CN106149726A - The filling stable grout method of dynamic pressure animal migration sand bed base under water soil - Google Patents

The filling stable grout method of dynamic pressure animal migration sand bed base under water soil Download PDF

Info

Publication number
CN106149726A
CN106149726A CN201610474934.8A CN201610474934A CN106149726A CN 106149726 A CN106149726 A CN 106149726A CN 201610474934 A CN201610474934 A CN 201610474934A CN 106149726 A CN106149726 A CN 106149726A
Authority
CN
China
Prior art keywords
filling
section
hole
sand bed
cement slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610474934.8A
Other languages
Chinese (zh)
Other versions
CN106149726B (en
Inventor
邱小佩
杨洋
梁健涛
张明辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU TAILISI CONSOLIDATION REINFORCED ENGINEERING Co Ltd
Original Assignee
GUANGZHOU TAILISI CONSOLIDATION REINFORCED ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU TAILISI CONSOLIDATION REINFORCED ENGINEERING Co Ltd filed Critical GUANGZHOU TAILISI CONSOLIDATION REINFORCED ENGINEERING Co Ltd
Priority to CN201610474934.8A priority Critical patent/CN106149726B/en
Publication of CN106149726A publication Critical patent/CN106149726A/en
Application granted granted Critical
Publication of CN106149726B publication Critical patent/CN106149726B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0023Slurry

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention provides the filling stable grout method of a kind of dynamic pressure animal migration sand bed base under water soil, the consolidation by grouting of the sand bed base soil below traffic tunnel, comprise the steps: 1) carry out cloth hole at the tunnel structure position that differential settlement occurs, mounting hole sleeve pipe in this hole;2) boring, and drill described concrete floor and pierce the sand bed base soil 1~3m below concrete floor, execute filling section as first, after first executes filling section pore-forming, pour into cement slurry wherein;Executing first and fill the lower section of section and hole, piercing the degree of depth is 1~3m, is second to execute filling section, after second executes filling section pore-forming, pours into cement slurry wherein, carries out subsection hole-drilling grouting the most from top to bottom;Each execute filling section in boring procedure cannot pore-forming time, pour into early solidifying property stabilizing material to boring position.The filling stable grout method that the present invention provides solves pressure and moves under flowing water, and animal migration sand bed is difficult to pore-forming, it is difficult to grout injection carries out the technical barrier that filling is stable.

Description

The filling stable grout method of dynamic pressure animal migration sand bed base under water soil
Technical field
The present invention relates to a kind of pressure that is applied to move there is under flowing water the grouting that the filling of animal migration sand bed foundation soil is stable Technology.
Background technology
Cement grout is generally used in the filling consolidation grouting of rock foundation and soft soil foundation, but owing to the structure of sand bed is special Property, cement slurry is difficult to pour into.At present, the consolidation by grouting to underground base soil is still a difficult problem, particularly sand bed at present by dynamic The impact of flowing water, occurs that when liquefaction migrates, difficulty is bigger.This kind of animal migration sand bed has the following characteristics that
1, when sand bed be stressed dynamic flowing water impact occur liquefaction, with water occur migrate time, be in tunnel structure subbasal Sand bed there will be animal migration and runs off, and makes structure produce differential settlement.
2, the dynamic flowing water that is stressed affects, and is diluted by priming charge slurry body, takes away, it is impossible to forms induration, and affects Consolidation effect.
3, the dynamic flowing water that is stressed impact and sand bed loose self drainage impact, carry out in sand bed in boring procedure, because of collapse hole, Gush etc. and to cause pore-forming difficulty;
4, at the tunnel structure used that puts into operation, because being affected by facility and structure headroom, conventional main equipment cannot March into the arena construction.
5, the operation tunnel after building up, because periphery liquefaction of soil mass, argillization, the water yield increase, causes hole retention of excessive fluid, water spray, husky, Soil runs off, and tunnel structure easily produces differential settlement or causes secondary disaster;
At present, the operation traffic tunnel structure after building up being occurred, pressure moves liquefaction argillization under flowing water 20~50L/min The reinforcement technique of the soil body and sand bed has no play-by-play.
Summary of the invention
The present invention is for making up the deficiencies in the prior art, it is provided that the filling of a kind of dynamic pressure animal migration sand bed base under water soil is steady Determining grouting method, this method solve pressure and move under flowing water, animal migration sand bed is difficult to pore-forming, it is difficult to grout injection carries out filling Stable technical barrier.
The present invention is for reaching its purpose, and the technical scheme of employing is as follows: filling of dynamic pressure animal migration sand bed base under water soil Fill out stable grout method, the consolidation by grouting of the sand bed base soil below traffic tunnel, comprise the steps:
1) cloth hole is carried out at the tunnel structure position that differential settlement occurs, the concrete bottom to tunnel structure of holing Plate and do not drill described concrete floor, mounting hole sleeve pipe in this hole;
2) subsection hole-drilling grouting from top to bottom: boring, and drill described concrete floor and pierce below concrete floor Sand bed base soil 1~3m, execute filling section as first, until first execute filling section pore-forming after, pour into cement slurry wherein;Treat that first executes After filling the cement slurry solidification in section, executing first and fill the lower section of section and hole, piercing the degree of depth is 1~3m, is second to execute filling Section, after second executes filling section pore-forming, pours into cement slurry wherein, after second executes the cement slurry solidification filled in section, then Second executes to fill and carries out next below section and execute well cementing operation filling section, carries out subsection hole-drilling grouting the most from top to bottom; Each execute filling section occur gushing in boring procedure or collapse hole and cannot pore-forming time, pour into the most solidifying property stabilizing material to boring position and enter The steady husky process of row.
Preferably, described morning, coagulating property stabilizing material included stability Cement paste, and its composition includes: Portland cement Serosity (ratio of mud 0.5:1~3:1), adds bentonite according to cement grout weight 3 ‰, adds according to cement grout weight 3 ‰ Water reducer, adds early strength agent according to cement grout weight 3 ‰.
Preferably, the filling pressure of executing pouring into the most solidifying property stabilizing material is 0.1~0.5Mpa.
As a kind of detailed description of the invention, step 1) in, after installing described orifice sleeve, arrange around orifice sleeve Multiple injected holes, inject the hydrophilic epoxy grouting material of EAA high osmosis in injected hole and carry out orifice sleeve at pipe laying sealing Reason.
As a kind of detailed description of the invention, step 2) described in cement slurry be cement bentonite slurry.
As a kind of detailed description of the invention, the ratio of mud of described cement slurry is 0.5~3:1.
Preferably step 2) each execute fill section execute filling pressure for than execute filling section buried depth degree of depth head difference big 0.1~ 0.3Mpa。
Preferably, step 2) in, execute after filling section pours into cement slurry to each, described orifice sleeve being set up grouting anti- Spouting device.
As a kind of detailed description of the invention, described grouting anti-spouting device is the casing cover mated with orifice sleeve external diameter Cap.
The technical scheme that the present invention provides, has the advantages that
The method of the present invention solves pressure and moves under flowing water, and animal migration sand bed is difficult to pore-forming, it is difficult to grout injection is carried out The technical barrier that filling is stable, can reinforce at the base sand bed of traffic tunnel structure run after building up.
Accompanying drawing explanation
Fig. 1 is the cloth hole floor map in the embodiment of the present invention;
Fig. 2 is embodiment of the present invention generalized section in work progress.
Fig. 3 is embodiment of the present invention well cementing schematic diagram in work progress.
Fig. 4 be the embodiment of the present invention in work progress in aperture mounting hole sleeve pipe generalized section.
Fig. 5 is the injected hole floor map that the embodiment of the present invention is arranged in work progress around orifice sleeve
Part description of reference numerals in figure: 1, traffic tunnel, 2, concrete floor, 3, sand bed base soil, 4, bore from top to bottom Hole grouting difference executes the hole depth filling section, and 41, first executes filling section;42, second filling section is executed;43, the 3rd filling section is executed;5, injected hole, 6, sleeve pipe block, 7, orifice sleeve.
Detailed description of the invention
The present invention provides the filling stable grout method of a kind of dynamic pressure animal migration sand bed base under water soil, and the method is used for The consolidation by grouting of the sand bed base soil 3 below traffic tunnel 1, mainly comprises the steps:
1) cloth hole is carried out at tunnel 1 structure position that differential settlement occurs, the concrete to tunnel structure of holing Base plate 2 and do not drill described concrete floor 2, mounting hole sleeve pipe 7 in this hole, see Fig. 1,4;
2) subsection hole-drilling grouting from top to bottom: boring, and drill described concrete floor and pierce below concrete floor Sand bed base soil 1~3m, execute filling section as first, until first execute filling section pore-forming after, pour into cement slurry wherein;Treat first After executing the cement slurry solidification filled in section, executing first and fill the lower section of section and hole, piercing the degree of depth is 1~3m, is second to execute Fill section, after second executes filling section pore-forming, pour into cement slurry wherein, after second executes the cement slurry solidification filled in section, then Carry out next and execute the well cementing operation filling section, carry out subsection hole-drilling grouting the most from top to bottom;Each filling section of executing is being bored Occur during hole gushing or collapse hole and cannot pore-forming time, pour into the most solidifying property stabilizing material to boring position and carry out steady husky process.
Wherein the most solidifying property stabilizing material preferably includes stability Cement paste, it is preferred that its composition includes: normal silicate Cement grout (ratio of mud 0.5:1~3:1), adds bentonite according to cement grout weight 3 ‰, according to cement grout weight 3 ‰ Add water reducer, add early strength agent according to cement grout weight 3 ‰.
The filling stable grout method provided by the present invention, is mainly solved pressure and moves under flowing water, and animal migration sand bed is not Easily pore-forming, causes being difficult to carry out, by grout injection, the technical problem that filling is firm.The method may be used for being currently running to be made The consolidation by grouting of the sand bed base soil below the traffic tunnel structure in, it is not necessary to main equipment can be constructed, easy to operate.
With embodiment, technical scheme is described further below in conjunction with the accompanying drawings:
Certain open cut subway circulation tunnel 1, buried depth H is 20m, is close between two river courses, comes into operation for many years, at running train Vibration effect and the impact of two river fluctuation tidewater, the tunnel 1 structural perimeter soil body produces liquefaction, argillization, and inequality occurs in tunnel 1 structure Even sedimentation, for guaranteeing the safe operation of tunnel structure, need to be to carrying out consolidation process bottom tunnel structure.See Fig. 1~2.Adding Admittedly process, in accordance with the following steps:
1) tunnel structure position differential settlement occur carrying out cloth hole, cloth hole floor map can be found in Fig. 1, cloth hole Pitch-row D, 1.0~3.0m, is pitch-row 2m shown in Fig. 1.See Fig. 4, behind cloth hole, the concrete to tunnel 1 structure of holing Base plate 2, and do not drill concrete floor 2.Mounting hole sleeve pipe 7 in being holed.In the present embodiment, orifice sleeve 7 top Expose to the height of part of concrete floor 2 more than 15cm.Multiple injected hole 5 is arranged, in this enforcement around orifice sleeve Specifically arranging 3 injected holes at orifice sleeve 50~80mm in example, injected hole aperture is 8~10mm;Preferably, three Injected hole is in waiting gore hole, and the angle between the preferred inclined layout of injected hole, and injected hole and orifice sleeve is preferably at 30 ° ~45 °.Then in injected hole, inject the hydrophilic epoxy grouting material of EAA high osmosis (for this area current material, can purchase in market Buy acquisition), thus orifice sleeve 7 is carried out pipe laying sealing process.
2) using the mode that (can be found in the direction of arrow in Fig. 2) from top to bottom to carry out subsection hole-drilling grouting, concrete operations are:
Hole in position, hole, orifice sleeve place, continue to pierce below concrete floor after drilling concrete floor 2 Sand bed base soil 1~3m deep, in boring procedure, when the concrete floor 2 drilled below tunnel 1 enters sand bed base soil 3 Time (1~3m is deep), in hole, the rate of output water is 20~50L/ to divide, water head-drop retention of excessive fluid about 1.2~1.5m, about 0.2Mpa head;Gush Water takes the grains of sand and the crushed stone of diameter 3.0~5.0cm out of, drilled grout hole because of sand bed gush cave in and cannot pore-forming.Note wherein After entering cement mortar, find seriously to be diluted, outflow with water, it is impossible to filling consolidates, and loses cement mortar sample during cleaning bottom of hole.Because becoming Hole, uses the most solidifying property stabilizing material of perfusion wherein, and executing filling pressure is 0.1~0.5Mpa.This most solidifying property stabilizing material is to flowing Sand bed has the surely husky effect of control water, plays steady husky effect.After being filled with the most solidifying property stabilizing material, hole and be able to pore-forming, this section Filling section 41 is executed as first.
Then in first executes and fill section 41, carry out the filling consolidation grouting of toughness cement slurry.
After first executes filling section cement slurry solidification, executing filling section first and continue below boring, piercing the degree of depth is 1~3m;With Sample, if collapse hole also occurs in this section of boring procedure, the most solidifying property stabilizing material of perfusion the most wherein;Hole to be drilled and pore-forming After, execute filling section 42 as second, in second executes and fill section, carry out the filling consolidation grouting of toughness cement slurry.
Proceed the 3rd well cementing executing filling 43 according to the second well cementing mode executing filling section, repeat no more.
Each executing, grouting anti-spouting device 6 is installed in orifice sleeve after filling section is in the milk, concrete as and aperture overlap The sleeve pipe block that pipe 7 external diameter coincide, thus avoid serosity to gush.After cement slurry solidifies, or next is executed filling section boring and makees This sleeve pipe block under industry front dump.Toughness cement slurry used specifically can use existing cement-bentonite slurry (ratio of mud control System 0.5~3:1, the present embodiment specially controls at 0.6:1~0.8:1) carry out filling grouting, difference execute fill section execute filling Pressure executes filling section buried depth degree of depth head difference big 0.1~0.3Mpa for ratio, and Fig. 2 show three construction sections, and 41~43 are followed successively by First paragraph, second segment, the 3rd section.
The present embodiment uses above-mentioned grouting method, has efficiently controlled the migration of the dynamic flowing water grains of sand.Through rich throughout the year The impact in water and dry season and the tracking and monitoring of structure tunnel, the sedimentation structure position being reinforced, so far effect stability.
In this embodiment, coagulating property stabilizing material morning used is stability Cement paste, and its composition includes: normal silicate Cement grout (ratio of mud 0.5:1~1:1), adds bentonite according to cement grout weight 3 ‰, according to cement grout weight 3 ‰ Add water reducer, add early strength agent according to cement grout weight 3 ‰.
Not specified part in literary composition, is common knowledge or routine techniques that those skilled in the art grasp or know Means, repeat the most one by one to this.If material therefor is not specified in embodiment, all acquisition can be bought in market.
The above, be only presently preferred embodiments of the present invention, and the present invention not does any pro forma restriction, therefore All contents without departing from technical solution of the present invention, any simply repair made for any of the above embodiments according to the technical spirit of the present invention Change, equivalent variations and modification, all still fall within the range of technical solution of the present invention.

Claims (9)

1. the filling stable grout method of dynamic pressure animal migration sand bed base under water soil, the sand bed base soil below traffic tunnel Consolidation by grouting, it is characterised in that comprise the steps:
1) carry out cloth hole at the tunnel structure position that differential settlement occurs, hole to the concrete floor below tunnel structure and Do not drill described concrete floor, mounting hole sleeve pipe in this hole;
2) subsection hole-drilling grouting from top to bottom: boring, and drill described concrete floor and pierce the sand below concrete floor Layer base soil 1~3m, executes filling section as first, after first executes filling section pore-forming, pours into cement slurry wherein;Treat that first executes filling section In cement slurry solidification after, execute first and fill the lower section of section and hole, piercing the degree of depth is 1~3m, is second to execute filling section, treats After second executes filling section pore-forming, pour into cement slurry wherein, after second executes the cement slurry solidification filled in section, then execute second Fill and below section, carry out next well cementing operation executing filling section, carry out subsection hole-drilling grouting the most from top to bottom;Each execute Fill section occur gushing in boring procedure or collapse hole and cannot pore-forming time, pour into the most solidifying property stabilizing material to boring position and carry out steady sand Process.
Filling stable grout method the most according to claim 1, it is characterised in that described morning, coagulating property stabilizing material included surely Qualitative Cement paste, the composition of described stability Cement paste includes: Portland cement serosity, according to normal silicate water Slurry liquid weight 3 ‰ addition bentonite, according to Portland cement slurry weight 3 ‰ addition water reducers, according to The early strength agent of 3 ‰ additions of Portland cement slurry weight, the ratio of mud of described Portland cement serosity is 0.5:1 ~3:1.
Filling stable grout method the most according to claim 1, it is characterised in that pour into the most solidifying property stabilizing material executes filling Pressure is 0.1~0.5Mpa.
Filling stable grout method the most according to claim 1, it is characterised in that step 1) in, install described aperture After sleeve pipe, around orifice sleeve, arrange multiple injected hole, in injected hole, inject the hydrophilic epoxy grouting material of EAA high osmosis Orifice sleeve is carried out pipe laying sealing process.
Filling stable grout method the most according to claim 1, it is characterised in that step 2) described in cement slurry be water Mud bentonite slurry.
Filling stable grout method the most according to claim 1, it is characterised in that the ratio of mud of described cement slurry is 0.5~3:1.
Filling stable grout method the most according to claim 1, it is characterised in that step 2) each execute fill section execute filling pressure Power executes filling section buried depth degree of depth head difference big 0.1~0.3Mpa for ratio.
Filling stable grout method the most according to claim 1, it is characterised in that step 2) in, fill to each filling section of executing After entering cement slurry, described orifice sleeve is set up grouting anti-spouting device.
Filling stable grout method the most according to claim 8, it is characterised in that described grouting anti-spouting device is and hole The sleeve pipe block of mouth sleeve outer coupling.
CN201610474934.8A 2016-06-22 2016-06-22 The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure Active CN106149726B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610474934.8A CN106149726B (en) 2016-06-22 2016-06-22 The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610474934.8A CN106149726B (en) 2016-06-22 2016-06-22 The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure

Publications (2)

Publication Number Publication Date
CN106149726A true CN106149726A (en) 2016-11-23
CN106149726B CN106149726B (en) 2018-03-20

Family

ID=57349803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610474934.8A Active CN106149726B (en) 2016-06-22 2016-06-22 The filling stable grout method of the underwater migration sand bed base soil of dynamic pressure

Country Status (1)

Country Link
CN (1) CN106149726B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004913A (en) * 2019-04-10 2019-07-12 中国水利水电第七工程局成都水电建设工程有限公司 A kind of deep settlement foundation stabilization construction method of proximity subway station
CN114960756A (en) * 2021-02-26 2022-08-30 宝山钢铁股份有限公司 Underwater net-hanging masking type tunnel and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000004079A (en) * 1998-06-30 2000-01-25 정사룡 Injecting method of ground hardening material and injecting rod thereof
CN101693615A (en) * 2009-09-29 2010-04-14 武汉市商品混凝土管理站 Sulphoaluminate cement base synchronous slip casting material and preparation method
CN102828502A (en) * 2012-08-15 2012-12-19 中科院广州化学有限公司 Construction method for in-situ reinforcing of high-pressure cement-chemical pulp compound grouting
CN103031847A (en) * 2012-12-20 2013-04-10 长江勘测规划设计研究有限责任公司 Reducing overlap joint combined type orifice pipe grouting method
CN103306272A (en) * 2013-06-28 2013-09-18 葛洲坝集团基础工程有限公司 In-hole blocking method for chemically grouting deep hole with epoxy resin

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000004079A (en) * 1998-06-30 2000-01-25 정사룡 Injecting method of ground hardening material and injecting rod thereof
CN101693615A (en) * 2009-09-29 2010-04-14 武汉市商品混凝土管理站 Sulphoaluminate cement base synchronous slip casting material and preparation method
CN102828502A (en) * 2012-08-15 2012-12-19 中科院广州化学有限公司 Construction method for in-situ reinforcing of high-pressure cement-chemical pulp compound grouting
CN103031847A (en) * 2012-12-20 2013-04-10 长江勘测规划设计研究有限责任公司 Reducing overlap joint combined type orifice pipe grouting method
CN103306272A (en) * 2013-06-28 2013-09-18 葛洲坝集团基础工程有限公司 In-hole blocking method for chemically grouting deep hole with epoxy resin

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004913A (en) * 2019-04-10 2019-07-12 中国水利水电第七工程局成都水电建设工程有限公司 A kind of deep settlement foundation stabilization construction method of proximity subway station
CN114960756A (en) * 2021-02-26 2022-08-30 宝山钢铁股份有限公司 Underwater net-hanging masking type tunnel and construction method thereof
CN114960756B (en) * 2021-02-26 2024-01-09 宝山钢铁股份有限公司 Underwater net-hanging masking type tunnel and construction method thereof

Also Published As

Publication number Publication date
CN106149726B (en) 2018-03-20

Similar Documents

Publication Publication Date Title
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN103603689B (en) Curtain grouting construction method for treating mined-out areas
CN101328811B (en) TGRM subsection moving-on type advanced deep hole grouting construction process
CN107975375B (en) A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel
CN102926770A (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN103806479A (en) Pile foundation combined grouting reinforcement construction method combining waterproof curtain
CN104612134A (en) Cast-in place pile post-grouting construction method for pouring construction
CN110331992A (en) A kind of hole daguanpeng construction method
CN103628912A (en) Goaf management filling grouting construction method
CN104912065B (en) Dowel pile construction method under water
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN110130936B (en) Construction method for sudden encountering untreated karst cave or crack in shield tunneling process
CN108166483A (en) Bored pile construction method
CN205918368U (en) Bore notes an organic whole and retreat formula slip casting drilling rod
CN105350988B (en) Tunnel Base reinforcement means
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN106320354A (en) Anti-seepage construction method for karst cave development stratum under overburden
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN107587504A (en) A kind of dry excavation method of the double steel pile casting churning drivens of cast-in-situ bored pile of overpass
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN109440757A (en) A kind of foundation reinforcement method for karst region
CN113027483A (en) Shield tunnel broken zone stratum grouting reinforcement equipment and grouting reinforcement method thereof
CN111287769A (en) Tunnel surrounding rock advanced grouting reinforcement structure and construction method thereof
CN103911993B (en) A kind of PHA anchor pole and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant