CN110906872B - 一种通过高效档侧弧垂观测调整导线的方法 - Google Patents

一种通过高效档侧弧垂观测调整导线的方法 Download PDF

Info

Publication number
CN110906872B
CN110906872B CN201911203881.6A CN201911203881A CN110906872B CN 110906872 B CN110906872 B CN 110906872B CN 201911203881 A CN201911203881 A CN 201911203881A CN 110906872 B CN110906872 B CN 110906872B
Authority
CN
China
Prior art keywords
sag
point
extra
high voltage
iron tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911203881.6A
Other languages
English (en)
Other versions
CN110906872A (zh
Inventor
杨作强
曹翀
李君章
齐林
肖贵成
王家彪
朱兆伟
卢凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Henan Power Transmission and Transformation Construction Co Ltd
Original Assignee
State Grid Corp of China SGCC
Henan Power Transmission and Transformation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Henan Power Transmission and Transformation Construction Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201911203881.6A priority Critical patent/CN110906872B/zh
Publication of CN110906872A publication Critical patent/CN110906872A/zh
Application granted granted Critical
Publication of CN110906872B publication Critical patent/CN110906872B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B11/00Measuring arrangements characterised by the use of optical techniques
    • G01B11/02Measuring arrangements characterised by the use of optical techniques for measuring length, width or thickness
    • G01B11/06Measuring arrangements characterised by the use of optical techniques for measuring length, width or thickness for measuring thickness ; e.g. of sheet material
    • G01B11/0608Height gauges
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Electric Cable Installation (AREA)
  • Length Measuring Devices With Unspecified Measuring Means (AREA)

Abstract

本发明提供一种通过高效档侧弧垂观测调整导线的方法,用于提供一种测量数据少,效率高的档侧弧垂观测方法,包括通过以全站仪为原点建立空间坐标系,使用全站仪的免棱镜模式对两座特高压铁塔两顶端以及弧垂上任意一点的求空间坐标,通过公式推导计算出弧垂,测量数据少,效率高。

Description

一种通过高效档侧弧垂观测调整导线的方法
技术领域
本发明属于弧垂观测技术领域,具体涉及一种通过高效档侧弧垂观测调整导线的方法。
背景技术
在输电线路架线弧垂观测过程中,常用的弧垂观测方法有,档端观测方法、档外观测方法、档内观测方法,还有档侧观测方法,由于特高压铁塔高,采用档端、档外、档内均无法进行观测,采用档侧观测时,每测量一次弧垂,均至少测量一次挂点距离lm或ln,通过挂点距离去计算最大弧垂,并且测量挂点距离要用到全站仪的免棱镜模式去测量,操作繁琐。
发明内容
本发明的目的是提供一种通过高效档侧弧垂观测调整导线的方法,用于提供一种测量数据少,效率高的档侧弧垂观测方法。
本发明解决其技术问题的技术方案为:一种通过高效档侧弧垂观测调整导线的方法,包括步骤1:设经纬仪观测点为O,第一特高压铁塔的顶部为A,第二特高压铁塔的顶部为B,第一特高压铁塔、第二特高压铁塔与O点所在的水平面的交点为A′、B′,设弧垂上任意一点为C,点C的弧垂为fx,点C在A’B’上的投影为C’,设A’B’为l,A’C’为lx,设第一特高压铁塔与第二特高压特塔的中点弧垂为f,设A与B的高差为h。
步骤2:设A、B、C三点的坐标分别为A(x1,y1,z1)、B(x2,y2,z2)、C(x3,y3,z3),使用全站仪的免棱镜模式进行弧垂观测,以O点为原点,测量A、B、C三点的坐标,A、B、C位于同一坐标系。
步骤3:通过
Figure GDA0003052500990000011
求l。
步骤4:通过h=(z2-z1)求h。
步骤5:通过
Figure GDA0003052500990000012
求lx
步骤6:通过
Figure GDA0003052500990000013
求fx
步骤7:通过
Figure GDA0003052500990000021
推算出
Figure GDA0003052500990000022
最大弧垂出现在什么位置视具体情况而定,其中常见的对于高差不超过10%的相邻杆塔之间的导线最大弧垂,出现在档距l中央,在本发明中,针对高差不超过10%的相邻杆塔来进行计算,默认最大弧垂出现在档距l中点。
本发明的有益效果为:通过以全站仪为原点建立空间坐标系,使用全站仪的免棱镜模式对两座特高压铁塔两顶端以及弧垂上任意一点的求空间坐标,通过公式推导计算出弧垂,测量数据少,效率高。
附图说明
图一是本发明的原理图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图一所示,本发明包括:
步骤1:设经纬仪观测点为O,第一特高压铁塔的顶部为A,第二特高压铁塔的顶部为B,第一特高压铁塔、第二特高压铁塔与O点所在的水平面的交点为A′、B′,设弧垂上任意一点为C,点C的弧垂为fx,点C在A’B’上的投影为C’,设A’B’为l,A’C’为lx,设第一特高压铁塔与第二特高压特塔的中点弧垂为f,设A与B的高差为h。
步骤2:设A、B、C三点的坐标分别为A(x1,y1,z1)、B(x2,y2,z2)、C(x3,y3,z3),使用全站仪的免棱镜模式进行弧垂观测,以O点为原点,测量A、B、C三点的坐标,A、B、C位于同一坐标系,在建立坐标系时,一般以O点竖直向上的方向为Z轴,X轴,y轴的正方向一般以便于测量为基准。
步骤3:通过
Figure GDA0003052500990000023
求l。
步骤4:通过h=(z2-z1)求h,在本实施例中,第二特高压铁塔的顶部B高于第一特高压铁塔的顶部A。
步骤5:通过
Figure GDA0003052500990000024
求lx
步骤6:通过
Figure GDA0003052500990000031
求fx
步骤7:通过
Figure GDA0003052500990000032
推算出
Figure GDA0003052500990000033
在弧垂观测领域中,考虑到实际架设过程中地面高度的问题,相邻的杆塔一般不会等高,其中常见的对于高差不超过10%的相邻杆塔之间的导线最大弧垂,认为出现在档距中央,该观点属于本领域技术人员公知的、默认的技术观点,在本发明中,针对高差不超过10%的相邻杆塔来进行计算,默认最大弧垂出现在档距中点。
通过以全站仪为原点建立空间坐标系,使用全站仪的免棱镜模式对两座特高压铁塔两顶端以及弧垂上任意一点的求空间坐标,通过公式推导计算出弧垂,测量数据少,效率高。

Claims (1)

1.一种通过高效档侧弧垂观测调整导线的方法,其特征在于,包括:
步骤1:设经纬仪观测点为O,第一特高压铁塔的顶部为A,第二特高压铁塔的顶部为B,第一特高压铁塔、第二特高压铁塔与O点所在的水平面的交点为A′、B′,设弧垂上任意一点为C,点C的弧垂为fx,点C在A’B’上的投影为C’,设A’B’为l,A’C’为lx,设第一特高压铁塔与第二特高压特塔的中点弧垂为f,设A与B的高差为h;
步骤2:设A、B、C三点的坐标分别为A(x1,y1,z1)、B(x2,y2,z2)、C(x3,y3,z3),使用全站仪的免棱镜模式进行弧垂观测,以O点为原点,测量A、B、C三点的坐标,A、B、C位于同一坐标系;
步骤3:通过
Figure FDA0003052500980000011
求l;
步骤4:通过h=(z2-z1)求h;
步骤5:通过
Figure FDA0003052500980000012
求lx
步骤6:通过
Figure FDA0003052500980000013
求fx
步骤7:通过
Figure FDA0003052500980000014
推算出
Figure FDA0003052500980000015
CN201911203881.6A 2019-11-29 2019-11-29 一种通过高效档侧弧垂观测调整导线的方法 Active CN110906872B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911203881.6A CN110906872B (zh) 2019-11-29 2019-11-29 一种通过高效档侧弧垂观测调整导线的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911203881.6A CN110906872B (zh) 2019-11-29 2019-11-29 一种通过高效档侧弧垂观测调整导线的方法

Publications (2)

Publication Number Publication Date
CN110906872A CN110906872A (zh) 2020-03-24
CN110906872B true CN110906872B (zh) 2021-08-20

Family

ID=69821013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911203881.6A Active CN110906872B (zh) 2019-11-29 2019-11-29 一种通过高效档侧弧垂观测调整导线的方法

Country Status (1)

Country Link
CN (1) CN110906872B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114353766A (zh) * 2021-12-20 2022-04-15 国家电网有限公司 输电线路档侧法观测导地线弧垂的方法及系统

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08233568A (ja) * 1995-02-24 1996-09-13 Hitachi Cable Ltd 架空線の弛度測定装置
CN102721371A (zh) * 2012-07-03 2012-10-10 华北电力大学(保定) 一种输电线弧垂计算装置及方法
CN102721875A (zh) * 2012-06-15 2012-10-10 四川电力科学研究院 一种基于输电导线表面等效电荷曲线积分的三维工频电场的测定方法
CN104715105A (zh) * 2015-02-11 2015-06-17 福州大学 一种基于悬链线的变电站软导线的最大弧垂建模方法
EP2895893A1 (en) * 2012-09-13 2015-07-22 Chevron U.S.A. Inc. System and method for performing simultaneous petrophysical analysis of composition and texture of rock formations
CN106248048A (zh) * 2016-08-10 2016-12-21 中国电力科学研究院 一种基于全站仪的档侧导线弧垂观测方法
WO2017078952A1 (en) * 2015-11-05 2017-05-11 United States Gypsum Company System and method for manufacturing cementitious boards with on-line board measurement
CN106871837A (zh) * 2017-02-13 2017-06-20 郑州信工智能化系统有限公司 弧垂测量方法及装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11048012B2 (en) * 2017-10-27 2021-06-29 Schlumberger Technology Corporation Formation characterization system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08233568A (ja) * 1995-02-24 1996-09-13 Hitachi Cable Ltd 架空線の弛度測定装置
CN102721875A (zh) * 2012-06-15 2012-10-10 四川电力科学研究院 一种基于输电导线表面等效电荷曲线积分的三维工频电场的测定方法
CN102721371A (zh) * 2012-07-03 2012-10-10 华北电力大学(保定) 一种输电线弧垂计算装置及方法
EP2895893A1 (en) * 2012-09-13 2015-07-22 Chevron U.S.A. Inc. System and method for performing simultaneous petrophysical analysis of composition and texture of rock formations
CN104715105A (zh) * 2015-02-11 2015-06-17 福州大学 一种基于悬链线的变电站软导线的最大弧垂建模方法
WO2017078952A1 (en) * 2015-11-05 2017-05-11 United States Gypsum Company System and method for manufacturing cementitious boards with on-line board measurement
CN106248048A (zh) * 2016-08-10 2016-12-21 中国电力科学研究院 一种基于全站仪的档侧导线弧垂观测方法
CN106871837A (zh) * 2017-02-13 2017-06-20 郑州信工智能化系统有限公司 弧垂测量方法及装置

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
《Measurements and calculations of gravitational and electrostatic wire sags for a 4.6 meter long drift chamber》;S. Sudoua等;《Nuclear Instruments and Methods in Physics Research A》;19961231;全文 *
《浅谈全站仪在变电站高跨软母线档距及弧垂测量中的应用》;刘林田,等;《山东电力高等专科学校学报》;20141231;全文 *
《采用图像处理技术的输电线路导线弧垂测量》;黄新波,等;《高电压技术》;20110831;全文 *
《高压电缆最低弧垂点的测量方法》;傅太生,等;《测绘技术装备》;20060228;全文 *

Also Published As

Publication number Publication date
CN110906872A (zh) 2020-03-24

Similar Documents

Publication Publication Date Title
CN109458988B (zh) 基于uwb无线测距技术的抱杆倾角测量方法
CN103207948B (zh) 基于风速相关性的风电场测风仪风速缺失数据插补方法
CN110906872B (zh) 一种通过高效档侧弧垂观测调整导线的方法
CN103559360A (zh) 一种三维架空电力线模型的构建方法及系统
CN108693450A (zh) 用于大跨越高杆塔的输电线路绕击闪络耐雷性能分析方法
CN110851932A (zh) 一种低压配电网三相单线图初始布局自动生成方法
CN103022945B (zh) 一种输电线路耐张塔跳线安装方法
CN109872384B (zh) 一种基于机载lidar点云数据的杆塔自动化建模方法
CN103268379A (zh) 架空输电导线任意位置空间截面相间距离精确计算方法
CN106845698A (zh) 一种台风影响电网断线率的预测方法
CN105222737B (zh) 输电线路弓子线弧垂测量方法
CN107563099A (zh) 一种顾及排位知识的架空输电线路杆塔排位方法
CN110906870B (zh) 一种通过水平角为90度的档侧弧垂观测调整导线的方法
CN101915566A (zh) 一种测量架空输电线路档距两端不等高时雷电绕击率的方法
CN110906871B (zh) 一种通过档侧弧垂观测调整导线的方法
CN109766648A (zh) 基于bim技术的牵引变电所导线预制安装施工方法
CN112784430A (zh) 一种输电线路进出线档导线相间距的计算方法
CN106202810A (zh) 一种双挂点v串零部件模型空间姿态的调整方法
CN105024323B (zh) 一种特高压直流工程极线穿墙套管布置结构及其设计方法
CN103795075A (zh) 变电站内输电线路三相电流不平衡导线相序排列调整方法
CN104965156B (zh) 一种利用极线故障电压进行pca聚类分析的故障选极方法
CN107843228A (zh) 多层扫描时序空间轨迹面积的获取方法
CN114509777A (zh) 一种基于Cesium平台的输电工程实体验收方法
CN111181009B (zh) 一种用于确定不等高避雷针保护范围的方法
CN110727907B (zh) 一种输电线路下方树木砍伐范围的计算方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant