CN111021412A - Underground comprehensive pipe gallery - Google Patents
Underground comprehensive pipe gallery Download PDFInfo
- Publication number
- CN111021412A CN111021412A CN201911398817.8A CN201911398817A CN111021412A CN 111021412 A CN111021412 A CN 111021412A CN 201911398817 A CN201911398817 A CN 201911398817A CN 111021412 A CN111021412 A CN 111021412A
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- chamber
- main pipe
- wall
- mounting panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004891 communication Methods 0.000 claims abstract description 19
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 18
- 239000010865 sewage Substances 0.000 claims abstract description 10
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- VVQNEPGJFQJSBK-UHFFFAOYSA-N Methyl methacrylate Chemical compound COC(=O)C(C)=C VVQNEPGJFQJSBK-UHFFFAOYSA-N 0.000 claims 1
- 229920005372 Plexiglas® Polymers 0.000 claims 1
- 239000007789 gas Substances 0.000 description 10
- 238000010276 construction Methods 0.000 description 2
- 239000011521 glass Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000001580 bacterial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000005489 elastic deformation Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000002737 fuel gas Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The invention discloses an underground comprehensive pipe gallery which comprises a square main pipe gallery, wherein an inner cavity of the main pipe gallery forms a communication power chamber, a water supply chamber is arranged on the inner wall of the main pipe gallery, a gas chamber is arranged on the outer wall of the main pipe gallery, and a sewage discharge chamber is arranged at the bottom of the main pipe gallery; the communication power chamber, the water supply chamber, the sewage discharge chamber and the gas chamber are mutually isolated; the upper end hoist and mount of communication electric power room have a plurality of pipelines, two liang of a set of pipelines pass through the mounting panel and install on the upper end inner wall of communication electric power room. Through reasonable arrangement in this scheme, set up communication electric power room, water supply room, blowdown room and gas chamber in suitable position to promote whole utility tunnel's space rate of utilization and security.
Description
Technical Field
The invention relates to an underground comprehensive pipe gallery.
Background
Previously, municipal utility lines in cities were typically buried directly beneath the ground, such as cables, water pipes, etc., but in order to implement uniform planning, design, construction and maintenance, municipal utilities built under the city for laying the municipal utility lines were often referred to as utility corridors. However, in the prior art, it is common to construct a utility tunnel under the ground and then to arrange all the utility lines in the tunnel, but this is inconvenient for managing the lines of different nature, and there may be interference between the lines of different nature, such as a sewage pipe and a water supply pipe that need to be arranged separately, a gas pipe and an electric power pipe that need to be arranged separately, and a high-pressure power transmission pipe and a communication pipe that need to be arranged separately in the electric power pipe.
Therefore, provide one kind in the use, can conclude it into different rooms in the piping lane according to the nature of pipeline, can conveniently manage, it is also especially important for its mounted position of selecting different according to the nature of different pipelines in addition, especially when disasters such as flood, earthquake take place, reasonable pipeline layout can effectual promotion underground piping lane resist natural disasters' ability.
Disclosure of Invention
The invention aims to overcome the defects in the prior art and provides an underground comprehensive pipe gallery.
An underground comprehensive pipe gallery comprises a square main pipe gallery, wherein an inner cavity of the main pipe gallery forms a communication power chamber, a water supply chamber is arranged on the inner wall of the main pipe gallery, a fuel gas chamber is arranged on the outer wall of the main pipe gallery, and a sewage discharge chamber is arranged at the bottom of the main pipe gallery; the communication power chamber, the water supply chamber, the sewage discharge chamber and the gas chamber are mutually isolated; the upper end hoist and mount of communication electric power room have a plurality of pipelines, two liang of pipelines a set of through the mounting panel install on the upper end inner wall of communication electric power room, the mounting panel be the T font, the bottom of mounting panel is equipped with the arc, the both ends of arc are circular-arcly to buckling upwards, the pipeline joint between arc and mounting panel, the butt has L shape support on the outer wall of pipeline, the upper end of L shape support links to each other with the lower surface of mounting panel, the lateral wall of L shape support and the outer wall looks butt of pipeline.
Preferably, the main corridor include left socle and right branch frame, left socle and right branch frame all be L shape, link to each other through the dovetail between left socle and the right branch frame, the head of left and right branch frame all is equipped with the square arch of outside salient, the afterbody of left and right branch frame all is equipped with the square groove that matches with square arch.
Preferably, the middle part of the arc-shaped plate is connected with the mounting plate through welding.
Preferably, a plurality of reinforcing ribs are arranged on the L-shaped bracket.
Preferably, the upper surface of the sewage chamber is provided with a plurality of observation windows.
Preferably, the material of observation window is organic glass.
Has the advantages that:
1. the great gas pipeline of harm degree sets up alone in the gas chamber after will revealing, and wherein the gas chamber adopts the setting of putting alone, and the gas chamber sets up in the outside of main pipe gallery, even take place to reveal, its risk of flowing into the main pipe gallery has also reduced to minimumly.
2. Set up the water supply chamber in the inside of main pipe gallery, compare in the gas chamber, the harm degree that the water supply chamber was revealed is less, so the water supply chamber sets up in the inside of main pipe gallery to adopt the mode that sets up alone, can reduce the volume of digging on the one hand, on the other hand, even the water pipe in the water supply chamber takes place to reveal, has also reduced its influence to all the other pipe chambeies to minimumly.
3. The blowdown room sets up in the bottom of main pipe gallery, can effectually prevent that the waste water in the blowdown room from flowing into inside the main pipe gallery to cause the interior air turbidity of main pipe gallery, bacterial growing.
4. Space in the main pipe gallery for the utilization of at utmost, and make things convenient for later stage operating personnel's routine maintenance, the inside all pipelines of main pipe gallery all adopt the mode of hoist and mount, and adopt the arc and the mode that the mounting panel that is T shape combined together, install two liang of top at main pipe gallery with the pipeline, rethread L shape support is consolidated, prevent that the pipeline from droing, the arc of both ends kickup can provide more firm holding power for the pipeline, with the installation intensity of reinforcing equipment, when receiving great impact, certain elastic deformation can take place for the arc, can guarantee that the pipeline is unlikely to the landing.
Drawings
FIG. 1 is a schematic view of the overall structure of an underground utility tunnel;
FIG. 2 is a schematic view of the installation of a pipeline;
FIG. 3 is a schematic structural view of a main pipe gallery;
1. the main pipe gallery 2, the communication power chamber 3, the gas chamber 4, the sewage chamber 5, the water supply chamber 6, the pipeline 7, the arc-shaped plate 9, the L-shaped bracket 10 and the square bulge are arranged on the water supply chamber 6.
Detailed Description
For the purpose of enhancing the understanding of the present invention, the present invention will be further described in detail with reference to the following examples and the accompanying drawings, which are only used for explaining the present invention and are not to be construed as limiting the scope of the present invention.
As shown in fig. 1-3, an underground utility tunnel, including being square main piping lane 1, the interior cavity of main piping lane 1 forms communication electric power room 2, is equipped with water supply chamber 5 on the inner wall of main piping lane 1, is equipped with gas chamber 3 on the outer wall of main piping lane 1, and the bottom of main piping lane 1 is equipped with blowdown room 4, the upper surface of blowdown room 4 is equipped with the observation window that a plurality of material is organic glass.
The communication power chamber 2, the water supply chamber 5, the sewage discharge chamber 4 and the gas chamber 3 are isolated from each other.
The upper end hoist and mount of communication electric power room 2 have a plurality of pipelines 7, two liang of pipelines 7 install on the upper end inner wall of communication electric power room 2 through mounting panel 6, mounting panel 6 be the T font, even there is arc 8 bottom of mounting panel 6 through the welding, upwards buckle at the both ends of arc 8 and be circular-arcly, 7 joints of pipeline between arc 8 and mounting panel 6, the butt has L shape support 9 on the outer wall of pipeline 7, L shape support 9 on be equipped with a plurality of strengthening rib.
The upper end of the L-shaped bracket 9 is connected with the lower surface of the mounting plate 6, and the side wall of the L-shaped bracket 9 is abutted against the outer wall of the pipeline 7.
The person in charge corridor 1 include left socle and right branch frame, left socle and right branch frame all be L shape, link to each other through the dovetail between left socle and the right branch frame, the head of left and right branch frame all is equipped with outside outstanding square bulge 10, the afterbody of left and right branch frame all is equipped with the square groove that matches with square bulge. The left support and the right support are spliced firstly, and then are spliced with the adjacent left support and the right support through the square protrusions 10 and the square grooves, so that the whole main pipe gallery can be spliced and installed quickly, and the construction time is saved.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.
Claims (6)
1. The underground comprehensive pipe gallery is characterized by comprising a square main pipe gallery, wherein an inner cavity of the main pipe gallery forms a communication power chamber, a water supply chamber is arranged on the inner wall of the main pipe gallery, a gas chamber is arranged on the outer wall of the main pipe gallery, and a sewage discharge chamber is arranged at the bottom of the main pipe gallery; the communication power chamber, the water supply chamber, the sewage discharge chamber and the gas chamber are mutually isolated; the upper end hoist and mount of communication electric power room have a plurality of pipelines, two liang of pipelines a set of through the mounting panel install on the upper end inner wall of communication electric power room, the mounting panel be the T font, the bottom of mounting panel is equipped with the arc, the both ends of arc are circular-arcly to buckling upwards, the pipeline joint between arc and mounting panel, the butt has L shape support on the outer wall of pipeline, the upper end of L shape support links to each other with the lower surface of mounting panel, the lateral wall of L shape support and the outer wall looks butt of pipeline.
2. The underground comprehensive pipe gallery according to claim 1, wherein the main pipe gallery comprises a left support and a right support, the left support and the right support are both L-shaped, the left support and the right support are connected through a dovetail groove, the heads of the left support and the right support are both provided with square protrusions protruding outwards, and the tails of the left support and the right support are both provided with square grooves matched with the square protrusions.
3. An underground utility tunnel according to claim 1, wherein the middle of the curved plates are connected to the mounting plate by welding.
4. An underground utility tunnel according to claim 1, wherein a plurality of reinforcing bars are provided on the L-shaped brackets.
5. An underground utility tunnel according to claim 1, in which the upper surface of the drainage chamber is provided with a plurality of observation windows.
6. The underground utility tunnel of claim 5, wherein the observation window is made of plexiglass.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911398817.8A CN111021412A (en) | 2019-12-30 | 2019-12-30 | Underground comprehensive pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911398817.8A CN111021412A (en) | 2019-12-30 | 2019-12-30 | Underground comprehensive pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111021412A true CN111021412A (en) | 2020-04-17 |
Family
ID=70199917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911398817.8A Pending CN111021412A (en) | 2019-12-30 | 2019-12-30 | Underground comprehensive pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111021412A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836285A (en) * | 2017-03-30 | 2017-06-13 | 江苏建筑职业技术学院 | One kind guards waterproof construction based on architecture information underground pipe gallery |
CN206319339U (en) * | 2016-12-01 | 2017-07-11 | 河北卓邦建设工程有限公司 | A kind of unstressed piping lane system |
CN208363129U (en) * | 2018-06-15 | 2019-01-11 | 四川先舟建设工程有限公司 | A kind of town road pipe gallery |
CN110273434A (en) * | 2019-07-24 | 2019-09-24 | 中国建筑第七工程局有限公司 | A kind of building site, which is faced, builds underground pipe gallery and construction method |
CN209816917U (en) * | 2019-02-19 | 2019-12-20 | 重庆钢铁集团设计院有限公司 | City utility tunnel structure |
CN212052861U (en) * | 2019-12-30 | 2020-12-01 | 花王生态工程股份有限公司 | Underground comprehensive pipe gallery |
-
2019
- 2019-12-30 CN CN201911398817.8A patent/CN111021412A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN206319339U (en) * | 2016-12-01 | 2017-07-11 | 河北卓邦建设工程有限公司 | A kind of unstressed piping lane system |
CN106836285A (en) * | 2017-03-30 | 2017-06-13 | 江苏建筑职业技术学院 | One kind guards waterproof construction based on architecture information underground pipe gallery |
CN208363129U (en) * | 2018-06-15 | 2019-01-11 | 四川先舟建设工程有限公司 | A kind of town road pipe gallery |
CN209816917U (en) * | 2019-02-19 | 2019-12-20 | 重庆钢铁集团设计院有限公司 | City utility tunnel structure |
CN110273434A (en) * | 2019-07-24 | 2019-09-24 | 中国建筑第七工程局有限公司 | A kind of building site, which is faced, builds underground pipe gallery and construction method |
CN212052861U (en) * | 2019-12-30 | 2020-12-01 | 花王生态工程股份有限公司 | Underground comprehensive pipe gallery |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104019327B (en) | A kind of urban Underground pipeline comprehensive corridor device | |
CN104265306B (en) | A kind of municipal administration shield tunnel | |
CN212052861U (en) | Underground comprehensive pipe gallery | |
CN205557584U (en) | Steel pipe corridor and large -scale utility tunnel system | |
CN111750172A (en) | Pipe jacking construction process | |
CN103775100B (en) | A kind of prefabricated assembled city integrated piping lane | |
CN111021412A (en) | Underground comprehensive pipe gallery | |
CN204113295U (en) | A kind of municipal shield tunnel | |
CN210397920U (en) | Horizontal sliding support system for transporting and supporting pipelines inside underground comprehensive pipe gallery | |
CN210315616U (en) | Energy-saving underground water drainage equipment for building | |
CN106245676A (en) | A kind of body and pipe gallery | |
CN205742273U (en) | A kind of fiberglass pipe gallery | |
CN102691312A (en) | Precast assembled pipeline combined shaft | |
CN206396789U (en) | A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge | |
CN204113300U (en) | Municipal tunnel | |
CN204424846U (en) | Pre-fabricated electric cables ditch | |
CN205171548U (en) | Novel plastics piping lane | |
CN211057848U (en) | Circular utility tunnel extensible structure of individual layer | |
CN213118031U (en) | Special anti-settling sleeve for ground source heat pump pipeline well | |
CN210129717U (en) | Firewall cable wall-penetrating protective sleeve fixing device for comprehensive pipe rack | |
CN204570727U (en) | Urban Underground shunting common trench | |
CN111519658A (en) | Novel assembled underground pipe gallery | |
CN105909006A (en) | Prefabricated splicing-combined transformer substation | |
CN206359996U (en) | Prefabricated assembled pipe gallery assembled up and down | |
CN207934166U (en) | A kind of structure of superstructure of the outdoor drainage Pipeline Crossing Program without basement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |