CN2356783Y - Device for molten metal electroslag continuous casting ingot and pile-up welding - Google Patents

Device for molten metal electroslag continuous casting ingot and pile-up welding Download PDF

Info

Publication number
CN2356783Y
CN2356783Y CN 98249024 CN98249024U CN2356783Y CN 2356783 Y CN2356783 Y CN 2356783Y CN 98249024 CN98249024 CN 98249024 CN 98249024 U CN98249024 U CN 98249024U CN 2356783 Y CN2356783 Y CN 2356783Y
Authority
CN
China
Prior art keywords
welding
chassis
pile
molten metal
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 98249024
Other languages
Chinese (zh)
Inventor
方崇实
方钧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 98249024 priority Critical patent/CN2356783Y/en
Application granted granted Critical
Publication of CN2356783Y publication Critical patent/CN2356783Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

The utility model relates to a device for molten metal electroslag continuous casting ingot and pile-up welding, which comprises a medium frequency induction furnace (23), a heat insulation casting ladle bogie (13), a slag melting crucible bogie (10), a follow clamping device, pump-and-pull devices (3) and (19), a crystallizer (2), an induction heating ring (28), wherein, the follow clamping device and the pump-and-pull devices are positioned at the upper end of a core shaft; the induction heating ring (28) is positioned in a sandwich layer which is positioned outside a heat insulation casting ladle (11). The utility model is used for shaft components of liquid metal slag pile-up welding or the repair for wear resistant rolls, and the utility model can be used for continuously and semicontinuously producing high alloy casting ingot. The utility model has the advantages that the efficiency can be enhanced by 5 to 10 times than conventional method of pile-up welding, the service life of pile-up welding rolls can be improved by 5 times, power can be saved by 40 percents than conventional electroslag remelting, the utility model is simple, and the manufacture is easy.

Description

The device of continuous casting of molten metal electroslag and built-up welding
The utility model relates to the device of continuous casting of a kind of molten metal electroslag and built-up welding, this device use electroslag technology directly the intermediate frequency furnace inner metal liquid is injected the conduction crystallization form continuously ingot and continuously with the molten metal built-up welding on the axle of crystallizer with formation antiwear heat resisting layer.
Laid-open U.S. Patents US4185682 and US4305451 have introduced current-conductive mold ESW and electroslag casting technology at present, this technology is through with the simple epoch that metal consumable electrode carries out electroslag smelting casting that rely on, make the easier control of electroslag process, the product quality of being produced is higher.Add crystallizer from beginning with particle balk cargo form, develop into and add crystallizer with liquid metals the nineties, make this technology obtain unprecedented use value, the technology that is called as ESR LM (liquid metals electroslag smelting casting) can also be used for titanium alloy production except continuous built-up welding and continuous casting.Use ESR LM technology to produce the roll maximum gauge and can reach 1000 millimeters or bigger, overlay cladding reaches 20~100 millimeters or thicker, and its efficient of more conventional overlaying method is wanted high ten times, and productivity ratio is 200~800 kilograms/hour, power consumption 1000 degree/tons.Produce compound high speed steel roll with conventional centrifugal casting and compare, the compound high speed steel roll crystal grain that ESR LM technology is produced is tiny, and carbide is and disperses to distribute, and the thick net distribution that is of centrifugal casting quick-cutting steel composite roller carbide grain; Centre spinning method can not be repaired the roll that has worn and torn, and the ESRLM method can be repaired the roll that has worn and torn.This method can economize on electricity 40% except process is easy to control, productivity ratio improves greatly.But, realize that the formed concrete equipment of ESR LM method is not open, outline of process and D2 steel, high-carbon high-high-vanadium high-speed steel roll result of the test are only disclosed.These tests are all carried out on existing conventional electroslag molten casting device, the roller diameter of being produced less (600 millimeters of φ), length less (1200 millimeters), therefore, as long as be fixed on just can steady production on the stripping platform in the lower end.Yet when producing elongated mandrel composite shaft series products, just the problem that all will fix of two ends is up and down arranged.In actual production, especially when the compound different-diameter of needs, different length axis products, the molten metal that the intermediate frequency furnace of preparation molten metal is produced is not to pour in crystallizer at short notice immediately, require different poring rates, so molten metal may solidify in casting ladle, influence is produced.
The purpose of this utility model is at the deficiencies in the prior art and defective, the device of continuous casting of a kind of molten metal electroslag and built-up welding is proposed, to solve the stable problem of producing in the elongated mandrel composite shaft series products, solving molten metal may coagulation problem in casting ladle.
The purpose of this utility model is achieved through the following technical solutions.
Continuous casting of a kind of molten metal electroslag and build-up welding apparatus, it comprises intermediate frequency furnace, insulated pouring bag chassis, change slag crucible chassis, mandrel upper end servo-actuated clamping device and drawing device, insulated pouring bag chassis comprises the insulated pouring bag, insulated pouring bag tumble system and underneath type insulated pouring bag chassis drive unit are changed comprising of slag crucible chassis slag crucible, graphite electrode, electrode lifting device, change slag crucible tipple and underneath type slag crucible chassis drive unit, mandrel upper end servo-actuated clamping device comprises clamping platform, column, pulley, steel wire rope and clamper.
In the interlayer outside the insulated pouring bag induction heating circle is arranged.
Advantage of the present utility model is that it can stablize and successfully produce the ingot of different-diameter and the axial workpiece of compound various different requirements in actual production, solved the stable problem of producing in the elongated mandrel composite shaft series products, having solved molten metal may coagulation problem in casting ladle.
Accompanying drawing 1 is the front elevational schematic of the continuous build-up welding apparatus of molten metal electroslag;
Accompanying drawing 2 is schematic top plan view of the continuous build-up welding apparatus of molten metal electroslag;
Accompanying drawing 3 is front elevational schematic of mandrel upper end servo-actuated clamping device;
Accompanying drawing 4 is front elevational schematic of molten metal electroslag D.C.casting device;
Accompanying drawing 5 is schematic top plan view of molten metal electroslag D.C.casting device;
Accompanying drawing 6 is schematic side view of molten metal electroslag D.C.casting device;
Introduce embodiment of the present utility model below in conjunction with accompanying drawing.
Embodiment 1:
In the accompanying drawing 1~3 1 is by the mandrel of repair welding, 2 is crystallizer, 3 are the clamping platform, 4 is column, 5 is pulley, 6 for changing the slag crucible, 7 is graphite electrode, 8 is electrode lifting device, 9 for changing slag crucible tipple, 10 for changing slag crucible chassis, 11 is the insulated pouring bag, 12 are the insulated pouring bag system that tumbles, 13 is insulated pouring bag chassis, 14 is platform, 15 is underneath type insulated pouring bag chassis drive unit, 16 for changing slag crucible chassis drive system, 17 is column, 18 is the pull platform drive system, 19 is the pull platform, 20 is roll lower end fixed cover, 21 is column, 22 is leading screw, 23 is intermediate frequency furnace, 24 is clamper, 25 is steel wire rope, 26 is counterweight.
The continuous build-up welding apparatus of a kind of molten metal electroslag, it comprises intermediate frequency furnace 23, insulated pouring bag chassis 13, change slag crucible chassis 10, mandrel upper end servo-actuated clamping device and drawing device, wherein insulated pouring bag chassis 13 comprises insulated pouring bag 11, insulated pouring bag tumble system 12 and underneath type insulated pouring bag chassis drive unit 15 are changed slag crucible chassis 10 comprising slag crucibles 6, graphite electrode 7, electrode lifting device 8, change slag crucible tipple 9 and underneath type slag crucible chassis drive unit 16, mandrel upper end servo-actuated clamping device comprises clamping platform 3, column 4, pulley 5, steel wire rope 25 and clamper 24.
In the interlayer outside the insulated pouring bag 11 induction heating circle 28 is arranged.
To be fixed on the roll lower end fixed cover 20 on the pull platform 19 by the lower end of the mandrel 1 of repair welding, the upper end is fixing by the clamper on the clamping platform 3 24, can be moved up and down with pull platform 19 by the mandrel 1 of repair welding and clamping platform 3, make it treat that the repair welding position is in the crystallizer 2.Molten metal is after melting is finished in intermediate frequency furnace 23, insulated pouring bag chassis 13 is opened to crystallizer 2, meanwhile, changing finishing slag process in the slag crucible 6 at the graphite electrode of changing on the slag crucible chassis 10 7, before change slag crucible chassis 10 reaches crystallizer 2, a certain amount of liquid slag is injected crystallizer 2, the crystallizer energising, make slag keep uniform temperature and rotation, start the insulated pouring bag system 12 that tumbles, a certain amount of molten metal is injected crystallizer 2 through running channel, after molten metal fuses by slag bath and mandrel 1, pull platform drive system 18 makes pull platform 19 drive mandrel 1 and moves down, change slag crucible 6 and regularly replenish slag liquid, in the interlayer outside the insulated pouring bag 11 induction heating circle 28 is arranged, make the bag inner metal liquid keep high temperature to crystallizer 2, and in crystallizer 2, regularly or uninterruptedly replenish molten metal, finish up to whole mandrel process of patch weld.
This appliance arrangement is simple, is easy to make, and raises the efficiency 5~10 times than conventional overlaying method, 5 times of the institute's surfacing roll life-span of producing raisings.
Embodiment 2:
In accompanying drawing 4~6, increase Dummy plate 27, all the other marks are identical with accompanying drawing 1~3.Pull platform 19 is elevated to certain altitude so that Dummy plate 27 is stretched in the current-conductive mold 2, molten metal is after melting is finished in intermediate frequency furnace 23, insulated pouring bag chassis 13 is opened to intermediate frequency furnace 23, the insulated pouring bag 11 of molten metal from intermediate frequency furnace 23 injection insulated pouring bag chassis 13 is before insulated pouring bag chassis 13 reaches crystallizer 2 subsequently.Meanwhile, changing finishing slag process in the slag crucible 6 at the graphite electrode of changing on the slag crucible chassis 10 7, before change slag crucible chassis 10 reaches crystallizer 2, a certain amount of liquid slag is injected crystallizer 2, the crystallizer energising, make slag keep uniform temperature and rotation, start the insulated pouring bag system 12 that tumbles, a certain amount of molten metal is injected crystallizer 2 through running channel, when molten metal after slag bath top drops to Dummy plate 27 and solidifies, pull platform drive system 18 makes pull platform 19 move down the beginning dummy ingot, change slag crucible 6 and regularly replenish slag liquid, in the interlayer outside the insulated pouring bag 11 induction heating circle 28 is arranged, make the bag inner metal liquid keep high temperature to crystallizer 2, and in crystallizer 2, regularly or uninterruptedly replenish molten metal, thereby realize the D.C.casting technical process.
This appliance arrangement is simple, is easy to make, than conventional electroslag remelting economize on electricity 40%.

Claims (2)

1, continuous casting of a kind of molten metal electroslag and build-up welding apparatus, it comprises intermediate frequency furnace (23), insulated pouring bag chassis (13), change slag crucible chassis (10), mandrel upper end servo-actuated clamping device and drawing device, it is characterized in that insulated pouring bag chassis (13) comprises insulated pouring bag (11), insulated pouring bag tumble system (12) and underneath type insulated pouring bag chassis drive unit (15), change slag crucible chassis (10) comprising slag crucible (6), graphite electrode (7), electrode lifting device (8), change slag crucible tipple (9) and underneath type slag crucible chassis drive unit (16), mandrel upper end servo-actuated clamping device comprises clamping platform (3), column (4), pulley (5), steel wire rope (25) and clamper (24).
2, device according to claim 1 is characterized in that in the outer interlayer of described insulated pouring bag (11) induction heating circle (28) being arranged.
CN 98249024 1998-11-23 1998-11-23 Device for molten metal electroslag continuous casting ingot and pile-up welding Expired - Fee Related CN2356783Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98249024 CN2356783Y (en) 1998-11-23 1998-11-23 Device for molten metal electroslag continuous casting ingot and pile-up welding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98249024 CN2356783Y (en) 1998-11-23 1998-11-23 Device for molten metal electroslag continuous casting ingot and pile-up welding

Publications (1)

Publication Number Publication Date
CN2356783Y true CN2356783Y (en) 2000-01-05

Family

ID=33993897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98249024 Expired - Fee Related CN2356783Y (en) 1998-11-23 1998-11-23 Device for molten metal electroslag continuous casting ingot and pile-up welding

Country Status (1)

Country Link
CN (1) CN2356783Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102189247A (en) * 2011-03-29 2011-09-21 沈阳东大兴科冶金技术有限公司 Heavy-current short-network direct attached gas shield three-phase electric slag furnace
CN102228965A (en) * 2011-06-21 2011-11-02 中国电子科技集团公司第二研究所 Automatic pouring system of vacuum strip casting furnace
CN102560551A (en) * 2012-01-04 2012-07-11 饶云福 Electrolytic aluminum anodic steel claw repairing equipment
CN103862296A (en) * 2014-03-27 2014-06-18 中冶华天工程技术有限公司 Bead welding device
CN109385504A (en) * 2018-11-27 2019-02-26 苏州大学 A kind of device and method using induction furnace and electric slag liquid casting steel-making
CN116441701A (en) * 2023-06-13 2023-07-18 内蒙古世星新材料科技有限公司 Automatic slag system and method of plate electroslag welding equipment

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102189247A (en) * 2011-03-29 2011-09-21 沈阳东大兴科冶金技术有限公司 Heavy-current short-network direct attached gas shield three-phase electric slag furnace
CN102189247B (en) * 2011-03-29 2013-09-18 沈阳东大兴科冶金技术有限公司 Heavy-current short-network direct attached gas shield three-phase electric slag furnace
CN102228965A (en) * 2011-06-21 2011-11-02 中国电子科技集团公司第二研究所 Automatic pouring system of vacuum strip casting furnace
CN102560551A (en) * 2012-01-04 2012-07-11 饶云福 Electrolytic aluminum anodic steel claw repairing equipment
CN102560551B (en) * 2012-01-04 2016-05-04 饶云福 Electrolytic aluminum anodic steel claw repairing equipment
CN103862296A (en) * 2014-03-27 2014-06-18 中冶华天工程技术有限公司 Bead welding device
CN109385504A (en) * 2018-11-27 2019-02-26 苏州大学 A kind of device and method using induction furnace and electric slag liquid casting steel-making
CN109385504B (en) * 2018-11-27 2019-07-05 苏州大学 A kind of device and method using induction furnace and electric slag liquid casting steel-making
CN116441701A (en) * 2023-06-13 2023-07-18 内蒙古世星新材料科技有限公司 Automatic slag system and method of plate electroslag welding equipment
CN116441701B (en) * 2023-06-13 2023-09-15 内蒙古世星新材料科技有限公司 Automatic slag system and method of plate electroslag welding equipment

Similar Documents

Publication Publication Date Title
US5325906A (en) Direct processing of electroslag refined metal
CN105522126B (en) The compound roll shaft manufacturing process of high-performance and equipment
CN113061741B (en) Electroslag remelting composite device and method for improving temperature distribution of slag bath by external magnetic field
CN105522138B (en) A kind of forged steel roll neck rich chromium cast iron composite roll Processes and apparatus
CN105401059A (en) Manufacturing technology and device for improved forged steel roller neck high nickel chrome molybdenum alloy cast composite roller
CN1061275C (en) Casting metal strip
CN111590054B (en) Device and method for preparing bimetal clad roller by ingot drawing type electroslag remelting method
CN1102469C (en) Continuous casting equipment and method for composite roller
CN105436474A (en) Manufacturing technique and device for improved bainite nodular cast iron composite roller provided with forged steel roller neck
EP0907756B1 (en) Processing of electroslag refined metal
CN105436475A (en) Modified manufacturing process for high-chromium cast iron composite roll through forged steel roll neck and equipment
CN105562647B (en) A kind of forged steel roll neck indefinite chill high-nickel-chromium molybdenum composite roll Processes and apparatus
CN105312541A (en) Improved technique and device for manufacturing nickel-chromium molybdenum alloy cast iron composite roller in forged steel roller neck
CN2356783Y (en) Device for molten metal electroslag continuous casting ingot and pile-up welding
CN108500238B (en) Production method of bimetal composite roller based on electroslag remelting
JP3949208B2 (en) Metal remelting method and apparatus used for manufacturing continuous casting
WO1989009291A1 (en) Electro-slag casting apparatus and method
CN103436709A (en) Device and method for preparing electroslag remelting ingot employing tubular electrode additional consumable blender
CN108247020B (en) Device for producing composite roller by adopting hollow roller
CN108145099B (en) Method and device for preparing large composite steel ingot by rotary insert core blank
CN1037246C (en) Special hollow casting made by inductive electroslag with centrifugal method
CN108543921A (en) Strong shear is with electromagnetic field coordinate system for the device and method of big specification homogeneous ingot casting
CN2264054Y (en) Compound movable electroslag smelting casting
CN114854994A (en) Device and method for preparing composite steel ingot based on conductive crystallizer
CN1164379C (en) Method for producing high speed steel roll ring

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee