CN110947923A CN201911319134.9A CN201911319134A CN110947923A CN 110947923 A CN110947923 A CN 110947923A CN 201911319134 A CN201911319134 A CN 201911319134A CN 110947923 A CN110947923 A CN 110947923A
Authority
CN
China
Prior art keywords
tundish
casting
liquid level
continuous casting
crystallizer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911319134.9A
Other languages
Chinese (zh)
Inventor
冀有军
岳月发
温跃峰
王建明
曹志光
冀晓辉
武巧俊
李艳龙
郭兴宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Xintai Steel Co ltd
Original Assignee
Shanxi Xintai Steel Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Xintai Steel Co ltd filed Critical Shanxi Xintai Steel Co ltd
Priority to CN201911319134.9A priority Critical patent/CN110947923A/en
Publication of CN110947923A publication Critical patent/CN110947923A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/009Continuous casting of metals, i.e. casting in indefinite lengths of work of special cross-section, e.g. I-beams, U-profiles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/18Controlling or regulating processes or operations for pouring
    • B22D11/181Controlling or regulating processes or operations for pouring responsive to molten metal level or slag level
    • B22D11/182Controlling or regulating processes or operations for pouring responsive to molten metal level or slag level by measuring temperature

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Abstract

The invention belongs to the technical field of steel making and continuous casting, and particularly relates to a process organization method for quickly changing a tundish of a section continuous casting machine with a beam blank below 600 kg/m. The invention provides a process operation method and a device for quickly changing a beam blank continuous casting tundish below 600kg/m, which reduce the vibration load by taking measures to shorten the time of quickly changing the tundish and reducing the friction force and solve the problem that the beam blank small section quickly changes the tundish vibration. The success of the quick-change tundish for the small section fills the blank of the quick-change tundish for the small section of the domestic special-shaped blank continuous casting machine.

Description

Quick change process for special-shaped blank continuous casting tundish below 600kg/m
Technical Field
The invention belongs to the technical field of steel making and continuous casting, and particularly relates to a technological operation method and a device for quickly replacing a tundish of a section continuous casting machine with a beam blank of below 600 kg/m.
Background
The quick-change tundish utilizes the tail blank of the upper tundish to replace a dummy bar, and processes of pulling the tail blank and conveying the dummy bar and the like are not needed, so that the production improvement and the efficiency improvement can be realized without stopping. The special-shaped blank web is thin, the solidification is fast, and the difficulty of quickly changing the tundish is high. At present, the domestic horse steel, Jinxi steel and sunshine steel special-shaped blank continuous casting machines successively implement tundish quick change through the improvement of continuous casting machine procedures, wherein the section specification of the Jinxi steel special-shaped blank is basically the same as that of our factory. However, the small section of the beam blank with the weight of less than 600kg per meter has the defects that the heat supplementing effect on the solidified blank shell is weak due to the fact that the liquid core in the blank shell with the relatively large section is less (high-temperature molten steel), the cooling solidification is quicker, the blank shell is harder in strength, the friction force between the blank shell and a crystallizer copper plate is larger, the load of a crystallizer vibration system is large, the vibration is more and more incapable of vibrating along with the time lapse within a few minutes, the pouring flow is started, the pouring success rate is low, and therefore the quick-change tundish is influenced. Therefore, the quick change of the tundish is not successfully implemented on the cross section below 600kg/m of the domestic special-shaped blank continuous casting machine.
Disclosure of Invention
The invention aims to provide a process operation method and a device for quickly changing a beam blank continuous casting tundish below 600kg/m, which reduce the vibration load by adopting measures and devices to shorten the time of the process of quickly changing the tundish and reducing the friction force and solve the problem that the vibration cannot be realized in the quick change process of the section below 600kg/m of the beam blank.
The technical scheme of the invention is as follows:
a quick change process of a continuous casting tundish of a beam blank with the thickness of below 600kg/m comprises the following steps:
①, performing slag reduction operation on the casting powder in the crystallizer 10 minutes before changing the tundish;
②, after each flow is blocked, the operation box carries out the following operations:
pulling speed back to 0 → stopping pulling correction → P3 putting a quick change mode on the disc and confirming that the quick change button lamp is in a normally on state; quickly blocking flow, immediately stirring a box body by using an L-shaped oxygen pipe → putting an inserting connecting piece in liquid molten steel → opening a tundish car, simultaneously starting withdrawal and straightening to pull the liquid level of the crystallizer to a position 600mm from the upper opening of the crystallizer, and stopping withdrawal and straightening to prepare for casting;
③, mounting the long wooden plug centering device on a standby tundish car in advance, enabling the standby tundish car and the online tundish car to act simultaneously after the connecting piece is inserted, and casting the large ladle after the standby tundish car is in place;
④, rapidly enabling the liquid level of the tundish to reach 10 tons after casting, measuring the temperature, simultaneously casting each flow, measuring the temperature again when the liquid level of the tundish rises to 15 tons, and slowly adjusting the height of the liquid level of the tundish according to the temperature of molten steel;
before casting, the set pulling speed of the operation box is adjusted to BB0:0.3m/min, BB1\ BB 2: 0.2m/min, BB 3: 0.15m/min, when the liquid level of the crystallizer steel rises to 45-55mm from the lower opening of the funnel, namely 20% -30% of the liquid level of the operation box is displayed, adding the covering slag, starting the pulling and straightening, and then adjusting the pulling speed according to the actual liquid level.
The centering device special for the special quick-change process of the beam blank continuous casting tundish below 600kg/m comprises a cylindrical intermediate body, wherein conical extending bodies with the same length are arranged at two ends of the cylindrical intermediate body respectively, the diameter of the outer ends of the conical extending bodies is smaller than that of the inner ends of the conical extending bodies, and an arc-shaped transition section is arranged between the cylindrical intermediate body and the conical extending bodies.
The quick-change process for the continuous casting tundish of the beam blank with the thickness of less than 600kg/m has the following remarkable effects:
1. the process time of the quick-change tundish is shortened by taking measures and devices, the process of the quick-change tundish is controlled within 5 minutes, the hardness of the casting blank in the quick-change process is reduced, and the vibration load is reduced.
2. The friction area between the crystallizer and the casting blank is reduced, and the friction force is reduced by 30 percent compared with the original friction force.
The down time of each quick-change tundish is reduced by 1.5 hours, and the yield is increased by about 300 t. The production can be increased by 300t 15 groups/month 12 months =5.4 ten thousand tons calculated by 15 groups changed rapidly per month. When the special-shaped parison continuous casting machine is opened singly, the production consumable materials required for casting are about 2300 plus 678=1622 units/group. Calculated by 15 groups of quick change every month, the material cost is saved by 29 ten thousand yuan every year.
Drawings
FIG. 1 is a time flow diagram of the quick-change process of the present invention;
fig. 2 is a schematic diagram of a long cork centralizer.
In the figure, 1-column intermediate; 2-an arc transition section; 3-pyramidal extensions.
Detailed Description
In order to make the objects, the process operation method, the device and the advantages of the embodiment of the invention clearer, the technical scheme in the embodiment of the invention is clearly and completely described below.
Referring to the attached figure 1, the quick change process of the special-shaped blank continuous casting tundish below 600kg/m is characterized in that a quick change mode of the tundish is added on the basis of the original special-shaped blank continuous casting machine, so that the automatic adjustment of the water flow of the crystallizer and the automatic gap water supply of a sector section and the automatic lifting and pressing functions of a withdrawal and straightening machine are realized by tracking the position of a connecting point in the quick change mode of the withdrawal speed returning to zero.
The quick-change process operation is divided into 11 items shown in fig. 1, the long cork centralizer shown in fig. 2 is designed and manufactured to realize simultaneous execution of 3 items, and the quick-change tundish process is controlled within 5 minutes.
Before the 'standby vehicle is driven in place', the long wooden plug centering device is firstly installed and fixed to each pouring runner of the tundish, and after the 'standby vehicle is driven in place' project is completed, two projects of 'ladle driving casting liquid level expansion' and 'tundish vehicle centering' are simultaneously carried out. And when the liquid level reaches 10-20 tons, the drainage operation of each flow is started, and when the liquid level rises to 15-30 tons, the casting operation is realized.
In the project of pulling the liquid level to the right position, the height of the liquid level of the steel in the crystallizer is quickly reduced to the position of 600mm according to the 450-inch position of the upper opening of the crystallizer, so that the friction area between the crystallizer and the casting blank is further reduced, and the vibration load is reduced.
Example 1
The tundish capacity is 30 tons, the thickness of the section of the crystallizer is 130mm, the length of the crystallizer is 1100mm, and the specific implementation process is as follows:
the first step is as follows: and performing slag reduction operation on the casting powder in the crystallizer about 10 minutes before the tundish is replaced.
The second step is that: after each flow is blocked, the operation box operates: pulling speed back to 0 → stopping pulling correction → P3 putting a quick change mode on the disc and confirming that the quick change button lamp is in a normally on state; immediately stirring the box body by using an L-shaped oxygen pipe after the flow blockage → putting an inserting connecting piece in liquid molten steel → opening a tundish car and simultaneously starting pulling and straightening to pull the liquid level of the crystallizer to a position 600mm away from the upper opening of the crystallizer, and stopping pulling and straightening to prepare for casting.
In the operation process, the long wooden plug centering device is installed on a standby tundish car in advance, the tundish car for standby after the connecting piece is inserted and the online tundish car act simultaneously, and a large ladle is immediately poured after the standby tundish car is in place.
The third step: and issuing a casting starting instruction, quickly enabling the liquid level of the tundish to reach 10 tons, measuring the temperature, simultaneously casting each flow, continuously and quickly rising the liquid level of the tundish to 15 tons, measuring the temperature again, and slowly adjusting the height of the liquid level of the tundish according to the temperature of molten steel.
Before casting, the set pulling speed of the operation box is adjusted to BB0:0.3m/min, BB1\ BB 2: 0.2m/min, BB 3: 0.15m/min, when the liquid level of the crystallizer steel rises to about 50mm from the lower opening of the funnel (20-30% is displayed by an operation box), adding protective slag, starting pulling and straightening (vibration does not need to press a starting button key, a tundish switching mode is directly changed into a casting state, a button with a lamp is turned off automatically), and then adjusting the pulling speed according to the actual liquid level. The subsequent casting is the same as the single casting operation.
By the embodiment, the success of continuously casting the quick-change tundish for the beam blank below 600kg/m is realized, and the blank of the quick-change tundish for the small section of the beam blank continuous casting machine in China is filled. The material cost is saved by 29 ten thousand yuan per year, and the yield can be increased by 300t 15 groups per month by 12 months =5.4 ten thousand tons per year.
Example 2
The special centering device for the process of rapidly changing the continuous casting tundish of the below-600 kg/m blank according to claim 1, structurally comprises a columnar intermediate body 1, tapered extensions 3 are arranged at two ends of the intermediate body, and an arc transition section 2 is arranged between the two tapered extensions, wherein the length of the columnar intermediate body is 54 mm, the diameter of the columnar intermediate body is 33 mm, the length of the arc transition section is 18 mm, the arc radius of the columnar intermediate body is 30mm, the outer diameter of each tapered extension is 14.5 mm, the inner end diameter of each tapered extension is 16 mm, and the length of each tapered extension is 205 mm.

Claims (2)

1. A quick change process of a beam blank continuous casting tundish with the weight of below 600kg/m is characterized by comprising the following steps:
①, performing slag reduction operation on the casting powder in the crystallizer 10 minutes before changing the tundish;
②, after each flow is blocked, the operation box carries out the following operations:
pulling speed back to 0 → stopping pulling correction → P3 putting a quick change mode on the disc and confirming that the quick change button lamp is in a normally on state; quickly blocking flow, immediately stirring a box body by using an L-shaped oxygen pipe → putting an inserting connecting piece in liquid molten steel → opening a tundish car, simultaneously starting withdrawal and straightening to pull the liquid level of the crystallizer to a position 600mm from the upper opening of the crystallizer, and stopping withdrawal and straightening to prepare for casting;
③, mounting the long wooden plug centering device on a standby tundish car in advance, enabling the standby tundish car and the online tundish car to act simultaneously after the connecting piece is inserted, and casting the large ladle after the standby tundish car is in place;
④, rapidly enabling the liquid level of the tundish to reach 10 tons after casting, measuring the temperature, simultaneously casting each flow, measuring the temperature again when the liquid level of the tundish rises to 15 tons, and slowly adjusting the height of the liquid level of the tundish according to the temperature of molten steel;
before casting, the set pulling speed of the operation box is adjusted to BB0:0.3m/min, BB1\ BB 2: 0.2m/min, BB 3: 0.15m/min, when the liquid level of the crystallizer steel rises to 45-55mm from the lower opening of the funnel, namely 20% -30% of the liquid level of the operation box is displayed, adding the covering slag, starting the pulling and straightening, and then adjusting the pulling speed according to the actual liquid level.
2. A special centering device for the quick-change process of a beam blank continuous casting tundish below 600kg/m as claimed in claim 1, which is characterized by comprising a cylindrical intermediate body (1), wherein conical extending bodies (3) with the same length are respectively arranged at two ends of the cylindrical intermediate body, the diameter of the outer ends of the conical extending bodies is smaller than that of the inner ends of the conical extending bodies, and an arc-shaped transition section (2) is arranged between the cylindrical intermediate body and the conical extending bodies.
CN201911319134.9A 2019-12-19 2019-12-19 Quick change process for special-shaped blank continuous casting tundish below 600kg/m Pending CN110947923A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911319134.9A CN110947923A (en) 2019-12-19 2019-12-19 Quick change process for special-shaped blank continuous casting tundish below 600kg/m

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911319134.9A CN110947923A (en) 2019-12-19 2019-12-19 Quick change process for special-shaped blank continuous casting tundish below 600kg/m

Publications (1)

Publication Number Publication Date
CN110947923A true CN110947923A (en) 2020-04-03

Family

ID=69982999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911319134.9A Pending CN110947923A (en) 2019-12-19 2019-12-19 Quick change process for special-shaped blank continuous casting tundish below 600kg/m

Country Status (1)

Country Link
CN (1) CN110947923A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113579184A (en) * 2021-07-28 2021-11-02 北京首钢股份有限公司 Slab tundish casting method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103769569A (en) * 2014-02-17 2014-05-07 河南省宏达炉业有限公司 Flow control device and method for continuous casting tundish
CN105268937A (en) * 2015-10-23 2016-01-27 首钢京唐钢铁联合有限责任公司 Control method for quick-change nozzle of tundish of continuous casting machine
CN106216622A (en) * 2016-08-29 2016-12-14 山东钢铁股份有限公司 A kind of method of quick-replaceable tundish in molten steel casting process
CN107262691A (en) * 2017-06-30 2017-10-20 张家港浦项不锈钢有限公司 A kind of method of different steel grade quick change in stainless steel continuous casting production
CN108555274A (en) * 2018-05-29 2018-09-21 马鞍山尚元冶金科技有限公司 Hot Metal in Beam Blank tundish quick change method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103769569A (en) * 2014-02-17 2014-05-07 河南省宏达炉业有限公司 Flow control device and method for continuous casting tundish
CN105268937A (en) * 2015-10-23 2016-01-27 首钢京唐钢铁联合有限责任公司 Control method for quick-change nozzle of tundish of continuous casting machine
CN106216622A (en) * 2016-08-29 2016-12-14 山东钢铁股份有限公司 A kind of method of quick-replaceable tundish in molten steel casting process
CN107262691A (en) * 2017-06-30 2017-10-20 张家港浦项不锈钢有限公司 A kind of method of different steel grade quick change in stainless steel continuous casting production
CN108555274A (en) * 2018-05-29 2018-09-21 马鞍山尚元冶金科技有限公司 Hot Metal in Beam Blank tundish quick change method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113579184A (en) * 2021-07-28 2021-11-02 北京首钢股份有限公司 Slab tundish casting method and device

Similar Documents

Publication Publication Date Title
RU2393034C2 (en) Method and device to produce metal strip
CN102303102B (en) Continuous casting process and continuous casting machine for extra-thick plate blank
CN104259415B (en) A kind of continuous cast method of continuous cast round billets
CN101293273A (en) Process for manufacturing low-aliquation large-scale hollow steel ingot
CN105522126A (en) Manufacturing technique and equipment for high-performance composite roller shaft
CN103464699B (en) A kind of method improving continuous casting tundish heat exchange success rate
CN102294455A (en) Non-stopped-pouring high-speed short-edge width regulating method of slab continuous casting machine crystallizer
CN110947923A (en) Quick change process for special-shaped blank continuous casting tundish below 600kg/m
CN112222368A (en) Method for operating butt joint and speed increasing of tundish in continuous casting of ultra-thick plate blank
CN102161080B (en) Manufacturing tool of high-compact wide and thick plate blank for wide and thick plate rolling mill and method
CN102672121B (en) Production method for continuous casting of vertical tube blanks
CN105251954A (en) Pouring mold and pouring method for steel ingot
US7770628B2 (en) Control of casting machine
CN104646641A (en) Pulling rate reduction control method and tundish changing control method in continuous casting system
CN102274932A (en) Two-ladle combined casting device and method for steel ingot
CN201201039Y (en) Casting apparatus for low aliquation large-sized hollow steel ingot
CN106011388A (en) Smelting process capable of improving flaw detection qualified rate of cast first-furnace heavy rail
CN116274927A (en) Production process for realizing heat exchange tundish by using multi-machine multi-flow aerosol cooling continuous casting machine
CN112296293B (en) Method for changing section in casting of double-flow slab continuous casting machine
CN205183722U (en) Novel conticaster
CN201940550U (en) Manufacturing tooling of high density, wide and thick plate blank for wide and heavy plate mill
CN102672120A (en) Production device for continuous casting of vertical tube blanks
CN106807908A (en) A kind of Novel connection casting machine
CN101844213B (en) Pulling-straightening equipment for producing continuous cast round billets
CN116748484A (en) Method for keeping molten steel cleanliness when ladle is replaced by continuous casting steelmaking equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination