CN111255536A - FCB operation method of gas-steam unit power plant - Google Patents

FCB operation method of gas-steam unit power plant Download PDF

Info

Publication number
CN111255536A
CN111255536A CN202010076069.8A CN202010076069A CN111255536A CN 111255536 A CN111255536 A CN 111255536A CN 202010076069 A CN202010076069 A CN 202010076069A CN 111255536 A CN111255536 A CN 111255536A
Authority
CN
China
Prior art keywords
steam
low
unit
valve
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010076069.8A
Other languages
Chinese (zh)
Other versions
CN111255536B (en
Inventor
胡琨
张鹏
徐清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority to CN202010076069.8A priority Critical patent/CN111255536B/en
Publication of CN111255536A publication Critical patent/CN111255536A/en
Application granted granted Critical
Publication of CN111255536B publication Critical patent/CN111255536B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • F01K23/101Regulating means specially adapted therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D11/00Preventing or minimising internal leakage of working-fluid, e.g. between stages
    • F01D11/02Preventing or minimising internal leakage of working-fluid, e.g. between stages by non-contact sealings, e.g. of labyrinth type
    • F01D11/04Preventing or minimising internal leakage of working-fluid, e.g. between stages by non-contact sealings, e.g. of labyrinth type using sealing fluid, e.g. steam
    • F01D11/06Control thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D17/00Regulating or controlling by varying flow
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/08Cooling; Heating; Heat-insulation
    • F01D25/12Cooling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/30Exhaust heads, chambers, or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K11/00Plants characterised by the engines being structurally combined with boilers or condensers
    • F01K11/02Plants characterised by the engines being structurally combined with boilers or condensers the engines being turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/10Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating characterised by the engine exhaust pressure
    • F01K7/12Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating characterised by the engine exhaust pressure of condensing type
    • F01K7/14Control means specially adapted therefor

Abstract

The invention relates to the technical field of power generation, and discloses an FCB operation method of a gas-steam unit power plant, which can instantly throw off all external power supply loads and an external power grid to be separated and enter island operation when an external power grid fault occurs in a power plant unit, so that the steam unit enters an idle running state, a gas turbine is not stopped, self power utilization of the power plant is maintained, the power plant unit does not need to be stopped when the power grid fault occurs, starting of a power generating unit is reduced, and fuel and station service power consumed when the power plant unit is started are saved; and open the main pipe system of start-up boiler pre-heating auxiliary steam after island operation a period of time, can prevent that island operation duration overlength from leading to the auxiliary steam system can't satisfy the needs that the unit started, make the auxiliary steam system can provide steam for exhaust-heat boiler and steam turbine pressure boost, warm pipe, pressure and the temperature needs of warm-up fast when being incorporated into the power networks again, shorten and start the duration, reduce and start fuel consumption.

Description

FCB operation method of gas-steam unit power plant
Technical Field
The invention relates to the technical field of power generation, in particular to an FCB operation method of a gas-steam unit power plant.
Background
In recent years, with the rapid development of national economy, the demand of society for electric power is increasing. The power grid becomes huge day by day, and the safety of the power grid is also tested seriously. The large-area power failure accidents occur in various countries around the world, including power-developed countries such as the United states, Canada, Britain, Russia, Italy and the like, and the large-area power failure is also caused by the power grid icing accident occurring in the south of 2008 in China. These accidents result in partial collapse or isolated operation of the grid and a total power outage at the power plant. When a power grid accident occurs to a power plant unit, unit parameters are changed violently, and unit equipment is out of control due to loss of service power, so that equipment damage caused by the accident is easily caused. Meanwhile, the power plant can be started only when the power grid is passively waited for to be recovered under the condition that a power supply is not started, the recovery time of the power grid is prolonged, part of the power plants adopt black-start equipment, but the common black-start unit is large in investment and high in maintenance cost. Therefore, in the state of a power grid accident, how to improve the self-healing capability of the power grid, quickly recover the power supply of the power grid, and ensure the service power supply of a power plant is particularly important for a power system, so that the realization of the FCB function brings more and more importance to the power grid and the power plant.
FASTCUTBACK, a fast de-rated power of a unit, referred to as FCB for short, means that when the unit operates above a certain load (e.g., 35% ECR), all external power supply loads are instantly thrown away due to internal or external (power grid) faults and grid disconnection, but under the condition that no boiler or combustion engine trips occur, the fast de-rated power maintains the automatic control function of 'generator disconnection with service power'. According to the planning of urban base-preserving power supplies by power grid companies in various regions, most of gas-electricity projects require the unit FCB function, when the power grid fails, the power is quickly reduced to maintain the operation of the unit with the service power of the power grid when the unit is disconnected with the power grid, and the power grid can be quickly supplied when the power grid is recovered and started.
For a split-shaft or single-shaft gas-steam combined cycle unit with a 3S clutch, FCB is easy to realize, and can be realized only by stopping a steam turbine and carrying service power by low-load operation of a combustion engine under the working condition. For the combined cycle unit without the 3S clutch, the FCB working condition means that the plant power consumption is low, so that only the gas turbine can run and the steam turbine idles, the unit is not provided with a bypass chimney, a steam-water pipeline between the waste heat boiler and the steam turbine is short, the pressure drop and the temperature drop are small, and the heat efficiency is high; a100% steam bypass system needs to be configured, the loading speed of the gas turbine cannot be as high as that of a simple circulation loading speed, and the no-load and low-load operation time is correspondingly prolonged according to the pressure and temperature requirements of boosting, warming and warming of the waste heat boiler and the steam turbine, so that the whole starting process of the unit is prolonged, and the starting fuel consumption is increased. An existing gas-steam combined cycle unit is generally provided with a main steam and reheat steam system, a condensate system, an auxiliary steam system, a condenser vacuumizing system, an open cooling water system, a circulating cooling water system, a drainage water system, a compressed air system, a steam turbine body shaft seal system, main engine lubricating oil, control oil, a sealing oil system and the like.
Disclosure of Invention
The invention aims to provide an FCB operation method of a gas-steam unit power plant, which can maintain low output operation of a unit and shorten the time for re-grid connection starting of the unit.
In order to achieve the above object, the present invention provides an FCB operation method of a gas-steam unit power plant, characterized by comprising the steps of:
s1: setting a gas unit and a steam unit according to the FCB operation requirement;
s2: when a fault occurs, the control device issues a cutter cutting instruction to enter an FCB running state;
s3: after the gas-steam unit receives the FCB starting signal, rapidly load shedding enters an island operation state;
s4: when the island operates for a period of time, starting a boiler to an auxiliary steam main pipe to pre-warm an auxiliary steam main pipe system;
s5: and when the grid fault is eliminated, the unit is re-connected to the grid and transmits power to the grid.
Preferably, in step S4, after the islanding operation is performed, when the low-pressure main steam parameters, such as the low-pressure main steam flow, the low-pressure main steam pressure, or the low-pressure main steam temperature, of the exhaust-heat boiler cannot meet the requirement of the low-pressure cylinder cooling steam parameter, the DCS opens the gate valve of the auxiliary steam supply main pipe of the start boiler and the stop valve of the auxiliary steam main pipe supply unit in a linkage manner, opens the auxiliary steam supply low-pressure cylinder cooling pipeline in a linkage manner, gradually closes the cold steam supply main pipe and the auxiliary steam supply main pipe, and supplies the low-pressure cylinder cooling steam and the shaft seal steam by the start boiler.
Preferably, step S3 includes:
(1) the gas turbine starts a quick load shedding action to rapidly shed the load to the service load;
(2) the bypass valve of the combustion chamber is fully opened;
(3) main and reheat steam systems: the high, medium and low pressure main steam valves are closed quickly, and after 20s, the low pressure main steam regulating valve is reset to the cooling steam inlet opening; meanwhile, the high, medium and low pressure bypass valves are opened and discharged to the condenser quickly; opening the high-exhaust ventilation valve and each drain valve;
(4) condensate system: the condensate pump standby pump is started in a linkage manner, the bypass valve of the steam turbine is opened to reduce the temperature, the steam exhaust water spraying temperature reduction valve of the low-pressure cylinder is opened, and the water curtain water spraying valve of the condenser is opened;
(5) the system comprises a condenser vacuumizing system, an open cooling water system, a circulating cooling water system, a drainage water system, a compressed air system, a steam turbine body shaft seal system, main engine lubricating oil, control oil, sealing oil systems and the like, and the normal operation is maintained.
Preferably, step S4 further includes:
(6) an auxiliary steam system: and (5) quickly opening the valve, then opening the auxiliary steam supply regulating valve to a normal opening, and interlocking and opening the auxiliary steam supply electric valve to the shaft seal system and the auxiliary steam supply low-pressure cylinder cooling pipe electric valve.
As the preferred scheme, the TCS is used for realizing the maintenance of the cooling steam inlet opening degree of the low-pressure main steam control valve; and the DCS is linked to open the low-pressure cylinder steam-exhaust water-spraying temperature-reducing valve and adjust the opening of the low-pressure cylinder steam-exhaust water-spraying adjusting valve.
As the preferred scheme, when the exhaust temperature of the low-pressure cylinder is too high, the bypass electric valve of the exhaust water spray regulating valve of the low-pressure cylinder is opened in a linkage manner.
Preferably, when the exhaust temperature of the low-pressure cylinder is higher than 120 degrees, the bypass electric valve of the exhaust water spray regulating valve of the low-pressure cylinder is opened in a linkage manner.
Preferably, in step S2, the fault includes the generator outlet switch being in the on-position when the main transformer high-side switch of the switchgear is tripped.
Preferably, in step S4, when the islanding operation exceeds 2h, the start-up boiler is opened to the auxiliary steam main to pre-warm the auxiliary steam main system.
Compared with the prior art, the FCB operation method of the gas-steam combined cycle unit has the beneficial effects that:
1. the invention can instantly throw off all external power supply loads and the external power grid are disconnected to enter island operation when the external power grid of the power plant unit has a fault, so that the steam unit enters an idle running state, and the gas turbine is not stopped, thereby maintaining the self-power consumption of the power plant, avoiding the stop of the power plant unit when the power grid has an accident, reducing the start of the power plant unit and saving the fuel and the station service power consumed when the power plant unit is started; and open the main pipe system of start-up boiler pre-heating auxiliary steam after island operation a period of time, can prevent that island operation duration overlength from leading to the auxiliary steam system can't satisfy the needs that the unit started, make the auxiliary steam system can provide steam for exhaust-heat boiler and steam turbine pressure boost, warm pipe, pressure and the temperature needs of warm-up fast when being incorporated into the power networks again, shorten and start the duration, reduce and start fuel consumption.
2. According to the invention, by monitoring the low-pressure main steam parameter value of the waste heat boiler, when the low-pressure main steam parameter value is low, the low-pressure cylinder cooling steam and the shaft seal steam are provided by the starting boiler through the auxiliary steam system, so that the whole starting process of the unit can be shortened. The steam unit carries out load shedding by closing steam inlet and steam exhaust. Wherein, open cold again to assist vapour and supply vapour governing valve and assist vapour and supply low pressure cylinder cooling tube motorised valve, let in cold steam at the low pressure cylinder, reduce the blast loss that the turbine friction heats. The bypass electric valve of the low-pressure cylinder steam-discharging water-spraying temperature-reducing valve, the low-pressure cylinder steam-discharging water-spraying regulating valve and the low-pressure cylinder steam-discharging water-spraying regulating valve is opened to control the steam-discharging temperature of the low-pressure cylinder, so that the trip and the shutdown are prevented.
Drawings
FIG. 1 is a schematic view of a gas-steam unit system according to an embodiment of the present invention.
FIG. 2 is a schematic diagram of an auxiliary steam system according to an embodiment of the invention.
Detailed Description
The following detailed description of embodiments of the present invention is provided in connection with the accompanying drawings and examples. The following examples are intended to illustrate the invention but are not intended to limit the scope of the invention.
As shown in fig. 1 and 2, a FCB operation method of a gas-steam unit power plant applied to a gas-steam unit according to a preferred embodiment of the present invention includes the steps of:
s1: setting a gas unit and a steam unit according to the FCB operation requirement;
s2: when a fault occurs, the control device issues a cutter cutting instruction to enter an FCB running state;
s3: after the gas-steam unit receives the FCB starting signal, rapidly load shedding enters an island operation state;
s4: when the island operates for a period of time, starting a boiler to an auxiliary steam main pipe to pre-warm an auxiliary steam main pipe system;
s5: and when the grid fault is eliminated, the unit is re-connected to the grid and transmits power to the grid.
According to the embodiment, when an external power grid fault occurs, a power plant unit instantly throws off all external power supply loads to be disconnected with the external power grid and enters island operation, so that the steam unit enters an idle running state, and the gas turbine is not stopped, so that the self-power utilization of the power plant is maintained, the power plant unit does not need to be stopped when the power grid fault occurs, the starting of the power plant unit is reduced, and fuel and station service power consumed when the power plant unit is started are saved; and open the main pipe system of start-up boiler pre-heating auxiliary steam after island operation a period of time, can prevent that island operation duration overlength from leading to the auxiliary steam system can't satisfy the needs that the unit started, make the auxiliary steam system can provide steam for exhaust-heat boiler and steam turbine pressure boost, warm pipe, pressure and the temperature needs of warm-up fast when being incorporated into the power networks again, shorten and start the duration, reduce and start fuel consumption.
Further, in step S4, after the islanding operation is performed, when the low-pressure main steam parameters such as the low-pressure main steam flow rate, the low-pressure main steam pressure, or the low-pressure main steam temperature of the exhaust-heat boiler cannot meet the requirement of the low-pressure cylinder cooling steam parameter, the DCS opens the gate valve of the auxiliary steam main supply pipe of the start boiler, the stop valve of the auxiliary steam main supply unit, and the DCS opens the auxiliary steam main supply low-pressure cylinder cooling pipeline in a linkage manner, gradually closes the cold auxiliary steam supply pipeline, the start boiler supplies the low-pressure cylinder cooling steam and the shaft seal steam, by monitoring the low-pressure main steam parameter value of the exhaust-heat boiler, when the low-pressure main steam parameter value is low, the start boiler supplies the low-pressure cylinder cooling steam and the shaft seal steam through the auxiliary steam system, so that the exhaust-heat boiler maintains a certain temperature, and maintains the low-pressure cylinder cooling steam, after the re-grid connection condition is achieved, the whole starting process of the unit can be shortened.
The present embodiment includes the following steps in the fast load dump of step S3:
(1) the gas turbine starts a quick load shedding action to rapidly shed a load to an auxiliary power load, the openness of a main fuel pressure control valve and a main fuel flow control valve of the embodiment is reduced, the openness of an on-duty fuel pressure control valve and an on-duty fuel flow control valve is increased, and the flame stability is maintained;
(2) the combustor bypass valve is fully closed to fully open;
(3) main and reheat steam systems: the high, medium and low pressure main steam valves are closed quickly, and after 20s, the low pressure main steam regulating valve is reset to the cooling steam inlet opening; meanwhile, the high, medium and low pressure bypass valves are opened and discharged to the condenser quickly; opening the high-exhaust ventilation valve and each drain valve;
(4) condensate system: the condensate pump standby pump is started in a linkage manner, the bypass valve of the steam turbine is opened to reduce the temperature, the steam exhaust water spraying temperature reduction valve of the low-pressure cylinder is opened, and the water curtain water spraying valve of the condenser is opened;
(5) a condenser vacuumizing system, an open cooling water system, a circulating cooling water system, a drainage water system, a compressed air system, a steam turbine body shaft seal system, main engine lubricating oil, control oil, sealing oil system and the like maintain normal operation;
(6) an auxiliary steam system: and (3) quickly opening the cooling and then opening the auxiliary steam supply regulating valve to a normal opening, interlocking and opening an auxiliary steam supply electric valve to the shaft seal system and an auxiliary steam supply low-pressure cylinder cooling pipe electric valve, and introducing cold steam into the low-pressure cylinder to reduce blast loss caused by friction heating of the steam turbine.
In the embodiment, the low-pressure main steam control valve is reset to the cooling steam inlet opening, and the TCS is used for maintaining the cooling steam inlet opening of the low-pressure main steam control valve; the DCS is used for opening the low-pressure cylinder steam-exhaust water-spraying temperature-reducing valve in a linkage manner and adjusting the opening degree of the low-pressure cylinder steam-exhaust water-spraying adjusting valve; the exhaust temperature of the low-pressure cylinder is controlled to prevent the trip and the shutdown. And when the exhaust temperature of the low-pressure cylinder is overhigh, the bypass electric valve of the exhaust water spray regulating valve of the low-pressure cylinder is opened in a linkage manner. In the embodiment, when the exhaust temperature of the low-pressure cylinder is higher than 120 degrees, the bypass electric valve of the exhaust water spray regulating valve of the low-pressure cylinder is opened in a linkage manner.
In step S2, the fault includes that when the main-transformer high-voltage side switch of the unit is tripped and the generator outlet switch is in the on-state, the FCB operation state is triggered to enter when the main-transformer high-voltage side switch of the unit is tripped and the generator outlet switch is in the on-state. And in step S4, when the island operation time exceeds 2h, the starting boiler is opened to the auxiliary steam main pipe to pre-warm the auxiliary steam main pipe system. Meanwhile, when the FCB operates, the exhaust temperature of a high-pressure cylinder of the DCS system, the internal metal temperature of a steam turbine in the TCS system, the exhaust pressure and the temperature of a low-pressure cylinder are closely monitored, the condition that the exhaust temperature of the high-pressure cylinder, the internal metal temperature of the steam turbine in the system, the exhaust pressure and the temperature of the low-pressure cylinder are higher than set values determined according to the condition of a unit for ensuring safe and normal operation of the unit is avoided, and the trip stop is prevented.
To sum up, the embodiment of the present invention provides an FCB operation method for a gas-steam combined cycle unit, which enables a power plant unit to instantly throw off all external power supply loads to be disconnected from an external power grid and enter an island operation when an external power grid fault occurs, enables the steam unit to enter an idle state, and enables a gas turbine not to stop, thereby maintaining self power consumption of the power plant, avoiding a stop during a power grid accident, reducing the start-up of the power plant, and saving fuel and station service power consumed when the unit is started; and open the main pipe system of start-up boiler pre-heating auxiliary steam after island operation a period of time, can prevent that island operation duration overlength from leading to the auxiliary steam system can't satisfy the needs that the unit started, make the auxiliary steam system can provide steam for exhaust-heat boiler and steam turbine pressure boost, warm pipe, pressure and the temperature needs of warm-up fast when being incorporated into the power networks again, shorten and start the duration, reduce and start fuel consumption.
The above description is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and substitutions can be made without departing from the technical principle of the present invention, and these modifications and substitutions should also be regarded as the protection scope of the present invention.

Claims (9)

1. A FCB operation method of a gas-steam unit power plant is characterized by comprising the following steps:
s1: setting a gas unit and a steam unit according to the FCB operation requirement;
s2: when a fault occurs, the control device issues a cutter cutting instruction to enter an FCB running state;
s3: after the gas-steam unit receives the FCB starting signal, rapidly load shedding enters an island operation state;
s4: when the island operates for a period of time, starting a boiler to an auxiliary steam main pipe to pre-warm an auxiliary steam main pipe system;
s5: and when the grid fault is eliminated, the unit is re-connected to the grid and transmits power to the grid.
2. The FCB operation method of the gas-steam unit power plant of claim 1, wherein in step S4, when a low-pressure main steam parameter such as a low-pressure main steam flow rate, a low-pressure main steam pressure, or a low-pressure main steam temperature of the exhaust-heat boiler fails to meet a low-pressure cylinder cooling steam parameter requirement after entering an island operation, a gate valve of an auxiliary steam supply main pipe of the start-up boiler and a stop valve of the auxiliary steam supply main pipe unit are opened by DCS linkage, an auxiliary steam supply low-pressure cylinder cooling pipeline is opened by DCS linkage, cold steam is gradually closed to the auxiliary steam supply main pipe, and low-pressure cylinder cooling steam and shaft seal steam are provided by the start-up boiler.
3. The FCB operation method of a gas-steam unit plant according to claim 1, wherein in step S3, it comprises:
(1) the gas turbine starts a quick load shedding action to rapidly shed the load to the service load;
(2) the bypass valve of the combustion chamber is fully opened;
(3) main and reheat steam systems: the high, medium and low pressure main steam valves are closed quickly, and after 20s, the low pressure main steam regulating valve is reset to the cooling steam inlet opening; meanwhile, the high, medium and low pressure bypass valves are opened and discharged to the condenser quickly; opening the high-exhaust ventilation valve and each drain valve;
(4) condensate system: the condensate pump standby pump is started in a linkage manner, the bypass valve of the steam turbine is opened to reduce the temperature, the steam exhaust water spraying temperature reduction valve of the low-pressure cylinder is opened, and the water curtain water spraying valve of the condenser is opened;
(5) the system comprises a condenser vacuumizing system, an open cooling water system, a circulating cooling water system, a drainage water system, a compressed air system, a steam turbine body shaft seal system, main engine lubricating oil, control oil, sealing oil systems and the like, and the normal operation is maintained.
4. The FCB operation method of a gas-steam unit plant according to claim 3, further comprising, in step S4:
(6) an auxiliary steam system: and (5) quickly opening the valve, then opening the auxiliary steam supply regulating valve to a normal opening, and interlocking and opening the auxiliary steam supply electric valve to the shaft seal system and the auxiliary steam supply low-pressure cylinder cooling pipe electric valve.
5. The FCB operation method of a gas-steam unit power plant of claim 3, wherein maintaining a cooling admission opening by the TCS is implemented as a low pressure main steam damper; and the DCS is linked to open the low-pressure cylinder steam-exhaust water-spraying temperature-reducing valve and adjust the opening of the low-pressure cylinder steam-exhaust water-spraying adjusting valve.
6. The FCB operating method of a gas-steam unit power plant of claim 5, wherein when the low-pressure cylinder exhaust steam temperature is too high, a bypass electric valve of the low-pressure cylinder exhaust steam spray water regulating valve is opened in a linkage manner.
7. The FCB operating method of a gas-steam unit power plant of claim 6, wherein the bypass electric valve of the low pressure cylinder steam exhaust water injection regulating valve is opened in a linkage manner when the low pressure cylinder steam exhaust temperature is higher than 120 °.
8. The FCB operation method of a gas-steam unit plant of claim 1, wherein in step S2, the fault comprises tripping a main unit main transformer high-voltage side switch but the generator outlet switch is in a closed position.
9. The FCB operation method of a gas-steam unit plant according to claim 1, wherein in step S4, when the islanding operation exceeds 2h, the start-up boiler is opened to the auxiliary steam main to pre-warm the auxiliary steam main system.
CN202010076069.8A 2020-01-22 2020-01-22 FCB operation method of gas-steam unit power plant Active CN111255536B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010076069.8A CN111255536B (en) 2020-01-22 2020-01-22 FCB operation method of gas-steam unit power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010076069.8A CN111255536B (en) 2020-01-22 2020-01-22 FCB operation method of gas-steam unit power plant

Publications (2)

Publication Number Publication Date
CN111255536A true CN111255536A (en) 2020-06-09
CN111255536B CN111255536B (en) 2022-08-30

Family

ID=70952617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010076069.8A Active CN111255536B (en) 2020-01-22 2020-01-22 FCB operation method of gas-steam unit power plant

Country Status (1)

Country Link
CN (1) CN111255536B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112865175A (en) * 2021-01-08 2021-05-28 西安热工研究院有限公司 FCB operation method of garbage power plant
CN112984613A (en) * 2021-03-02 2021-06-18 华能山东石岛湾核电有限公司 Maintenance method for nuclear power plant heating system during shutdown period
CN114060110A (en) * 2021-11-16 2022-02-18 西安热工研究院有限公司 Bypass heating heat cascade utilization system and method capable of supplying black start power supply
CN114592936A (en) * 2022-03-18 2022-06-07 中国能源建设集团广东省电力设计研究院有限公司 Cooling steam supply method and device based on gas-steam combined cycle unit
CN114719191A (en) * 2022-03-23 2022-07-08 华北电力科学研究院有限责任公司 Pipeline pre-warming method, system and controller

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4445180A (en) * 1973-11-06 1984-04-24 Westinghouse Electric Corp. Plant unit master control for fossil fired boiler implemented with a digital computer
JPH0219605A (en) * 1988-07-07 1990-01-23 Toshiba Corp Auxiliary steam pressure control device
JP2008014142A (en) * 2006-07-03 2008-01-24 Chugoku Electric Power Co Inc:The Method for responding to trip of auxiliary boiler during start of boiler unit
EP2119879A1 (en) * 2007-02-16 2009-11-18 Mitsubishi Heavy Industries, Ltd. Steam system, and its control system and control method
CN203962061U (en) * 2014-07-21 2014-11-26 福建晋江天然气发电有限公司 Utilize exhaust heat boiler that the Gas-steam Combined Cycle unit of auxiliary steam is provided
US8963350B1 (en) * 2013-11-06 2015-02-24 Bechtel Power Corporation Method and apparatus for extended operation of steam turbines in islanding mode
CN104612763A (en) * 2014-12-12 2015-05-13 贵州电力试验研究院 Device for starting intermediate-pressure cylinder device by using neighbor turbine steam in unitized unit and starting method thereof
CN104633638A (en) * 2014-09-01 2015-05-20 国家电网公司 Comprehensive control method for function of machine halt without boiler shutdown in power plant FCB
US20150185716A1 (en) * 2013-12-31 2015-07-02 General Electric Company Methods and systems for enhancing control of power plant generating units
JP2016183795A (en) * 2015-03-25 2016-10-20 中国電力株式会社 Unit start method for electric power plant
CN107060922A (en) * 2017-04-28 2017-08-18 申能股份有限公司 The auxiliary vapour system and its steam supplying method in thermal power plant
CN107060919A (en) * 2017-05-31 2017-08-18 邯钢集团邯宝钢铁有限公司 A kind of gas fired-boiler steam turbine power generation Quick starting energy-saving device and method
CN107227979A (en) * 2017-07-14 2017-10-03 上海电气电站设备有限公司 A kind of combination circulation steam turbine quickly starts warming-up system and method
CN206816311U (en) * 2017-04-28 2017-12-29 申能股份有限公司 The auxiliary vapour system in thermal power plant
CN207905873U (en) * 2018-02-07 2018-09-25 广州发展集团股份有限公司 A kind of structure of optimal startup or stoppage in transit gas-steam combined cycle set
CN108964123A (en) * 2018-07-17 2018-12-07 中山嘉明电力有限公司 A kind of FCB operation method applied to fuel gas-steam unit power plant
CN110159365A (en) * 2019-06-12 2019-08-23 中国能源建设集团广东省电力设计研究院有限公司 A kind of sequence starting method of the small steam turbine of two-shipper backheat

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4445180A (en) * 1973-11-06 1984-04-24 Westinghouse Electric Corp. Plant unit master control for fossil fired boiler implemented with a digital computer
JPH0219605A (en) * 1988-07-07 1990-01-23 Toshiba Corp Auxiliary steam pressure control device
JP2008014142A (en) * 2006-07-03 2008-01-24 Chugoku Electric Power Co Inc:The Method for responding to trip of auxiliary boiler during start of boiler unit
EP2119879A1 (en) * 2007-02-16 2009-11-18 Mitsubishi Heavy Industries, Ltd. Steam system, and its control system and control method
US8963350B1 (en) * 2013-11-06 2015-02-24 Bechtel Power Corporation Method and apparatus for extended operation of steam turbines in islanding mode
US20150185716A1 (en) * 2013-12-31 2015-07-02 General Electric Company Methods and systems for enhancing control of power plant generating units
CN203962061U (en) * 2014-07-21 2014-11-26 福建晋江天然气发电有限公司 Utilize exhaust heat boiler that the Gas-steam Combined Cycle unit of auxiliary steam is provided
CN104633638A (en) * 2014-09-01 2015-05-20 国家电网公司 Comprehensive control method for function of machine halt without boiler shutdown in power plant FCB
CN104612763A (en) * 2014-12-12 2015-05-13 贵州电力试验研究院 Device for starting intermediate-pressure cylinder device by using neighbor turbine steam in unitized unit and starting method thereof
JP2016183795A (en) * 2015-03-25 2016-10-20 中国電力株式会社 Unit start method for electric power plant
CN107060922A (en) * 2017-04-28 2017-08-18 申能股份有限公司 The auxiliary vapour system and its steam supplying method in thermal power plant
CN206816311U (en) * 2017-04-28 2017-12-29 申能股份有限公司 The auxiliary vapour system in thermal power plant
CN107060919A (en) * 2017-05-31 2017-08-18 邯钢集团邯宝钢铁有限公司 A kind of gas fired-boiler steam turbine power generation Quick starting energy-saving device and method
CN107227979A (en) * 2017-07-14 2017-10-03 上海电气电站设备有限公司 A kind of combination circulation steam turbine quickly starts warming-up system and method
CN207905873U (en) * 2018-02-07 2018-09-25 广州发展集团股份有限公司 A kind of structure of optimal startup or stoppage in transit gas-steam combined cycle set
CN108964123A (en) * 2018-07-17 2018-12-07 中山嘉明电力有限公司 A kind of FCB operation method applied to fuel gas-steam unit power plant
CN110159365A (en) * 2019-06-12 2019-08-23 中国能源建设集团广东省电力设计研究院有限公司 A kind of sequence starting method of the small steam turbine of two-shipper backheat

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
梁青等: "9E燃气轮机黑启动方案及实战", 《燃气轮机技术》 *
赵咏楠: "山西京玉电厂FCB功能的实现研究", 《中国优秀博硕士学位论文全文数据库(硕士)工程科技Ⅱ辑》 *
门冉: "火电机组FCB功能及其在电网黑启动中的应用", 《中国优秀博硕士学位论文全文数据库(硕士)工程科技Ⅱ辑》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112865175A (en) * 2021-01-08 2021-05-28 西安热工研究院有限公司 FCB operation method of garbage power plant
CN112865175B (en) * 2021-01-08 2023-05-30 西安热工研究院有限公司 FCB operation method of garbage power plant
CN112984613A (en) * 2021-03-02 2021-06-18 华能山东石岛湾核电有限公司 Maintenance method for nuclear power plant heating system during shutdown period
CN114060110A (en) * 2021-11-16 2022-02-18 西安热工研究院有限公司 Bypass heating heat cascade utilization system and method capable of supplying black start power supply
CN114592936A (en) * 2022-03-18 2022-06-07 中国能源建设集团广东省电力设计研究院有限公司 Cooling steam supply method and device based on gas-steam combined cycle unit
CN114719191A (en) * 2022-03-23 2022-07-08 华北电力科学研究院有限责任公司 Pipeline pre-warming method, system and controller
CN114719191B (en) * 2022-03-23 2024-01-30 华北电力科学研究院有限责任公司 Pipeline preheating method, system and controller

Also Published As

Publication number Publication date
CN111255536B (en) 2022-08-30

Similar Documents

Publication Publication Date Title
CN111255536B (en) FCB operation method of gas-steam unit power plant
CN108561196B (en) Safety protection system and method for cutting off operation of low-pressure cylinder of thermal power generating unit
CN103382860B (en) Steam turbine power generation heating system controlling method
CN108506057B (en) Cogeneration system for cutting off steam inlet of low-pressure cylinder and adjusting method
JP3800384B2 (en) Combined power generation equipment
CN109441575B (en) Method for operating heat supply network system of steam combined cycle generator set in heat supply period
CN108757068B (en) Combined cycle steam turbine set total cut heat supply control method and device
CN104633638A (en) Comprehensive control method for function of machine halt without boiler shutdown in power plant FCB
CN107120149B (en) The method and system of newly-built supercritical unit is debugged using external activated vapor
JP2000161014A5 (en)
CA2843446C (en) Method for operating a combined-cycle power plant
CN108104888B (en) Power grid frequency modulation system and method based on frequency modulation bypass
CN110500645B (en) Optimized control method for improving unit bypass heat supply operation reliability
CN112127960B (en) Steam turbine bypass control method based on full-automatic load shedding working condition
CN112431642A (en) Steam turbine system based on FCB control logic
JPH09112215A (en) Gas turbine power plant and method of operating thereof
CN114687805A (en) Turbine cooling and natural gas heating integrated gas turbine system
CN212841501U (en) System of 'steam-keeping mode' behind secondary reheating unit boiler MFT
CN107060922B (en) Auxiliary steam system of thermal power plant and steam supply method thereof
CN106246251B (en) Combined cycle thermoelectric co-feeding system and its height arrange control method of drawing gas
CN206190339U (en) Two branch road heating system of cogeneration steam turbine
JPH04148035A (en) Vapor cooled gas turbine system
CN212054843U (en) Automatic start-stop control system of gas-steam combined cycle unit
CN113374539B (en) Steam inlet control system of double-cylinder double-pressure waste heat generating set and steam supplementing control method thereof
CN111520197B (en) Steam turbine zero-output-based combined heat and power generation unit deep peak shaving system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant