CN111287769A - Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof - Google Patents

Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof Download PDF

Info

Publication number
CN111287769A
CN111287769A CN202010131558.9A CN202010131558A CN111287769A CN 111287769 A CN111287769 A CN 111287769A CN 202010131558 A CN202010131558 A CN 202010131558A CN 111287769 A CN111287769 A CN 111287769A
Authority
CN
China
Prior art keywords
tunnel
grouting
construction
surrounding rock
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010131558.9A
Other languages
Chinese (zh)
Inventor
李秀红
胡芳
左亚
邱士凯
杨浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Ceg 6 Architectural Engineering Co ltd
Original Assignee
Guizhou Ceg 6 Architectural Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Ceg 6 Architectural Engineering Co ltd filed Critical Guizhou Ceg 6 Architectural Engineering Co ltd
Priority to CN202010131558.9A priority Critical patent/CN111287769A/en
Publication of CN111287769A publication Critical patent/CN111287769A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/50Compositions for plastering borehole walls, i.e. compositions for temporary consolidation of borehole walls
    • C09K8/504Compositions based on water or polar solvents
    • C09K8/5045Compositions based on water or polar solvents containing inorganic compounds

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Civil Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention relates to the technical field of tunnel construction, in particular to a tunnel surrounding rock advanced grouting reinforcement structure and a construction method thereof, and the tunnel surrounding rock advanced grouting reinforcement structure comprises the following operation processes: advanced grouting construction preparation → a drilling machine is in place → a positioning hole → drilling → pulping → grouting and grouting → retreating → grouting is finished → grouting inspection → a grout stop wall is set → tunnel face excavation construction → tunnel excavation first support → tunnel structure construction; the tunnel surrounding rock advanced grouting reinforcement structure and the construction method thereof utilize advanced grouting to reinforce surrounding rock, can reduce the influence of underground water on tunnel construction, can effectively ensure the safety of excavation of tunnel earth and rockwork, greatly reduce the disturbance of tunnel construction on surrounding rock surrounding soil, and reduce the influence on the structure and operation of a tunnel below; the grouting-reinforced surrounding rock has a good waterproof effect, erosion of underground water to the tunnel enclosure structure can be well relieved, and the service life of the tunnel is prolonged.

Description

Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof
Technical Field
The invention relates to the technical field of tunnel construction, in particular to a tunnel surrounding rock advanced grouting reinforcement structure and a construction method thereof.
Background
When a newly constructed road passes through a mountain area, in order to obtain an optimal operation scheme of a line, a tunnel is inevitably constructed above an existing tunnel. In the tunnel section of the Wusse river on the expressway from Emei source to Han source, an upward crossing Queen railway line appears, and 282km is at an departure station. Effective measures are required to be taken, the construction process is optimized, broken surrounding rocks and surrounding strata are prevented from moving and collapsing due to the tunnel construction, and the influence on the safe operation of the existing lower railway tunnel is prevented.
In view of the above, the invention provides a tunnel surrounding rock advanced grouting reinforcement structure and a construction method thereof.
Disclosure of Invention
In order to solve the technical problems, the invention provides a tunnel surrounding rock advanced grouting reinforcement structure and a construction method thereof.
The invention is realized by the following technical scheme.
The invention provides a tunnel surrounding rock advanced grouting reinforcement structure, which comprises a grout stopping wall and a grouting reinforcement surrounding rock, and is characterized in that: the cross section in the contour line of the tunnel structure is provided with a drill hole, the direction of the drill hole is arranged along the longitudinal direction of the contour line of the tunnel structure, the position of the drill hole is arranged along the inner side of the contour line of the tunnel structure and towards the center of the tunnel, the drill hole is internally provided with a grouting wall for reinforcing the surrounding rock, the included angle between the grouting wall for reinforcing the surrounding rock and the horizontal direction of the tunnel is 30-60 degrees, and the cross section in the contour line of the tunnel structure is provided with a grout stopping wall.
Preferably, the grout stopping wall is a C20 concrete structure with the thickness of 1 m.
Preferably, the diameter of the drilled hole is not less than 108mm, the diameter of the final hole is not less than 90mm, the hole opening is a hot-rolled seamless steel pipe with the diameter of 108mm and the wall thickness of 5mm, and the pipe length is 3m for fixing.
The invention provides a construction method of a tunnel surrounding rock advanced grouting reinforcement structure, which is characterized by comprising the following steps: the method comprises the following operation processes: advanced grouting construction preparation → a drilling machine is in place → a positioning hole → drilling → pulping → grouting and grouting → retreating → grouting is finished → grouting inspection → a grout stop wall is set → tunnel face excavation construction → tunnel excavation first support → tunnel structure construction.
The orifice pipe of the drill hole is firmly embedded according to the designed position and is provided with a grout stopping measure.
The grouting material adopts A liquid and C liquid, the A liquid is sodium silicate and diluent, the C liquid is cement mixture, the grouting pressure is 1.0-2.0 Mpa, the grouting length is 2 times of the excavation depth, the hole jumping construction is carried out from the middle to the periphery, the grouting inspection is carried out after the grouting is finished, the inspection holes are drilled in the contour line range of the excavated tunnel structure, the inspection holes are plugged in full holes after the inspection is finished, and the grout stop wall is established.
And the tunnel face excavation construction is carried out by adopting an annular excavation reserved core soil method.
Preferably, the number of the inspection holes is at least 5, wherein the number of the inspection holes at the arch part is at least 2, the number of the inspection holes at the left side wall and the right side wall is at least 1 respectively, the number of the inspection holes at the bottom is 1, the diameter of each inspection hole is 110mm, the length of each inspection hole is about 12m, the average water yield is less than 0.2L/min, the water absorption capacity is less than 2L/min under the pressure of 1.0MPa, and the strength of a reinforcing body is not less than 3 MPa; the rock RQD index 1 reaches 75-80% and is qualified.
Preferably, the construction process of the annular excavation reserved core soil method comprises the following steps: construction preparation → surveying and laying → excavation and slag discharging of upper annular soil → upper primary support → excavation and slag discharging of left and right side wall soil → left and right side wall primary support → excavation of core soil → bottom primary support → tunnel structure construction.
Preferably, the surrounding rock monitoring measurement is performed at the time of upper primary support, left and right side wall primary support, and bottom primary support.
Preferably, the inspection hole is completely blocked by using M10 cement mortar.
Preferably, the mixing ratio of the solution A is as follows: sodium silicate: diluent =44L: 56L.
Preferably, the grouting and grouting are performed by a double-pipe drilling machine, and the grouting construction process of the double-pipe drilling machine comprises the following steps: drilling and water feeding → inserting pipe injecting liquid A and liquid C → back pumping pipe → grouting.
The invention has the beneficial effects that:
1. the surrounding rock is reinforced by advanced grouting, so that the influence of underground water on tunnel construction can be reduced, the safety of excavation of earth and stone sides of the tunnel can be effectively guaranteed, the disturbance of tunnel construction on soil bodies around the surrounding rock is greatly reduced, and the influence on the structure and operation of the tunnel below is reduced;
2. the grouting-reinforced surrounding rock has a good waterproof effect, erosion of underground water to the tunnel enclosure structure can be well relieved, and the service life of the tunnel is prolonged;
3. the field construction is guided by utilizing field timely monitoring measurement and test data, grouting parameters are dynamically controlled, grouting materials are reasonably selected, the grouting reinforcement effect is ensured, and the construction safety and rapidness are ensured.
Drawings
FIG. 1 is a flow chart of an advanced grouting construction process;
FIG. 2 is a flow chart of a construction process of a method for annularly excavating reserved core soil;
FIG. 3 is a cross-sectional view of an excavation sequence of a reserved core soil for annular excavation;
FIG. 4 is a longitudinal section view of an excavation sequence of the reserved core soil for annular excavation;
FIG. 5 is a cross-sectional layout of deep hole grouting;
FIG. 6 is a longitudinal section layout drawing of deep hole grouting;
in the figure: 1-upper annular soil, 2-left and right side wall soil, 3-core soil, 4-drilling, 5-tunnel structure contour line, 6-grout stopping wall and 7-grouting for reinforcing surrounding rock.
Detailed Description
The following further describes the technical solution of the present invention, but the scope of the claimed invention is not limited to the above.
Referring to the attached drawings 1-6, the advanced grouting reinforcement structure for the tunnel surrounding rock comprises a grout stop wall 6 and a grouting reinforcement surrounding rock 7, wherein a drill hole 4 is formed in the cross section in a tunnel structure contour line 5, the drill hole 4 is longitudinally arranged along the tunnel structure contour line 5, the drill hole 4 is arranged towards the center of a tunnel along the inner side of the tunnel structure contour line 5, the grouting reinforcement surrounding rock 7 is arranged in the drill hole 4, the included angle between the grouting reinforcement surrounding rock 7 and the horizontal direction of the tunnel is 30 degrees, and the grout stop wall 6 is arranged on the cross section in the tunnel structure contour line 5.
A construction method of a tunnel surrounding rock advanced grouting reinforcement structure comprises the following operation processes: advanced grouting construction preparation → a drilling machine is in place → a positioning hole → a drilling hole 4 → pulping → grouting → retreating → grouting is finished → grouting inspection → a grout stop wall 6 is set → tunnel face excavation construction → tunnel excavation first support → tunnel structure construction.
Before advanced grouting construction, a comprehensive geological prediction means is applied to find out the geological condition in front of the tunnel face of the tunnel, grouting parameters such as grouting concentration, diffusion radius and the like are optimized and adjusted properly according to the water outlet condition of the advanced water detecting hole and a water pressure test, and the arrangement, the number and the drill holes 4 of the drill holes 4 are adjusted and optimized.
The diameter of the opening of the drill hole 4 is not less than 108mm, the diameter of the final hole is not less than 90mm, the diameter of the hole opening is 108mm, the thickness of the hot-rolled seamless steel pipe is 5mm, the pipe length is 3m for fixing, the hole opening pipe is firmly embedded according to the designed position, and a grout stopping measure is arranged.
The grouting material adopts A liquid and C liquid, the A liquid is sodium silicate and diluent, the C liquid is cement admixture, the pressure of grouting is 2.0Mpa, the grouting length is 2 times of the excavation depth, when the grouting length is 12m, excavation is 6m, hole jumping construction is carried out from middle to periphery, grouting inspection is carried out after grouting is finished, the grouting inspection adopts the way that inspection holes are punched in the range of 5 of the contour line of the excavated tunnel structure, full-hole plugging is carried out on the inspection holes after inspection is finished, a grout stop wall 6 is established, and the grout stop wall 6 is a C20 concrete structure with the thickness of 1 m.
The mixing proportion of the solution A is as follows: sodium silicate: diluent =44L: 56L.
Grouting by using a double-pipe drilling machine, and grouting by using the double-pipe drilling machine: drilling and water feeding → inserting pipe injecting liquid A and liquid C → back pumping pipe → grouting.
The number of the inspection holes is at least 5, wherein the number of the inspection holes at the arch part is at least 2, the number of the inspection holes at the left side wall and the right side wall is at least 1 respectively, the number of the inspection holes at the bottom is 1, the diameter of the inspection holes is phi 110mm, the length is about 12m, the average water yield is less than 0.2L/min, the water absorption capacity is less than 2L/min under the pressure of 1.0MPa, and the strength of a reinforcing body is not less than 3 MPa; the rock mass RQD index 1 reaches 75-80% and is qualified, and the inspection hole is plugged completely by adopting M10 cement mortar.
In the construction process of grouting, when grouting pressure suddenly rises, the grouting pump of the liquid A is stopped, only the liquid C is injected, double-liquid grouting is carried out after the pumping pressure is recovered to be normal, the slurry inlet amount is large, the pressure does not rise for a long time, thick slurry is adjusted or the mixing ratio is adjusted, the slurry gelling time is shortened, small-pump-amount and low-pressure grouting is carried out, and the slurry has relative retention time in a rock stratum crack so as to be gelled. Intermittent grouting can also be used, but the stop time cannot exceed the gel time of the grout. If the system does need to be stopped for a long time, the liquid A grouting pump is stopped firstly, then the liquid C grouting pump is stopped, and the pipeline is cleaned by clear water to prevent the pipeline from being blocked.
When the slurry running phenomenon occurs on the tunnel face or the orifice, the gelling time is shortened, small pump amount and low-pressure grouting are carried out, or intermittent grouting is adopted, or external blockage is carried out, the pressure is suddenly reduced in the grouting process, the flow is increased, the flow is not increased again, the gelling time is shortened, and the slurry concentration is increased or intermittent grouting is used.
The tunnel face excavation construction is carried out by adopting an annular excavation reserved core soil method, and the construction process of the annular excavation reserved core soil method comprises the following steps: construction preparation → surveying and paying-off → excavation and slag discharging of upper annular soil 1 → upper primary support → excavation and slag discharging of left and right side wall soil 2 → left and right side wall primary support → excavation of core soil 3 → bottom primary support → tunnel structure construction, and surrounding rock monitoring and surveying are performed during upper primary support, left and right side wall primary support and bottom primary support.
The left side wall excavation adopts the mode of crisscross excavation, guarantees face overall stability. The number of excavation processes is large, the exposure time of an excavation surface is long when a cycle is completed, and the excavation surface needs to be stabilized in time. Except adopting and staying core soil 3, still need in time to hang the net and just spout a layer of thick concrete for the time, just can guarantee in time to stabilize the excavation face, strengthen the country rock control simultaneously and measure, carry out the accuracy and control to the country rock situation, guide face excavation, ensure excavation safety and country rock stability.
The tunnel structure construction should be strict according to the principle of "pipe is advanced, and grouting is tight, short excavation, seals soon, and the measurement of working" after the earth and rockfill excavation, in time carry out preliminary bracing and tunnel structure's construction, stabilize country rock and peripheral hydrology, geological conditions early, reduce the influence of construction to excavation section country rock and ground.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any way, and any simple modification, equivalent change and modification made to the above embodiment according to the technical spirit of the present invention are within the scope of the present invention without departing from the technical spirit of the present invention.

Claims (10)

1. The utility model provides a tunnel country rock advances slip casting reinforced structure, consolidates country rock (7) including only thick liquid wall (6) and mud jacking slip casting, its characterized in that: the cross section in the tunnel structure contour line (5) is provided with a drill hole (4), the direction of the drill hole (4) is arranged along the longitudinal direction of the tunnel structure contour line (5), the position of the drill hole (4) is arranged along the inner side of the tunnel structure contour line (5) towards the center of the tunnel, the drill hole (4) is internally provided with a grouting reinforcement surrounding rock (7), the included angle between the grouting reinforcement surrounding rock (7) and the horizontal direction of the tunnel is 30-60 degrees, and a grout stopping wall (6) is arranged on the cross section in the tunnel structure contour line (5).
2. The advanced grouting reinforcement structure for the surrounding rock of the tunnel according to claim 1, characterized in that: the grout stopping wall (6) is of a C20 concrete structure with the thickness of 1 m.
3. The advanced grouting reinforcement structure for the surrounding rock of the tunnel according to claim 1, characterized in that: the diameter of the opening of the drill hole (4) is not less than 108mm, the diameter of the final hole is not less than 90mm, the hole opening is a hot-rolled seamless steel pipe with the diameter of 108mm and the wall thickness of 5mm, and the pipe length is 3m for fixing.
4. The construction method of the tunnel surrounding rock advanced grouting reinforcement structure according to one of claims 1 to 3, characterized by comprising the following steps: the method comprises the following operation processes: advanced grouting construction preparation → a drilling machine is in place → a positioning hole → drilling (4) → pulping → grouting and grouting → retreating → grouting ending → grouting inspection → setting of a grout stopping wall (6) → tunnel face excavation construction → tunnel excavation first support → tunnel structure construction;
the orifice pipe of the drilling hole (4) is firmly embedded according to the designed position and is provided with a grout stopping measure;
the grouting material adopts A liquid and C liquid, the A liquid is sodium silicate and diluent, the C liquid is cement mixture, the grouting pressure is 1.0-2.0 Mpa, the grouting length is 2 times of the excavation depth, the hole jumping construction is carried out from the middle to the periphery, the grouting inspection is carried out after the grouting is finished, the grouting inspection adopts the way of punching inspection holes in the range of the contour line (5) of the excavated tunnel structure, the inspection holes are plugged in full holes after the inspection is finished, and a grout stop wall (6) is established;
and the tunnel face excavation construction is carried out by adopting an annular excavation reserved core soil method.
5. The construction method of the tunnel surrounding rock advanced grouting reinforcement structure according to claim 4, characterized by comprising the following steps: the number of the inspection holes is at least 5, wherein the number of the inspection holes at the arch part is at least 2, the number of the inspection holes at the left side wall and the right side wall is at least 1 respectively, the number of the inspection holes at the bottom is 1, the diameter of the inspection holes is phi 110mm, the length is about 12m, the average water yield is less than 0.2L/min, the water absorption capacity is less than 2L/min under the pressure of 1.0MPa, and the strength of a reinforcing body is not less than 3 MPa; the rock RQD index 1 reaches 75-80% and is qualified.
6. The construction method of the tunnel surrounding rock advanced grouting reinforcement structure according to claim 4, characterized by comprising the following steps: the construction process of the annular excavation reserved core soil method comprises the following steps: construction preparation → surveying and paying-off → excavation and slag discharging of upper annular soil (1 → upper primary support → excavation and slag discharging of left and right side wall soil (2) → left and right side wall primary support → excavation of core soil (3) → bottom primary support → tunnel structure construction.
7. The construction method of the tunnel surrounding rock advanced grouting reinforcement structure according to claim 6, characterized in that: and performing surrounding rock monitoring and measurement during upper primary support, left and right side wall primary support and bottom primary support.
8. The construction method of the tunnel surrounding rock advanced grouting reinforcement structure according to claim 4, characterized by comprising the following steps: and the inspection hole is sealed by M10 cement mortar.
9. The construction method of the tunnel surrounding rock advanced grouting reinforcement structure according to claim 4, characterized by comprising the following steps: the mixing proportion of the solution A is as follows: sodium silicate: diluent =44L: 56L.
10. The construction method of the tunnel surrounding rock advanced grouting reinforcement structure according to claim 4, characterized by comprising the following steps: grouting by using a double-pipe drilling machine, and grouting by using the double-pipe drilling machine: drilling and water feeding → inserting pipe injecting liquid A and liquid C → back pumping pipe → grouting.
CN202010131558.9A 2020-02-28 2020-02-28 Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof Pending CN111287769A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010131558.9A CN111287769A (en) 2020-02-28 2020-02-28 Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010131558.9A CN111287769A (en) 2020-02-28 2020-02-28 Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN111287769A true CN111287769A (en) 2020-06-16

Family

ID=71020222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010131558.9A Pending CN111287769A (en) 2020-02-28 2020-02-28 Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN111287769A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980674A (en) * 2020-08-31 2020-11-24 中铁十六局集团有限公司 Tunnel advanced curtain grouting process and comprehensive inspection and evaluation method
CN112727473A (en) * 2021-02-04 2021-04-30 中铁二院工程集团有限责任公司 Pre-anchoring rapid tunneling construction method for high-ground-stress large-deformation tunnel
CN114991819A (en) * 2022-05-20 2022-09-02 中国矿业大学(北京) Three-phase control technology for water damage tunnel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005273376A (en) * 2004-03-26 2005-10-06 Makoto Uemura Working face stabilizing method applicable to underground structure construction method
KR100563990B1 (en) * 2005-09-08 2006-03-29 건양씨엔이 (주) The apparatus and method of tunnel pre-supporting multi-grouting using pressurized ultra-sonic vibration equipment
CN103256060A (en) * 2013-05-18 2013-08-21 中铁十六局集团有限公司 Moisture rich and weak mylonite large section tunnel surrounding rock consolidation and excavation method
CN107642360A (en) * 2017-07-25 2018-01-30 彭峰 Tunneling boring front pre-grouting construction method
CN107725056A (en) * 2017-10-13 2018-02-23 中铁五局集团有限公司 One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
JP2019044571A (en) * 2017-08-31 2019-03-22 日特建設株式会社 Reinforcement method
CN110005442A (en) * 2019-04-26 2019-07-12 中铁二十三局集团第六工程有限公司 Under wear existing building Urban Underground mining sectbn surrounding rock consolidation technique

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005273376A (en) * 2004-03-26 2005-10-06 Makoto Uemura Working face stabilizing method applicable to underground structure construction method
KR100563990B1 (en) * 2005-09-08 2006-03-29 건양씨엔이 (주) The apparatus and method of tunnel pre-supporting multi-grouting using pressurized ultra-sonic vibration equipment
CN103256060A (en) * 2013-05-18 2013-08-21 中铁十六局集团有限公司 Moisture rich and weak mylonite large section tunnel surrounding rock consolidation and excavation method
CN107642360A (en) * 2017-07-25 2018-01-30 彭峰 Tunneling boring front pre-grouting construction method
JP2019044571A (en) * 2017-08-31 2019-03-22 日特建設株式会社 Reinforcement method
CN107725056A (en) * 2017-10-13 2018-02-23 中铁五局集团有限公司 One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
CN110005442A (en) * 2019-04-26 2019-07-12 中铁二十三局集团第六工程有限公司 Under wear existing building Urban Underground mining sectbn surrounding rock consolidation technique

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
任纪华: "暗挖法深孔预注浆加固施工技术 ", 《价值工程》 *
杨国忠等: "富水地层浅埋暗挖法隧道土体注浆加固施工技术 ", 《云南水力发电》 *
王海祥: "浅埋暗挖黄土隧道下穿铁路道岔区技术研究 ", 《铁道工程学报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980674A (en) * 2020-08-31 2020-11-24 中铁十六局集团有限公司 Tunnel advanced curtain grouting process and comprehensive inspection and evaluation method
CN112727473A (en) * 2021-02-04 2021-04-30 中铁二院工程集团有限责任公司 Pre-anchoring rapid tunneling construction method for high-ground-stress large-deformation tunnel
CN114991819A (en) * 2022-05-20 2022-09-02 中国矿业大学(北京) Three-phase control technology for water damage tunnel
CN114991819B (en) * 2022-05-20 2023-09-12 中国矿业大学(北京) Three-super control technology for water damage tunnel

Similar Documents

Publication Publication Date Title
CN108060908B (en) Long-distance horizontal directional drilling and grouting reinforcement process for water-rich sand layer under building group
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN101638987A (en) Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN111287769A (en) Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof
CN110985001A (en) Advanced curtain grouting construction method suitable for high-pressure water-rich karst tunnel
CN103334770A (en) Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN110130936B (en) Construction method for sudden encountering untreated karst cave or crack in shield tunneling process
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN110469332B (en) Advanced support consolidation method for tunnel penetrating through debris flow accumulation body
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN108952727B (en) A kind of grouting water blocking method of the vertical creviced formation of high inclination-angle
CN113374440A (en) Rapid plugging method and construction method for water inrush channel of hidden collapse column
CN114483109B (en) Curtain grouting advanced large pipe shed through construction method for crossing tunnel fault fracture zone
CN109826635B (en) Construction method for reinforcing shield receiving space peripheral soil body constructed by subsurface excavation method
CN114109442B (en) Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method
CN113027483A (en) Shield tunnel broken zone stratum grouting reinforcement equipment and grouting reinforcement method thereof
CN113668564A (en) Construction method for supporting and reinforcing open-cut underground passage adjacent to subway station
CN110821498B (en) Safe and rapid water plugging and reinforcing method in strong water-rich soft surrounding rock of operation tunnel
CN209603062U (en) Change the concentrative seepage plugging structure that dynamic water is hydrostatic in gallery
CN116816389A (en) Tunnel water-rich karst collapse cavity treatment method
CN113958324B (en) Method for grouting and reinforcing deep drilling of roadway bottom plate
CN106149726B (en) The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure
CN115012993A (en) Rapid and safe disposal method for tunnel water-rich karst surge body
CN114183170A (en) Karst grouting construction method
CN113404517A (en) Construction method for mud-bursting and water-flushing of tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200616