CN106836285A - One kind guards waterproof construction based on architecture information underground pipe gallery - Google Patents

One kind guards waterproof construction based on architecture information underground pipe gallery Download PDF

Info

Publication number
CN106836285A
CN106836285A CN201710202275.7A CN201710202275A CN106836285A CN 106836285 A CN106836285 A CN 106836285A CN 201710202275 A CN201710202275 A CN 201710202275A CN 106836285 A CN106836285 A CN 106836285A
Authority
CN
China
Prior art keywords
chamber
piping lane
guiding gutter
leak
guarded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710202275.7A
Other languages
Chinese (zh)
Inventor
璧典寒
赵亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Institute of Architectural Technology
Jiangsu Jianzhu Institute
Original Assignee
Jiangsu Institute of Architectural Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Institute of Architectural Technology filed Critical Jiangsu Institute of Architectural Technology
Priority to CN201710202275.7A priority Critical patent/CN106836285A/en
Publication of CN106836285A publication Critical patent/CN106836285A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution

Abstract

Waterproof construction is guarded based on architecture information underground pipe gallery the invention discloses one kind, underground pipe gallery waterproof field is related generally to.Including piping lane Building block block and remote computer based system, the piping lane Building block bulk inner is provided with power pipe line chamber, oil-gas pipeline chamber, integrated pipe line chamber, catchment drain chamber, the power pipe line chamber, piping lane top surface leak prison is additionally provided with oil-gas pipeline chamber and integrated pipe line chamber, guiding gutter and piping lane side leak monitoring guiding gutter, level sensor and control valve, piping lane Building block bulk inner side wall, the drain header being connected with drain chamber of catchmenting is equipped with first internal side wall and the second internal side wall, the level sensor and control valve are connected with remote computer based system signal.The beneficial effects of the present invention are:Draining can be effectively carried out, the position of serious infiltration can be timely found and determined when seeping water serious, timely leakage position can be found, positioned.

Description

One kind guards waterproof construction based on architecture information underground pipe gallery
Technical field
It is specifically a kind of that waterproof knot is guarded based on architecture information underground pipe gallery the present invention relates to underground pipe gallery waterproof field Structure.
Background technology
With the improvement of people ' s living standards, scientific and technical development so that existing building intelligent information degree Greatly improve.Underground pipe gallery is to be used for the public tunnel that concentration lays various municipal pipelines in Urban Underground.Compared to other hairs Up to country, the underground foundation Facilities Construction of China's underground pipe gallery is delayed, the phenomenon for the infiltration of underground pipe gallery inside often occur, and then Cause underground pipe gallery inside pipe fitting to be intake, and cause the corrosion of metal tube, substantially reduce the service life of pipe fitting, or even Cause the Accident of Large-scale phenomenon such as power system paralysis, leak, gas leakage.Existing underground pipe gallery structure has the following disadvantages:
1st, underground pipe gallery is widely distributed in underground, wherein the underground pipe gallery structure below urban road, due to city Vehicle flowrate above road is very big, and the vibrations that piping lane Building block block bears are larger, between adjacent piping lane Building block block Only by grout off, the cement for blocking can ftracture, drop, and easily cause the infiltration of underground pipe gallery inside, and underground Draining can not be effectively carried out after the infiltration of piping lane inside, when seeping water serious, can not timely be found.Especially for the earth's crust Active area, due to often there is small-sized earthquake, easily there is crack in piping lane Building block block, not only serious to reduce piping lane The service life of Building block block, and groundwater infiltration is easily caused at crack, into inside underground pipe gallery.
2nd, oil-gas pipeline chamber is provided with inside underground pipe gallery, gas pipeline and oil-gas pipeline is provided with oil-gas pipeline chamber, it is existing In oil-gas pipeline chamber in technology, when gas pipeline and oil-gas pipeline are leaked, it is impossible to enough timely to find, or can not Timely leakage position is positioned, causes maintenance not in time, cause huge economic loss, or even cause major accident.
So, it is art technology how using a kind of information-based underground pipe gallery monitoring waterproof construction of prior art design Personnel need the technical problem for solving.
The content of the invention
Waterproof construction is guarded based on architecture information underground pipe gallery it is an object of the invention to provide one kind, works as underground pipe gallery Draining can be effectively carried out during the infiltration of inside, also can timely be found when seeping water serious, and can determine serious infiltration Position, it is to avoid the pipe fitting water inlet of underground pipe gallery inside, or even cause the Accident of Large-scale phenomenon such as power system paralysis, leak, gas leakage; And when gas pipeline and oil-gas pipeline are leaked, can timely find and leakage position be positioned, Neng Gou The very first time is repaired, it is to avoid cause huge economic loss and major accident.
The present invention to achieve the above object, is achieved through the following technical solutions:
One kind guards waterproof construction, including piping lane Building block block and remote computation based on architecture information underground pipe gallery Machine control system, the piping lane Building block bulk inner is provided with power pipe line chamber, oil-gas pipeline chamber and integrated pipe line chamber, described Piping lane Building block block bottom is provided with drain chamber of catchmenting, and is provided with inside first between the power pipe line chamber and oil-gas pipeline chamber Side wall, is provided with the second internal side wall, the power pipe line chamber, oil-gas pipeline chamber between the oil-gas pipeline chamber and integrated pipe line chamber Pyramidal structure is with integrated pipe line chamber top surface, and the power pipe line chamber, oil-gas pipeline chamber and integrated pipe line chamber top surface are all provided with There is mozzle, piping lane top surface leak monitoring guiding gutter is additionally provided with the power pipe line chamber, oil-gas pipeline chamber and integrated pipe line chamber Guiding gutter is guarded with the leak of piping lane side, on the piping lane top surface leak monitoring guiding gutter and piping lane side leak monitoring guiding gutter Level sensor and control valve are equipped with, the piping lane top surface leak monitoring guiding gutter is arranged in piping lane Building block block Portion side wall, the first internal side wall and the second internal side wall top, piping lane side leak monitoring guiding gutter are arranged at piping lane spelling Dress building bulk inner sidewall bottom, piping lane Building block bulk inner side wall, the first internal side wall and the second private side The drain header being connected with drain chamber of catchmenting, the piping lane top surface leak monitoring guiding gutter and the leakage of piping lane side are equipped with wall Be equipped with the branch drain being connected with drain header on water monitoring guiding gutter, the level sensor and control valve with it is long-range Computer control system signal is connected.
Power pipeline support is provided with the power pipe line chamber, gas pipeline support and oil are provided with the oil-gas pipeline chamber Feed channel bearing, is provided with composite duct bearing and composite duct support in the integrated pipe line chamber.
Leakage warning device, the leakage warning device and remote computer based system are provided with the oil-gas pipeline chamber Signal is connected.
The piping lane top surface leak monitoring guiding gutter and piping lane side leak monitoring water conservancy diversion trench bottom are equipped with stillpot, institute State at piping lane top surface leak monitoring guiding gutter and piping lane side leak monitoring guiding gutter and piping lane Building block block sidewall contact It is provided with impurity filtering net.
The branch drain is less than near one end of control valve near one end of drain header.
The piping lane top surface leak guards guiding gutter and including electric power chamber top surface leak monitoring guiding gutter, the leakage of oil gas chamber top surface Water guards guiding gutter and comprehensive chamber top surface leak monitoring guiding gutter, and leak monitoring guiding gutter in the piping lane side includes electric power chamber side Face leak monitoring guiding gutter and comprehensive chamber side leak monitoring guiding gutter.
Support frame is provided between two oil gas chamber top surface leak monitoring guiding gutters, support frame as described above center is provided with Protective cover, the leakage warning device is arranged in protective cover.
The power pipe line chamber, oil-gas pipeline chamber and integrated pipe line chamber end face center position are provided with link, the water conservancy diversion Pipe one end is fixedly connected with link, and the mozzle other end is adapted with piping lane top surface leak monitoring guiding gutter.
Contrast prior art, the beneficial effects of the present invention are:
1st, the present apparatus includes piping lane Building block block and remote computer based system, is set in piping lane Building block block There is the leak of piping lane top surface to guard guiding gutter and piping lane side leak monitoring guiding gutter, the leak of piping lane top surface monitoring guiding gutter and piping lane Level sensor and control valve, piping lane Building block bulk inner side wall, first are equipped with side leak monitoring guiding gutter The drain header being connected with drain chamber of catchmenting is equipped with internal side wall and the second internal side wall, drain header is provided with draining Branch pipe, when because piping lane Building block block is due to the reason such as the earth's crust is active, urban road vehicle flowrate is big, makes piping lane Building block The vibrations that block bears are larger, cause piping lane Building block block the envelope between crack, adjacent piping lane Building block block occur Water blockoff mud ftractures, drops, and when causing the infiltration of underground pipe gallery inside, the infiltration of underground pipe gallery top surface can be led along the mozzle of top surface It flow in piping lane top surface leak monitoring guiding gutter, the infiltration of underground pipe gallery side can under gravity flow to the leakage of piping lane side In water monitoring guiding gutter, piping lane top surface leak monitoring guiding gutter and piping lane side leak monitoring guiding gutter set in its longitudinal direction There are multiple control valves, because infiltration is not serious under regular situation, minority is opened only by remote computer based system Control valve carries out draining, therefore, draining can be effectively carried out when underground pipe gallery inside is seeped water, when seeping water serious, by Less in the control valve opened under regular situation, seepage velocity can be more than drainage speed, cause the leak of piping lane top surface to be guarded and lead Chute and piping lane side leak monitoring guiding gutter internal water accumulation increase, when the horizontal line where liquid level reaches level sensor, liquid Level sensor can send alarm signal to remote computer based system, due to the one piping lane assembly of correspondence of each liquid level sensor Building block, it is possible to timely serious place of seeping water is positioned, so, also can be timely when seeping water serious Discovery, and can determine the position of serious infiltration, it is to avoid the pipe fitting water inlet of underground pipe gallery inside, or even cause power system paralysis The Accident of Large-scale phenomenon such as paralysis, leak, gas leakage.
2nd, by being provided with power pipeline support in power pipe line chamber, gas pipeline support and oil are provided with oil-gas pipeline chamber Feed channel bearing, is provided with composite duct bearing and composite duct support in integrated pipe line chamber, power pipe line chamber, oil-gas pipeline chamber and Integrated pipe line chamber is provided separately, and can be more orderly be carried out to all service conduits and pipeline is separated.
3rd, leakage warning device is set by oil-gas pipeline chamber, when gas pipeline and oil-gas pipeline are leaked, Leakage warning device can timely monitor the oil gas of combustion gas and volatilization, and leakage warning device is by signal transmission to long-range meter Calculation machine control system, due to each leakage warning device one piping lane Building block block of correspondence, therefore the present apparatus can be timely Discovery leakage and to leakage position position, can be repaired in the very first time, it is to avoid cause huge economic loss And major accident.
4th, it is respectively provided with precipitation by guarding water conservancy diversion trench bottom in piping lane top surface leak monitoring guiding gutter and the leak of piping lane side Groove, sandy soil or debris in infiltration can be deposited in stillpot, it is to avoid sandy soil or debris flow into drain header, cause draining master Blockage.Guiding gutter and piping lane side leak monitoring guiding gutter and piping lane Building block block are guarded by the leak of piping lane top surface Impurity filtering net is set at sidewall contact, and floating object or suspension in infiltration can be intercepted at impurity filtering net, kept away Exempt from floating object or suspension flows into drain header, cause drain header to block.
5th, it is less than near one end of control valve near one end of drain header by setting branch drain, can be convenient Infiltration is discharged in drain header.
6th, electric power chamber top surface leak monitoring guiding gutter, oil gas chamber top surface leak monitoring guiding gutter, comprehensive chamber top surface leak prison Protect and lead level sensor, the control on chute, electric power chamber side leak monitoring guiding gutter and comprehensive chamber side leak monitoring guiding gutter Valve processed is all flagged with different differentiation labels on remote computer based system, when any one level sensor sends report When alert, remote computer based system can be positioned timely, so that it is determined that go out serious place of seeping water, when any one When control valve is damaged, remote computer based system can be positioned timely, so that it is determined that the control in which place gone out Valve is damaged.
7th, support frame is provided between two oil gas chamber top surface leak monitoring guiding gutters, support frame center is provided with protection Cover, the underground water that oil-gas pipeline chamber top surface can be avoided to penetrate into causes damage to leakage warning device.
8th, by setting link, mozzle can be stably fixed to power pipe line chamber end face center position, oil gas Duct chamber end face center position and integrated pipe line chamber end face center position.
Brief description of the drawings
Accompanying drawing 1 is concrete structure schematic diagram of the present invention.
Accompanying drawing 2 is I portions enlarged drawing in accompanying drawing of the present invention 1.
Accompanying drawing 3 is II portions enlarged drawing in accompanying drawing of the present invention 2.
Label shown in accompanying drawing:
1st, piping lane Building block block;2nd, remote computer based system;3rd, power pipe line chamber;4th, oil-gas pipeline chamber;5、 Integrated pipe line chamber;6th, catchment drain chamber;7th, the first internal side wall;8th, the second internal side wall;9th, mozzle;10th, piping lane top surface leakage Water guards guiding gutter;11st, piping lane side leak monitoring guiding gutter;12nd, level sensor;13rd, control valve;14th, drain header; 15th, branch drain;16th, power pipeline support;17th, gas pipeline support;18th, oil-gas pipeline bearing;19th, composite duct bearing; 20th, composite duct support;21st, leakage warning device;22nd, stillpot;23rd, impurity filtering net;24th, electric power chamber top surface leak monitoring Guiding gutter;25th, oil gas chamber top surface leak monitoring guiding gutter;26th, comprehensive chamber top surface leak monitoring guiding gutter;27th, electric power chamber side Guiding gutter is guarded in leak;28th, comprehensive chamber side leak monitoring guiding gutter;29th, support frame;30th, protective cover;31st, link.
Specific embodiment
With reference to specific embodiment, the present invention is expanded on further.It should be understood that these embodiments are merely to illustrate the present invention Rather than limitation the scope of the present invention.In addition, it is to be understood that after the content for having read instruction of the present invention, people in the art Member can make various changes or modifications to the present invention, and these equivalent form of values equally fall within scope defined herein.
Of the present invention is that a kind of architecture information underground pipe gallery that is based on guards waterproof construction, and agent structure includes that piping lane is spelled Dress building block 1 and remote computer based system 2, are provided with power pipe line chamber 3, oil inside the piping lane Building block block 1 Feed channel chamber 4 and integrated pipe line chamber 5, the bottom of piping lane Building block block 1 are provided with drain chamber 6 of catchmenting, and drain chamber of catchmenting 6 is used To collect and discharge the underground water penetrated into piping lane Building block block 1.Between the power pipe line chamber 3 and oil-gas pipeline chamber 4 The first internal side wall 7 is provided with, the second internal side wall 8, the electric power are provided between the oil-gas pipeline chamber 4 and integrated pipe line chamber 5 Pipeline chamber 3, oil-gas pipeline chamber 4 and the top surface of integrated pipe line chamber 5 are pyramidal structure, and the power pipe line chamber 3, oil-gas pipeline chamber 4 and the top surface of integrated pipe line chamber 5 be equipped with mozzle 9, be set to pyramidal structure by by top surface, the work of the ponding of top surface in gravity Easier can be flowed in piping lane top surface leak monitoring guiding gutter 10 along mozzle 9 under, so as in piping lane top surface leak Collect in monitoring guiding gutter 10.The leakage of piping lane top surface is additionally provided with the power pipe line chamber 3, oil-gas pipeline chamber 4 and integrated pipe line chamber 5 Water guards guiding gutter 10 and piping lane side leak monitoring guiding gutter 11, and piping lane top surface leak monitoring guiding gutter 10 is used for collecting underground The infiltration of piping lane top surface, the infiltration of underground pipe gallery top surface can be guided to piping lane top surface leak monitoring and lead along the mozzle 9 of top surface In chute 10, leak monitoring guiding gutter 11 in piping lane side is used for collecting the infiltration of underground pipe gallery side, and underground pipe gallery side is oozed Water can flow in piping lane side leak monitoring guiding gutter 11 under gravity.Guiding gutter 10 is guarded in the piping lane top surface leak Guarded with the leak of piping lane side and level sensor 12 and control valve 13 are equipped with guiding gutter 11, level sensor 12 is used for feeling The leak of piping lane top surface is answered to guard the water surface elevation in guiding gutter 10 and piping lane side leak monitoring guiding gutter 11, control valve 13 is used To control the connection between branch drain 15 and piping lane top surface leak monitoring guiding gutter 10, piping lane side leak monitoring guiding gutter 11 Or close.The piping lane top surface leak monitoring guiding gutter 10 is arranged at the internal side wall of piping lane Building block block 1, the first private side The top of 7 and second internal side wall of wall 8, piping lane side leak monitoring guiding gutter 11 is arranged in piping lane Building block block 1 Portion's sidewall bottom, the first internal side wall 7 and the second internal side wall 8 are arranged on inside piping lane Building block block 1, in the absence of infiltration Phenomenon, so the first internal side wall 7 and the bottom of the second internal side wall 8 are without setting piping lane side leak monitoring guiding gutter 11.Institute State and be equipped with and drain chamber 6 of catchmenting in the internal side wall of piping lane Building block block 1, the first internal side wall 7 and the second internal side wall 8 On the drain header 14 being connected, the piping lane top surface leak monitoring guiding gutter 10 and piping lane side leak monitoring guiding gutter 11 The branch drain 15 being connected with drain header 14 is provided with, the setting of drain header 14 and branch drain 15 ensure that infiltration piping lane Underground water inside Building block block 1 can be easily discharged into drain chamber 6 of catchmenting, the level sensor 12 and control Valve 13 is connected with the signal of remote computer based system 2.When because piping lane Building block block 1 is because the earth's crust is active, city The reason such as road traffic is big, the vibrations for bearing piping lane Building block block 1 are larger, cause piping lane Building block block 1 to go out Existing closure cement between crack, adjacent piping lane Building block block 1 ftractures, drops, when causing the infiltration of underground pipe gallery inside, ground The infiltration of lower piping lane top surface can be guided in piping lane top surface leak monitoring guiding gutter 10 along the mozzle 9 of top surface, underground pipe gallery The infiltration of side can flow in piping lane side leak monitoring guiding gutter 11 under gravity, piping lane top surface leak monitoring water conservancy diversion Groove 10 and the leak of piping lane side monitoring guiding gutter 11 be provided with multiple control valves 13 in its longitudinal direction, under regular situation due to Infiltration is not serious, and the control valve 13 for opening minority only by remote computer based system 2 carries out draining, therefore, it is local Draining can be effectively carried out during lower piping lane inside infiltration, when seeping water serious, due to the control valve opened under regular situation 13 is less, and seepage velocity can be more than drainage speed, causes the leak of piping lane top surface to guard guiding gutter 10 and piping lane side leak monitoring The internal water accumulation of guiding gutter 11 increases, and when the horizontal line where liquid level reaches level sensor 12, liquid level sensor can be to long-range meter Calculation machine control system 2 sends alarm signal, due to each liquid level sensor one piping lane Building block block 1 of correspondence, so energy Enough that timely serious place of seeping water is positioned, liquid level sensor sends alarm signal to remote computer based system 2 While, remote computer based system 2 can open more control valves 13 and carry out draining, so, when seeping water serious Also can timely find, it is determined that the position of serious infiltration, and avoid the leak of piping lane top surface from guarding guiding gutter 10 or piping lane side Ponding in face leak monitoring guiding gutter 11 excessively overflows, and causes piping lane inside pipe fitting to be intake, or even cause power system to be paralysed, The Accident of Large-scale phenomenon such as leak, gas leakage.
In order to it is more orderly all service conduits and pipeline are carried out it is separated, in the power pipe line chamber 3 It is provided with power pipeline support 16, the oil-gas pipeline chamber 4 and is provided with gas pipeline support 17 and oil-gas pipeline bearing 18, it is described comprehensive Close in pipeline chamber 5 and be provided with composite duct bearing 19 and composite duct support 20.
In order to timely find combustion gas or oil gas leakage, leakage warning device 21 is provided with the oil-gas pipeline chamber 4, The leakage warning device 21 is connected with the signal of remote computer based system 2.When gas pipeline and oil-gas pipeline are leaked When, leakage warning device 21 can timely monitor the oil gas of combustion gas and volatilization, and leakage warning device 21 is by signal transmission To remote computer based system 2, due to each leakage warning device 21 one piping lane Building block block 1 of correspondence, therefore this Device can timely find leakage and leakage position is positioned, can be repaired in the very first time, it is to avoid cause huge Big economic loss and major accident.
In order to avoid drain header 14 is blocked, the piping lane top surface leak monitoring guiding gutter 10 and the leak of piping lane side are guarded The bottom of guiding gutter 11 is equipped with stillpot 22, the piping lane top surface leak monitoring guiding gutter 10 and piping lane side leak monitoring water conservancy diversion Impurity filtering net 23 is provided with groove 11 and the sidewall contact of piping lane Building block block 1.By setting stillpot 22, the sand in infiltration Soil or debris can be deposited in stillpot 22, it is to avoid sandy soil or debris flow into drain header 14, cause drain header 14 to block. By setting impurity filtering net 23, floating object or suspension in infiltration can be intercepted at impurity filtering net 23, it is to avoid Floating object or suspension flow into drain header 14, cause drain header 14 to block.
In order to easily infiltration is discharged in drain header 14, the branch drain 15 is close to the one of drain header 14 End is less than near one end of control valve 13.
In order that remote computer based system 2 can be positioned timely, so that it is determined that go out serious place of seeping water, And determine the place that control valve 13 is damaged.The piping lane top surface leak guards guiding gutter 10 and including the leakage of electric power chamber top surface Water monitoring guiding gutter 24, oil gas chamber top surface leak monitoring guiding gutter 25 and comprehensive chamber top surface leak monitoring guiding gutter 26, the pipe Corridor side leak monitoring guiding gutter 11 includes electric power chamber side leak monitoring guiding gutter 27 and comprehensive chamber side leak monitoring water conservancy diversion Groove 28.
In order to avoid the underground water that the top surface of oil-gas pipeline chamber 4 penetrates into causes damage to leakage warning device 21, described in two Support frame 29 is provided between the top surface leak monitoring guiding gutter 25 of oil gas chamber, the center of support frame as described above 29 is provided with protective cover 30, The leakage warning device 21 is arranged in protective cover 30.
In order to mozzle 9 is stably fixed into the end face center position of power pipe line chamber 3, the top surface of oil-gas pipeline chamber 4 Center and the end face center position of integrated pipe line chamber 5, the power pipe line chamber 3, oil-gas pipeline chamber 4 and integrated pipe line chamber 5 are pushed up Face center is provided with link 31, and the one end of the mozzle 9 is fixedly connected with link 31, the other end of the mozzle 9 with Piping lane top surface leak monitoring guiding gutter 10 is adapted.

Claims (8)

  1. It is 1. a kind of that waterproof construction is guarded based on architecture information underground pipe gallery, it is characterised in that:Including piping lane Building block block (1) power pipe line chamber (3), oil gas and remote computer based system (2), are provided with inside the piping lane Building block block (1) Duct chamber (4) and integrated pipe line chamber (5), piping lane Building block block (1) bottom are provided with drain chamber of catchmenting (6), the electricity The first internal side wall (7), the oil-gas pipeline chamber (4) and comprehensive pipeline are provided between solenoid line chamber (3) and oil-gas pipeline chamber (4) The second internal side wall (8), the power pipe line chamber (3), oil-gas pipeline chamber (4) and integrated pipe line chamber (5) top are provided between chamber (5) Face is pyramidal structure, and the power pipe line chamber (3), oil-gas pipeline chamber (4) and integrated pipe line chamber (5) top surface are equipped with water conservancy diversion Piping lane top surface leak monitoring is additionally provided with pipe (9), the power pipe line chamber (3), oil-gas pipeline chamber (4) and integrated pipe line chamber (5) Guiding gutter (11) is guarded in guiding gutter (10) and the leak of piping lane side, and guiding gutter (10) and piping lane side are guarded in the piping lane top surface leak Face leak is guarded and level sensor (12) and control valve (13) is equipped with guiding gutter (11), the piping lane top surface leak monitoring Guiding gutter (10) is arranged at piping lane Building block block (1) internal side wall, the first internal side wall (7) and the second internal side wall (8) Top, piping lane side leak is guarded guiding gutter (11) and is arranged at piping lane Building block block (1) internal side wall bottom, described It is equipped with and the row that catchments in piping lane Building block block (1) internal side wall, the first internal side wall (7) and the second internal side wall (8) Guiding gutter (10) and piping lane side leak monitoring are guarded in the drain header (14) that water cavity (6) is connected, the piping lane top surface leak The branch drain (15) being connected with drain header (14), the level sensor (12) and control are equipped with guiding gutter (11) Valve (13) is connected with remote computer based system (2) signal.
  2. It is 2. a kind of according to claim 1 that waterproof construction is guarded based on architecture information underground pipe gallery, it is characterised in that:It is described Be provided with power pipe line chamber (3) in power pipeline support (16), the oil-gas pipeline chamber (4) be provided with gas pipeline support (17) and Composite duct bearing (19) and composite duct support (20) are provided with oil-gas pipeline bearing (18), the integrated pipe line chamber (5).
  3. It is 3. a kind of according to claim 2 that waterproof construction is guarded based on architecture information underground pipe gallery, it is characterised in that:It is described Leakage warning device (21), the leakage warning device (21) and remote computer based system are provided with oil-gas pipeline chamber (4) (2) signal connection.
  4. It is 4. a kind of according to claim 1 that waterproof construction is guarded based on architecture information underground pipe gallery, it is characterised in that:It is described Guiding gutter (10) is guarded in the leak of piping lane top surface and piping lane side leak monitoring guiding gutter (11) bottom is equipped with stillpot (22), institute State the leak of piping lane top surface and guard guiding gutter (10) and piping lane side leak monitoring guiding gutter (11) and piping lane Building block block (1) Impurity filtering net (23) is provided with sidewall contact.
  5. It is 5. a kind of according to claim 1 that waterproof construction is guarded based on architecture information underground pipe gallery, it is characterised in that:It is described Branch drain (15) is less than near one end of control valve (13) near one end of drain header (14).
  6. It is 6. a kind of according to claim 3 that waterproof construction is guarded based on architecture information underground pipe gallery, it is characterised in that:It is described The leak of piping lane top surface is guarded guiding gutter (10) and guards guiding gutter (24), the top surface leak monitoring of oil gas chamber including the top surface leak of electric power chamber Guiding gutter (26) is guarded in guiding gutter (25) and comprehensive chamber top surface leak, and piping lane side leak guards guiding gutter (11) including electricity Guiding gutter (27) is guarded in the leak of power chamber side and guiding gutter (28) is guarded in the side leak of comprehensive chamber.
  7. It is 7. a kind of according to claim 6 that waterproof construction is guarded based on architecture information underground pipe gallery, it is characterised in that:Two The oil gas chamber top surface leak is provided with support frame (29) between guarding guiding gutter (25), and support frame as described above (29) center is provided with Protective cover (30), the leakage warning device (21) is arranged in protective cover (30).
  8. It is 8. a kind of according to claim 1 that waterproof construction is guarded based on architecture information underground pipe gallery, it is characterised in that:It is described Power pipe line chamber (3), oil-gas pipeline chamber (4) and integrated pipe line chamber (5) end face center position are provided with link (31), the water conservancy diversion Pipe (9) one end is fixedly connected with link (31), and mozzle (9) other end guards guiding gutter (10) with the leak of piping lane top surface It is adapted.
CN201710202275.7A 2017-03-30 2017-03-30 One kind guards waterproof construction based on architecture information underground pipe gallery Pending CN106836285A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710202275.7A CN106836285A (en) 2017-03-30 2017-03-30 One kind guards waterproof construction based on architecture information underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710202275.7A CN106836285A (en) 2017-03-30 2017-03-30 One kind guards waterproof construction based on architecture information underground pipe gallery

Publications (1)

Publication Number Publication Date
CN106836285A true CN106836285A (en) 2017-06-13

Family

ID=59141486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710202275.7A Pending CN106836285A (en) 2017-03-30 2017-03-30 One kind guards waterproof construction based on architecture information underground pipe gallery

Country Status (1)

Country Link
CN (1) CN106836285A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107401181A (en) * 2017-08-10 2017-11-28 温州市华昌建设有限公司 A kind of municipal network system and construction method
CN109099322A (en) * 2018-06-30 2018-12-28 崔树龙 A kind of underground pipe gallery monitoring waterproof construction based on architecture information
CN109137975A (en) * 2018-08-31 2019-01-04 辽宁科技大学 Piping lane based on BIM builds Synthetical Optimization
CN110080300A (en) * 2019-05-23 2019-08-02 田西武 A kind of multifunctional groups guard water-tight device in architecture information underground pipe gallery
CN110528576A (en) * 2019-07-31 2019-12-03 关艳玲 One kind guarding waterproof construction based on architecture information underground pipe gallery

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107401181A (en) * 2017-08-10 2017-11-28 温州市华昌建设有限公司 A kind of municipal network system and construction method
CN109099322A (en) * 2018-06-30 2018-12-28 崔树龙 A kind of underground pipe gallery monitoring waterproof construction based on architecture information
CN109137975A (en) * 2018-08-31 2019-01-04 辽宁科技大学 Piping lane based on BIM builds Synthetical Optimization
CN110080300A (en) * 2019-05-23 2019-08-02 田西武 A kind of multifunctional groups guard water-tight device in architecture information underground pipe gallery
CN110528576A (en) * 2019-07-31 2019-12-03 关艳玲 One kind guarding waterproof construction based on architecture information underground pipe gallery

Similar Documents

Publication Publication Date Title
CN106836285A (en) One kind guards waterproof construction based on architecture information underground pipe gallery
CN109707444B (en) Automatic start-up formula tunnel drainage system
CN204080839U (en) A kind of Yield rainfall relation device
CN203174663U (en) Device for pouring rainwater on high-rise building roof underground
CN104674889A (en) Tunnel fire system with water sources which are slope surface flowing water and road surface water
CN105386460B (en) Intelligent urban underground comprehensive pipe gallery
CN206646546U (en) One kind is based on architecture information underground pipe gallery monitoring waterproof construction
CN204370519U (en) A kind of domatic flowing water and road surface water of utilizing is as the tunnel fire protection system at water source
CN106368239A (en) Water stop structure arranged at position of expansion joint of urban underground comprehensive pipe rack and construction method of water stop structure
CN106531267A (en) Drainage system and method for underground nuclear power plant cavern group
CN208749398U (en) A kind of tapping equipment of coal mine overlying rock water
CN208395840U (en) A kind of preventative water draw-off of basement sump
CN207109987U (en) A kind of hondo formula closure works system
CN106437842B (en) The auxiliary that subway crosses dewatering type tunnel between sea area simultaneous transfers drainage pumping plant
CN204356843U (en) A kind of domatic flowing water and road surface water of utilizing is as the tunnel fire protection system at water source
CN206143724U (en) Canal lining restores foundation ditch drainage structures futilely under uninterrupted water delivery
CN206396786U (en) Suitable for the pipe gallery section structure of area of heavy rainfull
CN204356844U (en) A kind of domatic flowing water and road surface water of utilizing is as the tunnel fire protection system at water source
CN204370510U (en) A kind of road surface water and Tunnel Gushing of utilizing is as the tunnel fire protection system at water source
CN204343379U (en) A kind ofly utilize domatic flowing water as the tunnel fire protection system at water source
CN203741976U (en) Karst depression drainage device
CN103147482B (en) Device using rainwater on roof of high-rise building to fill ground water
CN106592734A (en) Integrated initial rainwater purification system with functions of collection, storage, purification and transfer
CN206419062U (en) The auxiliary that subway crosses dewatering type tunnel between sea area simultaneous transfers drainage pumping plant
CN212105953U (en) Drainage system device that tunnel road surface blockked up

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination