CN104846837A - 一种明排水基坑中超深井坑的施工方法 - Google Patents

一种明排水基坑中超深井坑的施工方法 Download PDF

Info

Publication number
CN104846837A
CN104846837A CN201510166257.9A CN201510166257A CN104846837A CN 104846837 A CN104846837 A CN 104846837A CN 201510166257 A CN201510166257 A CN 201510166257A CN 104846837 A CN104846837 A CN 104846837A
Authority
CN
China
Prior art keywords
well
foundation ditch
steel plate
ultra
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510166257.9A
Other languages
English (en)
Other versions
CN104846837B (zh
Inventor
黄建逵
陈杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nantong Sanjian Construction Group Co ltd
Original Assignee
Jiangsu Nantong No3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nantong No3 Construction Group Co Ltd filed Critical Jiangsu Nantong No3 Construction Group Co Ltd
Priority to CN201510166257.9A priority Critical patent/CN104846837B/zh
Publication of CN104846837A publication Critical patent/CN104846837A/zh
Application granted granted Critical
Publication of CN104846837B publication Critical patent/CN104846837B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/22Lining sumps in trenches or other foundation pits

Abstract

本发明公开了一种明排水基坑中超深井坑的施工方法,通过对基坑土方挖掘方式的改进以及井坑底部平铺带止水翼环的钢板、钢板中央设置预留钢管的方式,大大节省了劳动力的消耗,也有利于改善含水土层的承载力,减少管涌情况的发生,并消除土方时间效应的影响。

Description

一种明排水基坑中超深井坑的施工方法
技术领域
本发明属于井坑施工技术领域,具体涉及一种明排水基坑中超深井坑的施工方法。
背景技术
在当今的建筑施工中,地下室的应用十分广泛。在地下室内布置集水井、电梯井等超过大筏板深度的各种井坑十分普遍。在工程施工中,由于周边环境的要求,基坑不能进行地下水的抽排降水,对这种基坑进行超深井坑的施工后,很容易受到土方时间效应的影响,出现管涌现象。因此,需要提供一种新的技术方案来解决上述问题。
发明内容
本发明所要解决的技术问题是提供一种明排水基坑中超深井坑的施工方法。
为解决上述技术问题,本发明采用的技术方案是:
一种明排水基坑中超深井坑的施工方法,包括以下步骤:      
(1)在基坑土方部分用挖土机的挖斗挖掘汇水坑,汇水坑内的积水用潜水泵排出后开挖基坑土方,达到设计标高以上停止;
(2)沿基坑边坡周边挖掘排水盲沟,排水盲沟内用石子填铺,并在基坑四角以及沿排水盲沟周边每隔40m处设置集水井,集水井内净500*500*1200㎜,井壁为砖砌,井底采用级配石子;
(3)采用机械挖土与人力辅助的方式在基坑底部向下挖掘井坑土方,清底,整平;
(4)在井坑底部平铺焊有止水翼环的钢板,钢板中部开孔,并在孔的底部焊接U型预留钢管;
(5)在止水翼环内侧的钢板上搭设反向支模,在基坑底部、井坑边坡与反向支模之间浇筑素混凝土,形成侧向护壁,侧向护壁达到强度后拆除反向支模;
(6)清理井坑内的泥浆后,预留钢管的管口用封堵钢板进行封堵,并在侧向护壁的顶部边缘堆砌砖胎膜;
(7)在砖胎膜围起的井坑内绑扎基础钢筋,支设箱形内模,然后对基础钢筋部分进行浇筑混凝土。
所述步骤(2)中排水盲沟的宽度不小于500mm,深度不小于500mm。
所述步骤(4)中预留钢管的直径不小于50mm,长度不小于100mm,止水翼环厚3mm、高300mm。
与现有技术相比,本发明的优点是:本发明通过对基坑土方挖掘方式的改进以及井坑底部平铺带止水翼环的钢板、钢板中央设置预留钢管的方式,大大节省了劳动力的消耗,也有利于改善含水土层的承载力,减少管涌情况的发生,并消除土方时间效应的影响。
附图说明
下面结合附图和具体实施方式对本发明作进一步详细描述。
图1是本发明中反向支模混凝土浇筑示意图;
图2是本发明中预留钢管管口封闭示意图;
图3是本发明中基础钢筋绑扎示意图。
其中,1、止水翼环,2、钢板,3、预留钢管,4、井坑,41、箱形内模,5、反向支模,6、封堵钢板,7、基坑,8、侧向护壁,9、砖胎膜,10、基础钢筋,11、排水盲沟。
具体实施方式:
如图1至图3所示,一种明排水基坑中超深井坑的施工方法,包括以下步骤:      
(1)在基坑7土方部分用挖土机的挖斗挖掘汇水坑,汇水坑的大小、数量与汇水量相适应,待汇水坑内的积水用潜水泵排出后开挖基坑7土方,达到设计标高以上停止;
(2)沿基坑7边坡周边挖掘排水盲沟11,排水盲沟11的宽度不小于500mm,深度不小于500mm,如基坑7面积加大,可在基坑平面内纵横向开挖排水盲沟11,排水盲沟11内用石子填铺,并在基坑7四角以及沿排水盲沟11周边每隔40m处设置集水井,集水井内净500*500*1200㎜,井壁为砖砌,厚度为240mm,井底采用级配石子;
(3)根据设计要求,标示出地下结构内的集水井、电梯井等超深井坑的具体位置及放出开挖线,采用机械挖土与人力辅助的方式在基坑7底部向下挖掘井坑4土方,清底,整平;
(4)在井坑4底部平铺焊有止水翼环1的钢板2,钢板2中部开孔,并在孔的底部焊接U型预留钢管3,预留钢管3的直径不小于50mm,长度不小于100mm,止水翼环1厚3mm、高300mm;
(5)在止水翼环1内侧的钢板2上搭设反向支模5,在基坑7底部、井坑4边坡与反向支模5之间浇筑素混凝土,形成侧向护壁8,侧向护壁8达到强度后拆除反向支模5;
(6)清理井坑4内的泥浆后,预留钢管3的管口用封堵钢板6进行封堵,并在侧向护壁8的顶部边缘堆砌240mm厚的砖胎膜9;
(7)在砖胎膜9围起的井坑4内绑扎基础钢筋10,支设箱形内模41,并对箱形内模41的上口进行有效固定,防止后续混凝土浇筑时产生的浮力将其顶起,然后对基础钢筋10部分进行浇筑混凝土;为了保证混凝土浇筑密实,箱形内模41底部留有孔径不小于50mm的预留孔。

Claims (3)

1.一种明排水基坑中超深井坑的施工方法,其特征在于:包括以下步骤:
(1)在基坑土方部分用挖土机的挖斗挖掘汇水坑,汇水坑内的积水用潜水泵排出后开挖基坑土方,达到设计标高以上停止;
(2)沿基坑边坡周边挖掘排水盲沟,排水盲沟内用石子填铺,并在基坑四角以及沿排水盲沟周边每隔40m处设置集水井,集水井内净500*500*1200㎜,井壁为砖砌,井底采用级配石子;
(3)采用机械挖土与人力辅助的方式在基坑底部向下挖掘井坑土方,清底,整平;
(4)在井坑底部平铺焊有止水翼环的钢板,钢板中部开孔,并在孔的底部焊接U型预留钢管;
(5)在止水翼环内侧的钢板上搭设反向支模,在基坑底部、井坑边坡与反向支模之间浇筑素混凝土,形成侧向护壁,侧向护壁达到强度后拆除反向支模;
(6)清理井坑内的泥浆后,预留钢管的管口用封堵钢板进行封堵,并在侧向护壁的顶部边缘堆砌砖胎膜;
(7)在砖胎膜围起的井坑内绑扎基础钢筋,支设箱形内模,然后对基础钢筋部分进行浇筑混凝土。
2.根据权利要求1所述的一种明排水基坑中超深井坑的施工方法,其特征在于:所述步骤(2)中排水盲沟的宽度不小于500mm,深度不小于500mm。
3.根据权利要求1所述的一种明排水基坑中超深井坑的施工方法,其特征在于:所述步骤(4)中预留钢管的直径不小于50mm,长度不小于100mm,止水翼环厚3mm、高300mm。
CN201510166257.9A 2015-04-10 2015-04-10 一种明排水基坑中超深井坑的施工方法 Active CN104846837B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510166257.9A CN104846837B (zh) 2015-04-10 2015-04-10 一种明排水基坑中超深井坑的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510166257.9A CN104846837B (zh) 2015-04-10 2015-04-10 一种明排水基坑中超深井坑的施工方法

Publications (2)

Publication Number Publication Date
CN104846837A true CN104846837A (zh) 2015-08-19
CN104846837B CN104846837B (zh) 2016-12-07

Family

ID=53846796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510166257.9A Active CN104846837B (zh) 2015-04-10 2015-04-10 一种明排水基坑中超深井坑的施工方法

Country Status (1)

Country Link
CN (1) CN104846837B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567397A (zh) * 2016-11-10 2017-04-19 河北二十冶建设有限公司 深基坑地下水的控制方法及控制装置
CN111088842A (zh) * 2019-12-30 2020-05-01 倡创(上海)咨询管理事务所 电梯井基坑渗水防排结合综合处治施工方法
CN117009719A (zh) * 2023-10-07 2023-11-07 青建集团股份公司 一种建筑基坑内汇水量的计算方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003278165A (ja) * 2003-04-23 2003-10-02 Kazuhiro Urata かま場用排水ボックス
JP2007100401A (ja) * 2005-10-05 2007-04-19 Izumi Pump Seisakusho:Kk 地下水位低下装置
CN101289866A (zh) * 2007-04-16 2008-10-22 上海市第七建筑有限公司 软土地基下基坑工程中局部深坑预制混凝土胎模施工方法
CN101768976A (zh) * 2009-12-29 2010-07-07 中建城市建设发展有限公司 一种基坑降水节水装置及其施工方法
CN101781896A (zh) * 2010-03-20 2010-07-21 浙江裕众建设集团有限公司 混凝土垫上制作沉井的施工方法
CN201778331U (zh) * 2010-12-07 2011-03-30 中国华西企业股份有限公司 一种用于基坑护壁排水施工过程中的集水井系统
JP2011115458A (ja) * 2009-12-04 2011-06-16 Kyoraku Sangyo Kk パチンコ遊技機

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003278165A (ja) * 2003-04-23 2003-10-02 Kazuhiro Urata かま場用排水ボックス
JP2007100401A (ja) * 2005-10-05 2007-04-19 Izumi Pump Seisakusho:Kk 地下水位低下装置
CN101289866A (zh) * 2007-04-16 2008-10-22 上海市第七建筑有限公司 软土地基下基坑工程中局部深坑预制混凝土胎模施工方法
JP2011115458A (ja) * 2009-12-04 2011-06-16 Kyoraku Sangyo Kk パチンコ遊技機
CN101768976A (zh) * 2009-12-29 2010-07-07 中建城市建设发展有限公司 一种基坑降水节水装置及其施工方法
CN101781896A (zh) * 2010-03-20 2010-07-21 浙江裕众建设集团有限公司 混凝土垫上制作沉井的施工方法
CN201778331U (zh) * 2010-12-07 2011-03-30 中国华西企业股份有限公司 一种用于基坑护壁排水施工过程中的集水井系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王文彬: "地下室深基坑和底板施工技术及其实例探讨", 《科技与企业》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567397A (zh) * 2016-11-10 2017-04-19 河北二十冶建设有限公司 深基坑地下水的控制方法及控制装置
CN111088842A (zh) * 2019-12-30 2020-05-01 倡创(上海)咨询管理事务所 电梯井基坑渗水防排结合综合处治施工方法
CN117009719A (zh) * 2023-10-07 2023-11-07 青建集团股份公司 一种建筑基坑内汇水量的计算方法
CN117009719B (zh) * 2023-10-07 2024-01-09 青建集团股份公司 一种建筑基坑内汇水量的计算方法

Also Published As

Publication number Publication date
CN104846837B (zh) 2016-12-07

Similar Documents

Publication Publication Date Title
CN104196034B (zh) 一种利用钢板桩作为支护围堰的基坑施工方法
CN102418347B (zh) 一种深基坑内盲沟和集水井排水施工方法
CN104711994A (zh) 基坑深井降水及封堵施工方法
CN103741714A (zh) 地下工程全盖挖逆作法施工方法
CN102454167A (zh) 大型超深沉井的施工方法
CN103046565B (zh) 超深岩基深基坑降排水方法
CN102535488B (zh) 一种高水位地下室底板防水施工方法
CN212896422U (zh) 一种深基坑截排水装置
CN104131575A (zh) 一种岩溶高度发育地层坝基的堵漏排水方法
CN100510281C (zh) 超大直径、超埋深度调蓄池的半逆作施工方法
CN103015456A (zh) 地下混凝土构筑物基础底板中的坑中坑快速支模法
CN104846837B (zh) 一种明排水基坑中超深井坑的施工方法
CN105484277A (zh) 一种电梯基坑或集水坑内管井降水施工用构件及施工方法
CN212641685U (zh) 一种地下车库排水明沟与暗沟结合防渗漏系统
CN112095644A (zh) 一种深基坑截排水装置及其施工方法
CN205205844U (zh) 一种电梯基坑或集水坑内管井降水施工用构件
CN105155421B (zh) 一种单桩独柱墩河道浅水中全埋置圆形承台施工方法
CN105332382B (zh) 邻河基坑筑岛围堰粘土止水施工方法
CN110185051A (zh) 深窄基坑开挖施工排水方法
CN104499489A (zh) 一种基坑施工方法
CN103866787B (zh) 一种敞挖逆筑法混凝土防渗墙建造施工工艺
CN204435321U (zh) 一种火力发电厂取水明渠
CN208441115U (zh) 一种地下连续墙管涌封堵结构
CN208815550U (zh) 一种富水粉土地层降水与回灌施工系统
CN210122735U (zh) 一种基于外凸式翼脚板的地下结构抗浮体系

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 131, Haiman City, Jiangsu Province, Haimen City, Jiangsu

Patentee after: JIANGSU NANTONG SANJIAN CONSTRUCTION GROUP Co.,Ltd.

Address before: No. 131, Haiman City, Jiangsu Province, Haimen City, Jiangsu

Patentee before: NANTONG NO.3 CONSTRUCTION GROUP Co.,Ltd.

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20221101

Granted publication date: 20161207