CN110700683A - Haze engineering can be removed to outer loop that can practice thrift the land and the fit structural design scheme of parking engineering that sets up - Google Patents

Haze engineering can be removed to outer loop that can practice thrift the land and the fit structural design scheme of parking engineering that sets up Download PDF

Info

Publication number
CN110700683A
CN110700683A CN201810794740.5A CN201810794740A CN110700683A CN 110700683 A CN110700683 A CN 110700683A CN 201810794740 A CN201810794740 A CN 201810794740A CN 110700683 A CN110700683 A CN 110700683A
Authority
CN
China
Prior art keywords
haze
engineering
project
parking
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810794740.5A
Other languages
Chinese (zh)
Inventor
梁嘉麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Jiliang University
China University of Metrology
Original Assignee
China University of Metrology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Metrology filed Critical China University of Metrology
Priority to CN202110622093.1A priority Critical patent/CN113323494A/en
Priority to CN202111290976.3A priority patent/CN115559597A/en
Priority to CN201810794740.5A priority patent/CN110700683A/en
Priority to CN202310240772.1A priority patent/CN116122658A/en
Publication of CN110700683A publication Critical patent/CN110700683A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H14/00Buildings for combinations of different purposes not covered by any single one of main groups E04H1/00-E04H13/00 of this subclass, e.g. for double purpose; Buildings of the drive-in type
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/08Garages for many vehicles
    • E04H6/12Garages for many vehicles with mechanical means for shifting or lifting vehicles
    • E04H6/18Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Residential Or Office Buildings (AREA)
  • Road Paving Structures (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model provides a can practice thrift the outer loop of land used and remove haze engineering and the fit structural design scheme of parking engineering that sets up, its characterized in that on the basis that does not change the bucket-shaped haze tower engineering structure that removes, encircles and removes haze tower engineering outside wall and expand the design scheme requirement of building annular stereo garage engineering again and be: at least five independent three-in-one garage groups which surround the haze removal tower project and are composed of two rows of vertically arranged parking spaces (2) at the left side and the right side of a vertical elevator lifting shaft (3) in the middle are arranged in the annular stereo garage project; the left and right vertical boundaries at the two sides of the three-in-one garage group are connected with other similar types to form a vertical haze-removing hole (1) with a pentagon middle; the height distance between the parking spaces (2) is not more than 2 meters. Obviously, the complementarity of the haze removal tower project and the stereo garage project in the aspects of the integrated common structure design and the integrated common foundation ground is obvious in beneficial effect brought to the common urban construction. It is especially suitable for being implemented in cities or urban busy areas.

Description

Haze engineering can be removed to outer loop that can practice thrift the land and the fit structural design scheme of parking engineering that sets up
Technical Field
The invention relates to haze tower removal engineering, in particular to a parking engineering integrated structure design scheme which is arranged for outer ring haze removal engineering and can save land.
Background
At present, the haze tower engineering with the vertical high-altitude exhaust pipeline with the diameter of 10 meters and the height of more than 60 meters is published in the city of western security in China shortly before, and experiments show that the haze treatment work in the city area over about 10 square kilometers with the engineering as the center can be solved by each haze tower engineering, obviously, if province cities like the city of western security are provided, dozens of such engineering are built in the city, and the first major affairs for solving the haze problem in the city are expected to be solved in short time. However, the main body of the project is a vertical high altitude exhaust duct (haze tower) with a diameter of 10 meters and a height of 60 meters, although only 10 meters, because it is weak against transverse vibration forces (wind or seismic forces), and therefore, it is likely to consume many times the footprint of 10 meters in diameter.
The high-rise three-dimensional garage is a project which is often seen by people, the structural design of the high-rise three-dimensional garage is very familiar to people, the steel structure of the high-rise three-dimensional garage has extremely strong transverse vibration resistance and extremely small foundation land, however, the high-rise three-dimensional garage is also very difficult to realize in cities, particularly in downtown areas of cities, and a small three-dimensional garage with dozens of parking spaces is to be built. .
Obviously: if the projects with two different functions are designed in a combined way and share one foundation floor, unexpected effects can be produced from the aspects of floor occupation (beneficial to the stereo garage project and the haze removal tower project, namely the foundation land of the latter probably covers all the foundation land of the former) and the stability of the project structure (beneficial to the haze removal tower project), which is not better than that of the project with two different functions?
Disclosure of Invention
The purpose of the invention is as follows: it is to solve the above problem.
The key points of the invention are as follows: on the premise of firstly building haze-removing tower engineering in a certain place of a downtown, on the basis of basically not needing to additionally form a ground cover or increasing a small amount of ground covers, on the premise of completing the haze-removing tower engineering with the scale, hundreds of parking spaces can be increased, so that the problem of difficulty in parking in a city can be solved by a great and easy-to-solve happy event!
Compared with the prior art, the invention has the characteristics that:
on the premise that a haze removal project needs to be built in a certain place in a city area, on the basis that no additional ground crust is needed or a very small amount of ground crust is added, the haze removal project can be completed (according to the data built in the city of Western Ann, the diameter is 10 meters and the height is more than 60 meters) and the stereo garage project can be completed (hundreds of parking spaces of the garage are calculated according to the data after the haze removal project is built), so that conditions can be created for achieving unexpected beneficial effects when two projects with different functions are jointly designed. On the premise of not basically increasing a ground cover for an engineering foundation, a three-dimensional garage with hundreds of parking spaces can be built, conditions are created, and the anti-seismic capacity of the haze removal tower engineering which contributes to the ground cover is greatly improved due to the fact that the three-dimensional garage engineering is additionally built (the safety insurance coefficient is greatly increased).
Drawings
Fig. 1 shows an overview of the structural design of the present invention.
Fig. 2 is a top view of fig. 1.
1: a hole of the round long column body for haze removal tower engineering; 2: a car parking space; 3: a vertical elevator shaft; 4: removing the original design scheme of the haze tower; 5: exceed the corner cross-sectional area that circular tower body cross section was increased when building the garage except that haze tower periphery.
Detailed Description
In order to implement the present invention, the following technical solutions are adopted:
the invention has the structure that:
the method comprises the following steps: the haze removal tower engineering is carried out,
its characterized in that on the basis that does not change barrel-shaped haze tower engineering structure that removes, encircles and removes haze tower engineering outside wall and expand the design scheme requirement of building annular stereo garage engineering again and be:
at least five independent three-in-one garage groups which surround the haze removal tower project and are composed of two rows of vertically arranged parking spaces 3 at the left side and the right side of a vertical elevator shaft 2 in the middle are arranged in the annular stereo garage project;
vertical boundary of trinity garage group both sides about with other similar vertical hole 1 that forms middle pentagonal vertical haze tower engineering that removes. Considering that the diameter of the first haze removal tower project in the city of Xian is 10 meters, the circumference of the haze removal tower is close to a regular pentagon internally tangent to the project set up by 5 sets of three-dimensional garages.
The height distance between two layers of the parking spaces 3 is not more than 2 meters or 2.5 meters. The height of a common car can not exceed 1.5 meters.
And the height of the vertically arranged floors of the parking spaces 3 is equal to or less than the height of the haze removal tower project. Primarily with reference to the general story height range of stereo garage engineering as prior art.
The parking space 3 of the invention has the length of 6 meters and the width of 2.5 meters, and the plane length of each three-in-one garage group is 7.5 meters and the width of 2.5 meters. It determines the planar dimensions of the stereo garage project.
The using method of the invention is the same as the using method of the conventional stereo garage: the automobile is independently sent to the parking space 3 through the elevator, and then the automobile after parking is sent down by the elevator and is handed to a driver to drive to the other place.
Remove the bottom of haze tower engineering and be close to the half under of total height, can let by five groups "trinity garage group" surround and erect in view of the principle, adopt the circular former design 4 of 10 meters diameter promptly, in addition five corners of regular pentagon go up a plurality of five triangle-shaped cross-sectional areas 5 that come out, its air current flow resistance will be less than the round hole of 10 meters diameter, should replace the circular former design 4 of 10 meters diameters that removes the haze tower engineering, and half up again removes the haze tower and can consider the mode construction that adopts former design 4.
The problem that a stereo garage project with hundreds of parking spaces 3 can be newly built in a common urban area, particularly in an urban area which is downtown by the way of extruding out the place skins is not easy to handle, and the method is significant for solving the problem of difficulty in parking in cities.
Obviously: if the floor space serving as the foundation is not only used for completing a haze tower removing project, but also can be used for covering and completing a three-dimensional garage project with hundreds of parking spaces 3, for example, the three-dimensional garage project is beneficial to the foundation floor, and the problem should be completely solved. When the haze removal tower engineering is independently implemented, the problem of structural stability for long tower body (60 meters long) and the cost of occupying the ground cover in the whole foundation of the engineering can be saved (the main contradiction of the city is that the supply of the ground cover is extremely short).
It can be seen that the remarkable progress in the implementation of the integrated engineering is obvious due to the complementarity of the haze removal tower engineering and the stereo garage engineering in the aspects of integrated common structure design and integrated common foundation and ground; it is suitable for being implemented in a city or a hot and busy area in the city; it is suitable for being implemented in a city or a hot and busy area in the city.

Claims (3)

1. A parking project integrated structure design scheme which is arranged for an outer ring haze removal project and can save land,
comprises the following steps: the haze removal tower engineering is carried out,
its characterized in that on the basis that does not change barrel-shaped haze tower engineering structure that removes, encircles and removes haze tower engineering outside wall and expand the design scheme requirement of building annular stereo garage engineering again and be:
at least five independent three-in-one garage groups which surround the haze removal tower project and are composed of two rows of vertically arranged parking spaces (2) at the left side and the right side of a vertical elevator lifting shaft (3) in the middle are arranged in the annular stereo garage project;
the vertical boundary of the two sides of the three-in-one garage group is connected with other similar types to form a vertical haze-removing hole (1) with a pentagonal middle.
2. The utility model provides a according to claim 1 the outer ring that relates to can practice thrift the land is removed haze engineering and is set up parking project fit structural design scheme which characterized in that: the height distance between the two parking spaces (2) is not more than 2 meters or 2.5 meters.
3. The utility model provides a according to claim 1 the outer ring that relates to can practice thrift the land is removed haze engineering and is set up parking project fit structural design scheme which characterized in that: the height of the vertical floor of the parking space (2) is equal to or less than the height of the haze removal tower project.
CN201810794740.5A 2018-07-09 2018-07-09 Haze engineering can be removed to outer loop that can practice thrift the land and the fit structural design scheme of parking engineering that sets up Pending CN110700683A (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN202110622093.1A CN113323494A (en) 2018-07-09 2018-07-09 Structural design of elevator car-carrying stereo garage in annular arrangement and with haze removal function
CN202111290976.3A CN115559597A (en) 2018-07-09 2018-07-09 Dual-functional entity for integrally building haze removal tower and elevator car-carrying type stereo garage
CN201810794740.5A CN110700683A (en) 2018-07-09 2018-07-09 Haze engineering can be removed to outer loop that can practice thrift the land and the fit structural design scheme of parking engineering that sets up
CN202310240772.1A CN116122658A (en) 2018-07-09 2018-07-09 Structural design scheme capable of considering haze removal tower function and arranged in annular arrangement state of elevator type stereo garage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810794740.5A CN110700683A (en) 2018-07-09 2018-07-09 Haze engineering can be removed to outer loop that can practice thrift the land and the fit structural design scheme of parking engineering that sets up

Related Child Applications (3)

Application Number Title Priority Date Filing Date
CN202310240772.1A Division CN116122658A (en) 2018-07-09 2018-07-09 Structural design scheme capable of considering haze removal tower function and arranged in annular arrangement state of elevator type stereo garage
CN202110622093.1A Division CN113323494A (en) 2018-07-09 2018-07-09 Structural design of elevator car-carrying stereo garage in annular arrangement and with haze removal function
CN202111290976.3A Division CN115559597A (en) 2018-07-09 2018-07-09 Dual-functional entity for integrally building haze removal tower and elevator car-carrying type stereo garage

Publications (1)

Publication Number Publication Date
CN110700683A true CN110700683A (en) 2020-01-17

Family

ID=69192627

Family Applications (4)

Application Number Title Priority Date Filing Date
CN202310240772.1A Pending CN116122658A (en) 2018-07-09 2018-07-09 Structural design scheme capable of considering haze removal tower function and arranged in annular arrangement state of elevator type stereo garage
CN202111290976.3A Pending CN115559597A (en) 2018-07-09 2018-07-09 Dual-functional entity for integrally building haze removal tower and elevator car-carrying type stereo garage
CN201810794740.5A Pending CN110700683A (en) 2018-07-09 2018-07-09 Haze engineering can be removed to outer loop that can practice thrift the land and the fit structural design scheme of parking engineering that sets up
CN202110622093.1A Pending CN113323494A (en) 2018-07-09 2018-07-09 Structural design of elevator car-carrying stereo garage in annular arrangement and with haze removal function

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN202310240772.1A Pending CN116122658A (en) 2018-07-09 2018-07-09 Structural design scheme capable of considering haze removal tower function and arranged in annular arrangement state of elevator type stereo garage
CN202111290976.3A Pending CN115559597A (en) 2018-07-09 2018-07-09 Dual-functional entity for integrally building haze removal tower and elevator car-carrying type stereo garage

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN202110622093.1A Pending CN113323494A (en) 2018-07-09 2018-07-09 Structural design of elevator car-carrying stereo garage in annular arrangement and with haze removal function

Country Status (1)

Country Link
CN (4) CN116122658A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700682A (en) * 2018-07-09 2020-01-17 中国计量大学 Design scheme of fit structure capable of achieving complementary effect and relating to projects with two different functions including haze removal tower project
CN112627627A (en) * 2020-12-25 2021-04-09 周巽 Integrated construction scheme for stereo garage group project adapted environment project
CN112696068A (en) * 2020-12-25 2021-04-23 中国计量大学 Special stereo garage group and application example thereof in environmental engineering

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3290837A (en) * 1962-12-13 1966-12-13 Weston Maurice Multi-storey building structures
JPH04247129A (en) * 1991-02-01 1992-09-03 Nkk Corp Three dimensional composite structure
DE69103929D1 (en) * 1990-03-09 1994-10-20 Soilmec Spa Underground circular or variable radius garage.
CN1306142A (en) * 2001-03-08 2001-08-01 乙凸 Mansion with spiral walkway
CN202117371U (en) * 2011-06-17 2012-01-18 祖彦利 Vertically lifting stereoscopic garage
CN203916303U (en) * 2014-06-30 2014-11-05 晋中市三元风能除霾发电技术研究所 The large flow of autonomous type is except haze air cleaning system
CN203990224U (en) * 2014-08-19 2014-12-10 晋中市三元风能除霾发电技术研究所 Stand alone type urban air purifies except haze fog dissipation system
CN204326687U (en) * 2014-10-10 2015-05-13 张敏 A kind of spring steel work mansion
CN205370063U (en) * 2016-01-20 2016-07-06 巢湖学院 Three -dimensional garage
CN206676122U (en) * 2017-03-03 2017-11-28 顾佳宾 A kind of haze treating stations
CN108096967A (en) * 2017-05-15 2018-06-01 南京邦纳环保有限公司 Outdoor moisture film removes haze purifying column

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505886A (en) * 2011-10-11 2012-06-20 山东省自主创新促进中心 Ring-shaped three-dimensional garage
CN103046779B (en) * 2013-01-18 2015-10-21 沈昌 Multi-layer air garage
CN205908097U (en) * 2016-07-14 2017-01-25 福建平潭伯利恒科技有限公司 Parking tower

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3290837A (en) * 1962-12-13 1966-12-13 Weston Maurice Multi-storey building structures
DE69103929D1 (en) * 1990-03-09 1994-10-20 Soilmec Spa Underground circular or variable radius garage.
JPH04247129A (en) * 1991-02-01 1992-09-03 Nkk Corp Three dimensional composite structure
CN1306142A (en) * 2001-03-08 2001-08-01 乙凸 Mansion with spiral walkway
CN202117371U (en) * 2011-06-17 2012-01-18 祖彦利 Vertically lifting stereoscopic garage
CN203916303U (en) * 2014-06-30 2014-11-05 晋中市三元风能除霾发电技术研究所 The large flow of autonomous type is except haze air cleaning system
CN203990224U (en) * 2014-08-19 2014-12-10 晋中市三元风能除霾发电技术研究所 Stand alone type urban air purifies except haze fog dissipation system
CN204326687U (en) * 2014-10-10 2015-05-13 张敏 A kind of spring steel work mansion
CN205370063U (en) * 2016-01-20 2016-07-06 巢湖学院 Three -dimensional garage
CN206676122U (en) * 2017-03-03 2017-11-28 顾佳宾 A kind of haze treating stations
CN108096967A (en) * 2017-05-15 2018-06-01 南京邦纳环保有限公司 Outdoor moisture film removes haze purifying column

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700682A (en) * 2018-07-09 2020-01-17 中国计量大学 Design scheme of fit structure capable of achieving complementary effect and relating to projects with two different functions including haze removal tower project
CN112627627A (en) * 2020-12-25 2021-04-09 周巽 Integrated construction scheme for stereo garage group project adapted environment project
CN112696068A (en) * 2020-12-25 2021-04-23 中国计量大学 Special stereo garage group and application example thereof in environmental engineering

Also Published As

Publication number Publication date
CN115559597A (en) 2023-01-03
CN116122658A (en) 2023-05-16
CN113323494A (en) 2021-08-31

Similar Documents

Publication Publication Date Title
CN110700683A (en) Haze engineering can be removed to outer loop that can practice thrift the land and the fit structural design scheme of parking engineering that sets up
CN110700682A (en) Design scheme of fit structure capable of achieving complementary effect and relating to projects with two different functions including haze removal tower project
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN112696068A (en) Special stereo garage group and application example thereof in environmental engineering
CN107939141B (en) Steel structure tower and construction method thereof
CN216766935U (en) Embedded non-motor vehicle parking garage module
CN112681376B (en) Construction method of shaft type underground stereo garage
CN103061514B (en) Long-span steel structure corridor construction method
CN110685491A (en) Integrated structure design scheme for building stereo garage engineering on haze tower removal engineering base
CN215760640U (en) Short-limb shear wall frame structure for adding floor to existing building
CN113898242A (en) Integrated construction scheme of haze tower removing engineering and subminiature stereo garage engineering formed by height-limiting self-driving lane and elevator car in city
CN112861229A (en) Method for improving utilization rate of urban scarce land resources by using platform land technology
CN212984778U (en) Increase basement garage space utilization's multilayer machinery vehicle storehouse structure
CN108894581A (en) Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method
CN102968530A (en) Splicing method for converting space coordinates system of large-span spatial warping pipe truss
CN207633821U (en) A kind of city large tridimensional Garage
CN110685492A (en) Stereo garage built by means of foundation of haze tower engineering
CN109469332B (en) Method for installing multilayer steel structure
CN206337867U (en) A kind of self-propelled stereoscopic garage
CN112664039A (en) Stereo garage group project and environment project integrated construction scheme
CN115559596A (en) Integrated structure design scheme capable of achieving complementary effect of haze removal tower and spiral double-lane stereo garage
CN210737600U (en) Unit structure system of underground complex
CN211776326U (en) Can have enough to meet need prefabricated flag platform of porous formula reinforced concrete
CN214062509U (en) Assembled underground multi-layer shaft structure stereo garage
CN206942290U (en) A kind of pipe diagonal brace four pipe column foot station of prefabricated foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200117

RJ01 Rejection of invention patent application after publication