CN111210137A - Multifunctional power grid material management system - Google Patents

Multifunctional power grid material management system Download PDF

Info

Publication number
CN111210137A
CN111210137A CN201911422212.8A CN201911422212A CN111210137A CN 111210137 A CN111210137 A CN 111210137A CN 201911422212 A CN201911422212 A CN 201911422212A CN 111210137 A CN111210137 A CN 111210137A
Authority
CN
China
Prior art keywords
information
management
transmitting
layer
material management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911422212.8A
Other languages
Chinese (zh)
Inventor
佟忠正
林俊
吴赟
刘晔
蒋道环
王泽涌
洪雨天
王哲
伍斯龙
黄杰韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201911422212.8A priority Critical patent/CN111210137A/en
Publication of CN111210137A publication Critical patent/CN111210137A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a multifunctional power grid material management system, which comprises a user layer, a material management layer and a platform layer, wherein the user layer is connected with the material management layer, and the material management layer is interacted with the platform layer; the user layer is used for providing data interface service for users to enter the material management layer; the material management layer is used for managing power grid materials; the platform layer is used for interacting with data of the material management layer. The invention relates to the technical field of material management. The multifunctional power grid material management system can strengthen seamless connection of full-service data, increase data sharing among a material management layer, a digital archive platform, an emergency command platform and a marketing system platform, and is favorable for perfecting the material management system; the material management layer is interactively butted with the power grid production management platform, so that the management and planning of materials can be realized; by creating a uniform material management layer, the material management efficiency can be improved, and the difficulty of material management is reduced.

Description

Multifunctional power grid material management system
Technical Field
The invention relates to the technical field of material management, in particular to a multifunctional power grid material management system.
Background
With the development of economic technology and the improvement of living standard of people, electric energy becomes essential secondary energy in production and life of people, and brings endless convenience to production and life of people. The normal operation of the power system cannot be separated from the overhaul and maintenance of the power system, which needs the support and coordination of a large amount of power grid materials. With the increasing demand for reliability of power supply, uninterrupted or low-interrupted power supply is one of the most important targets for power grid operation.
Due to the requirement of no power outage or few power outages of the power grid, all materials of the power grid must be comprehensively, clearly and clearly mastered by power system personnel, so that the power grid materials required by field personnel can be positioned at the fastest speed when the power grid faces to construction, maintenance or overhaul, and the materials are dispatched and transported as fast as possible, so that the risk of power grid operation is reduced to the greatest extent, and the power utilization requirements of people are met as far as possible.
However, management and maintenance of the conventional power grid material management system are manually completed, so that the workload is high in a manual mode, a complete purchasing catalogue management flow is not established, the material management difficulty is high, the working efficiency is low, meanwhile, a power grid metering production management platform and a material management system cannot be connected seamlessly, sharing and service flow butt joint cannot be realized for data interaction among the systems, and the material management system, a digital archive, an emergency command platform and a marketing system only realize partial data sharing and cannot realize full-service data seamless connection.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a multifunctional power grid material management system, which solves the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: a multifunctional power grid material management system comprises a user layer, a material management layer and a platform layer, wherein the user layer is connected with the material management layer, and the material management layer is interactive with the platform layer;
the user layer is used for providing data interface service for users to enter the material management layer;
the material management layer is used for managing power grid materials;
the platform layer is used for interacting with data of the material management layer.
Further, the user layer comprises a unified user entry module and an enterprise user entry module;
the unified user entrance module provides a data interface for power grid staff to enter a material management layer;
the enterprise user entrance module provides a special data interface for an enterprise matched with the power grid to enter a material management layer.
Furthermore, the material management layer comprises a demand management module, a purchasing and supplying module, a contract and quality control management module, a storage and distribution module and a reverse logistics management module;
the demand management module is used for providing a demand analysis report for the materials required by the power grid;
the purchasing and supplying module completes purchasing work with a power grid supporting enterprise according to a demand analysis report provided by the demand management module;
the contract and quality control management module is used for signing and fulfilling contracts with enterprises and monitoring quality of goods and materials;
the storage and distribution module is used for storing, metering and distributing purchased materials;
the reverse logistics management module is used for managing idle, scrapped and reverse materials.
Furthermore, the demand management module is composed of material class management, purchasing standard management, demand forecasting management, demand plan management and purchasing plan management;
the purchasing and supplying module is managed by bidding management, non-bidding management, bid evaluation expert and expert library and supplier management;
the contract and quality control management module consists of standard contract text management, material contract execution management, quality control plan management, quality control technology management, quality control execution management and contract quality control analysis and evaluation;
the warehouse distribution management is composed of warehouse construction, warehouse management, warehouse operation management, storage management and distribution management;
the reverse logistics management is composed of reverse material recycling, idle material management and scrapped material management.
Further, the platform layer comprises a power grid production management platform, a marketing system platform, a digital archive platform and an emergency command platform.
Further, the interaction between the power grid metering production management platform and the material management layer comprises:
transmitting demand forecast information;
transmitting the demand plan information;
transmitting the information of the result of the acceptance of the arrived goods;
transmitting the arrival notification information;
transmitting the incoming goods acceptance information;
transmitting the information of the distribution tasks;
material transfer information is transmitted;
transmitting purchasing contract information;
transmitting the demand purchase return information;
transmitting bidding information;
transmitting supplier information;
transmitting inventory information;
transmitting warehouse information;
contract change information transmission;
warehousing bills, warehousing details and bar code information transmission;
transmitting goods returning information;
transmitting information of the base archives of the storehouse;
information transmission of the turnover box and the pallet;
the information of the recycling tasks of the turnover box and the pallet is transmitted;
transmitting the device detail information;
and transferring the state change information of the turnover box and the pallet.
Further, the interaction between the marketing system platform and the material management layer comprises:
transmitting warehouse information;
the first-aid kit measures the material, supplies the goods and supplements the transfer information transmission;
the information of the measuring equipment library position is changed and transmitted;
metering material distribution and transferring information transmission;
transmitting the information for receiving the measured materials;
the information transmission of the measured material returning is carried out;
transmitting the measured material scrapping information;
transmitting project information; transmitting material coding information;
initiating asset reception application information transmission;
feeding back asset acceptance application result information for transmission;
initiating asset ex-warehouse application information transmission;
transmitting warehouse change information;
and informing the storeroom change and the storeroom returning application information transmission.
Further, the interaction between the digital archive platform and the material management layer comprises:
synchronizing contract change master bill information;
synchronizing contract information;
synchronizing the detail information of contract change;
synchronizing contract attachment information;
synchronizing the contract detail information;
synchronizing contract termination information;
synchronizing contract termination detail information;
synchronizing contract change attachment information;
the contract termination attachment information is synchronized.
Further, the interaction between the emergency command platform and the material management layer comprises:
transmitting material adjustment and aid list information;
and transmitting material distribution list information.
(III) advantageous effects
The invention has the following beneficial effects:
(1) the multifunctional power grid material management system can strengthen seamless connection of full-service data, increase data sharing between a material management layer and a digital archive platform, an emergency command platform and a marketing system platform, and is favorable for perfecting the material management system.
(2) The multifunctional power grid material management system can realize management and planning of materials by interactively butting the material management layer with the power grid production management platform.
(3) This have multi-functional electric wire netting material management system through establishing unified material management layer, can improve the efficiency of managing the material to reduce the degree of difficulty to material management.
Of course, it is not necessary for any product in which the invention is practiced to achieve all of the above-described advantages at the same time.
Detailed Description
The technical solutions in the embodiments of the present invention are clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "opening," "upper," "lower," "thickness," "top," "middle," "length," "inner," "peripheral," and the like are used in an orientation or positional relationship that is merely for convenience in describing and simplifying the description, and do not indicate or imply that the referenced component or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be considered as limiting the present invention.
The embodiment of the invention provides a technical scheme that: a multifunctional power grid material management system comprises a user layer, a material management layer and a platform layer, wherein the user layer is connected with the material management layer, and the material management layer is interactive with the platform layer;
the user layer is used for providing data interface service for users to enter the material management layer;
the material management layer is used for managing the power grid materials;
the platform layer is used for interacting with data of the material management layer.
Specifically, the user layer comprises a unified user entry module and an enterprise user entry module;
the unified user entrance module provides a data interface for power grid employees to enter a material management layer;
the enterprise user entrance module provides a special data interface for an enterprise matched with the power grid to enter a material management layer.
Specifically, the material management layer comprises a demand management module, a purchasing and supplying module, a contract and quality control management module, a storage and distribution module and a reverse logistics management module;
the demand management module is used for providing a demand analysis report for the materials required by the power grid;
the purchasing and supplying module completes purchasing work with a power grid supporting enterprise according to a demand analysis report provided by the demand management module;
the contract and quality control management module is used for signing and fulfilling contracts with enterprises and monitoring the quality of goods and materials;
the storage and distribution module is used for storing, metering and distributing purchased materials;
the reverse logistics management module is used for managing idle, scrapped and reverse materials.
Specifically, the demand management module is composed of material class management, purchasing standard management, demand forecast management, demand plan management and purchasing plan management;
the purchasing and supplying module is managed by bidding management, non-bidding management, bid evaluation expert and expert library and supplier management;
the contract and quality control management module consists of standard contract text management, material contract execution management, quality control plan management, quality control technology management, quality control execution management and contract quality control analysis and evaluation;
the warehouse distribution management is composed of warehouse construction, warehouse management, warehouse operation management, storage management and distribution management;
the reverse logistics management is composed of reverse material recovery, idle material management and scrap material management.
Specifically, the platform layer comprises a power grid production management platform, a marketing system platform, a digital archive platform and an emergency command platform.
Specifically, the interaction between the power grid metering production management platform and the material management layer comprises:
transmitting demand forecast information;
transmitting the demand plan information;
transmitting the information of the result of the acceptance of the arrived goods;
transmitting the arrival notification information;
transmitting the incoming goods acceptance information;
transmitting the information of the distribution tasks;
material transfer information is transmitted;
transmitting purchasing contract information;
transmitting the demand purchase return information;
transmitting bidding information;
transmitting supplier information;
transmitting inventory information;
transmitting warehouse information;
contract change information transmission;
warehousing bills, warehousing details and bar code information transmission;
transmitting goods returning information;
transmitting information of the base archives of the storehouse;
information transmission of the turnover box and the pallet;
the information of the recycling tasks of the turnover box and the pallet is transmitted;
transmitting the device detail information;
and transferring the state change information of the turnover box and the pallet.
Specifically, the interaction between the marketing system platform and the material management layer includes:
transmitting warehouse information;
the first-aid kit measures the material, supplies the goods and supplements the transfer information transmission;
the information of the measuring equipment library position is changed and transmitted;
metering material distribution and transferring information transmission;
transmitting the information for receiving the measured materials;
the information transmission of the measured material returning is carried out;
transmitting the measured material scrapping information;
transmitting project information; transmitting material coding information;
initiating asset reception application information transmission;
feeding back asset acceptance application result information for transmission;
initiating asset ex-warehouse application information transmission;
transmitting warehouse change information;
and informing the storeroom change and the storeroom returning application information transmission.
Specifically, the interaction between the digital archive platform and the material management layer includes:
synchronizing contract change master bill information;
synchronizing contract information;
synchronizing the detail information of contract change;
synchronizing contract attachment information;
synchronizing the contract detail information;
synchronizing contract termination information;
synchronizing contract termination detail information;
synchronizing contract change attachment information;
the contract termination attachment information is synchronized.
Specifically, the interaction between emergency command platform and material management layer includes:
transmitting material adjustment and aid list information;
and transmitting material distribution list information.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims (8)

1. The utility model provides a have multi-functional electric wire netting material management system which characterized in that: including user layer, material management layer and platform layer, the user layer is connected with the material management layer, the material management layer is interactive with the platform layer:
the user layer is used for providing data interface service for users to enter the material management layer;
the material management layer is used for managing power grid materials;
the platform layer is used for interacting with data of the material management layer.
2. The utility grid material management system with multiple functions of claim 1, wherein: the user layer comprises a uniform user entrance module and an enterprise user entrance module;
the unified user entrance module provides a data interface for power grid staff to enter a material management layer;
the enterprise user entrance module provides a special data interface for an enterprise matched with the power grid to enter a material management layer.
3. The utility grid material management system with multiple functions of claim 1, wherein: the material management layer comprises a demand management module, a purchasing and supplying module, a contract and quality control management module, a storage and delivery module and a reverse logistics management module;
the demand management module is used for providing a demand analysis report for the materials required by the power grid;
the purchasing and supplying module completes purchasing work with a power grid supporting enterprise according to a demand analysis report provided by the demand management module;
the contract and quality control management module is used for signing and fulfilling contracts with enterprises and monitoring quality of goods and materials;
the storage and distribution module is used for storing, metering and distributing purchased materials;
the reverse logistics management module is used for managing idle, scrapped and reverse materials.
4. The utility grid material management system with multiple functions of claim 3, wherein: the demand management module is composed of material class management, purchasing standard management, demand forecast management, demand plan management and purchasing plan management;
the purchasing and supplying module is managed by bidding management, non-bidding management, bid evaluation expert and expert library and supplier management;
the contract and quality control management module consists of standard contract text management, material contract execution management, quality control plan management, quality control technology management, quality control execution management and contract quality control analysis and evaluation;
the warehouse distribution management is composed of warehouse construction, warehouse management, warehouse operation management, storage management and distribution management;
the reverse logistics management is composed of reverse material recycling, idle material management and scrapped material management.
5. The utility grid material management system with multiple functions of claim 1, wherein: the platform layer comprises a power grid production management platform, a marketing system platform, a digital archive platform and an emergency command platform.
6. The utility grid material management system with multiple functions of claim 4, wherein: the interaction between the power grid metering production management platform and the material management layer comprises the following steps:
transmitting demand forecast information;
transmitting the demand plan information;
transmitting the information of the result of the acceptance of the arrived goods;
transmitting the arrival notification information;
transmitting the incoming goods acceptance information;
transmitting the information of the distribution tasks;
material transfer information is transmitted;
transmitting purchasing contract information;
transmitting the demand purchase return information;
transmitting bidding information;
transmitting supplier information;
transmitting inventory information;
transmitting warehouse information;
contract change information transmission;
warehousing bills, warehousing details and bar code information transmission;
transmitting goods returning information;
and (3) transmitting information of the warehouse basic file:
information transmission of the turnover box and the pallet;
the information of the recycling tasks of the turnover box and the pallet is transmitted;
transmitting the device detail information;
and transferring the state change information of the turnover box and the pallet.
The utility grid material management system with multiple functions of claim 1, wherein: the interaction between the marketing system platform and the material management layer comprises:
transmitting warehouse information;
the first-aid kit measures the material, supplies the goods and supplements the transfer information transmission;
the information of the measuring equipment library position is changed and transmitted;
metering material distribution and transferring information transmission;
transmitting the information for receiving the measured materials;
the information transmission of the measured material returning is carried out;
transmitting the measured material scrapping information;
transmitting project information; transmitting material coding information;
initiating asset reception application information transmission;
feeding back asset acceptance application result information for transmission;
initiating asset ex-warehouse application information transmission;
transmitting warehouse change information;
and informing the storeroom change and the storeroom returning application information transmission.
7. The utility grid material management system with multiple functions of claim 1, wherein: the interaction between the digital archive platform and the material management layer comprises:
synchronizing contract change master bill information;
synchronizing contract information;
synchronizing the detail information of contract change;
synchronizing contract attachment information;
synchronizing the contract detail information;
synchronizing contract termination information;
synchronizing contract termination detail information;
synchronizing contract change attachment information;
the contract termination attachment information is synchronized.
8. The utility grid material management system with multiple functions of claim 1, wherein: the interaction between the emergency command platform and the material management layer comprises the following steps:
transmitting material adjustment and aid list information;
and transmitting material distribution list information.
CN201911422212.8A 2019-12-30 2019-12-30 Multifunctional power grid material management system Pending CN111210137A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911422212.8A CN111210137A (en) 2019-12-30 2019-12-30 Multifunctional power grid material management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911422212.8A CN111210137A (en) 2019-12-30 2019-12-30 Multifunctional power grid material management system

Publications (1)

Publication Number Publication Date
CN111210137A true CN111210137A (en) 2020-05-29

Family

ID=70788302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911422212.8A Pending CN111210137A (en) 2019-12-30 2019-12-30 Multifunctional power grid material management system

Country Status (1)

Country Link
CN (1) CN111210137A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112732823A (en) * 2020-12-30 2021-04-30 福建正孚软件有限公司 Method for realizing enterprise material supply whole process monitoring system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150186809A1 (en) * 2013-12-30 2015-07-02 Florida Power & Light Company System and method for tracking ami assets
CN109146375A (en) * 2018-08-15 2019-01-04 国网湖南省电力有限公司 Power grid material Management System and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150186809A1 (en) * 2013-12-30 2015-07-02 Florida Power & Light Company System and method for tracking ami assets
CN109146375A (en) * 2018-08-15 2019-01-04 国网湖南省电力有限公司 Power grid material Management System and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112732823A (en) * 2020-12-30 2021-04-30 福建正孚软件有限公司 Method for realizing enterprise material supply whole process monitoring system
CN112732823B (en) * 2020-12-30 2022-05-24 福建正孚软件有限公司 Method for realizing enterprise material supply whole-process monitoring system

Similar Documents

Publication Publication Date Title
CN111210138A (en) Management system for power grid reserve resources
CN105160463A (en) Enterprise management system on basis of project management
US20120095935A1 (en) Method for managing the inbound freight process of the supply chain on behalf of a retailer distribution network
CN102360463A (en) Logistic information real-time management method and system
CN109376976A (en) Material information management method and terminal device
CN109146375A (en) Power grid material Management System and method
CN108288148A (en) A kind of EPC Project Procurement Managements method, system and equipment and storage medium
CN115456522A (en) Shared tray management system and lease platform based on Internet of things
CN111210137A (en) Multifunctional power grid material management system
CN110689214A (en) Material supply intelligent collection management control platform
CN110889516A (en) Low-voltage service quick response visualization platform
CN108305004A (en) A kind of intelligent dispatching system and dispatching method for flexible manufacturing
CN112766850A (en) Material combined storage management platform
CN111738695A (en) Engineering project material management system
CN111563605A (en) Battery management system and method
CN204557557U (en) Wheat processing lean managing and control system
CN1395202A (en) Warehousing and storage system with optimum management process
Frank How one supply chain integrator resolved one investor owned utility’s ageing workforce challenges using a scalable solution
Wang et al. Applying logistics to construction material purchasing and Supplier Evaluation
Alvarado et al. Open transmission access: an efficient minimal role for the ISO
Ge et al. Research on the Operation of Changzhou Distribution Center of Huitong Express in the Peak Period of Online Shopping
US20240095658A1 (en) Integrated logistics ecosystem
Usman et al. Efficient Management of Construction Logistics: A Challenge to both Conventional and Technological Systems in the Developing Nations
YU et al. The Research and Design of the Materials Inventory Management System based on the digital pipeline
KR100901360B1 (en) Distribution management system and operating method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200529

RJ01 Rejection of invention patent application after publication