CN111005391A - 便于取出的高强度组合支护桩 - Google Patents

便于取出的高强度组合支护桩 Download PDF

Info

Publication number
CN111005391A
CN111005391A CN201911217091.3A CN201911217091A CN111005391A CN 111005391 A CN111005391 A CN 111005391A CN 201911217091 A CN201911217091 A CN 201911217091A CN 111005391 A CN111005391 A CN 111005391A
Authority
CN
China
Prior art keywords
pile
positioning
supporting
main
supporting pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911217091.3A
Other languages
English (en)
Other versions
CN111005391B (zh
Inventor
张梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Mikang Construction Engineering Co.,Ltd.
Original Assignee
Jingmen Haozhi Machinery Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingmen Haozhi Machinery Technology Co Ltd filed Critical Jingmen Haozhi Machinery Technology Co Ltd
Priority to CN201911217091.3A priority Critical patent/CN111005391B/zh
Publication of CN111005391A publication Critical patent/CN111005391A/zh
Application granted granted Critical
Publication of CN111005391B publication Critical patent/CN111005391B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种便于取出的高强度组合支护桩,主要为眀挖作业前对采取支护措施时使用,属工程施工支护工具类。特点为采用组合拼装模式,组装快捷、组装后极大增加强度,可扩大与缩小,取出方便,可反复使用。技术方案是它由主支护桩、次支护桩组成;主支护桩上设有定位栓、渗水孔、主桩挂钩孔;次支护桩上设有导位槽、次桩挂钩孔、组装定位刻度线、外扩标记刻度线、就位标记槽;导位槽设有进槽口、上限位、下限位、外扩定位;主支护桩和次支护桩截面均为凹型;定位栓可在导位槽内移动,使得次支护桩嵌套在主支护桩中向外扩张或向内收缩。

Description

便于取出的高强度组合支护桩
技术领域
本发明主要用于地下眀挖作业前对土方采取支护措施时使用,属于工程施工边坡支护工具类。
背景技术
我国目前地下明挖作业在支护措施适用板桩时多采用直板型、槽型或Z字型钢。该板桩受材料自身性能影响,强度不高,在打入过程中容易出现变形;就位使用时,随着土方开挖易出现松动;工程完工土方回填后,受土方挤压,侧向摩擦力增大又难以取出,使得打桩过程中经常出现型钢板桩变形须取出更换后二次打入、开挖时型钢板桩出现松动难以加固、完工后型钢板桩取出时又难以拔出,给施工带来极大不便且浪费材料、增加费用。
发明内容
本发明克服了上述问题,它采用组合拼装模式,将不同尺寸槽钢连结成整体,组装快捷、组装后极大增加强度,并且可灵活扩大与缩小,扩大时增强对土体的挤压提高稳定性,缩小时减小与土体摩擦力,方便取出,在施工过程中还可以将本发明当作降水管井使用,具备多功能且可反复使用。
本发明提供一种便于取出的高强度组合支护桩,其特征在于:它是由主支护桩1、次支护桩2组成;主支护桩1上设有定位栓3、渗水孔4、主桩挂钩孔5;次支护桩2上设有导位槽6、次桩挂钩孔7、组装定位刻度线12、外扩标记刻度线13、就位标记槽14;导位槽6设有进槽口8、上限位9、下限位10、外扩定位11;主支护桩1和次支护桩2截面均为凹型,可由槽钢加工而成,底部与土体接触面均裁剪为三角锥形;次支护桩2尺寸小于主支护桩1,使得次支护桩2可以嵌套在主支护桩1内部;定位栓3至主支护桩1顶部的垂直距离与上限位9至次支护桩2顶部垂直距离、进槽口8至组装定位刻度线12的垂直距离相同;组装定位刻度线12至外扩标记刻度线13的垂直距离与进槽口8至下限位10的垂直距离相同;就位标记槽14至次支护桩2外壁的水平距离与下限位10至外扩定位11的水平距离相同;定位栓3可在导位槽6内移动,使得次支护桩2嵌套在主支护桩1中向外扩张或向内收缩。
使用时将次支护桩2的进槽口8对面向主支护桩1内部的定位栓3,调整次支护桩2位置使定位刻度线12应刚好对应于主支护桩1顶部,将次支护桩2压进主支护桩1内,定位栓3进入导位槽6;勾住主桩挂钩孔5,缓慢提起主支护桩1,定位栓3沿导位槽6进入上限位9,此时主支护桩1与次支护桩2顶部平齐且相互结合紧密,组装完成,强度得到提高;支护桩进入土体预定深度后,勾住次桩挂钩孔7,向上缓慢提起次支护桩2,定位栓3将沿导位槽6由上限位9到达下限位10,外扩标记刻度线13露出后停止上提次支护桩2,转为向下压次支护桩2,定位栓3将沿导位槽6由下限位10到达外扩定位11,就位标记槽14超出主支护桩1侧壁后停止下压,组合桩完成外扩;在此下压过程中,次支护桩2向主支护桩1外部扩出,桩体积增大,增加摩擦力,提高稳定性;地下水由渗水孔4进入组合后的桩内,在桩内放入吸水管后可起到降水管井作用;取出时勾住次桩挂钩孔7,向上提起次支护桩2,定位栓3将沿导位槽6由外扩定位11到达下限位10,在此上提过程中,次支护桩2向主支护桩1内部收缩,桩体积缩小,减小摩擦力,便于组合桩拔出。
附图说明
1-主支护桩;2-次支护桩;3-定位栓;4-渗水孔;5-主桩挂钩孔;6-导位槽;7-次桩挂钩孔;8-进槽口;9-上限位;10-下限位;11-外扩定位;12-定位刻度线;13-外扩标记刻度线;14-就位标记槽。
图1是主支护桩立体示意图。
图2是次支护桩立体示意图。
图3是次支护桩放入主支护桩时示意图。
图4是组合完成后示意图。
图5是组合桩进入预定深度开始外扩时示意图。
图6是组合桩外扩完成时示意图。
具体实施方式
下面结合附图阐明本发明的具体工作原理。
参见图1、图2、图3,当使用本发明时,将次支护桩2的进槽口8对面向主支护桩1内部的定位栓3,调整次支护桩2位置使定位刻度线12应刚好对应于主支护桩1顶部,将次支护桩2压进主支护桩1内,定位栓3进入导位槽6。
参见图4,勾住主桩挂钩孔5,缓慢提起主支护桩1,定位栓3沿导位槽6进入上限位9,此时主支护桩1与次支护桩2顶部平齐且相互结合紧密,组装完成,强度得到提高,可以开始向需要支护的土体打本组合支护桩。
参见图5、图6,支护桩进入土体预定深度后,勾住次桩挂钩孔7,向上缓慢提起次支护桩2,定位栓3将沿导位槽6由上限位9到达下限位10,外扩标记刻度线13露出后停止上提次支护桩2,转为向下压次支护桩2,定位栓3将沿导位槽6由下限位10到达外扩定位11,就位标记槽14超出主支护桩1侧壁后停止下压,组合桩完成外扩。

Claims (1)

1.一种便于取出的高强度组合支护桩,其特征在于:它是由主支护桩1、次支护桩2组成;主支护桩1上设有定位栓3、渗水孔4、主桩挂钩孔5;次支护桩2上设有导位槽6、次桩挂钩孔7、组装定位刻度线12、外扩标记刻度线13、就位标记槽14;导位槽6设有进槽口8、上限位9、下限位10、外扩定位11;主支护桩1和次支护桩2截面均为凹型,可由槽钢加工而成,底部与土体接触面均裁剪为三角锥形;次支护桩2尺寸小于主支护桩1,使得次支护桩2可以嵌套在主支护桩1内部;定位栓3至主支护桩1顶部的垂直距离与上限位9至次支护桩2顶部垂直距离、进槽口8至组装定位刻度线12的垂直距离相同;组装定位刻度线12至外扩标记刻度线13的垂直距离与进槽口8至下限位10的垂直距离相同;就位标记槽14至次支护桩2外壁的水平距离与下限位10至外扩定位11的水平距离相同;定位栓3可在导位槽6内移动,使得次支护桩2嵌套在主支护桩1中向外扩张或向内收缩。
CN201911217091.3A 2019-12-03 2019-12-03 便于取出的高强度组合支护桩 Active CN111005391B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911217091.3A CN111005391B (zh) 2019-12-03 2019-12-03 便于取出的高强度组合支护桩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911217091.3A CN111005391B (zh) 2019-12-03 2019-12-03 便于取出的高强度组合支护桩

Publications (2)

Publication Number Publication Date
CN111005391A true CN111005391A (zh) 2020-04-14
CN111005391B CN111005391B (zh) 2021-04-06

Family

ID=70113531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911217091.3A Active CN111005391B (zh) 2019-12-03 2019-12-03 便于取出的高强度组合支护桩

Country Status (1)

Country Link
CN (1) CN111005391B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10280400A (ja) * 1997-04-07 1998-10-20 Taiyo:Kk パイル内セメント抜取用具
KR100995831B1 (ko) * 2010-07-28 2010-11-22 (주)대흥이엔지 자립식 옹벽
CN208379601U (zh) * 2018-05-02 2019-01-15 南昌大学 一种可回收式基坑支护桩及拆装装置
CN110284492A (zh) * 2019-06-04 2019-09-27 山东钢铁股份有限公司 一种加强形h形与u形组合的钢板桩结构及打桩装置
CN110424416A (zh) * 2019-07-25 2019-11-08 宁夏大学 一种电磁排水抗滑桩及其施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10280400A (ja) * 1997-04-07 1998-10-20 Taiyo:Kk パイル内セメント抜取用具
KR100995831B1 (ko) * 2010-07-28 2010-11-22 (주)대흥이엔지 자립식 옹벽
CN208379601U (zh) * 2018-05-02 2019-01-15 南昌大学 一种可回收式基坑支护桩及拆装装置
CN110284492A (zh) * 2019-06-04 2019-09-27 山东钢铁股份有限公司 一种加强形h形与u形组合的钢板桩结构及打桩装置
CN110424416A (zh) * 2019-07-25 2019-11-08 宁夏大学 一种电磁排水抗滑桩及其施工方法

Also Published As

Publication number Publication date
CN111005391B (zh) 2021-04-06

Similar Documents

Publication Publication Date Title
CN102943486A (zh) 一种预制压入式地下连续墙及其施工方法
CN111608192A (zh) 在大直径漂石和砂岩地层中安装钢板桩的方法及装置
CN111005391B (zh) 便于取出的高强度组合支护桩
CN201581394U (zh) 大桩尖注浆预制桩
CN202559363U (zh) 一种钢结构地下连续墙基坑支护结构
CN113897977A (zh) 一种边坡拱形骨架基槽的开槽模具及开槽方法
CN212772371U (zh) 一种细长沉井结构
CN204040042U (zh) 一种超大超深人工挖孔桩支护结构
CN204551504U (zh) 一种用于渠道边坡衬砌工程修补的半潜水围堰
CN114484128B (zh) 一种用于水利工程建设的塑料管连接结构
CN102493436A (zh) 矩形抗滑桩人工掘进新工法
CN216108544U (zh) 一种边坡拱形骨架基槽的开槽模具
CN214695638U (zh) 一种新型水冲成孔型钢基坑支护装置
CN212801549U (zh) h形双排钢板桩支护结构
CN213538986U (zh) 一种深基坑边坡钢管桩排桩支护结构
CN211713981U (zh) 一种管道工程防护结构
CN208748638U (zh) 水下强夯法装置
CN202208909U (zh) 迁移底盘式自升降平台
CN108166487B (zh) 预应力空心桩的挡土方法
CN201873990U (zh) 干取土咬合型矩形灌注桩成桩装置
CN201314046Y (zh) 现浇十字形桩沉模装置
CN111894009A (zh) 一种逆作法拼装钢板桩支护结构及施工方法
CN113898002B (zh) 具有倒凸型承台结构的筒型结构风机基础及其施工方法
CN213038366U (zh) 一种桩基施工结构
CN216041193U (zh) 一种smw工法桩型钢拔除套筒

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Feng Cuilan

Inventor before: Zhang Liang

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221221

Address after: 277700 room 3, incubator, No. 3, science and Technology City, economic development zone, Lanling County, Linyi City, Shandong Province

Patentee after: Shandong kupin Intelligent Technology Co.,Ltd.

Address before: Room 101, 1st floor, building 27, West Yueyue Hubei Road, Duodao District, Jingmen high tech Zone, Hubei Province

Patentee before: Jingmen Haozhi Machinery Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240511

Address after: Room 6609, 2nd Floor, Building 4, Free Trade Industrial Park, No. 2168 Zhenghe Fourth Road, Fengdong New City, Xi'an City, Shaanxi Province, 710000

Patentee after: Xi'an Mikang Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 277700 room 3, incubator, No. 3, science and Technology City, economic development zone, Lanling County, Linyi City, Shandong Province

Patentee before: Shandong kupin Intelligent Technology Co.,Ltd.

Country or region before: China