CN108166487B - 预应力空心桩的挡土方法 - Google Patents

预应力空心桩的挡土方法 Download PDF

Info

Publication number
CN108166487B
CN108166487B CN201711414026.0A CN201711414026A CN108166487B CN 108166487 B CN108166487 B CN 108166487B CN 201711414026 A CN201711414026 A CN 201711414026A CN 108166487 B CN108166487 B CN 108166487B
Authority
CN
China
Prior art keywords
pile
prestressed hollow
section
soil
sinking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711414026.0A
Other languages
English (en)
Other versions
CN108166487A (zh
Inventor
易万君
何莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201711414026.0A priority Critical patent/CN108166487B/zh
Publication of CN108166487A publication Critical patent/CN108166487A/zh
Application granted granted Critical
Publication of CN108166487B publication Critical patent/CN108166487B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

本发明涉及土木工程领域,具体是一种预应力空心桩的挡土方法;其特征是:包括按顺序依次将各节预应力空心桩依次沉桩;将倒数第二节预应力空心桩沉桩至距地面标高0.3m;将圆形挡土钢板水平地放置在桩顶封板表面并点焊固定;将最后一节预应力空心桩起吊并与倒数第二节预应力空心桩对接;在最后一节预应力空心桩的桩身做沉桩标高标记;将最后一节预应力空心桩沉桩至设计标高。本发明通过在桩基工程施工阶段,在最后一节桩的接桩位置布置挡土钢板,阻止压力土及地下水进入最后一节桩桩芯内,后续土方开挖至基底桩孔内无需清土即可直接安装桩孔锚固钢筋。而挡土钢板完全阻断地下水通过桩孔渗入结构底板,对防止地下室渗漏也有一定作用。

Description

预应力空心桩的挡土方法
技术领域
本发明涉及土木工程领域,具体是一种预应力空心桩的挡土方法。
背景技术
土建基础分部工程前期的桩基子分部工程施工,预应力空心桩通常采取直接静力压入或锤击打入至设计标高。在基础工程施工阶段,必然存在桩芯内清土清淤的问题。设计填芯高度越高,清淤越困难,甚至因为低效清淤影响基础工程整体进度。
发明内容
本发明的目的在于提供一种可以防止桩孔内渗入大量淤泥从而加快施工效率的方法。
为了达到上述目的,本发明是这样实现的:
一种预应力空心桩的挡土方法,包括
步骤1、按顺序依次将各节预应力空心桩依次沉桩,直至倒数第二节预应力空心桩,
步骤2、将倒数第二节预应力空心桩沉桩至距地面标高0.3m;
步骤3、清扫倒数第二节预应力空心桩的桩顶并将圆形挡土钢板水平地放置在桩顶封板表面并点焊固定;
步骤4、将最后一节预应力节空心桩起吊并与倒数第二节预应力空心桩对接,调节最后一节预应力空心桩的桩身垂直度并对中;
步骤5、将上述两节预应力空心桩的桩口对接并焊接;
步骤6、在最后一节预应力空心桩的桩身做沉桩标高标记;
步骤7、将最后一节预应力空心桩沉桩至设计标高。
本发明通过在桩基工程施工阶段,在最后一节桩的接桩位置布置挡土钢板,阻止压力土及地下水进入最后一节桩桩芯内,后续土方开挖至基底桩孔内无需清土即可直接安装桩孔锚固钢筋,具有操作简单、节约劳力、经济环保等特点。而挡土钢板完全阻断地下水通过桩孔渗入结构底板,对防止地下室渗漏也有一定作用。
附图说明
图1为本发明安装方法示意图。
具体实施方式
以下通过具体实施例进一步说明本发明。
如图1所示,一种预应力空心桩的挡土方法,包括
步骤1、按顺序依次将各节预应力空心桩依次沉桩,直至倒数第二节预应力空心桩1,
步骤2、将倒数第二节预应力空心桩1沉桩至距地面标高0.3m;
步骤3、清扫倒数第二节预应力空心桩1的桩顶并将圆形挡土钢板2水平地放置在桩顶封板表面并点焊固定;
步骤4、将最后一节预应力节空心桩3起吊并与倒数第二节预应力空心桩1对接,调节最后一节预应力空心桩3的桩身垂直度并对中;
步骤5、将上述两节预应力空心桩的桩口对接并焊接;
步骤6、在最后一节预应力空心桩3的桩身做沉桩标高标记;
步骤7、将最后一节预应力空心桩3沉桩至设计标高。
本发明通过在桩基工程施工阶段,在最后一节桩的接桩位置布置挡土钢板,阻止压力土及地下水进入最后一节桩桩芯内,后续土方开挖至基底桩孔内无需清土即可直接安装桩孔锚固钢筋,具有操作简单、节约劳力、经济环保等特点。而挡土钢板完全阻断地下水通过桩孔渗入结构底板,对防止地下室渗漏也有一定作用。

Claims (1)

1.一种预应力空心桩的挡土方法,其特征是:包括
步骤1、按顺序依次将各节预应力空心桩依次沉桩,直至倒数第二节预应力空心桩,
步骤2、将倒数第二节预应力空心桩沉桩至距地面标高0.3m;
步骤3、清扫倒数第二节预应力空心桩的桩顶,并将圆形挡土钢板水平地放置在桩顶封板表面并点焊固定;
步骤4、将最后一节预应力空心桩起吊并与倒数第二节预应力空心桩对接,调节最后一节预应力空心桩的桩身垂直度并对中;
步骤5、将上述两节预应力空心桩的桩口对接并焊接;
步骤6、在最后一节预应力空心桩的桩身做沉桩标高标记;
步骤7、将最后一节预应力空心桩沉桩至设计标高。
CN201711414026.0A 2017-12-25 2017-12-25 预应力空心桩的挡土方法 Active CN108166487B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711414026.0A CN108166487B (zh) 2017-12-25 2017-12-25 预应力空心桩的挡土方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711414026.0A CN108166487B (zh) 2017-12-25 2017-12-25 预应力空心桩的挡土方法

Publications (2)

Publication Number Publication Date
CN108166487A CN108166487A (zh) 2018-06-15
CN108166487B true CN108166487B (zh) 2020-09-11

Family

ID=62523908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711414026.0A Active CN108166487B (zh) 2017-12-25 2017-12-25 预应力空心桩的挡土方法

Country Status (1)

Country Link
CN (1) CN108166487B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114561952A (zh) * 2022-02-21 2022-05-31 中冶天工集团有限公司 一种预制式管桩装置及使用方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202090337U (zh) * 2011-05-26 2011-12-28 宿迁市固丰管桩有限公司 一种离心混凝土桩
CN203129134U (zh) * 2013-03-22 2013-08-14 厦门特房建设工程集团有限公司 一种部分贯通的抗拉预应力桩芯
CN104131567A (zh) * 2013-05-02 2014-11-05 上海城地建设股份有限公司 一种新型止水预制离心矩形桩围护结构及其施工方法
CN204551455U (zh) * 2015-03-26 2015-08-12 上海市房屋建筑设计院有限公司 一种后注浆预应力混凝土空心桩

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202090337U (zh) * 2011-05-26 2011-12-28 宿迁市固丰管桩有限公司 一种离心混凝土桩
CN203129134U (zh) * 2013-03-22 2013-08-14 厦门特房建设工程集团有限公司 一种部分贯通的抗拉预应力桩芯
CN104131567A (zh) * 2013-05-02 2014-11-05 上海城地建设股份有限公司 一种新型止水预制离心矩形桩围护结构及其施工方法
CN204551455U (zh) * 2015-03-26 2015-08-12 上海市房屋建筑设计院有限公司 一种后注浆预应力混凝土空心桩

Also Published As

Publication number Publication date
CN108166487A (zh) 2018-06-15

Similar Documents

Publication Publication Date Title
CN110485470B (zh) 一种富水地层预设顶管门洞与滑移式后靠墙的矩形工作井及其施工方法
CN102383431B (zh) 中掘预应力离心管桩沉桩装置及其沉桩法
JP5057223B2 (ja) 鋼製セグメントを用いた仮締切壁の施工方法
CN102767180A (zh) 一种静压锚杆桩补强基础施工方法
JP2018024982A (ja) 既設杭基礎の補強工法及び補強構造
CN110485468B (zh) 一种富水地层预设顶管门洞的永久性圆形工作井及其施工方法
CN102434717A (zh) 工字钢顶管工作坑的施工方法
CN114033388B (zh) 富水粉砂层地下隧道顶管用竖井施工方法
CN201762702U (zh) 钻孔咬合桩
CN101824825B (zh) 一种深基坑明挖施工方法
CN110468873A (zh) 一种小空间下桥台桩基托换结构及使用方法
CN110565686A (zh) 管廊下穿河道的施工方法
CN102220764B (zh) 深基坑支护体系的施工方法
CN108166487B (zh) 预应力空心桩的挡土方法
CN203007940U (zh) 边坡锤击施工中的管桩防护结构
CN210658340U (zh) 一种预制护壁
JP4113187B2 (ja) 地下構造物の構築方法
CN111472363A (zh) 一种位于既有建构筑物地下空间的基坑围护结构施工方法
CN216839456U (zh) 钢管桩桩端后注浆装置
CN102758434B (zh) 中掘预应力离心管桩沉桩装置及其沉桩法
CN104846837A (zh) 一种明排水基坑中超深井坑的施工方法
CN212427155U (zh) 榫槽式预制地下连续墙结构
CN114411745A (zh) 钢管桩桩端后注浆装置及其施工方法
CN210031875U (zh) 顶推用沉井装置
KR20100112725A (ko) 엄지말뚝과 쉬트파일의 연결방법 이용한 가시설 시공방법

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant