CN110866690A - Application of BIM model data in intelligent construction site - Google Patents

Application of BIM model data in intelligent construction site Download PDF

Info

Publication number
CN110866690A
CN110866690A CN201911107057.0A CN201911107057A CN110866690A CN 110866690 A CN110866690 A CN 110866690A CN 201911107057 A CN201911107057 A CN 201911107057A CN 110866690 A CN110866690 A CN 110866690A
Authority
CN
China
Prior art keywords
bim model
construction
construction site
data
application
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911107057.0A
Other languages
Chinese (zh)
Inventor
刘向东
梁波
宋文帅
杨剑斌
史振中
雍琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Industrial Equipment Installation Group Co Ltd
Original Assignee
Shanxi Industrial Equipment Installation Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Industrial Equipment Installation Group Co Ltd filed Critical Shanxi Industrial Equipment Installation Group Co Ltd
Priority to CN201911107057.0A priority Critical patent/CN110866690A/en
Publication of CN110866690A publication Critical patent/CN110866690A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention overcomes the defects in the prior art, provides the application of the BIM model data in the intelligent construction site, optimizes the construction process, saves the construction cost and improves the construction efficiency; in order to solve the technical problems, the invention adopts the technical scheme that: the application of the BIM model data in the intelligent construction site obtains construction plan progress and construction site data acquisition by carrying out lightweight analysis on the BIM model, then constructs a BIM4D model according to the construction plan progress, and constructs BIM model visualization according to the construction site data acquisition.

Description

Application of BIM model data in intelligent construction site
Technical Field
The invention discloses application of BIM model data in an intelligent construction site, relates to building construction management, and particularly relates to informatization application of BIM technology in project construction.
Background
In the information management system for the construction of the building construction project, most of information is manually filled, the accuracy and timeliness of the information are determined by human factors, and the information has no reference value for managing all aspects of the project in the actual application process.
Disclosure of Invention
The invention overcomes the defects in the prior art, provides the application of the BIM model data in the intelligent construction site, optimizes the construction process, saves the construction cost and improves the construction efficiency.
In order to solve the technical problems, the invention adopts the technical scheme that: the application of the BIM model data in the intelligent construction site obtains construction plan progress and construction site data acquisition by carrying out lightweight analysis on the BIM model, then constructs a BIM4D model according to the construction plan progress, and constructs BIM model visualization according to the construction site data acquisition.
The BIM4D model includes construction plan work volume, construction plan material volume, and construction plan labor.
The BIM model visualization comprises video BIM model positioning display, personnel information BIM model positioning display and equipment information BIM model positioning display.
Compared with the prior art, the invention has the beneficial effects that: the invention can flexibly extract the engineering quantity, reduce the frequency of manually extracting the engineering quantity repeatedly, extract the engineering quantity and the material quantity of any section in any time period at any time, provide basic data for extracting a material plan, reduce repeated purchase and multiple extraction of the material, reduce the capital occupation, reduce the occupied area of the material and improve the working efficiency.
Drawings
The invention is further described below with reference to the accompanying drawings.
FIG. 1 is a block diagram schematically illustrating the structure of the present invention.
Detailed Description
As shown in FIG. 1, the application of the BIM model data in the intelligent construction site obtains construction plan progress and construction site data acquisition by lightweight analysis of the BIM model, then builds a BIM4D model according to the construction plan progress, and builds BIM model visualization according to the construction site data acquisition.
The BIM4D model includes construction plan work volume, construction plan material volume, and construction plan labor.
The BIM model visualization comprises video BIM model positioning display, personnel information BIM model positioning display and equipment information BIM model positioning display.
According to the invention, the geometric data in the model is extracted through the light BIM model, the data is associated with the construction plan in the intelligent construction site, the 4D model is realized, the engineering basic data in the construction process is accurately and quickly analyzed into the engineering quantity, timely and accurate data support is provided for the formulation of a material purchasing plan and a labor force plan at any time, an accurate data basis is provided for zero inventory and zero labor force, and a data basis is provided for the judgment of the field management condition. And in combination with data collected by the intelligent worksite site using sensors, provide on-site real-time status data in BIM visualization.
The invention can flexibly extract the engineering quantity, reduce the frequency of manually extracting the engineering quantity repeatedly, extract the engineering quantity and the material quantity of any section in any time period at any time, provide basic data for extracting a material plan, reduce repeated purchase and multiple extraction of the material, reduce the capital occupation, reduce the occupied area of the material and improve the working efficiency.
The BIM related to the invention is a perfect information model, can connect data, processes and resources of different stages of the life cycle of a construction project, is a complete description of the project, provides real-time engineering data which can be combined and split randomly, can be generally used by all participants of the construction project, but is difficult to be really combined with construction management in practical application.
The invention is formed by further optimizing on the basis of a database system for BIM platform calculation of a building construction enterprise, and the modeling process of the invention refers to the files.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge of those skilled in the art without departing from the gist of the present invention.

Claims (3)

1. The application of the BIM model data in the intelligent construction site is characterized in that a construction plan progress and construction site data collection are obtained through lightweight analysis of the BIM model, then the BIM4D model is built according to the construction plan progress, and BIM model visualization is built according to the construction site data collection.
2. The use of BIM model data in an intelligent worksite according to claim 1, wherein the BIM4D model includes construction planning work volume, construction planning material volume, and construction planning labor.
3. The use of the BIM model data in the intelligent worksite according to claim 1, wherein the BIM model visualization comprises a video BIM model positioning display, a personnel information BIM model positioning display and an equipment information BIM model positioning display.
CN201911107057.0A 2019-11-13 2019-11-13 Application of BIM model data in intelligent construction site Pending CN110866690A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911107057.0A CN110866690A (en) 2019-11-13 2019-11-13 Application of BIM model data in intelligent construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911107057.0A CN110866690A (en) 2019-11-13 2019-11-13 Application of BIM model data in intelligent construction site

Publications (1)

Publication Number Publication Date
CN110866690A true CN110866690A (en) 2020-03-06

Family

ID=69654209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911107057.0A Pending CN110866690A (en) 2019-11-13 2019-11-13 Application of BIM model data in intelligent construction site

Country Status (1)

Country Link
CN (1) CN110866690A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111709106A (en) * 2020-06-08 2020-09-25 山西省工业设备安装集团有限公司 Construction process of multi-professional complex underground pipe network of DCPS (DCPS)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440600A (en) * 2013-09-13 2013-12-11 成都中铁隆工程集团有限公司 BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model
CN108596423A (en) * 2018-03-02 2018-09-28 重庆机电装备技术研究院有限公司 A kind of trackways engineering construction progress msg management method based on BIM
CN110008648A (en) * 2019-05-15 2019-07-12 平煤神马建工集团有限公司 A kind of wisdom building site Integration Data Model method based on BIM model

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103440600A (en) * 2013-09-13 2013-12-11 成都中铁隆工程集团有限公司 BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model
CN108596423A (en) * 2018-03-02 2018-09-28 重庆机电装备技术研究院有限公司 A kind of trackways engineering construction progress msg management method based on BIM
CN110008648A (en) * 2019-05-15 2019-07-12 平煤神马建工集团有限公司 A kind of wisdom building site Integration Data Model method based on BIM model

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111709106A (en) * 2020-06-08 2020-09-25 山西省工业设备安装集团有限公司 Construction process of multi-professional complex underground pipe network of DCPS (DCPS)
CN111709106B (en) * 2020-06-08 2023-06-13 山西省安装集团股份有限公司 Construction method of DCPS multi-specialty complex underground pipe network

Similar Documents

Publication Publication Date Title
CN106988221B (en) Unit construction bridge beam construction method based on BIM
US20130335413A1 (en) System and method for estimating construction duration
CN111369158A (en) BIM-based informatization quality management method and system
CN110490415B (en) Building progress assessment method for visual coordination of multiple unmanned aerial vehicles
CN111143915A (en) Steel structure modular installation method based on Tekla software platform
CN111144836A (en) Smart building integrated collaborative big data platform
CN114511202B (en) BIM-based full-period engineering project management method and platform
Boon et al. Evolution of quantity surveying practice in the use of BIM–the New Zealand experience
CN104680320A (en) BIM-based project management system and method
CN106910009A (en) Construction manpower management system based on BIM technology and its method for manpower management of constructing
CN106997511A (en) Railway beam course management system and railway beam a management method based on BIM technology
CN109583852B (en) Material and progress informatization management system for bridge cantilever pouring construction
CN110080549A (en) A kind of protection decision-making technique of gallows timber ancient building in Architectural Heritage
CN106503896A (en) Construction equipment management method based on BIM technology
CN113269527A (en) Method for accurately processing steel bar based on BIM steel bar shape and parameters
CN105069542A (en) Responsibility cost budget drafting method and system
CN116029682A (en) Construction progress management method and system based on BIM technology
CN110866690A (en) Application of BIM model data in intelligent construction site
Cao et al. A Digital Twin (DT) Framework at Design and Construction Phases
Patil et al. Labour productivity improvement by work-study tools of fiber composite company
CN103295085A (en) Highway engineering three-dimensional office system building method based on Google earth
Xiaosheng et al. Precast concrete building construction process comparison
TWI567687B (en) Asset management system and asset management method
KR101545998B1 (en) Method for Management Integration of Runoff-Hydraulic Model Data and System thereof
CN216014298U (en) Building supervisory systems based on BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200306