CN111210209A - Building engineering acceptance and wage approval management system with identity recognition function - Google Patents

Building engineering acceptance and wage approval management system with identity recognition function Download PDF

Info

Publication number
CN111210209A
CN111210209A CN202010309387.4A CN202010309387A CN111210209A CN 111210209 A CN111210209 A CN 111210209A CN 202010309387 A CN202010309387 A CN 202010309387A CN 111210209 A CN111210209 A CN 111210209A
Authority
CN
China
Prior art keywords
construction
worker
unit
identity recognition
workers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010309387.4A
Other languages
Chinese (zh)
Inventor
刘勇刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Yizhi Technology Co Ltd
Original Assignee
Chengdu Yizhi Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Yizhi Technology Co Ltd filed Critical Chengdu Yizhi Technology Co Ltd
Priority to CN202010309387.4A priority Critical patent/CN111210209A/en
Publication of CN111210209A publication Critical patent/CN111210209A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources
    • G06Q10/1053Employment or hiring
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a building engineering process acceptance and labor wage approval management system with identity identification; the system comprises a group leader mobile phone APP end, a worker mobile phone APP end, a platform server, a construction unit Web management system, a construction unit manager mobile phone APP end and a worker identity recognition system; the problems of authenticity and accuracy of project money settlement and wage distribution data of construction enterprises, labor teams and construction workers in the construction process of the construction project can be solved, and labor disputes caused by settlement of money are avoided. In addition, a worker identity recognition system is additionally arranged, and the system can be used for acquiring face and fingerprint data of workers, reading identity cards and work card information, uploading the information to a platform server, and performing identity recognition and attendance record matching on related workers of a construction task list; the problems of construction operators, construction quality and the like can be traced. The system has simple integral structure and low system construction cost; finally, the purpose of resource sharing can be achieved.

Description

Building engineering acceptance and wage approval management system with identity recognition function
Technical Field
The invention relates to the relevant field of constructional engineering, in particular to a cloud service-based constructional engineering acceptance and payroll approval management system with identity recognition.
Background
With the continuous development of information technology, the informatization level of enterprise management corresponding to the building construction industry is gradually improved, and particularly after the engineering money and the wage management system of modern enterprises are reformed, urgent requirements are put forward on the management informatization of corresponding enterprises. However, in the construction industry at the present stage, the forms of paper request forms, wage forms and the like are generally used for settlement of project money of labor teams and wage distribution of construction workers as settlement bases, and the method has the problems of low information transmission efficiency, incapability of tracing construction operators and construction quality problems, nonstandard and inaccurate project money/wage accounting process and the like, and leads to a great deal of labor disputes over time. And lack in the work progress and to workman identification, this also is not favorable to the management and control.
Disclosure of Invention
Therefore, in order to solve the above-mentioned disadvantages, the present invention provides a construction project acceptance and payroll approval management system with identity recognition; the system comprises a group leader mobile phone APP end, a worker mobile phone APP end, a platform server, a construction unit Web management system, a construction unit manager mobile phone APP end and a worker identity recognition system; the invention can solve the problems of data authenticity and accuracy of settlement of engineering money and wage distribution of construction enterprises, labor teams and construction workers in the construction process of construction engineering (including the fields of house construction, capital construction and the like), thereby avoiding labor disputes caused by settlement of money. In addition, a worker identity recognition system is additionally arranged, and the system can be used for acquiring face data of workers, reading the information of the work cards, uploading the face data and the information of the work cards to a platform server, and performing identity recognition and attendance record matching on related workers of the construction task list; the problems of construction operators, construction quality and the like can be traced.
The invention is realized in this way, construct a building engineering acceptance and payroll approval management system with identity recognition, which is characterized in that:
the system comprises a team leader mobile phone APP end, a worker mobile phone APP end, a platform server, a construction unit Web management system, a construction unit manager mobile phone APP end and a worker identity recognition system, which are communicated with each other through a network;
the construction unit Web management system; the construction process management system is used for carrying out sub-area division of the project, and carrying out construction process management, acceptance inspection and worker wage settlement auditing operation;
the mobile phone App end of the construction unit manager; the system is used for construction unit managers to perform construction progress tracking, inspection batch acceptance and engineering quality evaluation operation;
the APP terminal of the team leader mobile phone; the system is used for the team leader to perform construction progress tracking, acceptance check application, construction task list distribution and payroll summary operation;
the APP end of the worker mobile phone; the system is used for receiving a construction task list and carrying out self-checking and completion operations on the task list;
the worker identification system; the system is used for acquiring face data of workers, reading the information of the work cards and uploading the face data and the information to a platform server to perform identity recognition and attendance record matching on the relevant workers of the construction task list;
the worker identity recognition system is provided with a frame body, an identity recognition host, a touch display screen, a face recognition unit, a worker plate reading unit, a human body standing induction unit and a second display screen;
the identity recognition host is arranged in the frame body, the touch display screen is arranged at the upper end of the frame body, the face recognition unit is arranged at the top end of the frame body, the second display screen is positioned at the top of the frame body, the work card reading unit is positioned at the middle upper part of the outer side of the frame body, and the human body standing induction unit is positioned at the bottom of the frame body;
the output ends of the face recognition unit, the work card reading unit and the human body standing induction unit are connected with an identity recognition host; the output end of the identity recognition host is connected with the touch display screen and the second display screen.
The invention relates to a building engineering acceptance and payroll approval management system with identity recognition, which is characterized in that: the frame body is formed by welding stainless steel pipes, and the middle part of the frame body is reinforced by triangular corner edges; the identity recognition host is positioned inside the detachable protective frame.
The invention relates to a building engineering acceptance and payroll approval management system with identity recognition, which is characterized in that: the platform server is provided with a management unit, an identity recognition execution unit, a communication unit, a price and engineering quantity information work sheet generation unit and a database;
the identity recognition execution unit receives worker face information and worker plate information transmitted by the worker identity recognition system, and calls corresponding stored information from the database for checking the identity information of a worker currently entering a construction area;
the communication unit is used for the platform server to realize information communication;
after the construction is finished and the inspection of managers passes, a price and engineering quantity information work order generating unit generates a work order containing price and engineering quantity information for workers;
the database is used for storing corresponding data.
The invention relates to a building engineering acceptance and payroll approval management system with identity recognition, which is characterized in that: the implementation process of the system is as follows:
a, inputting personnel information; the face information and the work card information of a construction worker are uploaded to a database corresponding to a platform server through a worker identity recognition system for verification in construction;
b, the construction process is as follows;
before the construction is started, a construction unit Web management system is used for defining a construction area for a team leader and setting the project of the area on the basis of project division built in the system;
after the team leader obtains the construction area through the mobile phone APP terminal, adding workers into a specific construction item of the obtained construction area;
a worker carries out construction, completion marking and self-checking operations on a construction item of the worker through a mobile phone APP end; the method comprises the steps that in the construction process, face information and worker plate information of workers are collected simultaneously through a worker identity recognition system and are uploaded to a platform server in real time, the platform server checks whether the workers to enter a construction site are preset workers or not, and the checking results are fed back to the worker identity recognition system in real time; the system is used for automatically completing attendance record matching;
the team leader processes the construction progress of all workers through the mobile phone APP terminal, performs team self-inspection on the completed construction items, and submits the construction items to the platform server after the team self-inspection;
the platform server automatically informs the construction unit Web management system and the construction unit management personnel APP terminal for reminding relevant management personnel to carry out inspection batch spot check;
the management personnel carry out inspection batch sampling inspection on the construction operation of workers through the APP end of the construction unit, and output an inspection batch quality acceptance record table, and meanwhile, the construction quality of the workers is evaluated;
after the inspection of the manager is passed, the platform server generates a work order containing price and engineering quantity information for workers; the team leader can pack the record worksheet to generate a payroll table through the mobile phone APP terminal and submit the payroll table to the platform server;
the Web management system of the construction unit can acquire the generated payroll from the platform server, check the payroll, submit the checked payroll to a bank, and finish the payroll settlement of workers by the bank.
The following explains the corresponding terms in the art:
unit engineering: the product has independent construction conditions, but cannot be independently produced or generate benefits after being built; for a unit project with a larger scale, the part capable of forming an independent use function can be divided into a sub-unit project (GB 50300-2013, item 4.0.2). Before construction, the construction can be determined by the construction, supervision and construction unit negotiation, and the technical data can be collected and checked according to the determination.
And (4) branch engineering: the project can not independently exert capacity or benefit, does not have independent construction conditions, and has the condition of settlement of project cost. The branch engineering is a component of unit engineering, generally, a unit engineering can be divided into a plurality of branch engineering according to each part of the engineering entity, such as building construction unit engineering, and can be divided into earth and stone engineering, masonry engineering, concrete and reinforced concrete engineering, roofing engineering, decoration engineering and the like according to the part.
Sub-division engineering: the subdivision project is a unit project divided into several parts according to the construction site and professional properties.
And (3) branch engineering: the project sub-project is the subdivision of the project sub-project, is the basic project forming the project sub-project, also called project sub-sub or sub-project, and is a building project or installation project which can be produced by a simpler construction process and can be calculated by a proper measuring unit. Construction sections are generally divided according to different factors such as the construction method selected, the materials used, the specifications of structural members and the like.
And (3) checking batches: the inspection lot (inspection lot) is an inspection body composed of a certain number of samples, which are collected for inspection under the same production conditions or in a prescribed manner. Is a building terminology, has the property that is the basic wish of project quality acceptance, and is applied to building and bridge engineering.
Sub-project sub-regions: and (4) carrying out regional division on the project, wherein each region only corresponds to one labor team.
And (3) construction task: based on the concept of inspection lot, each inspection lot corresponds to one construction item task, and when the inspection lots exist in the project sub-area, the construction item tasks exist in the project sub-area and represent the construction item tasks needed to be completed by the team in the project sub-area.
A construction task list: when a team leader joins a worker to a certain construction task, it can be understood that the worker obtains a task arrangement, i.e., a construction task order.
Checking a batch acceptance record table: and when a professional worker, a supervisor, a project manager or other related responsible persons perform acceptance based on the inspection batch according to the quality acceptance standard and flow of the country or enterprise, outputting an acceptance record form.
Recording a work order: after the construction task list of the worker is completed, the inspection lot where the construction item corresponding to the task list is located is inspected by a project responsible person and passes the inspection, and the system automatically generates a worker work result evidence based on the construction task list and is used for carrying out wage approval on the worker.
The invention has the following advantages: the invention provides a building engineering process acceptance and labor wage approval management system with identity identification; the system comprises a group leader mobile phone APP end, a worker mobile phone APP end, a platform server, a construction unit Web management system, a construction unit manager mobile phone APP end and a worker identity recognition system; the invention can solve the problems of data authenticity and accuracy of settlement of engineering money and wage distribution of construction enterprises, labor teams and construction workers in the construction process of construction engineering (including the fields of house construction, capital construction and the like), thereby avoiding labor disputes caused by settlement of money. In addition, a worker identity recognition system is additionally arranged, and the system can be used for acquiring face data of workers, reading the information of the work cards, uploading the face data and the information of the work cards to a platform server, and performing identity recognition and attendance record matching on related workers of the construction task list; the problems of construction operators, construction quality and the like can be traced. In addition, the platform system is realized by utilizing the existing network architecture, the whole structure is simple, and the system construction cost is low; finally, the purpose of resource sharing can be achieved.
Drawings
FIG. 1 is a system architecture diagram of the present invention;
FIG. 2 is a block diagram of the worker identification system of the present invention;
FIG. 3 is a block diagram of the platform server of the present invention;
FIG. 4 is a schematic diagram of the worker identification system of the present invention;
FIG. 5 is a schematic flow chart of the system of the present invention.
Detailed Description
The present invention will be described in detail with reference to fig. 1 to 5, and the technical solutions in the embodiments of the present invention will be clearly and completely described, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a building engineering acceptance and payroll approval management system with identity recognition through improvement, which is implemented as follows;
as shown in FIG. 1; the system comprises a team leader mobile phone APP terminal 1, a worker mobile phone APP terminal 2, a platform server 3, a construction unit Web management system 4, a construction unit manager mobile phone APP terminal 5 and a worker identity recognition system 6, which are communicated with each other through a network;
the construction unit Web management system 4; the construction process management system is used for carrying out sub-area division of the project, and carrying out construction process management, acceptance inspection and worker wage settlement auditing operation;
the mobile phone APP terminal 5 of the construction unit manager; the system is used for construction unit managers to perform construction progress tracking, inspection batch acceptance and engineering quality evaluation operation;
the mobile phone APP terminal 1 of the team leader; the system is used for the team leader to perform construction progress tracking, acceptance check application, construction task list distribution and payroll summary operation;
the worker mobile phone APP terminal 2; the system is used for receiving a construction task list and carrying out self-checking and completion operations on the task list;
the worker identification system 6; the system is used for acquiring face data of workers, reading the information of the work cards and uploading the face data and the information to the platform server 3 to perform identity recognition and attendance record matching on the relevant workers of the construction task list;
the worker identification system 6 comprises a frame body 61, an identification host 62, a touch display screen 63, a face recognition unit 64, a worker card reading unit 65, a human body standing induction unit 66 and a second display screen 67 (the second display screen 67 is used as a secondary display screen for displaying other construction contents);
the identity recognition host 62 is arranged in the frame body 61, the touch display screen 63 is arranged at the upper end of the frame body 61, the face recognition unit 64 is arranged at the top end of the frame body 61, the second display screen 67 is positioned at the top of the frame body 61, the worker card reading unit 65 is positioned at the middle upper part of the outer side of the frame body 61, and the human body standing induction unit 66 is positioned at the bottom of the frame body 61;
the output ends of the face recognition unit 64, the work card reading unit 65 and the human body standing induction unit 66 are connected with the identity recognition host 62; the output end of the identity recognition host 62 is connected with the touch display screen 63 and the second display screen 67.
The worker identity recognition system 6 is integrally positioned in a construction area and used for enabling workers to perform face recognition and worker plate information reading in advance during the morning work, then uploading the information to the platform server 3, the platform server verifies whether the workers to be currently entered into a construction site are preset workers or not, the verification result is fed back to the worker identity recognition system 6 in real time, and the display result is displayed through the touch display screen 63; the method is used for automatically completing attendance record matching. The identification is realized as follows; a worker stands on the human body standing sensing unit 66, when the human body standing sensing unit senses that the worker stands on the human body standing sensing unit, the worker clicks identity recognition operation through the touch display screen 63, the face recognition unit 64 scans the face of the worker and collects face information, and meanwhile, the worker plate information of the worker is read through the worker plate reading unit 65 and uploaded; the mode of combining human face information and work card information is adopted for identity recognition, and meanwhile attendance records are matched.
In addition, in the implementation process of the method, a team leader processes the construction progress of all workers through a mobile phone APP terminal, performs team self-inspection on the completed construction items, and submits the construction items to a platform server after the team self-inspection; the platform server automatically informs the construction unit Web management system and the construction unit management personnel APP terminal for reminding relevant management personnel to carry out inspection batch spot check; the management personnel carry out inspection batch sampling inspection on the construction operation of workers through the APP end of the construction unit, and output an inspection batch quality acceptance record table, and meanwhile, the construction quality of the workers is evaluated; after the inspection of the manager is passed, the platform server generates a work order containing price and engineering quantity information for workers; the team leader can pack the record worksheet to generate a payroll table through the mobile phone APP terminal and submit the payroll table to the platform server; the Web management system of the construction unit can acquire the generated payroll from the platform server, check the payroll, submit the checked payroll to a bank, and finish the payroll settlement of workers by the bank. Therefore, the invention can solve the problems of the project payment settlement and the data authenticity and the accuracy of the wage distribution of the construction enterprises, the labor teams and the construction workers thereof in the construction process of the construction project, and the flow is standard, accurate and reasonable, thereby avoiding labor disputes caused by payment settlement.
As shown in fig. 4, the frame body 61 is formed by welding stainless steel tubes 68, and the middle part of the frame body 61 is reinforced by a triangular corner edge 69; the identification host 62 is located inside a removable protective frame 70.
As shown in fig. 3, the platform server 3 has a management unit 31, an identification execution unit 32, a communication unit 33, a price, work volume information processing sheet generation unit 34, and a database 35;
the identity recognition execution unit 32 receives the worker face information and the worker plate information transmitted by the worker identity recognition system 6, and calls corresponding stored information from a database for checking the identity information of the worker currently entering the construction area;
the communication unit 33 is used for the platform server 3 to realize information communication;
after the construction is completed and the inspection of the manager is passed, the price and engineering quantity information work order generating unit 34 generates a work order containing price and engineering quantity information for the worker;
the database 35 is used for storing corresponding data.
The whole operation of the system is implemented according to the following procedures:
step (1), adding a team leader into a corresponding engineering project through a team APP;
step (2), after the team leader joins in the project, inviting workers to be led one by one, and if the workers accept the invitation through the APP at the worker end, joining in the project if the invitation is successful;
step (3), a project manager creates a part project record in a Web management system of a construction unit;
step (4), after the construction is successful, calling out a corresponding building construction drawing with a format of CAD/PNG/PDF and the like based on the project, and framing a construction area on the drawing;
step (5), the framed construction area is allocated to the team leader which has added the project, and the total area engineering amount is configured for the area;
step (6), after the team grows to the area allocation of the project manager, automatically picking up the construction project task affairs of the sub project in the area;
step (7), a team leader pulls in a specific construction task through a team APP for workers who have joined a project, and the operation is essentially to create a construction task list for the workers;
step (8), after receiving the construction task list, workers can start to carry out actual construction according to information such as construction positions, construction procedures and the like in the task list;
step (9), after the construction of workers is completed, finding a corresponding construction task sheet through an APP of the workers, and clicking the task sheet to complete the operation;
step (10), after receiving the completion notice of the worker through the team APP, the team leader can start to check and accept the construction of the worker;
step (11), when all the construction task lists under a certain construction task are completed, the team leader can submit the completion state of the construction task through the team APP and apply for the actual quality acceptance of a superior manager;
step (12), a project manager can check all finished project sub-project areas of a current project through a mobile phone APP of a manager of a construction unit, and can select one or more areas to start inspection, batch inspection and acceptance;
step (13), after the project manager successfully checks and accepts the inspection batch through the mobile phone APP of the manager of the construction unit, the project manager outputs an inspection batch acceptance record table, and meanwhile, construction quality evaluation is carried out on the construction task list involved in the acceptance process;
step (14), directly binding the evaluation of the project manager to a specific construction worker or a worker group, wherein the evaluation received by the worker is equal to the evaluation received by the team group;
step (15), when the inspection lot of the project manager passes the inspection lot acceptance, all the construction task lists related to the inspection lot are completely finished;
step (16), the team leader can form a payroll table by the completely finished construction task list in batches through the team APP and submit the payroll table to a project manager;
and (17) receiving the payroll table submitted by the team leader by the project manager through the Web management system of the construction unit, checking, and directly submitting the payroll table to a bank system for payroll issue after the checking is passed.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (4)

1. The utility model provides a building engineering inspection and acceptance and payroll are decided management system with identification which characterized in that:
the system comprises a team leader mobile phone APP end (1), a worker mobile phone APP end (2), a platform server (3), a construction unit Web management system (4), a construction unit manager mobile phone APP end (5) and a worker identity recognition system (6), which are communicated with each other through a network;
the construction unit Web management system (4); the method is used for carrying out sub-area division of the project, carrying out construction process management, acceptance check and settlement and audit operation of workers on time according to proportion through the split of the acceptance check progress;
the mobile phone APP terminal (5) of the construction unit manager; the system is used for construction unit managers to perform construction progress tracking, inspection batch acceptance and engineering quality evaluation operation;
the mobile phone APP terminal (1) of the team leader; the system is used for the team leader to perform construction progress tracking, acceptance check application, construction task list distribution and payroll summary operation;
the worker mobile phone APP terminal (2); the system is used for receiving a construction task list and carrying out self-checking and completion operations on the task list;
-said worker identification system (6); the system is used for acquiring face and fingerprint data of workers, reading identity cards and work card information, and uploading the information to a platform server (3) to perform identity recognition and attendance record matching on related workers of a construction task list;
the worker identity recognition system (6) is provided with a frame body (61), an identity recognition host (62), a touch display screen (63), a face recognition unit (64), a worker card reading unit (65), a human body standing induction unit (66) and a second display screen (67);
the identity recognition host (62) is arranged in the frame body (61), the touch display screen (63) is arranged at the upper end of the frame body (61), the face recognition unit (64) is arranged at the top end of the frame body (61), the second display screen (67) is positioned at the top of the frame body (61), the work card reading unit (65) is positioned at the middle-upper part of the outer side of the frame body (61), and the human body standing induction unit (66) is positioned at the bottom of the frame body (61);
the output ends of the face recognition unit (64), the worker card reading unit (65) and the human body standing induction unit (66) are connected with the identity recognition host (62); the output end of the identity recognition host (62) is connected with the touch display screen (63) and the second display screen (67).
2. The system for checking and managing construction projects and payroll with identity recognition according to claim 1, wherein: the frame body (61) is formed by welding stainless steel pipes (68), and the middle part of the frame body (61) is reinforced by a triangular corner edge (69); the identification host (62) is located inside a removable protective frame (70).
3. The system for checking and managing construction projects and payroll with identity recognition according to claim 1, wherein: the platform server (3) is provided with a management unit (31), an identification execution unit (32), a communication unit (33), a price and engineering quantity information recording sheet generation unit (34) and a database (35);
the identity recognition execution unit (32) receives worker face information and worker plate information transmitted by the worker identity recognition system (6), and calls corresponding stored information from a database for checking the identity information of a worker currently entering a construction area;
the communication unit (33) is used for the platform server (3) to realize information communication;
after the construction is completed and the inspection of managers passes, a price and engineering quantity information work order generating unit (34) generates a work order containing price and engineering quantity information for workers;
the database (35) is used for storing corresponding data.
4. The system for checking and managing construction projects and payroll with identity recognition according to claim 1, wherein: the implementation process of the system is as follows:
a, inputting personnel information; the face information and the work card information of a construction worker are uploaded to a database (35) corresponding to a platform server (3) through a worker identity recognition system (6) and are used for verification in construction;
b, the construction process is as follows;
before the construction is started, a construction unit Web management system (4) is used for defining a construction area for a team leader and setting the project of the area on the basis of project projects built in the system;
after the team leader obtains the construction area through the mobile phone APP terminal, adding workers into a specific construction item of the obtained construction area;
a worker carries out construction, completion marking and self-checking operations on a construction item of the worker through a mobile phone APP end; in the construction process, the worker face information and the worker plate information are simultaneously acquired through the worker identity recognition system (6), and are immediately uploaded to the platform server, the platform server checks whether a worker currently entering a construction site is a preset worker, and an audit result is immediately fed back to the worker identity recognition system (6); the system is used for automatically completing attendance record matching;
the team leader processes the construction progress of all workers through the mobile phone APP terminal, performs team self-inspection on the completed construction items, and submits the construction items to the platform server (3) after the team self-inspection;
the platform server (3) automatically informs the construction unit Web management system (4) and the construction unit management personnel APP terminal (5) to remind relevant management personnel of carrying out inspection batch spot check;
the management personnel carry out inspection batch sampling inspection on the construction operation of workers through the APP end of the construction unit, and output an inspection batch quality acceptance record table, and meanwhile, the construction quality of the workers is evaluated;
after the inspection of the manager is passed, the platform server (6) generates a work order containing price and engineering quantity information for workers; the team leader can pack the pay list to generate a pay table through the mobile phone APP terminal and submit the pay table to the platform server (3);
the construction unit Web management system (1) can acquire the generated payroll table from the platform server (3), check the payroll table, submit the checked payroll table to a bank, and the bank finishes payroll settlement of workers.
CN202010309387.4A 2020-04-20 2020-04-20 Building engineering acceptance and wage approval management system with identity recognition function Pending CN111210209A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010309387.4A CN111210209A (en) 2020-04-20 2020-04-20 Building engineering acceptance and wage approval management system with identity recognition function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010309387.4A CN111210209A (en) 2020-04-20 2020-04-20 Building engineering acceptance and wage approval management system with identity recognition function

Publications (1)

Publication Number Publication Date
CN111210209A true CN111210209A (en) 2020-05-29

Family

ID=70787745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010309387.4A Pending CN111210209A (en) 2020-04-20 2020-04-20 Building engineering acceptance and wage approval management system with identity recognition function

Country Status (1)

Country Link
CN (1) CN111210209A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112907214A (en) * 2021-03-05 2021-06-04 一智科技(成都)有限公司 Construction task processing method, electronic device and storage medium
CN114037262A (en) * 2021-09-10 2022-02-11 一智科技(成都)有限公司 Construction task order dispatching method and system
WO2023284299A1 (en) * 2021-07-16 2023-01-19 一智科技有限公司 Method and system for supervising engineering project
CN117994887A (en) * 2024-03-29 2024-05-07 一智科技(成都)有限公司 Gate system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101645148A (en) * 2009-06-19 2010-02-10 中国科学院声学研究所 Construction order management method applied to operation support system and management system thereof
CN204480336U (en) * 2015-03-25 2015-07-15 乔荣爱 Multi-functional work attendance roll-call all-in-one and attendance checking system
CN106447176A (en) * 2016-09-12 2017-02-22 成都集致生活科技有限公司 Labor management system for building industry and use method of system
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN107527299A (en) * 2017-08-02 2017-12-29 深圳云联万企科技有限公司 A kind of record system of engineering construction daily record
CN108319946A (en) * 2018-01-18 2018-07-24 深圳市中科智诚科技有限公司 A kind of comprehensive face recognition device of Image Acquisition with regulatory function

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101645148A (en) * 2009-06-19 2010-02-10 中国科学院声学研究所 Construction order management method applied to operation support system and management system thereof
CN204480336U (en) * 2015-03-25 2015-07-15 乔荣爱 Multi-functional work attendance roll-call all-in-one and attendance checking system
CN106447176A (en) * 2016-09-12 2017-02-22 成都集致生活科技有限公司 Labor management system for building industry and use method of system
CN106709703A (en) * 2017-02-28 2017-05-24 天津华惠安信装饰工程有限公司 Method and system of decoration project construction management based on technology of internet of things
CN107527299A (en) * 2017-08-02 2017-12-29 深圳云联万企科技有限公司 A kind of record system of engineering construction daily record
CN108319946A (en) * 2018-01-18 2018-07-24 深圳市中科智诚科技有限公司 A kind of comprehensive face recognition device of Image Acquisition with regulatory function

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
岳宗杰: "船厂涂装作业制造执行管理系统研究", 《中国优秀硕士学位论文全文数据库-工程科技II辑》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112907214A (en) * 2021-03-05 2021-06-04 一智科技(成都)有限公司 Construction task processing method, electronic device and storage medium
WO2022183918A1 (en) * 2021-03-05 2022-09-09 一智科技有限公司 Construction task processing method, electronic device and storage medium
WO2023284299A1 (en) * 2021-07-16 2023-01-19 一智科技有限公司 Method and system for supervising engineering project
CN114037262A (en) * 2021-09-10 2022-02-11 一智科技(成都)有限公司 Construction task order dispatching method and system
CN117994887A (en) * 2024-03-29 2024-05-07 一智科技(成都)有限公司 Gate system
CN117994887B (en) * 2024-03-29 2024-07-23 一智科技(成都)有限公司 Gate system

Similar Documents

Publication Publication Date Title
CN111210209A (en) Building engineering acceptance and wage approval management system with identity recognition function
CN111598379B (en) Project management method, platform, device, computer equipment and storage medium
El-Gohary et al. Factors influencing construction labor productivity in Egypt
US20190220936A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
US20170053244A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
CN109345327B (en) Intelligent supplier information management and control platform for improving high-quality service
Mueller Integrated cost and schedule control for construction projects
CN111191965A (en) Overall process engineering consultation service evaluation system
CN113656505B (en) Digitization of distributed project management system and method for synchronizing data thereof
CN116051055A (en) Digital project management system
CN111461674A (en) Building engineering acceptance and wage approval system based on Saas cloud service
CN115170090A (en) Project management method and device, electronic equipment and readable storage medium
JP6928985B1 (en) Construction support cloud system and program
Memon et al. The use of inforamtion technology techniques in the construction industry of Pakistan
Lenard Future challenges in cost engineering: Creating cultural change through the development of core competencies
Maliha Building Information Modelling (BIM) in Order to Enhance the Capabilities of Project Managers in Applying Knowledge Areas in the Architecture
AYELE CONSTRUCTION PERFORMANCE MEASUREMENT PRACTICE IN THE ROAD SECTOR: IN CASE OF ADDIS ABABA CITY ROAD AUTHORITY PROJECTS
Nasr An integrated project planning and control system approach for measuring project performance
GEMORAW Cost control using earned value analysis for industrial constructions in Addis Ababa
JP6795866B1 (en) Construction support cloud system and program
Salmon Controlling with SAP: Practical guide
Kinuthia An Investigation into the use of construction management softwares: A survey of construction firms in Nairobi, Kenya
Ogunsina et al. An Experimental Evaluation of the Benefits of Automated Quantification of Construction Works
CN113220634B (en) Information management device and electronic equipment of engineering visa file
Bandara Strategies to minimise errors in contract documents to minimise disputes in building projects in Sri Lanka

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200529

RJ01 Rejection of invention patent application after publication