CN107060919A - A kind of gas fired-boiler steam turbine power generation Quick starting energy-saving device and method - Google Patents
A kind of gas fired-boiler steam turbine power generation Quick starting energy-saving device and method Download PDFInfo
- Publication number
- CN107060919A CN107060919A CN201710401181.2A CN201710401181A CN107060919A CN 107060919 A CN107060919 A CN 107060919A CN 201710401181 A CN201710401181 A CN 201710401181A CN 107060919 A CN107060919 A CN 107060919A
- Authority
- CN
- China
- Prior art keywords
- steam
- boiler
- heating
- valve
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
- F01K13/02—Controlling, e.g. stopping or starting
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
- F01K13/006—Auxiliaries or details not otherwise provided for
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05D—INDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
- F05D2260/00—Function
- F05D2260/85—Starting
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
- Y02P80/15—On-site combined power, heat or cool generation or distribution, e.g. combined heat and power [CHP] supply
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
Abstract
一种燃气锅炉汽机发电快速启动节能装置及方法,属于燃煤气锅炉汽机发电设备及方法技术领域,用于燃气锅炉汽机发电进行快速启动。其技术方案是:本发明增加了快速启动锅炉低部加热装置,在启动过程中采用了大气式除氧器低压循环加热、高压式除氧器低压循环加热、外部蒸汽锅炉底部直接加热、汽机低压滑参数启动等步骤,锅炉从点火生压、主蒸汽暖管、汽机滑参数启动并网代负荷共9小时。本发明大大缩短了燃煤气锅炉汽机发电机组的启动时间,降低了锅炉启动过程中的大量放散蒸汽,降低了机组启动成本,完善了燃气锅炉和汽机快速启动的安全问题,杜绝了机组并网前的蒸汽噪音对周边居民的污染,减少了钢铁企业煤气明火放散的现象。
An energy-saving device and method for quick start-up of gas-fired boiler steam turbine power generation, which belong to the technical field of gas-fired boiler steam turbine power generation equipment and methods, and are used for quick start-up of gas-fired boiler steam turbine power generation. The technical solution is: the invention adds a heating device for the lower part of the quick-start boiler, and adopts low-pressure circulation heating of the atmospheric deaerator, low-pressure circulation heating of the high-pressure deaerator, direct heating at the bottom of the external steam boiler, and low-pressure circulation of the steam turbine during the start-up process. Slip parameter start and other steps, the boiler is connected to the grid to replace the load for a total of 9 hours from the ignition and pressure generation, the main steam heating pipe, and the turbine slip parameter start. The invention greatly shortens the start-up time of the gas-fired boiler steam turbine generator set, reduces the large amount of steam released during the boiler start-up process, reduces the start-up cost of the unit, improves the safety problem of the gas-fired boiler and steam turbine quick start, and prevents the unit from being connected to the grid The current steam noise pollutes the surrounding residents and reduces the phenomenon of gas fires in iron and steel enterprises escaping.
Description
技术领域technical field
本发明涉及一种对钢铁企业燃气锅炉汽机发电进行快速启动并节能的装置及方法,属于钢铁企业燃煤气锅炉汽机发电设备及方法技术领域。The invention relates to a device and method for quickly starting and saving energy for gas-fired boiler steam turbine power generation in iron and steel enterprises, and belongs to the technical field of gas-fired boiler steam turbine power generation equipment and methods in iron and steel enterprises.
背景技术Background technique
目前,钢铁企业煤气的发生和使用具有波动性,如高炉休风或发生待料时、热风炉在使用煤气消耗量波动、设备检修、产品要求改变时造成煤气消耗量的波动等,波动系数一般为15%~20%,平衡这种煤气波动的措施是进行大量明火放散。为了合理利用煤气能源,绝大数钢铁企业采用锅炉燃烧高炉煤气汽机发电,利用大量低热值高炉煤气进行发电是一项新技术,在不影响锅炉安全运行的情况下,可通过调整发电负荷来增减高炉煤气的使用量,既有效地利用了高炉煤气资源,作为缓冲用户又能及时地调整煤气管网的压力波动,也存在轧钢加热炉等设备定修时,或热轧热送时,煤气富裕,需启动发电备用机组用于消耗煤气杜绝放散。At present, the occurrence and use of gas in iron and steel enterprises are volatile, such as when the blast furnace is closed or waiting for materials, the gas consumption of the hot blast furnace fluctuates, equipment maintenance, product requirements change, etc. The fluctuation coefficient of gas consumption is general. It is 15%-20%. The measure to balance this kind of gas fluctuation is to disperse a large number of open flames. In order to make reasonable use of gas energy, most iron and steel enterprises use boilers to burn blast furnace gas turbines to generate electricity. It is a new technology to use a large amount of low calorific value blast furnace gas to generate electricity. Without affecting the safe operation of boilers, it can be increased by adjusting the power generation load. Reducing the consumption of blast furnace gas not only makes effective use of blast furnace gas resources, but also adjusts the pressure fluctuations of the gas pipe network in a timely manner as a buffer for users. There are also cases where the steel rolling heating furnace and other equipment are scheduled to be repaired, or when hot rolling and hot delivery, the gas Wealthy, it is necessary to start the backup generating set for power generation to consume gas to prevent emission.
目前的锅炉汽机发电启动并网要经历以下几个过程:The current boiler steam turbine power generation starts and grid connection has to go through the following processes:
首先,锅炉上水上入冷态锅炉的水必须是除过氧的除盐水,其温度≥150℃,为了控制汽包壁温差应不大于50℃,减小金属热应力,严格控制上水时间和速度,一般上水时间≥3小时。First of all, the water entering the cold boiler from the boiler water must be desalted water with deoxygenation, and its temperature is ≥150°C. In order to control the temperature difference of the drum wall, it should not exceed 50°C, reduce the thermal stress of the metal, and strictly control the water supply time and Speed, the general watering time ≥ 3 hours.
其次,进行锅炉点煤气升压升温。锅炉在升压过程中,应控制锅筒内饱和温度的上升速率不大于1.75℃/分,开启锅炉对空排汽阀门进行放散,放散期间伴随噪音污染。尤其在0.01MPa~0.49MPa期间对应饱和温度146℃,温升速度快;随着压力升高其温度变化不大,但为锅炉膨胀均匀,需大量放散蒸汽,随着压力升高,噪音污染分贝越大。锅炉升至汽机主蒸汽压力8.83Mpa,主蒸汽535℃温度,需要4个小时。Secondly, carry out boiler point gas pressure boost and temperature rise. During the process of boosting the pressure of the boiler, the rising rate of the saturated temperature in the drum should be controlled not to exceed 1.75°C/min, and the boiler should be opened to vent the air to the air exhaust valve, and the noise pollution will be accompanied during the venting period. Especially during the period from 0.01MPa to 0.49MPa, the corresponding saturation temperature is 146°C, and the temperature rise rate is fast; as the pressure increases, the temperature does not change much, but because the boiler expands uniformly, a large amount of steam needs to be released. As the pressure increases, the noise pollution decibels bigger. It takes 4 hours for the boiler to rise to the pressure of the main steam of the turbine at 8.83Mpa and the temperature of the main steam at 535°C.
再有,锅炉向汽轮机供汽前,应对蒸汽管道进行暖管,需要4小时。当汽机主蒸汽压力8.83Mpa左右,主蒸汽535℃温度左右,汽轮机暖机冲转升速并网需要4个小时,期间根据蒸汽压力关闭锅炉对空排汽消除噪音污染和能源浪费。In addition, before the boiler supplies steam to the steam turbine, the steam pipe should be heated for 4 hours. When the main steam pressure of the turbine is about 8.83Mpa and the temperature of the main steam is about 535°C, it takes 4 hours for the steam turbine to warm up and run up to speed up and connect to the grid.
综上所述,正常的锅炉上水启动,直到汽机暖机升速并网带至负荷的全程最少需要15小时,且启动噪音大,严重影响周边居民的的生活,更严重的是在启动期间由于机组负荷无法并网,煤气明火需放散,在锅炉启动大量放散蒸汽和消耗煤气。To sum up, it takes at least 15 hours for the normal start-up of boiler water supply until the steam turbine is warmed up and connected to the grid to bring the load to the load, and the start-up noise is loud, which seriously affects the lives of surrounding residents, and what is more serious is during the start-up period Since the load of the unit cannot be connected to the grid, the gas fire needs to be vented, and a large amount of steam is released and gas is consumed when the boiler is started.
随着生产的发展,目前的锅炉汽机发电启动带来的启动并网时间长、启动噪音大、大量放散蒸汽和煤气等缺点已经远远不能适应生产需要,也不符合节能减排、避免污染环境的社会要求,亟待加以改进。With the development of production, the shortcomings of the current boiler and steam turbine power generation start-up, such as long start-up time, loud start-up noise, and large-scale release of steam and gas, are far from meeting production needs, and are not in line with energy saving and emission reduction, and avoiding environmental pollution. The social requirements need to be improved urgently.
技术人员通过研究机组启动过程中的加热方式和热力特性发现,机组的合理启动方式、方法应该是在启动过程中,使机组各部件得到均匀加热,使各部温差、胀差、热应力和热变形等均在允许范围内变化,尽可能地缩短机组总的启动时间,并兼顾机组启动的安全性与经济性。By studying the heating mode and thermal characteristics during the start-up process of the unit, the technicians found that the reasonable start-up method and method of the unit should be to heat all parts of the unit evenly during the start-up process, so that the temperature difference, expansion difference, thermal stress and thermal deformation of each part etc. are changed within the allowable range, the total start-up time of the unit is shortened as much as possible, and the safety and economy of the unit start-up are taken into consideration.
发明内容Contents of the invention
本发明所要解决的技术问题是提供一种燃煤气锅炉汽机发电快速启动节能装置及方法,这种装置及方法不但可以有效地解决钢铁企业燃煤气锅炉汽机发电机组启动期间温差大、启动时间过长、煤气放散的问题,又可杜绝锅炉和汽机启动期间的能源浪费和噪音污染的问题。The technical problem to be solved by the present invention is to provide an energy-saving device and method for quick start-up of gas-fired boiler steam turbine power generation. The problem of excessive length and gas release can also eliminate the problems of energy waste and noise pollution during the start-up of boilers and turbines.
解决上述技术问题的技术方案是:The technical scheme that solves the above-mentioned technical problem is:
一种燃煤气锅炉汽机发电快速启动节能装置,它包括高压除氧器、高压给水泵、高压加热器、锅炉本体、汽机电动主汽阀门、汽机、发电机,高压除氧器通过管道与高压给水泵连接,高压给水泵通过管道与高压加热器连接,高压加热器通过管道与锅炉给水系统连接,锅炉给水系统通过管道与锅炉本体连接,锅炉通过蒸汽管道与汽机电动主汽阀门连接,汽机电动主汽阀门通过蒸汽管道与汽机连接,汽机与发电机相连接,其改进之处是,它还有快速启动锅炉低部加热装置,快速启动锅炉低部加热装置包括大气式除氧器、低压给水泵、外部加热蒸汽阀门、蒸汽加热分汽缸、蒸汽加热分配阀门、蒸汽加热分配止逆阀,外部过热蒸汽管道通过外部加热蒸汽阀门与蒸汽加热分汽缸相连接,蒸汽加热分汽缸分别通过管道与大气式除氧器、锅炉水冷壁集箱相连接,在蒸汽加热分汽缸与锅炉水冷壁集箱的连接管道中安装有蒸汽加热分配阀门和蒸汽加热分配止逆阀。A quick-start energy-saving device for gas-fired boiler steam turbine power generation, which includes a high-pressure deaerator, a high-pressure feed water pump, a high-pressure heater, a boiler body, a steam turbine electric main steam valve, a steam turbine, and a generator. The high-pressure deaerator passes through pipelines and high-pressure The feedwater pump is connected, the high-pressure feedwater pump is connected to the high-pressure heater through the pipeline, the high-pressure heater is connected to the boiler water supply system through the pipeline, the boiler water supply system is connected to the boiler body through the pipeline, the boiler is connected to the steam turbine electric main steam valve through the steam pipeline, and the steam turbine electric The main steam valve is connected to the steam turbine through the steam pipe, and the steam turbine is connected to the generator. The improvement is that it also has a heating device for the lower part of the quick-start boiler. The heating device for the lower part of the quick-start boiler includes an atmospheric deaerator, a low-pressure feed Water pump, external heating steam valve, steam heating sub-cylinder, steam heating distribution valve, steam heating distribution check valve, external superheated steam pipeline is connected with steam heating sub-cylinder through external heating steam valve, and steam heating sub-cylinder is connected to the atmosphere through pipelines The steam heating distribution valve and the steam heating distribution check valve are installed in the connecting pipe between the steam heating sub-cylinder and the boiler water cooling wall header.
上述燃煤气锅炉汽机发电快速启动节能装置,所述锅炉本体包括省煤器、汽包、下降管、水冷壁、水冷壁集箱和定期排污阀,它们通过高压管道进行连接。The above gas-fired boiler steam turbine power generation quick start energy-saving device, the boiler body includes an economizer, a steam drum, a downcomer, a water wall, a water wall header and a regular blowdown valve, which are connected through a high-pressure pipeline.
上述燃煤气锅炉汽机发电快速启动节能装置,所述汽机本体包括汽机主汽阀前疏水系统、汽机电动主汽阀门、汽机本体疏水系统和汽机,它们通过高压管道进行连接。The gas-fired boiler steam turbine power generation quick-start energy-saving device described above, the turbine body includes a drainage system before the main steam valve of the turbine, an electric main steam valve of the turbine, a drainage system of the turbine body and the turbine, which are connected through high-pressure pipes.
上述燃煤气锅炉汽机发电快速启动节能装置,所述快速启动锅炉低部加热装置的蒸汽加热分汽缸安装有压力表、温度计和配套阀门,蒸汽加热分汽缸底部安装用以排除凝结水的疏水装置。The above-mentioned gas-fired boiler steam turbine power generation quick start energy-saving device, the steam heating sub-cylinder of the lower heating device of the quick start boiler is equipped with a pressure gauge, a thermometer and supporting valves, and the bottom of the steam heating sub-cylinder is installed with a drainage device for removing condensed water .
上述燃煤气锅炉汽机发电快速启动节能装置,所述快速启动锅炉低部加热装置的大气式除氧器安装有水位计、除氧头和配套阀门,锅炉外部冷态的精脱盐水管道通过电动阀门组与大气式除氧器连接,大气式除氧器底部通过管道和阀门组与低压给水泵连接,低压给水泵通过管道和阀门组与高压除氧器连接,输送除氧加热过的热水,锅炉的定期排污阀9通过管道和电动阀门组与大气式除氧器相连接。The gas-fired boiler steam turbine power generation quick-start energy-saving device mentioned above, the atmospheric deaerator of the heating device at the lower part of the quick-start boiler is equipped with a water level gauge, a deaerator head and supporting valves, and the cold refined desalted water pipeline outside the boiler passes through the electric The valve group is connected to the atmospheric deaerator, the bottom of the atmospheric deaerator is connected to the low-pressure feed water pump through the pipeline and the valve group, and the low-pressure feed water pump is connected to the high-pressure deaerator through the pipe and valve group to deliver the heated hot water for deaeration , the regular blowdown valve 9 of the boiler is connected with the atmospheric deaerator through a pipeline and an electric valve group.
一种使用上述装置的燃煤气锅炉汽机发电快速启动节能方法,它包括以下步骤:A quick-start energy-saving method for gas-fired boiler steam turbine power generation using the above-mentioned device, which includes the following steps:
第一步,通过大气式除氧器对锅炉进行低压循环加热:In the first step, the boiler is heated by low-pressure circulation through the atmospheric deaerator:
向蒸汽加热分汽缸通入外部过热蒸汽,外部冷态的精脱盐水送入大气式除氧器,开启蒸汽加热分汽缸送与大气式除氧器的调节阀,对大气式除氧器的精脱盐水进行加热除氧;低压给水泵向锅炉送水,锅炉水对锅炉设备加热,降温后的锅炉水经过大气式除氧器加热升温,再经过低压给水泵向锅炉送水,实现对锅炉的低压热循环,锅炉汽包壁温可达到40℃时;The external superheated steam is fed into the steam heating sub-cylinder, and the external cold fine desalted water is sent to the atmospheric deaerator, and the regulating valve of the steam heating sub-cylinder to send to the atmospheric deaerator is opened to control the fine deaerator of the atmospheric deaerator. The desalinated water is heated to remove oxygen; the low-pressure feed water pump sends water to the boiler, and the boiler water heats the boiler equipment. cycle, when the boiler drum wall temperature can reach 40°C;
第二步,通过高压式除氧器对锅炉进行低压循环加热:The second step is to conduct low-pressure circulation heating of the boiler through the high-pressure deaerator:
当锅炉汽包壁温≥40℃时,向高压除氧器投入加热蒸汽,开启高压给水泵将高压除氧器热水经过高压加热器送入锅炉,热水锅炉放热后送入大气式除氧器,再经过低压给水泵送入高压除氧器形成对锅炉的低压加热循环,锅炉汽包壁温可达到80℃时;When the wall temperature of the boiler drum is ≥40°C, put heating steam into the high-pressure deaerator, turn on the high-pressure feed water pump to send hot water from the high-pressure deaerator to the boiler through the high-pressure heater, and send it to the atmospheric deaerator after the hot water boiler releases heat. Oxygenator, and then sent to the high-pressure deaerator through the low-pressure feed water pump to form a low-pressure heating cycle for the boiler, when the boiler drum wall temperature can reach 80 °C;
第三步,外部蒸汽对锅炉底部直接加热:In the third step, the external steam directly heats the bottom of the boiler:
外部加热蒸汽通过加热分配阀门和蒸汽加热分配止逆阀进入锅炉保持加热均匀,锅炉汽包壁温可达到100℃时;The externally heated steam enters the boiler through the heating distribution valve and the steam heating distribution check valve to maintain uniform heating, and the boiler drum wall temperature can reach 100°C;
第四步,汽机低压滑参数启动:In the fourth step, the low-pressure slip parameter of the turbine is started:
锅炉点燃煤气,煤气燃烧稳定后,锅炉压力升,汽包产生的饱和蒸汽,经加热后变成过热蒸汽对主蒸汽管道进行暖管;当主蒸汽暖管合格后,维持锅炉燃烧稳定,汽机滑参数启动暖机,汽机达到规定转速后,发电机20并网发电。The boiler ignites the gas. After the gas combustion is stable, the pressure of the boiler rises, and the saturated steam generated by the drum turns into superheated steam after heating to warm the main steam pipe. Start the warm-up, and after the turbine reaches the specified speed, the generator 20 is connected to the grid to generate electricity.
上述燃煤气锅炉汽机发电快速启动节能方法,所述第一步包括以下步骤:The above-mentioned gas-fired boiler steam turbine power generation quick start energy-saving method, the first step includes the following steps:
a.开启蒸汽加热分汽缸的疏水阀,缓慢微开外部加热蒸汽阀门对系统进行暖管,等暖管合格后,当蒸汽加热分汽缸的压力大≥0.05MPa时,关闭疏水阀;a. Open the steam trap of the steam heating sub-cylinder, slowly open the external heating steam valve to warm the system pipes, and after the heating pipe is qualified, when the pressure of the steam heating sub-cylinder is greater than or equal to 0.05MPa, close the trap;
b.缓慢打开外部加热蒸汽阀门对蒸汽加热分汽缸输送过热蒸汽,当蒸汽加热分汽缸的过热蒸汽压力≥0.3MPa和过热蒸汽温度≥150℃正常后,关小外部加热蒸汽阀门,保持蒸汽加热分汽缸内过热蒸汽压力和温度稳定;b. Slowly open the external heating steam valve to deliver superheated steam to the steam heating sub-cylinder. When the superheated steam pressure of the steam heating sub-cylinder is ≥0.3MPa and the superheated steam temperature is ≥150℃, turn off the external heating steam valve to keep the steam heating in the sub-cylinder Stable superheated steam pressure and temperature;
c.将外部冷态的精脱盐水通过管道和电动阀门组送入大气式除氧器,并保持液位在2/3处;c. Send the external cold fine desalted water into the atmospheric deaerator through the pipeline and electric valve group, and keep the liquid level at 2/3;
d.开启蒸汽加热分汽缸与大气式除氧器的调节阀,对大气式除氧器内的精脱盐水加热除氧,保持大气式除氧器内水温度≥100℃;d. Open the steam heating sub-cylinder and the regulating valve of the atmospheric deaerator, heat and deoxygenate the refined desalted water in the atmospheric deaerator, and keep the water temperature in the atmospheric deaerator ≥ 100°C;
e.开启低压给水泵向锅炉送水,热水经过省煤器送入汽包,汽包热水经过下降管和水冷器送到水冷壁集箱,经过放热后的水温度降低,水中的热量用于加热锅炉设备的金属温度,开启定期排污阀,把降低温度后的锅炉水送入大气式除氧器加热升温,升温后水经过低压给水泵再送入锅炉省煤器形成低压循环加热过程,根据大气式除氧器内温度,调节大气式除氧器加热蒸汽量,始终保持在当大气式除氧器内的水温度≥100℃,对锅炉系统进行低压循环加热,低压循环时间时间1小时内,锅炉汽包壁温可达到40℃时。e. Turn on the low-pressure feed water pump to send water to the boiler, the hot water is sent to the steam drum through the economizer, and the hot water of the steam drum is sent to the water-cooled wall header through the downcomer and the water cooler, and the temperature of the water after heat release is reduced, and the heat in the water is used Heating the metal temperature of the boiler equipment, opening the regular blowdown valve, sending the lowered boiler water into the atmospheric deaerator to heat up the temperature, after the temperature rises, the water passes through the low-pressure feed water pump and then into the boiler economizer to form a low-pressure cycle heating process, according to the atmosphere The temperature in the atmospheric deaerator, adjust the heating steam volume of the atmospheric deaerator, and always keep the water temperature in the atmospheric deaerator ≥ 100 ℃, carry out low-pressure cycle heating for the boiler system, and the low-pressure cycle time is within 1 hour. When the boiler drum wall temperature can reach 40°C.
上述燃煤气锅炉汽机发电快速启动节能方法,所述第二步包括以下步骤:In the above gas-fired boiler steam turbine power generation quick start energy-saving method, the second step includes the following steps:
f.当锅炉汽包壁温≥40℃时,向高压除氧器投入加热蒸汽,保持高压除氧器的水的温度≥150℃,关闭送锅炉省煤器低压循环水阀门,开启高压循环水阀门,开启高压给水泵从高压除氧器送水,经过高压加热器送入锅炉省煤器,热水经过省煤器送入汽包,汽包热水经过下降管、水冷器、水冷壁集箱和定期排污阀送入大气式除氧器,再经过低压给水泵送入高压除氧器形成低压加热循环,始终保持在当高压式除氧器内水温度≥150℃,对锅炉系统进行低压循环加热;f. When the wall temperature of the boiler drum is ≥40°C, put heating steam into the high-pressure deaerator, keep the water temperature of the high-pressure deaerator ≥150°C, close the low-pressure circulating water valve of the boiler economizer, open the high-pressure circulating water valve, Turn on the high-pressure feed water pump to send water from the high-pressure deaerator, and send it to the boiler economizer through the high-pressure heater. The hot water is sent to the steam drum through the economizer. The sewage valve is sent to the atmospheric deaerator, and then sent to the high-pressure deaerator through the low-pressure feed water pump to form a low-pressure heating cycle, and the water temperature in the high-pressure deaerator is always kept at ≥ 150 ° C, and the boiler system is heated in a low-pressure cycle;
g.当锅炉汽包壁温≥80℃时,关闭锅炉定期排污阀,停止低压给水泵,停止高压给水泵,停止循环加热,锅炉上水至汽包水位计最低可见水位,循环时间1小时内,锅炉汽包壁温可达到80℃时。g. When the wall temperature of the boiler drum is ≥80°C, close the regular blowdown valve of the boiler, stop the low-pressure feed water pump, stop the high-pressure feed water pump, stop the circulation heating, and fill the boiler with water to the lowest visible water level of the drum water level gauge. Within 1 hour of cycle time, the boiler Drum wall temperature can reach 80 ℃.
上述燃煤气锅炉汽机发电快速启动节能方法,所述第三步包括以下步骤:In the above gas-fired boiler steam turbine power generation quick start energy-saving method, the third step includes the following steps:
h.缓慢开启蒸汽加热分配阀门,加热蒸汽通过加热分配阀门和蒸汽加热分配止逆阀进入水冷壁集箱保持加热均匀,管道不振动,控制汽包上下壁温差不大于40℃(国家规范),蒸汽加热分汽缸保持在0.1 MPa,加强加热;待炉水温度上升至100℃左右,根据管道振动情况,缓慢全开外部加热蒸汽阀门,全面投入锅炉底部加热系统全面进行无火升压升温,1小时内,锅炉汽包壁温可达到100℃时。h. Slowly open the steam heating distribution valve, the heating steam enters the water-cooled wall header through the heating distribution valve and the steam heating distribution check valve to keep the heating uniform, the pipeline does not vibrate, and the temperature difference between the upper and lower walls of the steam drum is controlled not to exceed 40°C (national standard), and the steam heating The sub-cylinder is kept at 0.1 MPa, and heating is strengthened; when the temperature of the boiler water rises to about 100°C, according to the vibration of the pipeline, slowly fully open the external heating steam valve, and fully put into the heating system at the bottom of the boiler to fully increase the pressure and temperature without fire, within 1 hour , When the boiler drum wall temperature can reach 100 ℃.
上述燃煤气锅炉汽机发电快速启动节能方法,所述第四步包括以下步骤:In the above gas-fired boiler steam turbine power generation quick start energy-saving method, the fourth step includes the following steps:
I.锅炉点燃煤气,煤气燃烧稳稳定后,因锅炉内温度已高达100℃以上,加快升压速度,锅炉压力直接升到0.49MPa,当汽包压力大于0.5MPa时,关闭蒸汽加热分配阀门和蒸汽加热分配止逆阀,关闭外部加热蒸汽阀门,退出锅炉底部加热系统,根据锅炉汽温、汽压上升速度要求,微开启锅炉对空排汽,加快升压升温;I. The boiler ignites the gas, and after the gas burns stably, because the temperature in the boiler has reached above 100°C, the pressure increase speed is accelerated, and the boiler pressure rises directly to 0.49MPa. When the steam drum pressure is greater than 0.5MPa, close the steam heating distribution valve and steam heating Distribute the non-return valve, close the external heating steam valve, exit the heating system at the bottom of the boiler, and slightly open the boiler to exhaust steam to the air according to the requirements of the boiler steam temperature and steam pressure rising speed, so as to speed up the pressure and temperature rise;
j.当锅炉的主蒸汽压力到达0.59Mpa,主蒸汽温度190~205℃,关严汽机电动主汽阀门,开启汽机主汽阀前疏水系统和汽机本体疏水系统,汽包产生的饱和蒸汽经加热后变成过热蒸汽送至汽机电动主汽阀门前,通过汽机主汽阀前疏水系统对主蒸汽管道进行暖管;j. When the pressure of the main steam of the boiler reaches 0.59Mpa and the temperature of the main steam is 190-205°C, close the motorized main steam valve of the turbine, open the drain system before the main steam valve of the turbine and the drain system of the turbine body, and the saturated steam generated by the steam drum will change after being heated. The superheated steam is sent to the electric main steam valve of the turbine, and the main steam pipeline is warmed through the drainage system in front of the main steam valve of the turbine;
k.当主蒸汽暖管合格后,且汽机电动主汽阀门前蒸汽压力≥1.2 MPa、主汽温度≥220℃、过热度≥50℃时,锅炉关闭对空排汽,维持锅炉燃烧稳定,主蒸汽压力和温度不下跌,汽机滑参数启动暖机,当汽机冲转到400 r/min~500 r/min听音检查低速暖机检查5分钟;k. When the main steam heating pipe is qualified, and the steam pressure in front of the electric main steam valve of the turbine is ≥1.2 MPa, the main steam temperature is ≥220°C, and the superheat is ≥50°C, the boiler is turned off to exhaust steam to the air to maintain stable combustion of the boiler, and the main steam pressure and If the temperature does not drop, start the warm-up with the slip parameters of the steam turbine. When the turbine speeds up to 400 r/min~500 r/min, listen to the sound and check the low-speed warm-up for 5 minutes;
l.汽机10分钟内均匀升速到1200 r/min,并在1200 r/min暖机检查30分钟;l. The steam turbine speeds up to 1200 r/min evenly within 10 minutes, and warms up at 1200 r/min for 30 minutes;
m.汽机20分钟内转速从1200 r/min匀速升速到3000 r/min(过汽机和发电临界转速时,要快速平稳通过),并在3000 r/min暖机检查15分钟。发电机并网发电;m. The speed of the steam turbine is increased from 1200 r/min to 3000 r/min at a constant speed within 20 minutes (when passing the critical speed of the steam turbine and power generation, it should be passed quickly and smoothly), and the warm-up inspection is carried out at 3000 r/min for 15 minutes. Generators connected to the grid for power generation;
n.关闭汽机本体疏水系统,当锅炉出口蒸汽参数以及蒸发达到额定值时,汽轮机也刚好带上额定负荷,滑参数启动程序再4个小时启动并网完成,6个小时内带负荷暖机并具备满负荷工况。n. Turn off the drainage system of the steam turbine body. When the steam parameters and evaporation at the boiler outlet reach the rated value, the steam turbine just takes on the rated load. The start-up procedure with slip parameters will be started in another 4 hours and the grid connection will be completed. Within 6 hours, it will warm up with load and have full capacity Load condition.
本发明的有益效果是:The beneficial effects of the present invention are:
本发明的燃煤气锅炉汽机发电快速启动节能装置增加了快速启动锅炉低部加热装置,在启动过程中采用了大气式除氧器低压循环加热、高压式除氧器低压循环加热、外部蒸汽锅炉底部直接加热、汽机低压滑参数启动等步骤,锅炉从点火生压、主蒸汽暖管、汽机滑参数启动并网代负荷共9小时,在启动过程只有微量蒸汽放散,同时杜绝了煤气放散现象,且启动全程无噪音污染。The gas-fired boiler steam turbine power generation quick-start energy-saving device of the present invention adds a quick-start boiler lower part heating device, and adopts atmospheric type deaerator low-pressure circulation heating, high-pressure deaerator low-pressure circulation heating, and external steam boiler in the start-up process. Bottom direct heating, steam turbine low-pressure sliding parameter start-up and other steps, the boiler starts from ignition pressure generation, main steam heating pipe, turbine sliding parameter start-up and grid-connected load generation for a total of 9 hours. During the start-up process, only a small amount of steam is released, and gas release is eliminated And start the whole process without noise pollution.
本发明大大缩短了燃煤气锅炉汽机发电机组的启动时间,降低了锅炉启动过程中的大量放散蒸汽,降低了机组启动成本,完善了燃气锅炉和汽机快速启动的安全问题,杜绝了机组并网前的蒸汽噪音对周边居民的的污染,减少了钢铁企业煤气明火放散的现象。The invention greatly shortens the start-up time of the gas-fired boiler steam turbine generator set, reduces the large amount of steam released during the boiler start-up process, reduces the start-up cost of the unit, improves the safety problem of the gas-fired boiler and steam turbine quick start, and prevents the unit from being connected to the grid The current steam noise pollutes the surrounding residents and reduces the phenomenon of gas fires in iron and steel enterprises escaping.
本发明开辟了利用钢铁企业的煤气高效利用的新路,又解决了然煤气锅炉汽机发电启动时间长的难题,具有显著的经济效益和社会效益。The invention opens up a new way of efficient utilization of gas in iron and steel enterprises, and solves the problem of long start-up time of the gas boiler and turbine for power generation, and has significant economic and social benefits.
附图说明Description of drawings
图1是本发明的燃煤气锅炉汽机发电快速启动节能装置结构示意图。Fig. 1 is a structural schematic diagram of a gas-fired boiler steam turbine power generation quick-start energy-saving device according to the present invention.
图中标记如下:高压除氧器1、高压给水泵2、高压加热器3、省煤器4、汽包5、下降管6、水冷壁7、水冷壁集箱8、定期排污阀9、大气式除氧器10、低压给水泵11、外部加热蒸汽阀门12、蒸汽加热分汽缸13、蒸汽加热分配阀门14、蒸汽加热分配止逆阀15、汽机主汽阀前疏水系统16、汽机电动主汽阀门17、汽机本体疏水系统18、汽机19、发电机20、低压循环水阀门21、高压循环水阀门22、精脱盐水23、过热蒸汽24、快速启动锅炉低部加热装置25。The marks in the figure are as follows: high-pressure deaerator 1, high-pressure feed water pump 2, high-pressure heater 3, economizer 4, steam drum 5, downcomer 6, water wall 7, water wall header 8, regular blowdown valve 9, atmosphere Type deaerator 10, low-pressure feed water pump 11, external heating steam valve 12, steam heating sub-cylinder 13, steam heating distribution valve 14, steam heating distribution check valve 15, steam turbine main steam valve front drainage system 16, turbine electric main steam Valve 17, steam turbine body drainage system 18, steam turbine 19, generator 20, low-pressure circulating water valve 21, high-pressure circulating water valve 22, refined and desalinated water 23, superheated steam 24, and heating device 25 at the bottom of the quick-start boiler.
具体实施方式detailed description
本发明的燃煤气锅炉汽机发电快速启动节能装置包括高压除氧器1、高压给水泵2、高压加热器3、锅炉本体、汽机电动主汽阀门17、汽机19和快速启动锅炉低部加热装置25。The gas-fired boiler steam turbine power generation quick-start energy-saving device of the present invention includes a high-pressure deaerator 1, a high-pressure feed water pump 2, a high-pressure heater 3, a boiler body, a steam turbine electric main steam valve 17, a steam turbine 19, and a heating device for the lower part of the quick-start boiler 25.
图中显示,高压除氧器1通过管道与高压给水泵2连接,高压给水泵2通过管道与高压加热器3连接,高压加热器3通过管道与锅炉给水系统连接,锅炉给水系统通过管道与锅炉本体连接。锅炉通过蒸汽管道与汽机电动主汽阀门17连接,汽机电动主汽阀门17通过蒸汽管道与汽机19连接,汽机19与发电机20相连接。The figure shows that the high-pressure deaerator 1 is connected to the high-pressure feed water pump 2 through the pipeline, the high-pressure feed water pump 2 is connected to the high-pressure heater 3 through the pipeline, the high-pressure heater 3 is connected to the boiler water supply system through the pipeline, and the boiler water supply system is connected to the boiler through the pipeline. Ontology connection. The boiler is connected to the steam turbine electric main steam valve 17 through the steam pipeline, the steam turbine electric main steam valve 17 is connected to the steam turbine 19 through the steam pipeline, and the steam turbine 19 is connected to the generator 20 .
图中显示,锅炉本体包括省煤器4、汽包5、下降管6、水冷壁7、水冷壁集箱8和定期排污阀9,它们通过高压管道进行连接。As shown in the figure, the boiler body includes an economizer 4, a steam drum 5, a downcomer 6, a water wall 7, a water wall header 8 and a regular blowdown valve 9, which are connected through high-pressure pipes.
图中显示,汽机本体包括汽机主汽阀前疏水系统16、汽机电动主汽阀门17、汽机本体疏水系统18和汽机19,它们通过高压管道进行连接。As shown in the figure, the turbine body includes a drainage system 16 before the main steam valve of the turbine, an electric main steam valve 17 of the turbine, a drainage system 18 of the turbine body and a turbine 19, which are connected through high-pressure pipelines.
图中显示,快速启动锅炉低部加热装置25包括大气式除氧器10、低压给水泵11、外部加热蒸汽阀门12、蒸汽加热分汽缸13、蒸汽加热分配阀门14、蒸汽加热分配止逆阀15和相关的管道阀们等设备。As shown in the figure, the heating device 25 at the lower part of the quick-start boiler includes an atmospheric deaerator 10, a low-pressure feed water pump 11, an external heating steam valve 12, a steam heating sub-cylinder 13, a steam heating distribution valve 14, and a steam heating distribution check valve 15 And related pipeline valves and other equipment.
图中显示,过热蒸汽系统的蒸汽加热分汽缸13安装有压力表、温度计和配套阀门,蒸汽加热分汽缸13底部安装疏水装置用以排除凝结的水。过热蒸汽24通过外部加热蒸汽阀门12通过管道与蒸汽加热分汽缸13连接。蒸汽加热分汽缸13内的过热蒸汽24一部分通过管道和调节阀与大气式除氧器10连接,另一部分过热蒸汽24通过管道与蒸汽加热分配阀门14和蒸汽加热分配止逆阀15连接,过热蒸汽24通过蒸汽加热分配阀门14和蒸汽加热分配止逆阀15管道与锅炉水冷壁集箱连接。As shown in the figure, the steam heating sub-cylinder 13 of the superheated steam system is equipped with a pressure gauge, a thermometer and supporting valves, and a drain device is installed at the bottom of the steam heating sub-cylinder 13 to remove condensed water. The superheated steam 24 is connected with the steam heating sub-cylinder 13 through a pipeline through the external heating steam valve 12 . Part of the superheated steam 24 in the steam heating sub-cylinder 13 is connected to the atmospheric deaerator 10 through pipelines and regulating valves, and the other part of the superheated steam 24 is connected to the steam heating distribution valve 14 and the steam heating distribution check valve 15 through pipelines. 24 is connected to the boiler water wall header through steam heating distribution valve 14 and steam heating distribution check valve 15 pipes.
图中显示,水蒸汽系统的大气式除氧器10安装有水位计、除氧头和配套阀门。锅炉使用外部冷态的精脱盐水23通过管道和电动阀门组与大气式除氧器10连接,大气式除氧器10底部通过管道和阀门组与低压给水泵11连接,输送除氧加热过的热水,低压给水泵11通过管道和阀门组与高压除氧器1连接。Shown in the figure, the atmospheric deaerator 10 of the steam system is equipped with a water level gauge, a deaerator head and supporting valves. The boiler uses the external cold fine desalinated water 23 to connect with the atmospheric deaerator 10 through the pipeline and the electric valve group, and the bottom of the atmospheric deaerator 10 is connected with the low-pressure feed water pump 11 through the pipeline and the valve group, and transports deoxygenated heated Hot water, low-pressure feed water pump 11 is connected with high-pressure deaerator 1 through pipeline and valve group.
图中显示,锅炉循环加热水系统的锅炉的定期排污阀9通过管道和电动阀门组与大气式除氧器10连接。The figure shows that the periodic blowdown valve 9 of the boiler of the boiler circulating heating water system is connected with the atmospheric deaerator 10 through a pipeline and an electric valve group.
本发明的燃气锅炉汽机发电快速启动节能方法在启动过程中采用了大气式除氧器低压循环加热、高压式除氧器低压循环加热、外部蒸汽锅炉底部直接加热、汽机低压滑参数启动等步骤,锅炉从点火生压、主蒸汽暖管、汽机滑参数启动并网代负荷共9小时,在启动过程只有微量蒸汽放散,同时杜绝了煤气放散现象,且启动全程无噪音污染。具体步骤如下:The energy-saving method for quick start-up of gas-fired boiler steam turbine power generation in the start-up process adopts the steps of low-pressure circulation heating of atmospheric deaerator, low-pressure circulation heating of high-pressure deaerator, direct heating at the bottom of external steam boiler, and start-up of steam turbine with low-pressure slip parameters. The boiler was started for 9 hours from ignition and pressure generation, main steam heating pipe, and turbine sliding parameters to grid connection and load generation. During the start-up process, only a small amount of steam was released, and the phenomenon of gas release was eliminated at the same time, and there was no noise pollution during the start-up process. Specific steps are as follows:
第一步,通过大气式除氧器对锅炉进行低压循环加热:In the first step, the boiler is heated by low-pressure circulation through the atmospheric deaerator:
a.开启蒸汽加热分汽缸13的疏水阀,缓慢微开外部加热蒸汽阀门12对系统进行暖管,等暖管合格后,当蒸汽加热分汽缸13的压力大≥0.05MPa时,关闭疏水阀;a. Open the steam trap of the steam heating sub-cylinder 13, slowly open the external heating steam valve 12 to warm the system, and after the heating pipe is qualified, when the pressure of the steam heating sub-cylinder 13 is greater than or equal to 0.05MPa, close the steam trap;
b.缓慢打开外部加热蒸汽阀门12对蒸汽加热分汽缸13输送过热蒸汽,当蒸汽加热分汽缸13的过热蒸汽压力≥0.3MPa和过热蒸汽温度≥150℃正常后,关小外部加热蒸汽阀门12,保持蒸汽加热分汽缸13内过热蒸汽压力和温度稳定;b. Slowly open the external heating steam valve 12 to deliver superheated steam to the steam heating sub-cylinder 13. When the superheated steam pressure of the steam heating sub-cylinder 13 is ≥ 0.3MPa and the superheated steam temperature is ≥ 150℃, turn off the external heating steam valve 12 to keep the steam The pressure and temperature of the superheated steam in the heating sub-cylinder 13 are stable;
c.将外部冷态的精脱盐水23通过管道和电动阀门组送入大气式除氧器10,并保持液位在2/3处;c. Send the external cold fine desalted water 23 into the atmospheric deaerator 10 through the pipeline and electric valve group, and keep the liquid level at 2/3;
d.开启蒸汽加热分汽缸13与大气式除氧器10的调节阀,对大气式除氧器10内的精脱盐水23加热除氧,保持大气式除氧器10内水温度≥100℃;d. Open the regulating valve of the steam heating sub-cylinder 13 and the atmospheric deaerator 10, heat and deoxygenate the refined desalted water 23 in the atmospheric deaerator 10, and keep the water temperature in the atmospheric deaerator 10 ≥ 100°C;
e.开启低压给水泵11向锅炉送水,热水经过省煤器4送入汽包5,汽包5热水经过下降管6和水冷器7送到水冷壁集箱8,经过放热后的水温度降低,水中的热量用于加热锅炉设备的金属温度,开启定期排污阀9,把降低温度后的锅炉水送入大气式除氧器10加热升温,升温后水经过低压给水泵11再送入锅炉省煤器4形成低压循环加热过程,根据大气式除氧器10内温度,调节大气式除氧器10加热蒸汽量,始终保持在当大气式除氧器10内的水温度≥100℃,对锅炉系统进行低压循环加热,低压循环时间时间1小时内,锅炉汽包壁温可达到40℃时。e. Turn on the low-pressure feed water pump 11 to send water to the boiler, hot water is sent to the steam drum 5 through the economizer 4, and the hot water from the steam drum 5 is sent to the water-cooled wall header 8 through the downcomer 6 and the water cooler 7, and the water temperature after heat release The heat in the water is used to heat the metal temperature of the boiler equipment, and the regular blowdown valve 9 is opened to send the boiler water with reduced temperature to the atmospheric deaerator 10 to heat up. The coal heater 4 forms a low-pressure cycle heating process. According to the temperature in the atmospheric deaerator 10, the heating steam volume of the atmospheric deaerator 10 is adjusted, and the water temperature in the atmospheric deaerator 10 is always kept at ≥ 100°C. The system carries out low-pressure circulation heating, and the low-pressure circulation time is within 1 hour, when the boiler drum wall temperature can reach 40°C.
第二步,通过高压式除氧器对锅炉进行低压循环加热:The second step is to conduct low-pressure circulation heating of the boiler through the high-pressure deaerator:
f.当锅炉汽包壁温≥40℃时,向高压除氧器1投入加热蒸汽24,保持高压除氧器1的水的温度≥150℃,关闭送锅炉省煤器4的低压循环水阀门21,开启高压循环水阀门22,开启高压给水泵2从高压除氧器1送水,经过高压加热器3送入锅炉省煤器4,热水经过省煤器4送入汽包5,汽包5热水经过下降管6、水冷器7、水冷壁集箱8和定期排污阀9送入大气式除氧器10,再经过低压给水泵11送入高压除氧器1形成低压加热循环,始终保持在当高压式除氧器1内水温度≥150℃,对锅炉系统进行低压循环加热;f. When the wall temperature of the boiler drum is ≥40°C, put heating steam 24 into the high-pressure deaerator 1, keep the temperature of the water in the high-pressure deaerator 1 ≥150°C, and close the low-pressure circulating water valve 21 for the boiler economizer 4, Turn on the high-pressure circulating water valve 22, turn on the high-pressure feed water pump 2 to send water from the high-pressure deaerator 1, and send it to the boiler economizer 4 through the high-pressure heater 3, and send hot water to the steam drum 5 through the economizer 4, and the steam drum 5 is heated The water is sent to the atmospheric deaerator 10 through the downcomer 6, the water cooler 7, the water-cooled wall header 8 and the regular blowdown valve 9, and then sent to the high-pressure deaerator 1 through the low-pressure feed water pump 11 to form a low-pressure heating cycle, which is always kept at When the temperature of the water in the high-pressure deaerator 1 is ≥150°C, the boiler system is heated in a low-pressure cycle;
g.当锅炉汽包壁温≥80℃时,关闭锅炉定期排污阀9,停止低压给水泵11,停止高压给水泵1,停止循环加热,锅炉上水至汽包水位计最低可见水位,循环时间1小时内,锅炉汽包壁温可达到80℃时。g. When the wall temperature of the boiler drum is ≥80°C, close the boiler periodic blowdown valve 9, stop the low-pressure feed water pump 11, stop the high-pressure feed water pump 1, stop the circulation heating, fill the boiler with water to the lowest visible water level of the drum water level gauge, and cycle for 1 hour Inside, when the boiler drum wall temperature can reach 80°C.
第三步,外部蒸汽对锅炉底部直接加热:In the third step, the external steam directly heats the bottom of the boiler:
h.缓慢开启蒸汽加热分配阀门14,加热蒸汽24通过蒸汽加热分配阀门14和蒸汽加热分配止逆阀15进入水冷壁集箱8保持加热均匀,管道不振动,控制汽包上下壁温差不大于40℃(国家规范),蒸汽加热分汽缸13保持在0.1 MPa,加强加热;待炉水温度上升至100℃左右,根据管道振动情况,缓慢全开外部加热蒸汽阀门12,全面投入锅炉底部加热系统全面进行无火升压升温,1小时内,锅炉汽包壁温可达到100℃时。h. Slowly open the steam heating distribution valve 14, the heating steam 24 enters the water-cooled wall header 8 through the steam heating distribution valve 14 and the steam heating distribution check valve 15 to maintain uniform heating, the pipeline does not vibrate, and the temperature difference between the upper and lower walls of the steam drum is controlled not to exceed 40°C ( According to the national standard), the steam heating sub-cylinder 13 is kept at 0.1 MPa, and the heating is strengthened; when the temperature of the boiler water rises to about 100°C, according to the vibration of the pipeline, the external heating steam valve 12 is slowly and fully opened, and the heating system at the bottom of the boiler is fully put into the bottom of the boiler. The fire boosts the pressure and heats up, and within 1 hour, the wall temperature of the boiler drum can reach 100°C.
第四步,汽机低压滑参数启动:In the fourth step, the low-pressure slip parameter of the turbine is started:
I.锅炉点燃煤气,煤气燃烧稳稳定后,因锅炉内温度已高达100℃以上,加快升压速度,锅炉压力直接升到0.49MPa,当汽包5压力大于0.5MPa时,关闭蒸汽加热分配阀门14和蒸汽加热分配止逆阀15,关闭外部加热蒸汽阀门12,退出锅炉底部加热系统,根据锅炉汽温、汽压上升速度要求,微开启锅炉对空排汽,加快升压升温;I. The boiler ignites the gas, and after the gas burns stably, because the temperature inside the boiler has reached above 100°C, the pressure increase speed is accelerated, and the boiler pressure rises directly to 0.49MPa. When the pressure of the steam drum 5 is greater than 0.5MPa, close the steam heating distribution valve 14 and The steam heating distribution check valve 15 closes the external heating steam valve 12, exits the heating system at the bottom of the boiler, and slightly opens the boiler to exhaust steam to the air according to the requirements of the boiler steam temperature and steam pressure rising speed to speed up the pressure increase and temperature rise;
j.当锅炉的主蒸汽压力到达0.59Mpa,主蒸汽温度190~205℃,关严汽机电动主汽阀门17,开启汽机主汽阀前疏水系统16和汽机本体疏水系统18,汽包5产生的饱和蒸汽经加热后变成过热蒸汽送至汽机电动主汽阀门17前,通过汽机主汽阀前疏水系统16对主蒸汽管道进行暖管;j. When the main steam pressure of the boiler reaches 0.59Mpa and the main steam temperature is 190-205°C, close the electric main steam valve 17 of the turbine, open the drainage system 16 before the main steam valve of the turbine and the drainage system 18 of the turbine body, and the saturated steam generated by the steam drum 5 After being heated, it becomes superheated steam and sends it to the electric main steam valve 17 of the turbine, and the main steam pipeline is warmed through the drainage system 16 in front of the main steam valve of the turbine;
k.当主蒸汽暖管合格后,且汽机电动主汽阀门17前蒸汽压力≥1.2 MPa、主汽温度≥220℃、过热度≥50℃时,锅炉关闭对空排汽,维持锅炉燃烧稳定,主蒸汽压力和温度不下跌,汽机滑参数启动暖机,当汽机冲转到400 r/min~500 r/min听音检查低速暖机检查5分钟;k. When the main steam heating pipe is qualified, and the steam pressure in front of the steam turbine electric main steam valve 17 is ≥1.2 MPa, the main steam temperature is ≥220°C, and the superheat is ≥50°C, the boiler is turned off to exhaust steam to the air to maintain stable combustion of the boiler and the main steam pressure and the temperature does not drop, the turbine slip parameters start the warm-up, when the turbine rushes to 400 r/min-500 r/min, listen to the sound and check the low-speed warm-up check for 5 minutes;
l.汽机10分钟内均匀升速到1200 r/min,并在1200 r/min暖机检查30分钟;l. The steam turbine speeds up to 1200 r/min evenly within 10 minutes, and warms up at 1200 r/min for 30 minutes;
m.汽机20分钟内转速从1200 r/min匀速升速到3000 r/min(过汽机和发电临界转速时,要快速平稳通过),并在3000 r/min暖机检查15分钟。发电机20并网发电;m. The speed of the steam turbine is increased from 1200 r/min to 3000 r/min at a constant speed within 20 minutes (when passing the critical speed of the steam turbine and power generation, it should be passed quickly and smoothly), and the warm-up inspection is carried out at 3000 r/min for 15 minutes. The generator 20 is connected to the grid for power generation;
n.关闭汽机本体疏水系统18,当锅炉出口蒸汽参数以及蒸发达到额定值时,汽轮机也刚好带上额定负荷,滑参数启动程序再4个小时启动并网完成,6个小时内带负荷暖机并具备满负荷工况。n. Turn off the drainage system 18 of the steam turbine body. When the steam parameters and evaporation at the boiler outlet reach the rated value, the steam turbine just takes on the rated load. The start-up procedure of the sliding parameter will be started in 4 hours and the grid connection will be completed. Within 6 hours, it will warm up with load and have Full load condition.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710401181.2A CN107060919B (en) | 2017-05-31 | 2017-05-31 | A quick-start energy-saving device and method for gas-fired boiler steam turbine power generation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710401181.2A CN107060919B (en) | 2017-05-31 | 2017-05-31 | A quick-start energy-saving device and method for gas-fired boiler steam turbine power generation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN107060919A true CN107060919A (en) | 2017-08-18 |
| CN107060919B CN107060919B (en) | 2019-05-03 |
Family
ID=59617377
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710401181.2A Expired - Fee Related CN107060919B (en) | 2017-05-31 | 2017-05-31 | A quick-start energy-saving device and method for gas-fired boiler steam turbine power generation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107060919B (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110822285A (en) * | 2019-11-15 | 2020-02-21 | 龙岩烟草工业有限责任公司 | Vapor delivery system and method |
| CN110878711A (en) * | 2018-09-06 | 2020-03-13 | 上海昊熙能源科技有限公司 | A small thermal power plant fluid pressure differential utilization system and its use method |
| CN111255536A (en) * | 2020-01-22 | 2020-06-09 | 中国能源建设集团广东省电力设计研究院有限公司 | FCB operation method of gas-steam unit power plant |
| CN111335976A (en) * | 2020-03-17 | 2020-06-26 | 西安热工研究院有限公司 | One-key starting method of coal-fired generator set based on steam feed pump starting mode |
| CN111335975A (en) * | 2020-03-17 | 2020-06-26 | 西安热工研究院有限公司 | One-key start method of coal-fired generator set based on electric feed pump start method |
| CN113736954A (en) * | 2021-09-01 | 2021-12-03 | 邯郸钢铁集团有限责任公司 | Method for supplying steam and improving superheat degree of steam for steelmaking heat accumulator |
| CN114251665A (en) * | 2021-12-31 | 2022-03-29 | 华西能源工业股份有限公司 | An adjacent furnace heating system applied to a solid waste incineration boiler |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2166692C1 (en) * | 2000-03-31 | 2001-05-10 | Ульяновский государственный технический университет | Boiler plant |
| JP2012102711A (en) * | 2010-11-12 | 2012-05-31 | Chugoku Electric Power Co Inc:The | Temperature reducing device steam heat recovery facilities |
| CN203744208U (en) * | 2013-12-27 | 2014-07-30 | 冯伟忠 | Energy-saving type quick starting system |
| CN104566331A (en) * | 2014-12-24 | 2015-04-29 | 浙江省电力设计院 | Back-pressure type heat regenerative system for combined heat and power generation |
| CN105823035A (en) * | 2016-03-22 | 2016-08-03 | 昆明理工大学 | Solar device for conducting water supplementing and deoxidizing on boiler |
-
2017
- 2017-05-31 CN CN201710401181.2A patent/CN107060919B/en not_active Expired - Fee Related
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2166692C1 (en) * | 2000-03-31 | 2001-05-10 | Ульяновский государственный технический университет | Boiler plant |
| JP2012102711A (en) * | 2010-11-12 | 2012-05-31 | Chugoku Electric Power Co Inc:The | Temperature reducing device steam heat recovery facilities |
| CN203744208U (en) * | 2013-12-27 | 2014-07-30 | 冯伟忠 | Energy-saving type quick starting system |
| CN104566331A (en) * | 2014-12-24 | 2015-04-29 | 浙江省电力设计院 | Back-pressure type heat regenerative system for combined heat and power generation |
| CN105823035A (en) * | 2016-03-22 | 2016-08-03 | 昆明理工大学 | Solar device for conducting water supplementing and deoxidizing on boiler |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110878711A (en) * | 2018-09-06 | 2020-03-13 | 上海昊熙能源科技有限公司 | A small thermal power plant fluid pressure differential utilization system and its use method |
| CN110822285A (en) * | 2019-11-15 | 2020-02-21 | 龙岩烟草工业有限责任公司 | Vapor delivery system and method |
| CN111255536A (en) * | 2020-01-22 | 2020-06-09 | 中国能源建设集团广东省电力设计研究院有限公司 | FCB operation method of gas-steam unit power plant |
| CN111255536B (en) * | 2020-01-22 | 2022-08-30 | 中国能源建设集团广东省电力设计研究院有限公司 | FCB operation method of gas-steam unit power plant |
| CN111335976A (en) * | 2020-03-17 | 2020-06-26 | 西安热工研究院有限公司 | One-key starting method of coal-fired generator set based on steam feed pump starting mode |
| CN111335975A (en) * | 2020-03-17 | 2020-06-26 | 西安热工研究院有限公司 | One-key start method of coal-fired generator set based on electric feed pump start method |
| CN113736954A (en) * | 2021-09-01 | 2021-12-03 | 邯郸钢铁集团有限责任公司 | Method for supplying steam and improving superheat degree of steam for steelmaking heat accumulator |
| CN114251665A (en) * | 2021-12-31 | 2022-03-29 | 华西能源工业股份有限公司 | An adjacent furnace heating system applied to a solid waste incineration boiler |
Also Published As
| Publication number | Publication date |
|---|---|
| CN107060919B (en) | 2019-05-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107060919B (en) | A quick-start energy-saving device and method for gas-fired boiler steam turbine power generation | |
| CN107355770B (en) | By steam feed pump to the method for boiler water filling when a kind of Unit Commitment | |
| CN105352361B (en) | For steam-line blowing method of the ultra supercritical without stove water pump direct current cooker | |
| EP2165116B1 (en) | Immediate response steam generating method | |
| CN105317482B (en) | A kind of Combined Cycle Unit starts method | |
| CN103382860A (en) | Control method for steam turbine power generation and heat supply system | |
| CN101118211A (en) | High temperature steam oxidation test device | |
| CN100558912C (en) | A device for mixing saturated steam and superheated steam for use in vacuum refining furnaces | |
| CN115507376A (en) | Thermal auxiliary system suitable for quick start and stop of pulverized coal once-through boiler and control method | |
| CN117146248A (en) | Fused salt heating steam generation system with pressure relief function | |
| CN112768101A (en) | System and method for starting nuclear power unit of high-temperature gas cooled reactor by sliding pressure | |
| CN201665688U (en) | A converter steelmaking steam recovery device | |
| CN106322346B (en) | A kind of method of direct current cooker sliding parameter blowing out | |
| CN207661753U (en) | A kind of coke dry quenching boiler waterworks | |
| CN103673650A (en) | Steel mill surplus gas and sanitary steam comprehensive utilization system and method | |
| CN106285810B (en) | The apparatus and method that a kind of wet saturated steam is used for sintering waste heat generating | |
| CN203744223U (en) | Critical unit heating system | |
| CN118009301B (en) | Intelligent control method, control system and storage medium for boiler | |
| CN112443828A (en) | Electric heating steam superheating system | |
| CN206092091U (en) | Wet saturated steam is used for device of sintering cogeneration | |
| CN212252568U (en) | Boiler recirculation heat exchange starting system of subcritical header control water supply system | |
| CN205977286U (en) | Pressure regulating system of natural gas distributing type energy | |
| CN203615773U (en) | Comprehensive recycling system of surplus coal gas and saturated steam of steel plant | |
| CN104481610A (en) | Apparatus and method for keeping non-stop operation of steam turbines in waste heat power plants of iron and steel plant | |
| CN114543074A (en) | Starting system of direct-current coal-fired generator set |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190503 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |