CN106149726B - The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure - Google Patents

The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure Download PDF

Info

Publication number
CN106149726B
CN106149726B CN201610474934.8A CN201610474934A CN106149726B CN 106149726 B CN106149726 B CN 106149726B CN 201610474934 A CN201610474934 A CN 201610474934A CN 106149726 B CN106149726 B CN 106149726B
Authority
CN
China
Prior art keywords
filling
section
hole
cement slurry
sand bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610474934.8A
Other languages
Chinese (zh)
Other versions
CN106149726A (en
Inventor
邱小佩
杨洋
梁健涛
张明辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU TAILISI CONSOLIDATION REINFORCED ENGINEERING Co Ltd
Original Assignee
GUANGZHOU TAILISI CONSOLIDATION REINFORCED ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU TAILISI CONSOLIDATION REINFORCED ENGINEERING Co Ltd filed Critical GUANGZHOU TAILISI CONSOLIDATION REINFORCED ENGINEERING Co Ltd
Priority to CN201610474934.8A priority Critical patent/CN106149726B/en
Publication of CN106149726A publication Critical patent/CN106149726A/en
Application granted granted Critical
Publication of CN106149726B publication Critical patent/CN106149726B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0023Slurry

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention provides a kind of filling stable grout method of the underwater migration sand bed base soil of dynamic pressure, for the consolidation by grouting of the sand bed base soil below traffic tunnel, comprises the following steps:1) cloth hole, the mounting hole sleeve pipe in the hole are carried out at the tunnel structure position for differential settlement occur;2) drill, and drill the concrete floor and the sand bed base 1~3m of soil pierced below concrete floor, filling section is applied as first, after first applies and fill section pore-forming, pour into cement slurry thereto;Apply to fill first and drilled below section, it is 1~3m to pierce depth, and filling section is applied for second, after second applies and fill section pore-forming, pours into cement slurry thereto, so carries out subsection hole-drilling grouting from top to bottom successively;It is each apply fill section in boring procedure can not pore-forming when, pour into early solidifying property stabilizing material to drilling position.Filling stable grout method provided by the invention solves pressure and moved under flowing water, and migration sand bed is difficult to pore-forming, it is difficult to which grout injection carries out the stable technical barrier of filling.

Description

The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure
Technical field
The present invention relates to a kind of grouting moved applied to pressure and have the filling of migration sand bed foundation soil stable under flowing water Technology.
Background technology
Cement grout is generally used in the filling consolidation grouting of rock foundation and soft soil foundation, but because the structure of sand bed is special Property, cement slurry is difficult to pour into.At present, the consolidation by grouting to underground base soil is still a problem, particularly sand bed at present by dynamic The influence of flowing water, when there is liquefaction migration, difficulty is bigger.This kind of migration sand bed has the characteristics that:
1st, when sand bed be stressed dynamic flowing water influence liquefaction occur, migrated with water when, it is subbasal in tunnel structure Sand bed occurs that migration is lost in, and structure is produced differential settlement.
2nd, the dynamic flowing water that is stressed influences, and is diluted, takes away by priming charge slurry body, can not form induration, and influences Consolidation effect.
3rd, the dynamic flowing water of being stressed influences and the loose self drainage of sand bed influences, and is carried out in sand bed in boring procedure, because collapse hole, Gush etc. and to cause pore-forming difficult;
4th, in the tunnel structure that uses of putting into operation, because being influenceed by facility and structure headroom, conventional large scale equipment can not March into the arena construction.
5th, the operation tunnel after building up, because of periphery liquefaction of soil mass, argillization, water increase, cause drilling water burst, spray water, husky, Soil is lost in, and differential settlement is easily produced to tunnel structure or triggers secondary disaster;
At present, occur pressure to the operation traffic tunnel structure after building up and move the argillization that liquefied under 20~50L/min of flowing water The reinforcement technique of the soil body and sand bed has no play-by-play.
The content of the invention
The present invention is to make up the deficiencies in the prior art, there is provided a kind of filling of the underwater migration sand bed base soil of dynamic pressure is steady Determine grouting method, this method solve pressure and move under flowing water, migration sand bed is difficult to pore-forming, it is difficult to which grout injection is filled Stable technical barrier.
For the present invention to reach its purpose, the technical scheme of use is as follows:The underwater migration sand bed base soil of dynamic pressure fills Stable grout method is filled out, for the consolidation by grouting of the sand bed base soil below traffic tunnel, is comprised the following steps:
1) cloth hole, the concrete bottom to drill to tunnel structure are carried out at the tunnel structure position for differential settlement occur Plate and the concrete floor is not drilled, the mounting hole sleeve pipe in the hole;
2) subsection hole-drilling is in the milk from top to bottom:Drilling, and drill the concrete floor and pierce below concrete floor Sand bed base 1~3m of soil, apply filling section as first, after first apply fill section pore-forming after, pour into cement slurry thereto;Treat that first applies After filling the cement slurry solidification in section, apply to fill being drilled below section first, it is 1~3m to pierce depth, and filling is applied for second Section, after second applies and fill section pore-forming, cement slurry is poured into thereto, after second applies the cement slurry solidification filled in section, then Second applies the next well cementing operation for applying filling section of progress below filling section, so progress subsection hole-drilling grouting from top to bottom successively; It is each apply fill section occur gushing in boring procedure or collapse hole and can not pore-forming when, pour into early solidifying property stabilizing material to drilling position and enter The steady husky processing of row.
Preferably, the morning, which coagulates property stabilizing material, includes stability Cement paste, and its composition includes:Portland cement Slurries (the ratio of mud 0.5:1~3:1) bentonite, is added according to cement grout weight 3 ‰, is added according to cement grout weight 3 ‰ Water reducer, early strength agent is added according to cement grout weight 3 ‰.
Preferably, the filling pressure of applying for pouring into early solidifying property stabilizing material is 0.1~0.5Mpa.
As a kind of embodiment, in step 1), after installing the orifice sleeve, arranged around orifice sleeve Multiple injected holes, into injected hole, the injection hydrophilic epoxy grouting material of EAA high osmosis is carried out at pipe laying sealing to orifice sleeve Reason.
As a kind of embodiment, cement slurry described in step 2) is cement bentonite slurry.
As a kind of embodiment, the ratio of mud of the cement slurry is 0.5~3:1.
It is preferred that step 2) it is each apply fill section apply fill pressure be than apply fill section buried depth depth head difference it is big by 0.1~ 0.3Mpa。
Preferably, in step 2), filled to each apply after section pours into cement slurry, it is anti-that grouting is set up in the orifice sleeve Spouting device.
As a kind of embodiment, the grouting anti-spouting device is the casing cover matched with orifice sleeve external diameter Cap.
Technical scheme provided by the invention, has the advantages that:
The method of the present invention solves pressure and moved under flowing water, and migration sand bed is difficult to pore-forming, it is difficult to which grout injection is carried out Stable technical barrier is filled, the base sand bed of the traffic tunnel structure after building up in operation can be reinforced.
Brief description of the drawings
Fig. 1 is the cloth hole floor map in the embodiment of the present invention;
Fig. 2 is diagrammatic cross-section of the embodiment of the present invention in work progress.
Fig. 3 is well cementing schematic diagram of the embodiment of the present invention in work progress.
Fig. 4 be the embodiment of the present invention in work progress in aperture mounting hole sleeve pipe diagrammatic cross-section.
Fig. 5 is the injected hole floor map that the embodiment of the present invention is arranged in work progress around orifice sleeve
Part description of reference numerals in figure:1st, traffic tunnel, 2, concrete floor, 3, sand bed base soil, 4, bore from top to bottom Hole grouting difference applies the hole depth for filling section, and 41, first applies filling section;42nd, second filling section is applied;43rd, the 3rd filling section is applied;5th, injected hole, 6th, sleeve pipe block, 7, orifice sleeve.
Embodiment
The present invention provides a kind of filling stable grout method of the underwater migration sand bed base soil of dynamic pressure, and this method is used for The consolidation by grouting of the sand bed base soil 3 of the lower section of traffic tunnel 1, mainly comprises the following steps:
1) cloth hole, the concrete to drill to tunnel structure are carried out in the structure position of tunnel 1 for differential settlement occur Bottom plate 2 and the concrete floor 2 is not drilled, the mounting hole sleeve pipe 7 in the hole, referring to Fig. 1,4;
2) subsection hole-drilling is in the milk from top to bottom:Drilling, and drill the concrete floor and pierce below concrete floor Sand bed base 1~3m of soil, apply filling section as first, after first apply fill section pore-forming after, pour into cement slurry thereto;Treat first After applying the cement slurry solidification in filling section, apply to fill being drilled below section first, it is 1~3m to pierce depth, is applied for second Section is filled, after second applies and fill section pore-forming, pours into cement slurry thereto, after second applies the cement slurry solidification filled in section, then Next well cementing operation applied and fill section is carried out, so carries out subsection hole-drilling grouting from top to bottom successively;Each filling section of applying is being bored Occur gushing during hole or collapse hole and can not pore-forming when, pour into early solidifying property stabilizing material to drilling position and carry out steady husky processing.
Wherein early solidifying property stabilizing material preferably includes stability Cement paste, it is preferred that its composition includes:Normal silicate Cement grout (the ratio of mud 0.5:1~3:1) bentonite, is added according to cement grout weight 3 ‰, according to cement grout weight 3 ‰ Water reducer is added, early strength agent is added according to cement grout weight 3 ‰.
By filling stable grout method provided by the invention, mainly solve pressure and move under flowing water, migration sand bed is not Easy pore-forming, cause to be difficult to carry out the firm technical problem of filling by grout injection.This method can be used for being currently running and make The consolidation by grouting of sand bed base soil below traffic tunnel structure in, can be constructed without large scale equipment, easy to operate.
Technical scheme is described further with reference to the accompanying drawings and examples:
Certain open cut subway circulation tunnel 1, buried depth H are 20m, close between two river courses, are come into operation for many years, in running train The influence of vibration effect and two river fluctuation tidewater, the structural perimeter soil body of tunnel 1 produce liquefaction, argillization, and the structure of tunnel 1 occurs uneven Even sedimentation, to ensure the safe operation of tunnel structure, consolidation process need to be carried out to tunnel structure bottom.Referring to Fig. 1~2.Adding Admittedly handle, in accordance with the following steps:
1) cloth hole is carried out to there is the tunnel structure position of differential settlement, cloth hole floor map can be found in Fig. 1, cloth hole Pitch-row D is pitch-row 2m shown in Fig. 1 in 1.0~3.0m.Referring to Fig. 4, after cloth hole, drill to the concrete below the structure of tunnel 1 Bottom plate 2, and concrete floor 2 is not drilled.The mounting hole sleeve pipe 7 in drilling.In the present embodiment, the top of orifice sleeve 7 The height for exposing to the part of concrete floor 2 is more than 15cm.Multiple injected holes 5 are arranged around orifice sleeve, in this implementation It is specifically that injected hole aperture is in 8~10mm away from 3 injected holes are arranged at 50~80mm of orifice sleeve in example;Preferably, three Injected hole is in wait triangle cloth hole, the preferably inclined arrangement of injected hole, and the angle between injected hole and orifice sleeve is preferably at 30 ° ~45 °.Then injected into injected hole EAA high osmosis hydrophilic epoxy grouting material (for this area current material, can market purchase Buy acquisition), pipe laying sealing processing thus is carried out to orifice sleeve 7.
2) subsection hole-drilling grouting is carried out by the way of using from top to bottom (reference can be made to the direction of arrow in Fig. 2), concrete operations are:
Drilled where orifice sleeve in hole position, continuing to pierce below concrete floor after drilling concrete floor 2 1~3m of sand bed base soil it is deep, in boring procedure, when the entrance sand bed base of concrete floor 2 soil 3 for drilling the lower section of tunnel 1 When (1~3m is deep), the rate of output water is 20~50L/ points in hole, water head-drop water burst about 1.2~1.5m, about 0.2Mpa head;Gush Water takes 3.0~5.0cm of the grains of sand and diameter crushed stone out of, drilled grout hole because sand bed is gushed and caved in can not pore-forming.Note thereto After entering cement mortar, find seriously to be diluted, outflow with water, can not fill consolidation, lose cement mortar sample during cleaning bottom of hole.Because can not be into Hole, using the early solidifying property stabilizing material of perfusion thereto, it is 0.1~0.5Mpa to apply and fill pressure.This early coagulates property stabilizing material to flowing Sand bed has the steady husky effect of control water, plays steady husky effect.After being filled with early solidifying property stabilizing material, drill and be able to pore-forming, the section Applied as first and fill section 41.
Then applied first and fill the filling consolidation grouting that toughness cement slurry is carried out in section 41.
After first applies the cement slurry solidification of filling section, apply filling section first and continue below drilling, it is 1~3m to pierce depth;Together Sample, if also occurring collapse hole in this section of boring procedure, perfusion is early thereto coagulates property stabilizing material;Hole to be drilled and pore-forming Afterwards, applied as second and fill section 42, applied second and fill the filling consolidation grouting that toughness cement slurry is carried out in section.
Continue the 3rd well cementing for applying filling 43 according to the second well cementing mode for applying filling section, repeat no more.
In each apply grouting anti-spouting device 6 is installed in orifice sleeve after filling section is in the milk, it is specific as covered with aperture The identical sleeve pipe block of the external diameter of pipe 7, so as to avoid slurries from gushing.After cement slurry solidification, or next apply fills section drilling work The sleeve pipe block under industry front dump.Toughness cement slurry used can specifically use existing cement-bentonite slurry (ratio of mud control System is 0.5~3:1, it is specially control in the present embodiment 0.6:1~0.8:1) carry out filling grouting, difference apply fill section apply filling Pressure is bigger 0.1~0.3Mpa than applying filling section buried depth depth head difference, and Fig. 2 show three construction sections, and 41~43 are followed successively by First paragraph, second segment, the 3rd section.
The present embodiment uses above-mentioned grouting method, has efficiently controlled the migration of the dynamic flowing water grains of sand.By rich throughout the year The influence in water and dry season and the tracking and monitoring of structure tunnel, so far the sedimentation structure position being reinforced, effect stability.
In the embodiment, it is stability Cement paste that morning used, which coagulates property stabilizing material, and its composition includes:Normal silicate Cement grout (the ratio of mud 0.5:1~1:1) bentonite, is added according to cement grout weight 3 ‰, according to cement grout weight 3 ‰ Water reducer is added, early strength agent is added according to cement grout weight 3 ‰.
Not specified part in text, it is common knowledge or routine techniques that those skilled in the art grasp or known Means, this is no longer repeated one by one., can market purchase acquisition if material therefor is not specified in embodiment.
The above described is only a preferred embodiment of the present invention, any formal limitation not is done to the present invention, therefore All contents without departing from technical solution of the present invention, the technical spirit according to the present invention any are simply repaiied to made for any of the above embodiments Change, equivalent variations and modification, in the range of still falling within technical solution of the present invention.

Claims (8)

1. the filling stable grout method of the underwater migration sand bed base soil of dynamic pressure, for the sand bed base soil below traffic tunnel Consolidation by grouting, it is characterised in that comprise the following steps:
1) carry out cloth hole at the tunnel structure position for differential settlement occur, drill concrete floor to tunnel structure and The concrete floor is not drilled, the mounting hole sleeve pipe in the hole;
2) subsection hole-drilling is in the milk from top to bottom:Drilling, and drill the concrete floor and the sand pierced below concrete floor Layer base 1~3m of soil, filling section is applied as first, after first applies and fill section pore-forming, pours into cement slurry thereto;Treat that first applies filling section After interior cement slurry solidification, apply to fill being drilled below section first, it is 1~3m to pierce depth, applies filling section for second, treats After second applies filling section pore-forming, cement slurry is poured into thereto, is applied after second applies the cement slurry solidification filled in section, then second Fill and next well cementing operation applied and fill section is carried out below section, so carry out subsection hole-drilling grouting from top to bottom successively;It is each to apply Fill section occur gushing in boring procedure or collapse hole and can not pore-forming when, to drilling position pour into early solidifying property stabilizing material carry out it is steady husky Handle, after hole to be drilled and pore-forming, the filling consolidation grouting that toughness cement slurry is carried out in section is filled in described apply;
Each filling pressure of applying for applying filling section is bigger 0.1~0.3Mpa than applying filling section buried depth depth head difference.
2. filling stable grout method according to claim 1, it is characterised in that the morning, which coagulates property stabilizing material, to be included surely Qualitative Cement paste, the composition of the stability Cement paste include:Portland cement slurries, according to normal silicate water The bentonite of 3 ‰ additions of slurry liquid weight, 3 ‰ water reducers added according to Portland cement slurry weight, according to The early strength agent that the 3 ‰ of Portland cement slurry weight add, the ratio of mud of the Portland cement slurries is 0.5:1 ~3:1.
3. filling stable grout method according to claim 1, it is characterised in that pour into early solidifying property stabilizing material applies filling Pressure is 0.1~0.5Mpa.
4. filling stable grout method according to claim 1, it is characterised in that in step 1), install the aperture After sleeve pipe, multiple injected holes are arranged around orifice sleeve, the hydrophilic epoxy grouting material of EAA high osmosis is injected into injected hole Pipe laying sealing processing is carried out to orifice sleeve.
5. filling stable grout method according to claim 1, it is characterised in that cement slurry described in step 2) is water Mud bentonite slurry.
6. filling stable grout method according to claim 1, it is characterised in that the ratio of mud of the cement slurry is 0.5~3:1.
7. filling stable grout method according to claim 1, it is characterised in that in step 2), section filling is filled to each apply After entering cement slurry, grouting anti-spouting device is set up in the orifice sleeve.
8. filling stable grout method according to claim 7, it is characterised in that the grouting anti-spouting device is and hole The sleeve pipe block of mouth sleeve outer matching.
CN201610474934.8A 2016-06-22 2016-06-22 The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure Active CN106149726B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610474934.8A CN106149726B (en) 2016-06-22 2016-06-22 The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610474934.8A CN106149726B (en) 2016-06-22 2016-06-22 The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure

Publications (2)

Publication Number Publication Date
CN106149726A CN106149726A (en) 2016-11-23
CN106149726B true CN106149726B (en) 2018-03-20

Family

ID=57349803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610474934.8A Active CN106149726B (en) 2016-06-22 2016-06-22 The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure

Country Status (1)

Country Link
CN (1) CN106149726B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004913A (en) * 2019-04-10 2019-07-12 中国水利水电第七工程局成都水电建设工程有限公司 A kind of deep settlement foundation stabilization construction method of proximity subway station
CN114960756B (en) * 2021-02-26 2024-01-09 宝山钢铁股份有限公司 Underwater net-hanging masking type tunnel and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000004079A (en) * 1998-06-30 2000-01-25 정사룡 Injecting method of ground hardening material and injecting rod thereof
CN101693615A (en) * 2009-09-29 2010-04-14 武汉市商品混凝土管理站 Sulphoaluminate cement base synchronous slip casting material and preparation method
CN102828502A (en) * 2012-08-15 2012-12-19 中科院广州化学有限公司 Construction method for in-situ reinforcing of high-pressure cement-chemical pulp compound grouting
CN103031847A (en) * 2012-12-20 2013-04-10 长江勘测规划设计研究有限责任公司 Reducing overlap joint combined type orifice pipe grouting method
CN103306272A (en) * 2013-06-28 2013-09-18 葛洲坝集团基础工程有限公司 In-hole blocking method for chemically grouting deep hole with epoxy resin

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000004079A (en) * 1998-06-30 2000-01-25 정사룡 Injecting method of ground hardening material and injecting rod thereof
CN101693615A (en) * 2009-09-29 2010-04-14 武汉市商品混凝土管理站 Sulphoaluminate cement base synchronous slip casting material and preparation method
CN102828502A (en) * 2012-08-15 2012-12-19 中科院广州化学有限公司 Construction method for in-situ reinforcing of high-pressure cement-chemical pulp compound grouting
CN103031847A (en) * 2012-12-20 2013-04-10 长江勘测规划设计研究有限责任公司 Reducing overlap joint combined type orifice pipe grouting method
CN103306272A (en) * 2013-06-28 2013-09-18 葛洲坝集团基础工程有限公司 In-hole blocking method for chemically grouting deep hole with epoxy resin

Also Published As

Publication number Publication date
CN106149726A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN106121661A (en) A kind of tunnel trunk is by loess separating surface water rich strata construction method
CN107975375B (en) A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel
CN104806257A (en) Sandy gravel stratum shield construction cap-type ground advance reinforcement structure and sandy gravel stratum shield construction cap-type ground advance reinforcement method
CN103806479A (en) Pile foundation combined grouting reinforcement construction method combining waterproof curtain
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN110331992A (en) A kind of hole daguanpeng construction method
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
US11840820B2 (en) Method for strengthening and lifting high-rise building having raft foundation
CN110469332B (en) Advanced support consolidation method for tunnel penetrating through debris flow accumulation body
CN203361143U (en) Combination structure of high-pressure jet grouting pile and prestressed pipe pile
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN106837382A (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN111287769A (en) Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof
CN106149726B (en) The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure
CN203654272U (en) Lateral friction boring filling pile for isolation pile
CN105133641A (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN104790982A (en) Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN103911993A (en) PHA (preliminary hazard analysis) anchor rod and construction method thereof
CN110644492B (en) Comprehensive grouting construction method for steep dip angle wide-crack stratum
CN102979087B (en) Construction method for rotary excavation pile
CN101100858A (en) Construction method for drilling tool center pumping concrete post mudjack concrete pouring pile and construction device thereof
CN103669347B (en) Underwater anchor rod construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant