CN110851932A - 一种低压配电网三相单线图初始布局自动生成方法 - Google Patents
一种低压配电网三相单线图初始布局自动生成方法 Download PDFInfo
- Publication number
- CN110851932A CN110851932A CN201910993601.XA CN201910993601A CN110851932A CN 110851932 A CN110851932 A CN 110851932A CN 201910993601 A CN201910993601 A CN 201910993601A CN 110851932 A CN110851932 A CN 110851932A
- Authority
- CN
- China
- Prior art keywords
- line
- sector
- phase
- angle
- low
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910993601.XA CN110851932B (zh) | 2019-10-18 | 2019-10-18 | 一种低压配电网三相单线图初始布局自动生成方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910993601.XA CN110851932B (zh) | 2019-10-18 | 2019-10-18 | 一种低压配电网三相单线图初始布局自动生成方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110851932A true CN110851932A (zh) | 2020-02-28 |
CN110851932B CN110851932B (zh) | 2023-05-30 |
Family
ID=69597496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910993601.XA Active CN110851932B (zh) | 2019-10-18 | 2019-10-18 | 一种低压配电网三相单线图初始布局自动生成方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110851932B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111639412A (zh) * | 2020-04-17 | 2020-09-08 | 许继集团有限公司 | 基于地理沿布图自动生成单线图的方法 |
CN111737841A (zh) * | 2020-08-21 | 2020-10-02 | 杭州电子科技大学 | 一种scdn单线图的径向无交叉均匀分布方法 |
CN112562038A (zh) * | 2020-12-22 | 2021-03-26 | 广东电网有限责任公司茂名供电局 | 一种基于聚类分析的低压配电网图形生成方法 |
CN113190936A (zh) * | 2020-12-25 | 2021-07-30 | 深圳供电局有限公司 | 低压单线图绘图方法、电力系统、计算机设备和存储介质 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120221986A1 (en) * | 2009-11-25 | 2012-08-30 | Draftlogic Inc. | System and process for automated circuiting and branch circuit wiring |
CN108629061A (zh) * | 2017-03-23 | 2018-10-09 | 南京南瑞继保电气有限公司 | 一种混合式布局的配电网单线图自动生成方法 |
CN109858095A (zh) * | 2018-12-28 | 2019-06-07 | 杭州电子科技大学 | 基于扇形的变电站为中心配电网单线图初始布局计算方法 |
CN109885859A (zh) * | 2018-12-28 | 2019-06-14 | 杭州电子科技大学 | 加惯性力的变电站为中心配网单线图自动布局计算方法 |
-
2019
- 2019-10-18 CN CN201910993601.XA patent/CN110851932B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120221986A1 (en) * | 2009-11-25 | 2012-08-30 | Draftlogic Inc. | System and process for automated circuiting and branch circuit wiring |
CN108629061A (zh) * | 2017-03-23 | 2018-10-09 | 南京南瑞继保电气有限公司 | 一种混合式布局的配电网单线图自动生成方法 |
CN109858095A (zh) * | 2018-12-28 | 2019-06-07 | 杭州电子科技大学 | 基于扇形的变电站为中心配电网单线图初始布局计算方法 |
CN109885859A (zh) * | 2018-12-28 | 2019-06-14 | 杭州电子科技大学 | 加惯性力的变电站为中心配网单线图自动布局计算方法 |
Non-Patent Citations (4)
Title |
---|
AKHTAR HUSSAIN,ETC: "A standards-based approach for Auto-drawing single line diagram of multivendor smart distribution systems" * |
宋国彬: "配电网馈线单线图自动布局的研究" * |
章坚民,邱程峰,等: "变电站为中心配电网单线图(二)初始自动布局" * |
陈韬: "智能单相配电技术的研究与应用" * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111639412A (zh) * | 2020-04-17 | 2020-09-08 | 许继集团有限公司 | 基于地理沿布图自动生成单线图的方法 |
CN111737841A (zh) * | 2020-08-21 | 2020-10-02 | 杭州电子科技大学 | 一种scdn单线图的径向无交叉均匀分布方法 |
CN112562038A (zh) * | 2020-12-22 | 2021-03-26 | 广东电网有限责任公司茂名供电局 | 一种基于聚类分析的低压配电网图形生成方法 |
CN113190936A (zh) * | 2020-12-25 | 2021-07-30 | 深圳供电局有限公司 | 低压单线图绘图方法、电力系统、计算机设备和存储介质 |
CN113190936B (zh) * | 2020-12-25 | 2023-03-03 | 深圳供电局有限公司 | 低压单线图绘图方法、电力系统、计算机设备和存储介质 |
Also Published As
Publication number | Publication date |
---|---|
CN110851932B (zh) | 2023-05-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110851932A (zh) | 一种低压配电网三相单线图初始布局自动生成方法 | |
Birchfield et al. | Grid structural characteristics as validation criteria for synthetic networks | |
CN105335584B (zh) | 配网系统单线图生成优化装置和方法 | |
CN106340897B (zh) | 一种配电网分布式电源准入容量的确定方法 | |
Sciano et al. | Evaluation of DC links on dense-load urban distribution networks | |
CN106446399B (zh) | 电缆布局方法及用于电缆布局的终端设备 | |
CN105117518A (zh) | 一种辐射接线模式的配电馈线单线图自动绘制方法及系统 | |
CN109598377B (zh) | 一种基于故障约束的交直流混合配电网鲁棒规划方法 | |
CN110826800B (zh) | 光伏电站布局方法和装置 | |
WO2021128223A1 (zh) | 风电场布局的优化方法、优化系统及计算机可读存储介质 | |
CN108988400B (zh) | 用于多机并联电力电子变压器的功率分配方法及电子设备 | |
CN109858095A (zh) | 基于扇形的变电站为中心配电网单线图初始布局计算方法 | |
CN108199381A (zh) | 一种用于风电接入系统电压稳定性的切负荷地点选择方法 | |
Sedighi et al. | Simultaneous optimization of electrical interconnection configuration and cable sizing in offshore wind farms | |
Nasiri et al. | Integration of smart grid technologies for voltage regulation in low voltage distribution grids | |
Rimbawati et al. | Analysis Comparison Of The Voltage Drop Before And After Using The Turbine In The Bintang Asih Microhydro Power Plant System | |
KR20150028436A (ko) | 분산형 전원 연계 가능 용량 산정 장치 및 방법 | |
CN110311372A (zh) | 基于谱聚类的电网分区方法 | |
CN111639412A (zh) | 基于地理沿布图自动生成单线图的方法 | |
CN112270448A (zh) | 发电设备的布局优化方法、装置及计算机可读存储介质 | |
Goqo et al. | Off-load tap-change transformer impact under high distributed PV generation | |
CN111222209A (zh) | 一种低压配电网三相电路分相单线图的优化生成方法 | |
Zuo et al. | Double-sided ring topology for offshore wind fram collector system layout: A multi-cable application | |
Gupta et al. | Predicting Voltage Variations in Low Voltage Networks with Prosumers | |
CN103368205A (zh) | 基于风电总上网有功潮流确定电压可行域的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210326 Address after: 311100 Building 5, 138 Yunlian Road, Yuhang District, Hangzhou City, Zhejiang Province Applicant after: Marketing service center of State Grid Zhejiang Electric Power Co.,Ltd. Applicant after: HANGZHOU DIANZI University Applicant after: ZHEJIANG HUAYUN INFORMATION TECHNOLOGY Co.,Ltd. Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane Applicant before: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY LIMITED ELECTRIC POWER Research Institute Applicant before: HANGZHOU DIANZI University Applicant before: ZHEJIANG HUAYUN INFORMATION TECHNOLOGY Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20211231 Address after: 311100 Building 5, 138 Yunlian Road, Yuhang District, Hangzhou City, Zhejiang Province Applicant after: Marketing service center of State Grid Zhejiang Electric Power Co.,Ltd. Applicant after: ZHEJIANG HUAYUN INFORMATION TECHNOLOGY Co.,Ltd. Address before: 311100 Building 5, 138 Yunlian Road, Yuhang District, Hangzhou City, Zhejiang Province Applicant before: Marketing service center of State Grid Zhejiang Electric Power Co.,Ltd. Applicant before: HANGZHOU DIANZI University Applicant before: ZHEJIANG HUAYUN INFORMATION TECHNOLOGY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |