one end side wall in the groove, the threaded rod is equipped with opening, sliding sleeve is connected to mobile bar in the opening, the both ends of the mobile bar are respectively and fixedly provided with two the second connecting rods being parallel to each other, and two second connecting rods of the same side are one group.The utility model realizes the function of facilitating and carry out disassembly support rod, does not need to destroy wall, the integrality of the wall of guarantee, to ensure that the quality of wall, facilitates extraction support rod, can repeat using reducing the waste of material.
Description
Technical field
The utility model relates to shear wall self-heat conserving technical field more particularly to a kind of IPS Cast-in-place concrete shear wall self-heat conservings
Architecture system.
Background technique
Cast-in-place shear wall structure exterior-wall heat insulation construction quality relationship is to building energy conservation environment protecting, due to exterior insulation energy
Enough effectively to avoid cold-heat bridge effect, heat insulation effect is clearly higher than inside holding, therefore, is used widely in recent years, IPS heat preservation
Plate is the abbreviation of EPS single-side steel wire mesh frame plate, it is the zinc-coated wire mesh sheet of the tectonism by single side and the plating for penetrating EPS sheet
Zinc steel wire (hereinafter referred to as " abdomen silk ") is kept the temperature by automated production wire bonding, and by the three-dimensional space rack of boundary mortar cladding
Plate, traditional exterior-wall heat insulation construction way are that patch paving insulation board is needed when being laid on the outside of masonry after the completion of outer walling
Plastic tube is injected in wall, steel pipe is then injected in plastic tube, is played a supporting role, and after the completion of use, steel pipe is dug
Out, it reuses, but while digging out steel pipe, wall can be gone out and cause to damage, or even influence wall quality, for this purpose, we
A kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system is proposed to solve the above problems.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of IPS Cast-in-place concrete proposed
Shear wall structure of self-heat preservation system system.
To achieve the goals above, the utility model uses following technical solution:
A kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system, including the second concrete layer, second concrete
The side of layer is equipped with attachment device, and the side of the attachment device is fixed with casing, and the second concrete is run through in one end of casing
Layer simultaneously extends to the second concrete layer other side, and the side of second concrete layer is equipped with the first screed-coat, described sleeve pipe
Side is equipped with groove, and threaded rod is fixed on one end side wall in the groove, and the threaded rod is equipped with opening, the opening
Interior sliding sleeve is connected to mobile bar, and the both ends of the mobile bar are respectively and fixedly provided with two the second connecting rods being parallel to each other, and the same side
Two the second connecting rods be one group, one end of same group of two the second connecting rods is fixed with sliding block jointly, in the groove
Sliding slot is equipped in opposing sidewalls, and sliding slot and sliding block correspond, and sliding block is mounted in sliding slot, the side of the sliding block is equal
It is rotatably connected to first connecting rod, clamping plate is rotatably connected in the opposing sidewalls in the groove, and clamping plate is located at cunning
The side of slot, one end of the first connecting rod are rotatably connected on the side of clamping plate, and screw thread is socketed with support on the threaded rod
Bar, and support rod is located between two clamping plates, the other side of second concrete layer are equipped with insulating layer, and the one of the insulating layer
Side is equipped with the first concrete layer, is equidistantly equipped with multiple locating pieces in first concrete layer, and the side of locating piece is fixed
It is connected to the side of insulating layer, one end of described sleeve pipe through insulating layer and the first concrete layer and extends to the first concrete layer
Side, the side of first concrete layer is equipped with the second screed-coat, and the side of second screed-coat is equipped with finish coat.
Preferably, the attachment device includes two inserted links being parallel to each other that the second concrete layer side is arranged in, and two
One end of a inserted link is run through the second concrete layer and is extended in the first screed-coat, and common fixing sleeve is connected to solid on two inserted links
Fixed board, and one end of casing is fixedly connected on the side of fixed plate.
Preferably, described sleeve pipe is made of PVC material.
Preferably, the support rod is made of carbon steel material.
Preferably, the insulating layer uses IPS plate.
Preferably, the opposite side of two clamping plates is equipped with anti-skid chequer.
In the utility model, in use, being inserted into two inserted links on the second concrete layer, it is fixed between two inserted links
Fixed board is fixed with casing in fixed plate, and support rod is injected in casing and screw togather threaded rod, support rod is mobile to push movable block
Mobile, movable block is mobile to drive the second connecting rod mobile, and the mobile band movable slider of the second connecting rod is mobile, and sliding block is mobile to drive first
Connecting rod is mobile, and first connecting rod drives clamping plate rotation, and clamping plate clamping brace bar is completed to carry out stablizing support when using
Afterwards, rotary supporting rod is sealed filling heat preservation material in groove to removing support rod from groove, due to will be
Both sides of the insulation board pours the concrete of not uniform thickness simultaneously, and general relatively thin side is 50mm, and thicker side is 100mm-220mm, and reinforcing bar
Spacing is small, can not vibrate, thus when constructing by placing cushion block special by certain spacing, using fine aggregate from close property coagulation
Soil, control two sides concreting height difference and the measures such as a little are poured, to control the offset that insulation board is generated by lateral pressure, to reach
To IPS cast-in-place concrete pouring quality and section thickness requirement, first floor IPS composite shear wall, filling wall and foundation ring girder or
The vertical junction of lower layer's wall, in advance by design drawing and related atlas requirement, on the outside at the steel bar welding net in concrete and
The steel bar stress position of inside concrete, which is stayed, sets vertical overlap joint additional bar, and IPS composite shear wall, filling wall are in floor position
The vertical junction set, the welded steel fabric in the concrete of outside can directly stretch out floor 200mm and be overlapped, can also add and take
Connect reinforcing bar, overlap joint reinforcing bar should before IPS network frame plate is installed binding on IPS network frame plate top, for guarantee additional bar position and
Spacing, can the level of end binding at an upper portion thereof be fixed temporarily reinforcing bar, the vertical transport of IPS network frame plate construction site can use
The mode of tower crane lifting carries out in order according to the number of its position, when monolithic lifts, should add the lumps of wood or take other
Measure, to prevent the deformation of steel bar welding net, the installation of IPS network frame plate should carry out in a manner of by a closing, sequential connection, gentlier
IPS network frame plate artificial mode can be used directly install in place, the biggish IPS network frame plate of weight can be direct in vertical lifting
In place, the fine tuning after IPS network frame plate is in place should pad the lumps of wood on insulation board, then be tapped with iron hammer, must not directly agitate or
Bar frame is struck, after the installation of IPS network frame plate is in place, its vertical straight degree is coped with and measures and rectify a deviation, then taken using steel pipe
If interim retaining frame, to guarantee the stability of IPS network frame plate, the installation of IPS network frame plate is in place, be fixed temporarily after, should immediately and wall
And the regular reinforcement of sleeper carries out binding and fixing, the connection between IPS network frame plate should be required according to construction drawing and related atlas,
It is carried out using additional bar binding, overlap joint same specification welded mesh two ways, for the net cross-sectional area for guaranteeing concrete, outside
The overlap joint of (the relatively thin side of concrete) steel bar welding net must use IPS special steel wire mesh sheet, and method progress, IPS net should be taken using button
After frame plate installation is fixed and carries out reinforcing bar connection, the laying that can carry out spool, chamber and built-in fitting in wall is fixed, and is being constructed
In the process, since thicker fulgurite or other pipelines needs vertically walk pipe or other reasons along wall, when steel bar welding net need to be cut,
It should be overlapped and be repaired in truncated position with same specification steel bar welding net after stringing, the lap of splice should meet related specification requirement, tie up
Tying point number is no less than a quarter of grid number, while pipelining, should require on IPS network frame plate according to arrangement and method for construction
Spacing installation customization cushion block, after the installation is completed, reply includes IPS network frame plate, regular reinforcement, pipelining, cushion block to IPS network frame plate
Installation etc. carries out acceptance of concealed work, and through-wall bolt hole should be by outdoor side perforating in template, and outdoor side template bottom, which should be stayed, sets height
Cleanout is spent, the insulation board fragment in template is cleaned up and blocked cleanout, IPS with dust catcher after through-wall bolt is fixed
Cast-in-place concrete network frame plate should be poured using self-compacting concrete, other walls and building can be used normal concrete and pour
It builds, when two kinds of concrete can be used being poured, should first pour normal concrete, then pour IPS composite shear wall, filling again
The self-compacting concrete of wall should block bolt hole after form removable, and blocking bolt hole should first insert and insulation board uniform thickness
Thermal insulation material, then hole both ends are tamped with dry mortar or pea gravel concreten, the utility model, which realizes, facilitates progress
The function of dismantling support rod, does not need to destroy wall, the integrality of the wall of guarantee, to ensure that the matter of wall
Amount, facilitates extraction support rod, can repeat using reducing the waste of material.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system inside pipe casing
Structural schematic diagram;
Fig. 2 be the utility model proposes a kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system the second coagulation
Soil layer construction schematic diagram;
Fig. 3 be the utility model proposes a kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system A at structure put
Big figure.
In figure:1 first concrete layer, 2 insulating layers, 3 locating pieces, 4 second concrete layers, 5 casings, 6 grooves, 7 support rods,
8 first screed-coats, 9 finish coats, 10 second screed-coats, 11 inserted links, 12 fixed plates, 13 clamping plates, 14 first connecting rods, 15 sliding slots,
16 sliding blocks, 17 threaded rods, 18 openings, 19 movable blocks, 20 second connecting rods.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
Referring to Fig.1-3, a kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system, including the second concrete layer 4, the
The side of two concrete layers 4 is equipped with attachment device, is conveniently attached casing 5, and the side of attachment device is fixed with casing 5, and
One end of casing 5 is through the second concrete layer 4 and extends to 4 other side of the second concrete layer, facilitates insertion support rod 7, carries out
Stablize support, the side of the second concrete layer 4 is equipped with the first screed-coat 8, and progress is levelling, and the side of casing 5 is equipped with groove 6, recessed
Threaded rod 17 is fixed on one end side wall in slot 6, threaded rod 17 is equipped with opening 18, and sliding sleeve is connected to mobile bar in opening 18
19, mobile bar 19 is moved along 18 directions of opening, and the both ends of mobile bar 19 are respectively and fixedly provided with two the second connecting rods 20 being parallel to each other,
Mobile bar 19 drives the second connecting rod 20 mobile, and two second connecting rods 20 of the same side are one group, and two of same group the
One end of two connecting rods 20 is fixed with sliding block 16 jointly, and the second connecting rod 20 is mobile with movable slider 16, in groove 6 in opposing sidewalls
It is equipped with sliding slot 15, and sliding slot 15 and sliding block 16 correspond, and sliding block 16 is mounted in sliding slot 15, sliding block 16 is in sliding slot 15
Mobile, the side of sliding block 16 is rotatably connected to first connecting rod 14, and sliding block 16 is mobile to drive first connecting rod 14 mobile, groove
Clamping plate 13 is rotatably connected in opposing sidewalls in 6, and clamping plate 13 is located at the side of sliding slot 15, first connecting rod 14
One end is rotatably connected on the side of clamping plate 13, and first connecting rod 14 drives clamping plate 13 to rotate, and screw thread is socketed with branch on threaded rod 17
Strut 7, one end of support rod 7 screws togather threaded rod 17, and support rod 7 is located between two clamping plates 13, and support rod 7 is mobile to push away
Dynamic movable block 19 is mobile, and movable block 19 is mobile to drive the second connecting rod 20 mobile, and the mobile band movable slider 16 of the second connecting rod 20 moves
Dynamic, sliding block 16 is mobile to drive first connecting rod 14 mobile, and first connecting rod 14 drives clamping plate 13 to rotate, 13 clamping brace bar of clamping plate
7 to carry out stablizing support, and after the completion of use, rotary supporting rod 7, so that support rod 7 be removed from groove 6, second is mixed
The other side of solidifying soil layer 4 is equipped with insulating layer 2, is kept the temperature, and the side of insulating layer 2 is equipped with the first concrete layer 1, the first concrete
Multiple locating pieces 3 are equidistantly equipped in layer 1, and the side of locating piece 3 is fixedly connected on the side of insulating layer 2, one end of casing 5
Through insulating layer 2 and the first concrete layer 1 and the side for extending to the first concrete layer 1, the side of the first concrete layer 1 is equipped with
Second screed-coat 10, progress is levelling, and the side of the second screed-coat 10 is equipped with finish coat 9, convenient-laying.
In the utility model, attachment device includes two inserted links being parallel to each other that 4 side of the second concrete layer is arranged in
11, one end of two inserted links 11 is run through the second concrete layer 4 and is extended in the first screed-coat 8, stablizes and fixes, two inserted links
Common fixing sleeve is connected to fixed plate 12 on 11, and one end of casing 5 is fixedly connected on the side of fixed plate 12, facilitates and is consolidated
Fixed, casing 5 is made of PVC material, is easy to use, waterproof and anticorrosion, and support rod 7 is made of carbon steel material, durable,
Insulating layer 2 uses IPS plate, and IPS insulation board, i.e. steel wire net rack thermal-insulating board belong to one kind of New Building Materials, primarily serve guarantor
Temperature function is shortened the construction period, reduces cost, while long service life, will not go out, it can be achieved that building heat preservation is really integrated with structure
Show hollowing, cracking, seep water, fall off and other issues, the opposite side of two clamping plates 13 is equipped with anti-skid chequer, is conveniently clamped
Support rod 7.
In the utility model, in use, two inserted links 11 are inserted on the second concrete layer 4, it is solid between two inserted links 11
Surely there is fixed plate 12, casing 5 is fixed in fixed plate 12, support rod 7 is injected in casing 5 and screws togather threaded rod 17, support rod 7 moves
Dynamic to push movable block 19 mobile, the second connecting rod 20 of mobile drive of movable block 19 is mobile, and the second connecting rod 20 is mobile to be driven
Sliding block 16 is mobile, and sliding block 16 is mobile to drive first connecting rod 14 mobile, and first connecting rod 14 drives clamping plate 13 to rotate, and clamping plate 13 presss from both sides
Compact schemes bar 7 is to carry out stablizing support, after the completion of use, rotary supporting rod 7, so that support rod 7 be moved from groove 6
Out, filling heat preservation material in groove 6 is sealed, due to pour the concrete of not uniform thickness simultaneously in both sides of the insulation board, one
As relatively thin side be 50mm, thicker side is 100mm-220mm, and bar spacing is small, can not vibrate, therefore by by certain when constructing
Spacing place cushion block special, a little etc. arranged using fine aggregate automatic close concrete, control two sides concreting height difference and pouring
It applies, to control the offset that insulation board is generated by lateral pressure, to reach IPS cast-in-place concrete pouring quality and section thickness is wanted
Ask, in first floor IPS composite shear wall, filling wall and foundation ring girder or the vertical junction of lower layer's wall, press in advance design drawing and
Related atlas requirement, at the steel bar welding net in the concrete and steel bar stress position of inside concrete, which is stayed, on the outside sets vertical take
It connects with additional bar, the steel bar welding of IPS composite shear wall, filling wall in the vertical junction of floor location, outside concrete
It connects net and can directly stretch out floor 200mm and overlapped, overlap joint reinforcing bar can also be added, overlap joint reinforcing bar should be before the installation of IPS network frame plate
Binding is on IPS network frame plate top, for position and the spacing for guaranteeing additional bar, can the level of end binding at an upper portion thereof be fixed temporarily
Reinforcing bar, the vertical transport of IPS network frame plate construction site can be pressed by the way of tower crane lifting according to the number of its position
Sequence carries out, and when monolithic lifts, should add the lumps of wood or take other measures, to prevent the deformation of steel bar welding net, IPS network frame plate
Installation should carry out in a manner of by a closing, sequential connection, and artificial mode can be used in lighter IPS network frame plate directly pacifies in place
Dress, the biggish IPS network frame plate of weight can be directly in place in vertical lifting, and the fine tuning after IPS network frame plate is in place should be in insulation board
The lumps of wood on upper pad, is then tapped with iron hammer, directly must not agitate or strike bar frame, after the installation of IPS network frame plate is in place, reply
Its vertical straight degree measures and rectifies a deviation, and then interim retaining frame is set up using steel pipe, to guarantee the stability of IPS network frame plate, IPS
Network frame plate installation is in place, be fixed temporarily after, binding and fixing, IPS network frame plate should be carried out with the regular reinforcement of wall and sleeper immediately
Between connection should be according to construction drawing and the requirement of related atlas, using additional bar binding, two kinds of same specification welded mesh of overlap joint
Mode carries out, and for the net cross-sectional area for guaranteeing concrete, the overlap joint of outside (the relatively thin side of concrete) steel bar welding net must use IPS
Special steel wire mesh sheet, and method should be taken using button and carried out, after the installation of IPS network frame plate is fixed and carries out reinforcing bar connection, wall can be carried out
The laying of spool, chamber and built-in fitting is fixed in body, in the construction process, since thicker fulgurite or other pipelines are needed along wall
Vertically walking pipe or other reasons should be after stringing, with same specification steel bar welding net in truncated position when need to cut steel bar welding net
Overlap joint repairing, the lap of splice should meet related specification requirement, and binding points are no less than a quarter of grid number, pipelining
Meanwhile the spacing installation customization cushion block that should be required on IPS network frame plate according to arrangement and method for construction, IPS network frame plate after the installation is completed, are answered
Acceptance of concealed work, through-wall bolt hole in template are carried out to including IPS network frame plate, regular reinforcement, pipelining, cushion block installation etc.
Should be by outdoor side perforating, outdoor side template bottom, which should be stayed, sets height cleanout, with dust catcher by template after through-wall bolt is fixed
Interior insulation board fragment cleans up and blocks cleanout, and IPS cast-in-place concrete network frame plate should be carried out using self-compacting concrete
It pours, other walls and building can be used normal concrete and pour, and when two kinds of concrete can be used being poured, should first pour general
Logical concrete, the self-compacting concrete for then pouring IPS composite shear wall again, filling wall, coped with after form removable bolt hole into
Row blocks, and the thermal insulation material with insulation board uniform thickness should first be inserted by blocking bolt hole, then will with dry mortar or pea gravel concreten
It tamps at hole both ends.
More than, the only preferable specific embodiment of the utility model, but the protection scope of the utility model is not limited to
In this, anyone skilled in the art within the technical scope disclosed by the utility model, according to the utility model
Technical solution and its utility model design be subject to equivalent substitution or change, should all cover the protection scope of the utility model it
It is interior.
Claims (6)
1. a kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system, including the second concrete layer (4), which is characterized in that institute
The side for stating the second concrete layer (4) is equipped with attachment device, and the side of the attachment device is fixed with casing (5), and casing (5)
One end through the second concrete layer (4) and extending to the second concrete layer (4) other side, second concrete layer (4)
Side is equipped with the first screed-coat (8), and the side of described sleeve pipe (5) is equipped with groove (6), on one end side wall in the groove (6)
It is fixed with threaded rod (17), the threaded rod (17) is equipped with opening (18), and described opening (18) interior sliding sleeve is connected to mobile bar
(19), the both ends of the mobile bar (19) are respectively and fixedly provided with two the second connecting rods (20) being parallel to each other, and two of the same side
Second connecting rod (20) is one group, and one end of same group of two the second connecting rods (20) is fixed with sliding block (16) jointly, described
It is equipped with sliding slot (15) in groove (6) interior opposing sidewalls, and sliding slot (15) and sliding block (16) correspond, and sliding block (16) is installed
In sliding slot (15), the side of the sliding block (16) is rotatably connected to first connecting rod (14), opposite in the groove (6)
It is rotatably connected on side wall clamping plate (13), and clamping plate (13) is located at the side of sliding slot (15), the first connecting rod
(14) one end is rotatably connected on the side of clamping plate (13), and screw thread is socketed with support rod (7) on the threaded rod (17), and supports
Bar (7) is located between two clamping plates (13), and the other side of second concrete layer (4) is equipped with insulating layer (2), the insulating layer
(2) side is equipped with the first concrete layer (1), is equidistantly equipped with multiple locating pieces (3) in first concrete layer (1), and
The side of locating piece (3) is fixedly connected on the side of insulating layer (2), and insulating layer (2) and first are run through in one end of described sleeve pipe (5)
Concrete layer (1) and the side for extending to the first concrete layer (1), the side of first concrete layer (1) are equipped with second and look for
The side of leveling (10), second screed-coat (10) is equipped with finish coat (9).
2. a kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system according to claim 1, which is characterized in that institute
Stating attachment device includes two inserted links (11) that are parallel to each other of the setting in the second concrete layer (4) side, two inserted links (11)
One end run through the second concrete layer (4) and extend in the first screed-coat (8), be fixedly attached jointly on two inserted links (11)
Have fixed plate (12), and one end of casing (5) is fixedly connected on the side of fixed plate (12).
3. a kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system according to claim 1, which is characterized in that institute
Casing (5) is stated to be made of PVC material.
4. a kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system according to claim 1, which is characterized in that institute
Support rod (7) is stated to be made of carbon steel material.
5. a kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system according to claim 1, which is characterized in that institute
Insulating layer (2) are stated using IPS plate.
6. a kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system according to claim 1, which is characterized in that two
The opposite side of a clamping plate (13) is equipped with anti-skid chequer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820561475.1U CN208122041U (en) | 2018-04-19 | 2018-04-19 | A kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820561475.1U CN208122041U (en) | 2018-04-19 | 2018-04-19 | A kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208122041U true CN208122041U (en) | 2018-11-20 |
Family
ID=64190637
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820561475.1U Expired - Fee Related CN208122041U (en) | 2018-04-19 | 2018-04-19 | A kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208122041U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110295705A (en) * | 2019-07-05 | 2019-10-01 | 谭士虎 | A kind of non-bearing wall body insulating brick |
CN111335483A (en) * | 2018-12-18 | 2020-06-26 | 王琛 | Self-locking structure for building |
-
2018
- 2018-04-19 CN CN201820561475.1U patent/CN208122041U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111335483A (en) * | 2018-12-18 | 2020-06-26 | 王琛 | Self-locking structure for building |
CN111335483B (en) * | 2018-12-18 | 2021-08-17 | 王琛 | Self-locking structure for building |
CN110295705A (en) * | 2019-07-05 | 2019-10-01 | 谭士虎 | A kind of non-bearing wall body insulating brick |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101985882B (en) | Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel | |
CN109736353A (en) | Construction method of composite single-side formwork deep foundation pit basement outer wall | |
CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
CN103410317A (en) | Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part | |
CN101818539A (en) | Assembled integral building and construction method thereof | |
CN105780976B (en) | Compound concrete shear wall structure and its concreting method | |
CN110777983A (en) | Synchronous construction structure and method for concrete filled wall and cast-in-place structure | |
CN110258848A (en) | A kind of construction method of building energy conservation CL composite shear wall | |
CN104405062A (en) | Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment | |
CN110905523A (en) | Subway vertical shaft construction method | |
CN108505805A (en) | Large-scale cast-in-place pond and its construction method are split in expansion reinforcing band control | |
CN105134009A (en) | Sill coping concrete structure of frame structure infilled wall and construction method | |
CN103161176B (en) | Tower crane foundation construction method in main building disjunctor garage | |
CN107524471A (en) | A kind of tunnel end plugging construction method | |
CN110552370A (en) | Reverse construction method based annular lining wall integral single-side formwork construction method | |
CN108867690B (en) | Reverse construction method for pile plate retaining wall of large foundation pit | |
CN110792200A (en) | Masonry construction method without post-picking and pipe wrapping structure thereof | |
CN110158645A (en) | Prefabricated components Hybrid connections assembly concrete pipe gallery | |
CN201943086U (en) | Underground building wall body | |
CN208122041U (en) | A kind of IPS Cast-in-place concrete shear wall structure of self-heat preservation system system | |
CN111042569B (en) | Construction method for additionally building linear accelerator machine room in limited space of hospital basement | |
CN106968692B (en) | Tunnel excavation supporting structure and construction method thereof | |
CN105951842A (en) | Raft lower reversed beam polystyrene board caul construction method | |
CN108240038A (en) | Super plane concrete structure and construction method based on multi-level network form post-cast strip | |
CN107905609A (en) | Underground people's air defense construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181120 |
|
CF01 | Termination of patent right due to non-payment of annual fee |