CN110957865A - 一种电机引线接头压接导通率100%的操作方法 - Google Patents

一种电机引线接头压接导通率100%的操作方法 Download PDF

Info

Publication number
CN110957865A
CN110957865A CN201911220295.2A CN201911220295A CN110957865A CN 110957865 A CN110957865 A CN 110957865A CN 201911220295 A CN201911220295 A CN 201911220295A CN 110957865 A CN110957865 A CN 110957865A
Authority
CN
China
Prior art keywords
arc
pressing
wire
crimping
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911220295.2A
Other languages
English (en)
Inventor
朱宇杉
林军
阮臻
曹中仁
汪开心
谢明
石建辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daye Dongai Electric Co Ltd
Original Assignee
Daye Dongai Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daye Dongai Electric Co Ltd filed Critical Daye Dongai Electric Co Ltd
Priority to CN201911220295.2A priority Critical patent/CN110957865A/zh
Publication of CN110957865A publication Critical patent/CN110957865A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K15/00Methods or apparatus specially adapted for manufacturing, assembling, maintaining or repairing of dynamo-electric machines
    • H02K15/0056Manufacturing winding connections
    • H02K15/0068Connecting winding sections; Forming leads; Connecting leads to terminals

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Power Engineering (AREA)
  • Manufacture Of Motors, Generators (AREA)

Abstract

本发明是一种电机引线接头压接导通率100%的操作方法,包括压接装置,1)将凵形固定扣放置在压接装置的底座上,使固定扣两侧与压刀两侧内壁贴合;2)将电机定子线圈漆包线的线头放入固定扣内,将电机引线一端的若干根导电丝放入固定扣内;3)确定压接剩余高度H满足公式:H≤H1+H2+(Sm‑Sq‑S1‑S2)/W,其中H1为所述弧形槽B的高度,H2为弧形槽A的高度,Sm为固定扣横截面积、漆包线截面积、引线导电丝总面积三者之和,Sq为漆包线线膜厚度的总截面积,S1为两个弧形槽B的面积,S2为弧形槽A的面积,W为所述凹槽的宽度;4)压刀下压,下压量X满足公式:M‑H‑0.1mm≤X≤M‑H‑0.01mm,其中M为压刀总行程;本发明极大地提高了定子接线导通率。

Description

一种电机引线接头压接导通率100%的操作方法
技术领域
本发明涉及电机生产技术领域,具体是一种电机引线接头压接导通率100%的操作方法。
背景技术
电机引线能否正常导通是冰箱/冷柜制冷压缩机影响整机质量的关键指标之一,电机定子引线导通率是压缩机生产商及制冷电机科研机构关注的焦点。电机插头组件中的引线与电机定子漆包线一般采取压接方式进行连接,保证电机插头组件的引线与电机定子漆包线连接处的有效正常导通直接关系到电机能否正常使用。目前压缩机电机行业尚无有效方法完全避免制冷压缩机电机引线接头处不导通(断线)的问题,电机引线接头导通率(合格电机数量/总生产数量)仅为70-85%,造成了电机行业返工返修费大幅攀升,增加了返修成本,且对电机制造商的市场形象造成不良影响。
发明内容
本发明的目的就是为了完全避免制冷压缩机电机引线接头处断线的问题,提供一种电机引线接头压接导通率100%的操作方法。
本发明的具体方案是:一种电机引线接头压接导通率100%的操作方法,包括压接装置,压接装置包括底座和压刀,压刀主体为倒置的凹字形,压刀顶部与动力头连接,所述底座位于压刀中间凹槽内且宽度与凹槽相等,底座顶部设有放置凵形固定扣的弧形槽A,压刀顶部横梁底面对称地设有两个弧形槽B,两个弧形槽B之间形成向下的顶尖,两个弧形槽B分别与压刀两侧内壁相切;采用所述压接装置进行压接操作具体包括以下步骤:
1)将凵形固定扣放置在底座上,使固定扣两侧与压刀两侧内壁贴合;
2)将电机定子线圈漆包线的线头放入固定扣内,将电机引线一端的若干根导电丝放入固定扣内;
3)确定压接剩余高度H满足公式:H≤H1+H2+(Sm-Sq-S1-S2)/W,其中H1为所述弧形槽B的高度,H2为弧形槽A的高度,Sm为固定扣横截面积、漆包线截面积、引线导电丝总面积三者之和,Sq为漆包线线膜厚度的总截面积,S1为两个弧形槽B的面积,S2为弧形槽A的面积,W为所述凹槽的宽度;
4)压刀下压,下压量X满足公式:M-H-0.1mm≤X≤M-H-0.01mm,其中M为压刀总行程。
优选的,所述下压量X满足公式:M-H-0.08mm≤X≤M-H-0.02mm。
优选的,所述凹槽宽度W为3.54mm~3.60mm。
本发明原理如下:压接时通过挤压引线及漆包线进行固定,压接过程中设置合理的压刀下压量使漆包线的外层漆膜完全被挤掉,从而保证引线与漆包线的纤芯完全导通。
本发明相比现有技术具有以下优点:可大幅提升批产电机的引线接头导通率,同时避免由于压刀下压量过大导致线被压断,极大地降低了断线返修率。
附图说明
图1是本发明的压接装置的主视图;
图2本发明压接完后接头的横截面剖视图;
图中:1-底座,2-压刀,3-固定扣,4-漆包线,5-导电丝,6-弧形槽A,7-弧形槽B,8-顶尖。
具体实施方式
实施例一
参见图1-2,本实施例采用一种压接装置,压接装置包括底座1和压刀2,压刀2主体为倒置的凹字形,压刀2顶部与动力头连接,所述底座1位于压刀2中间凹槽内且宽度与凹槽相等,底座1顶部设有放置凵形固定扣3的弧形槽A6,压刀2顶部横梁底面对称地设有两个弧形槽B7,两个弧形槽B7之间形成向下的顶尖8,两个弧形槽B7分别与压刀2两侧内壁相切;采用所述压接装置进行压接操作具体包括以下步骤:
1)将凵形固定扣3放置在底座1的弧形槽A6上,使固定扣3两侧与压刀2两侧内壁贴合;
2)将电机定子线圈漆包线4的线头包括两根φ0.6mm主绕组及一根φ0.4mm的副绕组放入固定扣3内,将电机引线一端的若干根铜丝5放入固定扣3内;
3)确定压接剩余高度H,H满足公式:H≤H1+H2+(Sm-Sq-S1-S2)/W,其中所述弧形槽B的高度H1为0.9mm,弧形槽A的高度H2为0.15mm,Sm为固定扣横截面积3.14mm2、漆包线截面积0.6908mm2、引线导电丝总面积0.75mm2三者之和,Sq为漆包线线膜厚度的总截面积,两个弧形槽B的面积S1为2.543mm2,弧形槽A的面积S2为0.35mm2,所述凹槽的宽度W为3.60mm,H1+H2+(Sm-Sq-S1-S2)/W=0.9+0.15+(3.14+0.75+0.6908-2.543-0.35)/3.6=1.516mm;
4)压刀下压,压刀总行程M为5mm,下压量X定为5-1.516-0.094=3.39mm。
按此下压量连续压接1000台定子接头,进行全检,检测结果为全部导通,导通率达到100%。
对比例一
本对比例与实施例一的参数均相同,但下压量X定为3.50mm,连续压接1000台定子接头,进行全检,检测结果为导通912台,不导通88台,导通率91.2%。
对比例二
本对比例与实施例一的参数均相同,但下压量X定为3.36mm,连续压接1000台定子接头,进行全检,检测结果为导通954台,不导通46台,导通率95.4%。
通过对比发现,下压量X设置在(M-H-0.1mm,M-H-0.01mm)的范围内相对能极大地提升导通率。

Claims (3)

1.一种电机引线接头压接导通率100%的操作方法,其特征是:包括压接装置,压接装置包括底座和压刀,压刀主体为倒置的凹字形,压刀顶部与动力头连接,所述底座位于压刀中间凹槽内且宽度与凹槽相等,底座顶部设有放置凵形固定扣的弧形槽A,压刀顶部横梁底面对称地设有两个弧形槽B,两个弧形槽B之间形成向下的顶尖,两个弧形槽B分别与压刀两侧内壁相切;采用所述压接装置进行压接操作具体包括以下步骤:
1)将凵形固定扣放置在底座上,使固定扣两侧与压刀两侧内壁贴合;
2)将电机定子线圈漆包线的线头放入固定扣内,将电机引线一端的若干根导电丝放入固定扣内;
3)确定压接剩余高度H满足公式:H≤H1+H2+(Sm-Sq-S1-S2)/W,其中H1为所述弧形槽B的高度,H2为弧形槽A的高度,Sm为固定扣横截面积、漆包线截面积、引线导电丝总面积三者之和,Sq为漆包线线膜厚度的总截面积,S1为两个弧形槽B的面积,S2为弧形槽A的面积,W为所述凹槽的宽度;
4)压刀下压,下压量X满足公式:M-H-0.1mm≤X≤M-H-0.01mm,其中M为压刀总行程。
2.根据权利要求1所述的一种电机引线接头压接导通率100%的操作方法,其特征是:所述下压量X满足公式:M-H-0.08mm≤X≤M-H-0.02mm。
3.根据权利要求1所述的一种电机引线接头压接导通率100%的操作方法,其特征是:所述凹槽宽度W为3.54mm~3.60mm。
CN201911220295.2A 2019-12-03 2019-12-03 一种电机引线接头压接导通率100%的操作方法 Pending CN110957865A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911220295.2A CN110957865A (zh) 2019-12-03 2019-12-03 一种电机引线接头压接导通率100%的操作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911220295.2A CN110957865A (zh) 2019-12-03 2019-12-03 一种电机引线接头压接导通率100%的操作方法

Publications (1)

Publication Number Publication Date
CN110957865A true CN110957865A (zh) 2020-04-03

Family

ID=69979499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911220295.2A Pending CN110957865A (zh) 2019-12-03 2019-12-03 一种电机引线接头压接导通率100%的操作方法

Country Status (1)

Country Link
CN (1) CN110957865A (zh)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0600416A1 (en) * 1992-12-01 1994-06-08 Sumitomo Wiring Systems, Ltd. Terminal crimping apparatus
US5914546A (en) * 1996-06-14 1999-06-22 Hitachi, Ltd. Connection structure of a wire bundling terminal and coil leading-out wires, and small size motor and alternator for a vehicle using the connection structure
JP2004071237A (ja) * 2002-08-02 2004-03-04 Yazaki Corp 電線の圧着装置
CN101842940A (zh) * 2007-11-02 2010-09-22 株式会社自动网络技术研究所 压接端子、带端子电线及带端子电线的制造方法
CN101227052B (zh) * 2007-01-18 2011-11-02 矢崎总业株式会社 压接设备和金属端子
CN103094720A (zh) * 2011-11-03 2013-05-08 江西东华科技园有限责任公司 一种漆包线免剥漆快速连结工艺
CN103138453A (zh) * 2013-03-04 2013-06-05 苏州爱知科技有限公司 电机、铆接设备及利用该设备进行铆接的方法
CN103441615A (zh) * 2013-08-20 2013-12-11 广东美芝精密制造有限公司 引线连接装置及连接方法
CN105103387A (zh) * 2013-03-27 2015-11-25 松下知识产权经营株式会社 电动机的电线连接方法
CN205319336U (zh) * 2015-12-25 2016-06-15 青岛云路新能源科技有限公司 铜铝漆包线连接件
CN109565140A (zh) * 2016-07-19 2019-04-02 Aptiv技术有限公司 压接工具和使用该压接工具获得的端子

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0600416A1 (en) * 1992-12-01 1994-06-08 Sumitomo Wiring Systems, Ltd. Terminal crimping apparatus
US5914546A (en) * 1996-06-14 1999-06-22 Hitachi, Ltd. Connection structure of a wire bundling terminal and coil leading-out wires, and small size motor and alternator for a vehicle using the connection structure
JP2004071237A (ja) * 2002-08-02 2004-03-04 Yazaki Corp 電線の圧着装置
CN101227052B (zh) * 2007-01-18 2011-11-02 矢崎总业株式会社 压接设备和金属端子
CN101842940A (zh) * 2007-11-02 2010-09-22 株式会社自动网络技术研究所 压接端子、带端子电线及带端子电线的制造方法
CN103094720A (zh) * 2011-11-03 2013-05-08 江西东华科技园有限责任公司 一种漆包线免剥漆快速连结工艺
CN103138453A (zh) * 2013-03-04 2013-06-05 苏州爱知科技有限公司 电机、铆接设备及利用该设备进行铆接的方法
CN105103387A (zh) * 2013-03-27 2015-11-25 松下知识产权经营株式会社 电动机的电线连接方法
CN103441615A (zh) * 2013-08-20 2013-12-11 广东美芝精密制造有限公司 引线连接装置及连接方法
CN205319336U (zh) * 2015-12-25 2016-06-15 青岛云路新能源科技有限公司 铜铝漆包线连接件
CN109565140A (zh) * 2016-07-19 2019-04-02 Aptiv技术有限公司 压接工具和使用该压接工具获得的端子

Similar Documents

Publication Publication Date Title
US10431905B2 (en) Method for crimping connection structure
EP2256751B1 (en) Electromagnetic coil with terminal means
CN102362398B (zh) 用于制造具有端子的电线的方法
JP2014187039A5 (zh)
KR20160058856A (ko) 단자 압착기용 압착 공구
JP2014135279A (ja) 圧着コンタクト及びそれを有するケーブル組立体
KR101173900B1 (ko) 프로브핀 및 그 제조방법
JP2012155889A (ja) 端子付電線及び圧着端子
CN110957865A (zh) 一种电机引线接头压接导通率100%的操作方法
JP2013171753A (ja) 端子付電線及びその製造方法
CN218567405U (zh) 一种汽车温度线束生产用电路通断连接检测装置
CN107369939B (zh) 电连接器和电连接器的安装装置
JP2017010713A (ja) プラグ付き同軸ケーブルの製造方法及び製造装置
JP6324267B2 (ja) 圧着接続構造体の製造方法
KR101076280B1 (ko) 어태치먼트
JP2010186622A (ja) 電線の圧着装置
CN210296833U (zh) 一种同步电机连接线生产用压线装置
CN220857477U (zh) 一体成型式电缆中间头压接成型装置
CN220456790U (zh) 一种螺钉式接线端子
JP6582089B2 (ja) 圧着接続構造体、端子圧着装置、および端子圧着用歯型
CN101656141B (zh) 防止电子变压器的电子引线短路的方法及加工设备
JP2020017407A (ja) アルミニウム電線圧着端子、圧着装置、および圧着方法
CN213816705U (zh) 一种用于hdmi高清连接线的线束生产装置
CN218919947U (zh) 一种免压式接线端头
CN210490679U (zh) 马达和包含该马达的电气设备

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No.9 Ganghu Road, Luoqiao sub district office, Daye City, Huangshi City, Hubei Province 435100

Applicant after: Huangshi Dongbei Motor Co.,Ltd.

Address before: No.9 Ganghu Road, Luoqiao sub district office, Daye City, Huangshi City, Hubei Province 435100

Applicant before: Daye Dongai Electric Co.,Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20200403

RJ01 Rejection of invention patent application after publication