CN110273434A CN201910671873.8A CN201910671873A CN110273434A CN 110273434 A CN110273434 A CN 110273434A CN 201910671873 A CN201910671873 A CN 201910671873A CN 110273434 A CN110273434 A CN 110273434A
Authority
CN
China
Prior art keywords
piping lane
main body
lane main
pipe gallery
building site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910671873.8A
Other languages
Chinese (zh)
Other versions
CN110273434B (en
Inventor
王旭杰
王向军
杜鹏超
曹维存
徐洪瑞
乔海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201910671873.8A priority Critical patent/CN110273434B/en
Publication of CN110273434A publication Critical patent/CN110273434A/en
Application granted granted Critical
Publication of CN110273434B publication Critical patent/CN110273434B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/02Arrangement of sewer pipe-lines or pipe-line systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/14Devices for separating liquid or solid substances from sewage, e.g. sand or sludge traps, rakes or grates
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
    • F16L3/221Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals having brackets connected together by means of a common support
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
    • F16L3/223Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/06Installations of electric cables or lines in or on the ground or water in underground tubes or conduits; Tubes or conduits therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

Face the present invention provides a kind of building site and builds underground pipe gallery and construction method, belong to technical field of building construction, building site faces that build underground pipe gallery include piping lane main body, piping lane reinforcement assembly, driving mechanism, drain assembly, conduit assembly, CA cable assembly and filter assemblies, piping lane reinforcement assembly is fixedly arranged on the outer wall of piping lane main body when construction, driving mechanism is set on piping lane reinforcement assembly and is used to open piping lane main body, drain assembly is set on piping lane main body bottom plate, conduit assembly and CA cable assembly are separately positioned on the inner sidewall of piping lane main body, finally filter assemblies are separately positioned at the top and bottom of piping lane.A kind of building site provided by the invention, which is faced, builds underground pipe gallery and construction method, building site faces that build underground pipe gallery be to integrate cable duct, rain rill and the comprehensive piping lane in supply and discharge ditch, has the function of that use is more, construction method is simple, security risk is avoided, and is not susceptible to the technical effect of blocking.

Description

A kind of building site, which is faced, builds underground pipe gallery and construction method
Technical field
The invention belongs to technical field of building construction, are to be related to a kind of building site and face building underground pipe gallery and applying more specifically Work method.
Background technique
Pipe gallery be collect power cable, telecommunications, plumbing, heating power, rain sewage, the one such as combustion gas synthetically are descended to construct Object.There are two types of the constructions of existing pipe gallery, and a kind of for cast-in-place pipe gallery, another kind is the pipe gallery of precast assembly, Cast-in-place pipe gallery situ wet operation is big, and the operating space needed is big, so that the excacation amount of piping lane foundation pit is big, construction Period is long.And the pipe gallery of precast assembly can significantly reduce on-site wet operation amount, relative to cast-in-place construction piping lane energy Enough shorten construction period, solves the problems of cast-in-place pipe gallery.
In some construction site construction operations, since the construction period in building site is longer, for needs and the safety of constructing, warp Often in some small-sized piping lanes of building site temporary construction, but current building site faces that build piping lane be usually to excavate a zanjon to be formed, The piping lane is used as cable duct or is used as gutter, using having a single function, when as gutter in use, due to rainwater Influenced with impurity etc., phenomena such as often blocking in piping lane, influence the use of piping lane, and the upper port of the piping lane not yet Protective device is set, security risk is easily caused.
Summary of the invention
Face the purpose of the present invention is to provide a kind of building site and build underground pipe gallery and construction method, it is intended to solve existing building site The technical issues of use of piping lane has a single function, blocking easily occurs and causes security risk.
To achieve the above object, the technical solution adopted by the present invention is that: a kind of building site be provided face and build underground pipe gallery, comprising:
Piping lane main body, the length direction along piping lane is horizontally disposed, and upper end is equipped with opening, and is hinged in side for covering The cover board of opening, the cover board are engraved structure and circulate for rainwater;
Piping lane reinforcement assembly, packet is set on the outer wall of the piping lane main body, for reinforcing the piping lane main body;
Driving mechanism is movably arranged on the piping lane reinforcement assembly, for driving the cover board to rotate;
Drain assembly for being discharged remaining rainwater in the piping lane main body, including is set on the piping lane main body bottom plate Be lauched leakage, the main sewer on the outside of the piping lane main body and connection it is described be lauched leakage the main sewer between Pre-buried drainpipe;
Conduit assembly is used for support drainage pipeline on the inner sidewall of the piping lane main body;
CA cable assembly is used for support cable on the inner sidewall of the piping lane main body;With
Filter assemblies are set under the cover board for filtering the rain and impurity flowed into the piping lane main body, including laterally First filter screen of side and the second filter screen being vertically set on the piping lane main body bottom plate.
Further, the building site face build underground pipe gallery further include maintenance component, the maintenance component include setting in institute State the maintenance platform of piping lane body interior and the maintenance car being arranged on the maintenance platform;The maintenance car is used for the pipe Road component, the CA cable assembly and the filter assemblies repair use.
Further, the conduit assembly include the draining sliding rail being installed on the piping lane main body inner sidewall and with institute State several draining brackets that draining sliding rail is slidably connected;It is connected on the draining sliding rail sliding for limiting the draining bracket The mounting height of dynamic limited block, the draining bracket is fixed by means of the limited block;
The draining bracket is L-shaped, and is used for support drainage pipeline.
Further, the driving mechanism include with the bracket of the magnetic-type connection of piping lane reinforcement assembly, be hinged on institute State the telescoping cylinder of cradle top and the snap ring being located on the cover board;The snap ring is in " 8 " font, and one end and the cover board are cut with scissors It connects, the ejection end of the other end and the telescoping cylinder is hinged, and the cover board is rotated by means of the flexible of the telescoping cylinder.
Further, the CA cable assembly include the cable fixed mount being installed on the piping lane main body inner sidewall and with institute State the cable tray for support cable of cable fixed mount mounting.
Further, the cable fixed mount is equipped with multiple first hooks, and the end of the cable tray is equipped with and institute State the second hook that the first hook matches mounting;
The cable tray includes master carrier and is uniformly arranged the Small bracket in the master carrier two sides, and the Small bracket is used In support cable, the end of the master carrier is arranged in second hook.
Further, the inner sidewall of the piping lane main body is equipped with multiple card convexs for the first filter screen described in support, First filter screen is overlapped in multiple card convexs simultaneously detachable.
Further, the bottom plate of the piping lane main body is equipped with multiple shackle members for the second filter screen described in clamping, The shackle member is filtered with the center line symmetrical setting of the piping lane main body length direction for vertically fixing described second Net.
Further, the side of the maintenance platform is installed with the baffle for entering the maintenance car for blocking impurity, institute Baffle is stated in fold-line-shaped.
Further, the bottom of the piping lane reinforcement assembly is installed with piping lane base plate, the two sides of the piping lane base plate It is fixed in zanjon by anchor pile.
Face the construction method for building underground pipe gallery the present invention also provides a kind of building site: being included in front of the piping lane main body construction first Construction location and the piping lane base plate to the piping lane main body carry out line setting, release the position of the piping lane main body Line, sideline and excavating sideline;
Anchor pile is worn when cutting depth reaches the bottom surface absolute altitude of the piping lane base plate according to excavating sideline grooving It crosses the piping lane base plate and is fixed in zanjon;
According to the center line of the piping lane base plate, the position line of the piping lane main body is released, according to the piping lane The position line of main body installs the piping lane main body, and it is integral to consolidate the piping lane main body with the piping lane base plate;
After the piping lane main body configures acceptance(check) paragraph by paragraph, the cover board is installed in piecewise configuration, makes the cover board and institute It is hinged to state piping lane main body, after being adjusted in place to the cover board, seam crossing is sealed between every section of the piping lane main body;
The groove for installing the main sewer is excavated in the side of the piping lane base plate, it is first piecewise in the trench It is laid with the base plate, and the piecewise laying main sewer on the base plate, and makes the pre-buried drainpipe and institute State main sewer connection;
The card convex is installed on the side wall of the piping lane main body, the shackle member is installed on bottom plate, in the piping lane master The conduit assembly, the CA cable assembly, the filter assemblies and the maintenance component are installed, when needing to open the lid in body When plate, the driving mechanism can be installed on the piping lane reinforcement assembly similar in the piping lane main body to be opened.
A kind of building site provided by the invention, which is faced, to be built the beneficial effect of underground pipe gallery and construction method and is: with prior art phase Than the present invention, which faces in a kind of building site, builds underground pipe gallery and construction method, and piping lane main body carries cable duct, rain rill and supply and discharge ditch etc. Function is surrounded by piping lane reinforcement assembly on the outer wall of piping lane main body, can reinforce the stability of piping lane main body, in piping lane main body The cover board of upper setting can cover piping lane main body, and flow through rainwater from cover board, and cover board can be rotated by means of driving mechanism, Be conducive to open observation piping lane main body, when rainwater arrival piping lane body interior, and be flowed along the length direction of piping lane main body;Setting Filter assemblies can filter the impurity in rainwater, block piping lane main body not, when having remaining rainwater in piping lane main body, pass through Drain assembly can be discharged, and maintenance piping lane body interior is drying regime, the use for solving existing building site piping lane has a single function, The technical issues of blocking easily occurs and causes security risk, has the function of the use for increasing piping lane, is collection cable duct, rain rill With supply and discharge ditch in the comprehensive piping lane of one, piping lane main body is covered and can be raised by cover board, avoids security risk, filtering group Part can be by the contaminant filter in rainwater, the technical effect for phenomena such as avoiding blocking.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without creative efforts, can also be attached according to these Figure obtains other attached drawings.
Fig. 1 is that the structural schematic diagram for building underground pipe gallery is faced in a kind of building site provided in an embodiment of the present invention;
Fig. 2 is that the conduit assembly structural schematic diagram for building underground pipe gallery is faced in a kind of building site provided in an embodiment of the present invention;
Fig. 3 is that the CA cable assembly structural schematic diagram for building underground pipe gallery is faced in a kind of building site provided in an embodiment of the present invention;
Fig. 4 is enlarged drawing at the A in Fig. 1.
In figure: 1, piping lane main body;11, cover board;12, card convex;13, shackle member;14, groove;15, connecting rod;2, piping lane is reinforced Component;3, driving mechanism;31, bracket;32, telescoping cylinder;33, snap ring;34, magnet;4, drain assembly;41, it is lauched leakage;42, it arranges Supply mains;43, pre-buried drainpipe;5, conduit assembly;51, sliding rail, 52, draining bracket are drained;53, limited block;6, CA cable assembly; 61, cable fixed mount;62, cable tray;621, master carrier;622, Small bracket;63, the first hook;64, the second hook;7, mistake Filter component;71, the first filter screen;72, the second filter screen;8, component is repaired;81, maintenance platform;82, maintenance car;83, baffle; 9, piping lane base plate;91, anchor pile;10, base plate.
Specific embodiment
In order to which technical problems, technical solutions and advantages to be solved are more clearly understood, tie below Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only To explain the present invention, it is not intended to limit the present invention.
Also referring to Fig. 1-Fig. 4, now a kind of building site provided by the invention is faced and builds underground pipe gallery and is illustrated.Described one Kind of building site, which is faced, builds underground pipe gallery, including piping lane main body 1, piping lane reinforcement assembly 2, driving mechanism 3, drain assembly 4, conduit assembly 5, CA cable assembly 6 and filter assemblies 7.
Piping lane main body 1 is horizontally disposed along the length direction of piping lane, and upper end is equipped with opening, and is hinged in side for covering The cover board 11 of opening, cover board 11 are engraved structure and circulate for rainwater.Length direction of the piping lane main body 1 along the zanjon excavated Successively arrange, it is end to end.
The packet of piping lane reinforcement assembly 2 is set on the outer wall of piping lane main body 1, for reinforcing piping lane main body 1, by piping lane main body 1 Outer wall surrounds.
Driving mechanism 3 is movably arranged on piping lane reinforcement assembly 2 simultaneously detachably, for driving cover board 11 in piping lane main body 1 Rotation, for the open or close to piping lane main body 1.
Drain assembly 4 is for being discharged remaining rainwater in piping lane main body 1, including being set to being lauched on 1 bottom plate of piping lane main body Leakage 41, the main sewer 42 set on 1 outside of piping lane main body and connection are in the pre-buried row being lauched between leakage 41 and main sewer 42 Water pipe 43.Remaining rainwater in piping lane main body 1 can flow in pre-buried drainpipe 43 from being lauched in leakage 41, it is total to then pass to draining It is focused in pipe 42.
Conduit assembly 5 is set on the inner sidewall of piping lane main body 1, is used for support drainage pipeline.
CA cable assembly 6 is set on the inner sidewall of piping lane main body 1, is used for support cable.
Filter assemblies 7 are used to filter the rain and impurity flowed into piping lane main body 1, including be laterally set to below cover board 11 the One filter screen 71 and vertical the second filter screen 72 on 1 bottom plate of piping lane main body.
A kind of building site provided by the invention, which is faced, builds underground pipe gallery, compared with prior art, the carrying of piping lane main body 1 cable duct, The functions such as rain rill and supply and discharge ditch, are surrounded by piping lane reinforcement assembly 2 on the outer wall of piping lane main body 1, can reinforce piping lane master The stability of body 1, the cover board 11 being arranged in piping lane main body 1 can cover piping lane main body 1, and flow through rainwater from cover board 11, Cover board 11 can be rotated by means of driving mechanism 3, be conducive to open observation piping lane main body 1, when rainwater reaches in piping lane main body 1 Portion, and flowed along the length direction of piping lane main body 1;The filter assemblies 7 of setting can filter the impurity in rainwater, make piping lane main body 1 It does not block, when having remaining rainwater in piping lane main body 1, can be discharged by drain assembly 4, maintain inside piping lane main body 1 to be dry The technical issues of dry state, the use for solving existing building site piping lane has a single function, blocking easily occurs and causes security risk, Have the function of the use for increasing piping lane, is to integrate cable duct, rain rill and the comprehensive piping lane in supply and discharge ditch, cover board 11 Piping lane main body 1 is covered and can be raised, avoids security risk, the contaminant filter in rainwater can be avoided occurring by filter assemblies 7 The technical effect of phenomena such as blocking.
In a specific embodiment, arc convex is equipped among the bottom plate of piping lane main body 1, the arc convex is for being discharged Rainwater flows rainwater to two sides.Base plate 10 is equipped in excavating the zanjon finished, the base plate 10 is total for support draining Pipe 42, for preventing main sewer 42 from deforming in zanjon.
In a specific embodiment, the section of piping lane main body 1 is U-shaped, and the section of piping lane reinforcement assembly 2 is also U-shaped, rain Water is flowed through from cover board 11, and one end of cover board 11 and the side of piping lane main body 1 are hinged, passes through 3 open or close of driving mechanism.If The depth for setting main sewer 42 is lower than the depth for being lauched leakage 41, the i.e. lower section that is located at piping lane main body 1 of main sewer 42, according to naturally The effect of gravity, the rainwater in piping lane main body 1 can be flow in main sewer 42 along pre-buried drainpipe 43, make piping lane main body 1 Middle holding drying, does not influence to use.After rainwater-collecting in main sewer 42, it flow in rainwater collection pool and is handled.
Face a kind of specific embodiment for building underground pipe gallery as a kind of building site provided by the invention, referring to Fig. 1, building site Face that build underground pipe gallery further include maintenance component 8, maintenance component 8 includes that maintenance platform 81 piping lane main body 1 inside is arranged in and sets Set the maintenance car 82 on maintenance platform 81;Maintenance car 82 is for tieing up conduit assembly 5, CA cable assembly 6 and filter assemblies 7 Repair use.Maintenance platform 81 is used to support maintenance car 82, is placed with maintenance tool in maintenance car 82, when piping lane main body 1 has crackle When, conduit assembly 5 mounting height when needing to adjust, when the installation site of CA cable assembly 6 needs to adjust, placement can be passed through Maintenance tool in maintenance car 82 repairs, and operation is relatively convenient, eliminate also to be found from ground maintenance tool into Row maintenance, saves maintenance time, can on-call maintenance.
In a specific embodiment, the height of maintenance platform 81 is higher than the height of the bottom plate of piping lane main body 1, and effect is to work as In piping lane main body 1 when circulation rain, rainwater is unlikely to cover maintenance platform 81, guarantees that maintenance platform 81 does not weather.In addition It is set to damp-proof device on maintenance car 82, is used for maintenance tool moisture proof.Damp-proof device is moisture seal band, can wrap maintenance car 82 Dress sealing, is connected between maintenance car 82 and maintenance platform 81 by chain, so the flow of rainwater is larger when there is biggish rainwater When, first is that maintenance car 82 will not be brewed, second is that not will cause 82 humidity of maintenance car, it ensure that the normal use of maintenance tool.
Face a kind of specific embodiment for building underground pipe gallery as a kind of building site provided by the invention, please refers to Fig. 1 and figure 2, conduit assembly 5 includes the draining sliding rail 51 being installed on 1 inner sidewall of piping lane main body and is slidably connected with draining sliding rail 51 Several draining brackets 52;It is connected with the limited block 53 slided for limiting draining bracket 52 on draining sliding rail 51, drains bracket 52 mounting height is fixed by means of limited block 53;It is L-shaped to drain bracket 52, and is used for support drainage pipeline.Drain bracket 52 height on draining sliding rail 51 is adjustable, and then adjustable drainage pipeline is located at the height inside piping lane main body 1, adjusts Section mode is simple, easy to adjust and practical.
In a specific embodiment, draining sliding rail 51 is bolted on the inner sidewall of piping lane main body 1, and draining is slided Rail 51 is equipped with track, and the surface that draining bracket 52 and draining sliding rail 51 contact with each other is equipped with sliding slot, then sliding slot and track phase Mutually sliding connection, and then the position that can be located at by draining bracket 52 on draining sliding rail 51, adjustable support supply and discharge The bearing height of waterpipe.
In a specific embodiment, for the ease of fixing behind the position for regulating draining bracket 52, pass through limited block 53 be connected to draining sliding rail 51 on limited, and then can fix draining bracket 52 be located at draining sliding rail 51 on position.Limit Position block 53 be inverted U, just can clamping it is in orbit, on limited block 53 be equipped with anti-slip layer, when limited block 53 is clamped on track After upper, the frictional force between limited block 53 and track can be increased by anti-slip layer, then draining can be fixed on by draining bracket 52 On sliding rail 51, and then the effect for adjusting support drainage pipeline height being realized, this regulative mode is fairly simple, flexibly, with When can adjust.
Face a kind of specific embodiment for building underground pipe gallery as a kind of building site provided by the invention, please refers to Fig. 1 and figure 4, driving mechanism 3 include with the bracket 31 of the magnetic-type connection of piping lane reinforcement assembly 2, be hinged on the top of bracket 31 telescoping cylinder 32 and The snap ring 33 being located on cover board 11;Snap ring 33 is in " 8 " font, and one end and cover board 11 are hinged, the ejection of the other end and telescoping cylinder 32 End is hinged, and cover board 11 is rotated by means of the flexible of telescoping cylinder 32.When needing to open piping lane main body 1, driving machine can be passed through Structure 3 drives cover board 11 to rotate, and controls the collapsing length of telescoping cylinder 32, can control the opening space size of cover board 11, realize The full opening or half opened condition of piping lane main body 1.
In a specific embodiment, the bottom of bracket 31 is equipped with magnet 34, also is provided in the inside of piping lane reinforcement assembly 2 Magnet 34, two equal bands of magnet 34 are magnetic and can attract each other, and one is the pole N, another is the pole S, when bracket 31 is mounted on After on piping lane reinforcement assembly 2, bracket 31 can be attracted by magnetic attraction, realize the fixation of bracket 31.Wherein telescoping cylinder 32 is Electric expansion cylinder, being plugged on may be implemented flexible function on power supply, and then can open or close to cover board 11.It is covering Plate 11 is equipped with a groove 14, and the inside of groove 14 is equipped with a connecting rod 15, and 15 both ends of connecting rod are separately connected two sides of groove 14 Wall, tool is there are two cyclic structure on snap ring 33, one of cyclic structure and connecting rod 15 is hinged, another cyclic structure and flexible The ejection end of cylinder 32 is hinged.Articulated link chain between snap ring 33 and telescoping cylinder 32 can be dismantled, can be with when not using telescoping cylinder 32 Bracket 31 is disassembled from piping lane reinforcement assembly 2, while telescoping cylinder 32 being disassembled from snap ring 33, then snap ring 33 is just The space on ground can be not take up in groove 14.
Face a kind of specific embodiment for building underground pipe gallery as a kind of building site provided by the invention, please refers to Fig. 1 and figure 3, CA cable assembly 6 includes the cable fixed mount 61 being installed on 1 inner sidewall of piping lane main body and the use with the mounting of cable fixed mount 61 In the cable tray 62 of support cable.The cable of municipal administration is placed on cable tray 62 by support, cable not with rain Water contact, is also not take up ground space.
Face a kind of specific embodiment for building underground pipe gallery as a kind of building site provided by the invention, please refers to Fig. 1 and figure 3, cable fixed mount 61 is equipped with multiple first hooks 63, and the end of cable tray 62, which is equipped with, matches mounting with the first hook 63 Second hook 64;First hook 63 and the second mutually mounting of hook 64, cable tray 62 are articulated in the first different hooks 63 On, the adjustment of the position to cable tray 62 may be implemented.
Cable tray 62 includes master carrier 621 and is uniformly arranged the Small bracket 622 in 621 two sides of master carrier, Small bracket 622 For support cable, the end of master carrier 621 is arranged in the second hook 64.Small bracket 622 be located at the two sides of master carrier 621 and It being arranged side by side, cable can be placed on Small bracket 622, be suitble to the placement of multi-cable line, cable is placed in piping lane, Ground space is saved, and advantageous to installation and maintenance.
Face a kind of specific embodiment for building underground pipe gallery as a kind of building site provided by the invention, referring to Fig. 1, piping lane The inner sidewall of main body 1 is equipped with multiple card convexs 12 for the first filter screen 71 described in support, and the first filter screen 71 is overlapped on more It is in a card convex 12 and detachable.First filter screen 71 plays the role of the rain impurities in water that filtering flows into piping lane main body 1, miscellaneous Matter can't pass the first filter screen 71, be filtered, and multiple card convexs 12 are all in the same horizontal plane, and be used to support the first filter screen 71, in addition the first filter screen 71 can also be disassembled from card convex 12, when needing to clean the first filter screen 71, open cover board 11, directly removed from card convex 12.
Face a kind of specific embodiment for building underground pipe gallery as a kind of building site provided by the invention, referring to Fig. 1, piping lane The bottom plate of main body 1 is equipped with multiple shackle members 13 for the second filter screen of clamping 72, and shackle member 13 is with 1 length side of piping lane main body To center line symmetrical setting, and for vertically fixing the second filter screen 72.Shackle member 13 is stainless steelwork.Shackle member 13 Bottom end is fixed on the bottom plate of piping lane main body 1, and upper end is card slot type structure and is used to fix the second filter screen 72, the second filter screen 72 are plugged in shackle member 13, can be fixed by the second filter screen 72 by multiple shackle members 13.Second filter screen 72 plays pair The effect of the dmp filter to circulate in piping lane main body 1, due to there is the filtering of the first filter screen 71, then the second filter screen 72 also can It on the basis of the first filter screen 71, is further filtered, plays the role of double-stage filtering, make finally to flow at rainwater Rainwater at reason is without impurity etc..
In a specific embodiment, pore size filter of the pore size filter of the first filter screen 71 less than the second filter screen 72.
Face a kind of specific embodiment for building underground pipe gallery as a kind of building site provided by the invention, referring to Fig. 1, maintenance The side of platform 81 is installed with the baffle 83 for entering maintenance car 82 for blocking impurity, and baffle 83 is in fold-line-shaped.Baffle 83 is not Rust steelwork is made, and can play the role of blocking maintenance platform 81 and maintenance car 82 to flow into the rainwater of piping lane main body 1, make to repair Platform 81 and maintenance car 82 reduce the impact of rainwater.
Face a kind of specific embodiment for building underground pipe gallery as a kind of building site provided by the invention, referring to Fig. 1, piping lane The bottom of reinforcement assembly 2 is installed with piping lane base plate 9, and the two sides of piping lane base plate 9 pass through the fixed depth excavated of anchor pile 91 In ditch.In order to reinforce the stability of piping lane main body 1 and piping lane reinforcement assembly 2, increase fixed piping lane in excavating the zanjon completed Base plate 9, piping lane base plate 9 is fixed in the zanjon of excavation by anchor pile 91, and then has consolidated piping lane reinforcement assembly 2.
Fig. 1-4 is please referred to, now a kind of building site provided by the invention is faced and builds the construction method of underground pipe gallery and is illustrated.Institute State a kind of building site and face the construction method for building underground pipe gallery: including before piping lane main body 1 is constructed first to the construction location of piping lane main body 1 And piping lane base plate 9 carries out line setting, releases the position line, sideline and the excavating sideline of piping lane main body 1;
Anchor pile 91 is passed through when cutting depth reaches the bottom surface absolute altitude of piping lane base plate 9 according to excavating sideline grooving Piping lane base plate 9 is simultaneously fixed in zanjon;
According to the center line of piping lane base plate 9, the position line of piping lane main body 1 is released, according to the position of piping lane main body 1 Line installs piping lane main body 1, and it is integral to consolidate piping lane main body 1 with piping lane base plate 9;
For piping lane main body 1 paragraph by paragraph after configuration acceptance(check), cover board 11 is installed in piecewise configuration, makes cover board 11 and piping lane main body 1 Hingedly, after being adjusted in place to cover board 11, seam crossing is sealed between every section of piping lane main body 1;
The groove for installing main sewer 42 is excavated in the side of piping lane base plate 9, first piecewise laying in the trench Base plate 10, and piecewise laying main sewer 42 on base plate 10, and it is connected to pre-buried drainpipe 43 with main sewer 42;
Card convex 12 is installed on the side wall of piping lane main body 1, shackle member 13 is installed on bottom plate, is installed in piping lane main body 1 Conduit assembly 5, CA cable assembly 6, filter assemblies 7 and maintenance component 8 can be in piping lanes to be opened when needing to open cover board 11 Driving mechanism 3 is installed on the similar piping lane reinforcement assembly 2 of main body 1.
In a specific embodiment, card convex 12 is fixed in piping lane main body 1 by rivet, two adjacent piping lanes It is closely knit by mortar injection between main body 1, so that rainwater is not leaked outside from the gap of piping lane main body 1, achievees the effect that sealing.Pipe The length direction center line of corridor main body 1 will guarantee to be overlapped with the length direction center line of piping lane reinforcement assembly 2, and the consolidation of the two Combined and fixed using mortar injection or filling concrete, the section of piping lane main body 1 is U-shaped, production cover board 11 with a thickness of 90mm, There are certain height difference between cover board 11 and piping lane reinforcement assembly 2, effect is that rainwater is avoided to be deposited at the top of piping lane.Production pipe Corridor main body 1 with a thickness of 100mm, the thickness of piping lane reinforcement assembly 2 is also 100mm.When needing to clean drain assembly 4, draining Component 4 can be disassembled from piping lane main body 1, and cover board 11 covers piping lane main body 1, can drive lid by the driving mechanism 3 of setting Plate 11 rotates, and can operate to the inside of piping lane main body 1.
The construction method for building underground pipe gallery is faced in a kind of building site provided by the invention, and compared with prior art, piping lane main body 1 is held The functions such as download cable ditch, rain rill and supply and discharge ditch, are surrounded by piping lane reinforcement assembly 2, Neng Goujia on the outer wall of piping lane main body 1 The stability of strong piping lane main body 1, the cover board 11 being arranged in piping lane main body 1 can cover piping lane main body 1, and make rainwater from cover board 11 In flow through, cover board 11 can be rotated by means of driving mechanism 3, be conducive to open observation piping lane main body 1, when rainwater reach piping lane Inside main body 1, and flowed along the length direction of piping lane main body 1;The filter assemblies 7 of setting can filter the impurity in rainwater, make pipe Corridor main body 1 does not block, and when having remaining rainwater in piping lane main body 1, can be discharged by drain assembly 4, maintains in piping lane main body 1 Portion is drying regime, has the function of the use for increasing piping lane, and construction method is simple, and the construction time is short, and progress is fast, piping lane main body It is to integrate cable duct, rain rill and the comprehensive piping lane in supply and discharge ditch, piping lane main body 1 is covered and can be raised by cover board 11, Avoid security risk, filter assemblies 7 can be by the contaminant filter in rainwater, the technical effect for phenomena such as avoiding blocking.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of building site, which is faced, builds underground pipe gallery characterized by comprising
Piping lane main body, the length direction along piping lane is horizontally disposed, and upper end is equipped with opening, and is hinged in side for covering opening Cover board, the cover board be engraved structure and for rainwater circulate;
Piping lane reinforcement assembly, packet is set on the outer wall of the piping lane main body, for reinforcing the piping lane main body;
Driving mechanism is movably arranged on the piping lane reinforcement assembly, for driving the cover board to rotate;
Drain assembly, for remaining rainwater in the piping lane main body to be discharged, under being set on the piping lane main body bottom plate Water leakage, the main sewer on the outside of the piping lane main body and connection it is described be lauched leakage the main sewer between it is pre- Bury drainpipe;
Conduit assembly is used for support drainage pipeline on the inner sidewall of the piping lane main body;
CA cable assembly is used for support cable on the inner sidewall of the piping lane main body;With
Filter assemblies, for filtering the rain and impurity flowed into the piping lane main body, including being laterally set to below the cover board First filter screen and the second filter screen being vertically set on the piping lane main body bottom plate.
2. a kind of building site as described in claim 1, which is faced, builds underground pipe gallery, which is characterized in that the building site, which is faced, builds underground pipe gallery also Including repairing component, the maintenance component includes that the maintenance platform of the piping lane body interior is arranged in and is arranged in the maintenance Maintenance car on platform;The maintenance car is for tieing up the conduit assembly, the CA cable assembly and the filter assemblies Repair use.
3. a kind of building site as described in claim 1, which is faced, builds underground pipe gallery, which is characterized in that the conduit assembly includes being installed in Draining sliding rail on the piping lane main body inner sidewall and several draining brackets being slidably connected with the draining sliding rail;It is described Draining sliding rail on be connected with for limit it is described draining bracket sliding limited block, it is described draining bracket mounting height by means of The limited block is fixed;
The draining bracket is L-shaped, and is used for support drainage pipeline.
4. a kind of building site as described in claim 1, which is faced, builds underground pipe gallery, which is characterized in that the driving mechanism include with it is described The bracket of the magnetic-type connection of piping lane reinforcement assembly, the card for being hinged on the telescoping cylinder of the cradle top and being located on the cover board Ring;The snap ring is in " 8 " font, and one end and the cover board are hinged, and the ejection end of the other end and the telescoping cylinder is hinged, the lid Plate is rotated by means of the flexible of the telescoping cylinder.
5. a kind of building site as described in claim 1, which is faced, builds underground pipe gallery, which is characterized in that the CA cable assembly includes being installed in Cable fixed mount on the piping lane main body inner sidewall and the cable for support cable with cable fixed mount mounting Bracket.
6. a kind of building site as claimed in claim 5, which is faced, builds underground pipe gallery, which is characterized in that the cable fixed mount is equipped with more A first hook, the end of the cable tray are equipped with the second hook that mounting is matched with first hook;
The cable tray includes master carrier and is uniformly arranged the Small bracket in the master carrier two sides, and the Small bracket is for holding Cable is held in the palm, the end of the master carrier is arranged in second hook.
7. a kind of building site as described in claim 1, which is faced, builds underground pipe gallery, which is characterized in that on the inner sidewall of the piping lane main body Equipped with multiple card convexs for the first filter screen described in support, first filter screen is overlapped in multiple card convexs and removable It unloads.
8. a kind of building site as described in claim 1, which is faced, builds underground pipe gallery, which is characterized in that set on the bottom plate of the piping lane main body There are multiple shackle members for the second filter screen described in clamping, the shackle member is with the center line of the piping lane main body length direction It is symmetrical arranged, and for vertically fixing second filter screen;
The bottom of the piping lane reinforcement assembly is installed with piping lane base plate, and the two sides of the piping lane base plate are fixed by anchor pile In zanjon.
9. a kind of building site as claimed in claim 2, which is faced, builds underground pipe gallery, which is characterized in that the side of the maintenance platform is fixed There is the baffle for entering the maintenance car for blocking impurity, the baffle is in fold-line-shaped.
10. the construction method for building underground pipe gallery is faced in a kind of building site for constructing claim 1-9 any one, which is characterized in that packet Include: before the piping lane main body construction first the construction location to the piping lane main body and the piping lane base plate carry out positioning put Line releases the position line, sideline and the excavating sideline of the piping lane main body;
According to excavating sideline grooving, when cutting depth reaches the bottom surface absolute altitude of the piping lane base plate, anchor pile is passed through into institute It states piping lane base plate and is fixed in zanjon;
According to the center line of the piping lane base plate, the position line of the piping lane main body is released, according to the piping lane main body The position line, the piping lane main body is installed, and it is integral to consolidate the piping lane main body and the piping lane base plate;
After the piping lane main body configures acceptance(check) paragraph by paragraph, the cover board is installed in piecewise configuration, makes the cover board and the pipe Corridor main body is hinged, and after being adjusted in place to the cover board, seam crossing is sealed between every section of the piping lane main body;
The groove for installing the main sewer is excavated in the side of the piping lane base plate, first piecewise laying in the trench The base plate, and the piecewise laying main sewer on the base plate, and make the pre-buried drainpipe and the row Supply mains's connection;
The card convex is installed on the side wall of the piping lane main body, the shackle member is installed on bottom plate, in the piping lane main body The conduit assembly, the CA cable assembly, the filter assemblies and the maintenance component are installed, when needing to open the cover board When, the driving mechanism is installed on the piping lane reinforcement assembly similar in the piping lane main body to be opened.
CN201910671873.8A 2019-07-24 2019-07-24 Building site temporary construction underground pipe gallery and construction method Active CN110273434B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910671873.8A CN110273434B (en) 2019-07-24 2019-07-24 Building site temporary construction underground pipe gallery and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910671873.8A CN110273434B (en) 2019-07-24 2019-07-24 Building site temporary construction underground pipe gallery and construction method

Publications (2)

Publication Number Publication Date
CN110273434A true CN110273434A (en) 2019-09-24
CN110273434B CN110273434B (en) 2024-07-30

Family

ID=67965367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910671873.8A Active CN110273434B (en) 2019-07-24 2019-07-24 Building site temporary construction underground pipe gallery and construction method

Country Status (1)

Country Link
CN (1) CN110273434B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021412A (en) * 2019-12-30 2020-04-17 花王生态工程股份有限公司 Underground comprehensive pipe gallery
CN111705834A (en) * 2020-06-19 2020-09-25 诸葛磊 Underground pipe profile water supply and drainage device
CN112227496A (en) * 2020-09-29 2021-01-15 何滔 Multifunctional comprehensive subway drainage ditch structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205399633U (en) * 2016-03-06 2016-07-27 孙之伟 Municipal administration road drainage structure
CN206467692U (en) * 2017-01-23 2017-09-05 广东首汇蓝天工程科技有限公司 Pipe gallery escape hole cover
CN107268689A (en) * 2017-06-27 2017-10-20 中国市政工程西北设计研究院有限公司 Prevent road rain water from entering the safety device and application system of underground pipe gallery
CN206712345U (en) * 2017-04-19 2017-12-05 青岛土木建工集团有限公司 A kind of construction cable clip
KR101895753B1 (en) * 2018-03-21 2018-09-06 (주)국제광엔지니어링 Boundary stone carrying cables
CN108755904A (en) * 2018-06-01 2018-11-06 衢州市科诚技术开发有限公司 A kind of novel municipal drainage system
CN109950854A (en) * 2019-03-18 2019-06-28 常州市绿佳环保设备有限公司 For the monoblock type composite material cable in tunnel, gutter
CN210315661U (en) * 2019-07-24 2020-04-14 中国建筑第七工程局有限公司 Underground pipe gallery is faced in building site

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205399633U (en) * 2016-03-06 2016-07-27 孙之伟 Municipal administration road drainage structure
CN206467692U (en) * 2017-01-23 2017-09-05 广东首汇蓝天工程科技有限公司 Pipe gallery escape hole cover
CN206712345U (en) * 2017-04-19 2017-12-05 青岛土木建工集团有限公司 A kind of construction cable clip
CN107268689A (en) * 2017-06-27 2017-10-20 中国市政工程西北设计研究院有限公司 Prevent road rain water from entering the safety device and application system of underground pipe gallery
KR101895753B1 (en) * 2018-03-21 2018-09-06 (주)국제광엔지니어링 Boundary stone carrying cables
CN108755904A (en) * 2018-06-01 2018-11-06 衢州市科诚技术开发有限公司 A kind of novel municipal drainage system
CN109950854A (en) * 2019-03-18 2019-06-28 常州市绿佳环保设备有限公司 For the monoblock type composite material cable in tunnel, gutter
CN210315661U (en) * 2019-07-24 2020-04-14 中国建筑第七工程局有限公司 Underground pipe gallery is faced in building site

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021412A (en) * 2019-12-30 2020-04-17 花王生态工程股份有限公司 Underground comprehensive pipe gallery
CN111705834A (en) * 2020-06-19 2020-09-25 诸葛磊 Underground pipe profile water supply and drainage device
CN111705834B (en) * 2020-06-19 2021-09-28 诸葛磊 Underground pipe profile water supply and drainage device
CN112227496A (en) * 2020-09-29 2021-01-15 何滔 Multifunctional comprehensive subway drainage ditch structure
CN112227496B (en) * 2020-09-29 2022-02-01 何滔 Multifunctional comprehensive subway drainage ditch structure

Also Published As

Publication number Publication date
CN110273434B (en) 2024-07-30

Similar Documents

Publication Publication Date Title
CN110273434A (en) A kind of building site, which is faced, builds underground pipe gallery and construction method
CN107938692B (en) Drainage and recharging construction method and structure
CA2793904C (en) Run-of-river power plant
CN106284412A (en) A kind of prefabricated pipe gallery and construction method
CN108385627B (en) Hydropower station diversion tunnel plugging construction method based on karst landform
CN106759781A (en) A kind of intelligent city rainwater regulating pondage system and its construction method
CN106758799B (en) System for reclaiming rainwater and its construction method for sponge urban interchange
CN112343654B (en) Maintainable drainage system for extremely water-rich stratum tunnel and tunnel
CN109056879A (en) A kind of riverway sludge cleaning plant and construction method
CN111005420B (en) Rainwater collection system and construction method thereof
KR20100054537A (en) Tunnel abutment precast block structure and drainage structure of new concept and method constructing abutment used by them
CN210315661U (en) Underground pipe gallery is faced in building site
CN108934654B (en) Ancient tree in-situ protection method in river regulation
CN107044150B (en) A kind of urban road rainwater penetration system and its construction method
CN205907698U (en) Full automatic water discharging device of sump pit
CN106759788B (en) A kind of sponge city Flood Pondage Action reclaiming system and its construction method
CN106836287B (en) A kind of construction method of pipe gallery
CN110578367A (en) Prefabricated vatch basin
CN103726514A (en) Anti-leakage structure and anti-leakage construction method for underground continuous wall
CN113914361A (en) Subway station cover-excavation construction method without road surface breaking
CN111622785A (en) Automatic overflow device for confined water at tunnel bottom and installation method thereof
CN112982319A (en) Structure and method for conducting diversion, emptying and water taking through dam foundation culvert
CN206887797U (en) Multifunctional road rhone
CN110541442A (en) rapid dredging rainwater inspection well structure and construction method thereof
RU2374398C1 (en) Sewage well and method for repair of water disposal system wells

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No. 267, economic development zone, Zhengzhou City, Henan Province, 450000

Applicant after: CHINA CONSTRUCTION SEVENTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 100176 No. 31 Building, 18 Fengchuang Science Park, Kechuang Thirteenth Street, Yizhuang Economic and Technological Development Zone, Daxing District, Beijing

Applicant before: CHINA CONSTRUCTION SEVENTH ENGINEERING DIVISION Corp.,Ltd.

CB02 Change of applicant information
GR01 Patent grant