CN108894581A - Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method - Google Patents

Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method Download PDF

Info

Publication number
CN108894581A
CN108894581A CN201810685143.9A CN201810685143A CN108894581A CN 108894581 A CN108894581 A CN 108894581A CN 201810685143 A CN201810685143 A CN 201810685143A CN 108894581 A CN108894581 A CN 108894581A
Authority
CN
China
Prior art keywords
elevator
engineering
haze tower
driver
parking stall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810685143.9A
Other languages
Chinese (zh)
Inventor
梁嘉麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Jiliang University
Original Assignee
China Jiliang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Jiliang University filed Critical China Jiliang University
Priority to CN201810685143.9A priority Critical patent/CN108894581A/en
Publication of CN108894581A publication Critical patent/CN108894581A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H14/00Buildings for combinations of different purposes not covered by any single one of main groups E04H1/00-E04H13/00 of this subclass, e.g. for double purpose; Buildings of the drive-in type
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/08Garages for many vehicles
    • E04H6/12Garages for many vehicles with mechanical means for shifting or lifting vehicles
    • E04H6/18Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

It is a kind of help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method:On the basis of not changing arc except haze tower engineering structure, around except on the outside of haze tower engineering wall expand build annular three-dimensional garage engineering again;Except the application method of haze tower does not become, and the application method of stereo garage changes:When automobile enters garage:Firstly, driver drives certainly from spiral shape, (1) drives from lower to upper to parking stall (8) to park, and then, driver takes elevator and downstairs leaves;When automobile is to be left:First, driver oneself goes to multiply and go upstairs by an elevator, and walk to oneself parking stall (8), then, driver drives towards the direction of upper layer, direction of travel when being previously entered drives to reach at floor indicator (2) and until elevator is in place afterwards i.e. into elevator, after under elevator to can drive to leave after bottom.--- it is obvious except haze tower engineering is designed with stereo garage engineering whole body structure with the mutual supply urban construction bring beneficial effect of mutual foundation land for building these two aspects obviously.

Description

Help to solve simultaneously Urban Parking Difficulty except the structure improvement of haze tower engineering is set Meter scheme and application method
Technical field
The present invention relates to removing haze tower engineering, more particularly to it is a kind of help to solve simultaneously Urban Parking Difficulty except haze The Structure Improvement Design scheme and its application method of tower engineering.
Background technique
Currently, having the haze tower engineering of 10 rice diameters, more than 60 meters high of vertical high-altitude exhaust pipe not long ago in China Xi'an comes out, and through testing, each such haze tower engineering can solve about 10 square kilometres centered on the engineering The haze in city overhead handles work, it is clear that and tens such engineerings are built in the provincial capital as Xi'an, city again, The city solves the problems, such as that the cardinal task of haze is just expected to shortly be resolved.--- however, the master as the engineering Body is that have 10 rice diameters, more than 60 meters high of vertical high-altitude exhaust pipe (haze tower body), although only having 10 rice diameters, because Very weak for its anti-transverse vibration forces (wind-force or seismic force), therefore, the area on the land occupation basis consumed in it is likely to 10 A lot of times of rice diameter occupied area.
And high-level stereo garage is the engineering that people are frequently seen, structure design has also been the very familiar thing of people Preferably, its anti-transverse vibration forces of steel structure structure are extremely strong, and its basic land used is few, however, in city, it is especially noisy in city Urban district is intended to build the small three-dimensional garage of exactly only tens parking stalls to be typically also very difficult matters.
Obviously:If the engineering of above-mentioned two different function is carried out co-design, one piece of basic land for building is shared, from land occupation Angle for (be beneficial to stereo garage engineering with except haze tower engineering --- the basic land used of the latter is likely to cover the former All basic lands used) and the stability (being beneficial to except haze tower engineering) of engineering structure for, will all generate unexpected Effect, wouldn't be more OK?
Summary of the invention
The purpose of the present invention:Exactly in order to solve the problems, such as above-mentioned " wouldn't be more OK ".
Key of the invention is:Just under the premise of firstly the need of building in urban district somewhere except haze tower engineering, basic On do not need separately to ward off land for building, or on the basis of increasing batch minute quantity land for building, completing under the premise of removing haze tower engineering of above-mentioned scale, Nearly thousand parking stalls can be increased again, how great and achieve a solution in passing this will be for solving the problems, such as city parking hardly possible Happy event!
The present invention compared with the prior art the characteristics of:
Due to not needing separately to ward off land for building under the premise of firstly the need of building in urban district somewhere except haze tower engineering, or increase On the basis of criticizing minute quantity land for building, it can both complete to remove the haze tower engineering (data built up according to above-mentioned Xi'an:10 rice diameters with More than 60 meters of height) stereo garage engineering (calculating that the library parking stall is 384 or 192 according in rear data) can be completed again, this is just When carrying out co-design for the engineering of two different function, it can get unexpected beneficial effect and create conditions condition.—— Under the premise of not increasing an engineering foundation land for building substantially, and it more than enough can build the solid for having several hundred a parking stalls Garage creates condition, and devote land for building except shock resistance of the haze tower engineering oneself in structure also due to incidentally building Stereo garage engineering and (security insurance coefficient is substantially increased) is significantly increased.
Detailed description of the invention
Fig. 1 illustrates structural design scheme overview of the invention.
Fig. 2 is the top view of Fig. 1.
1:Spiral shape is driven certainly;2:Vertical floor indicator;3:Spiral shape is arranged side by side from driving road and spiral shape The line of demarcation of parking stall between the two;4:The automobile to berth on parking stall;5:Except the round long cylinder of haze tower engineering;6:It is three-dimensional The outer enclosure wall of garage engineering;7:In the automobile that spiral shape is travelled from driving road; 8:With spiral shape be arranged side by side mode distribution lattice The parking stall of office.
Specific embodiment
In order to realize the above-mentioned present invention, proposed adoption technical solution below:
The present invention is in structure:
Have:Except haze tower engineering,
It is characterized in that, on the basis of not changing arc except haze tower engineering structure, around except wall on the outside of haze tower engineering Expand again and builds the design scheme requirement of annular three-dimensional garage engineering and be:
Setting outer ring spiral shape driver is separate from driving road 1 at this from driving road 1 in above-mentioned annular three-dimensional garage engineering The outer side in the center of circle is arranged the parking stall 8 that a circle is capable of adjacent parking side by side again on the way, also, in spiral shape driver from driving The outer side in line of demarcation 3 of the parking stall 8 that 1 spiral shape being arranged with outer side is arranged side by side between the two, at least stops at one Setting is used for the vertical floor indicator 2 of elevator on the position of position 8;
The ground on the parking stall 8 be with it is consistent or horizontal from 1 gradient of driving road.
Elevator in the floor indicator 2 can also have simultaneously during carrier vehicle take into account it is manned Space.--- about ten people of receiving personnel should be allowed to record in elevator.
Described is not to be exceeded 2.5 meters from the spacing between two layers that the ring spiral shape in driving road 1 is capable of forming.--- it examines Worry allows not allowing motor bus to enter by medium and small automobile and berth.
Emphasis of the invention is to remove the periphery of haze tower engineering and building annular three-dimensional garage again in the form of around it Engineering, the specific design scheme of the supplement of the engineering are as follows:
In the present invention except the distance in round long cylinder 5 exterior wall to the line of demarcation 3 of haze tower engineering is 3 meters, that is, it is horizontal The width in round driver from driving road 1 is 3 meters.
The length on parking stall 8 is 6 meters, and width is 2.5 meters;Therefore, 6 inner wall of enclosure wall outside line of demarcation 3 to stereo garage engineering Distance be 6 meters, that is, the wide of toroidal zone that parking stall 8 is arranged side by side with circular manner is 6 meters, and automobile is on parking stall 8 Headstock when inside parking should be towards stereo garage engineering inner side of outer wall, and the tailstock is close to line of demarcation 3.
Use method of the invention:
The present invention is due to zoarium design and after overall structure variation, as except haze tower engineering project is except the use of haze It is consistent in method with former application method.
The present invention due to zoarium design and overall structure variation after, had occurred in the application method as stereo garage with Many different variations:
Constitute the specifically used method of stereo garage engineering part of the invention:
When automobile is intended to enter the present invention:
Parking stall 8 is reached from lower to upper firstly, being picked up in person by driver from spiral shape from driving road 1, and is illustrated according to Fig. 2 The direction for allowing automobile head towards enclosure wall 6 outside stereo garage engineering park, the tailstock is close to line of demarcation 3;
Then, driver leaves automobile, oneself at floor indicator 2 and until elevator take afterwards in place the elevator downstairs from Format invention.
When driver, which is intended to pick up the car, leaves the present invention:
Firstly, driver oneself reaches oneself vapour at floor indicator 2 and until elevator takes the elevator afterwards in place upstairs Floor where vehicle simultaneously walks to the parking stall 8 where oneself automobile;
Then, into the direction after the automobile of oneself towards upper layer (along from driving when being previously entered the present invention Road 1 advance direction) by car steering to floor indicator 2 at and until elevator take afterwards in place the elevator go downstairs arrival bottom After can drive to leave the present invention.
Furthermore:
In the case where passing in and out the general situation of automobile quantity, when automobile enters the present invention, it is necessary to be utilized using driver's self-driving automobile Spiral shape, must be according to the direction short distance of driving to go up a slope when coming in when driving to reach parking stall 8 and park, and leaving from driving road 1 From the position for reaching floor indicator 2 and elevator carrier vehicle is allowed downstairs to drive to leave elevator again, that is, leaves the present invention and sail for it Place;--- however, working as the unusual time, when a large amount of automobile queuings are intended to enter the present invention, also it is available with elevator carrier vehicle upstairs, then It is parked by driver parking stall 8 of driving.
Another situation is that:For example, the place that is located at of the present invention just near stadium or meeting-place, utilizes present invention parking Concentrated very much into the time gone out, at this moment, so that it may make full use of a spiral shape in the present invention from driving road 1, Ke Yi In a period of time (such as:Half an hour) only import but no export, and within another a period of time (such as:It is also half an hour) only go out not Into.The elevator runing time of this period is also consistent from driving road 1 with a spiral shape.--- other times, that is, enter with go out Time multiplicity, then handled according to regular situation.
According to above-mentioned application method, estimating that about 20 can be parked a car by spiral each circle, (elevator is equal to one The parking stall 8 of automobile), then:After having deducted elevator occupy-place, every layer can stop 16, automobile, 4 of each every first floor of elevator pipe Automobile on parking stall 8 is left away (upstairs regardless of carrier vehicle), if just having 96 vapour with 24 layers of the parking stall 8 that can reach totally Vehicle, 384 automobiles in 384 parking stalls 8 in 4 entire stereo garages of elevator condominium.It is fair when stopping idle, when , may be just problematic when parking is full, therefore, the elevator number of service can also exponentially can be increased as the case may be Amount is.--- if it is considered that the level of stereo garage engineering of the present invention part is halved, as 12 layers, 8 sum of parking stall Halving is 192, and such quantity collocation that the quantity and four elevators of every floor that may be such that parking stall 8 is arranged may be more It can be reasonable.
Obviously, the floor indicator 2 in the present invention is mainly used for carrier vehicle and goes downstairs, but also must take into account it is manned up and down Vehicle, this spy's card are absolutely not same with crowd.However, this is absolutely not same, perhaps bring is can to solve city in passing, special It is not the parking difficulty problem of city hive.
--- in general urban district, business district especially therein can squeeze out land for building in passing and create a stereo garage engineering It is not just the matters for being easy to accomplish, this has great significance for solving the problems, such as that city parking is difficult.
Obviously:If the occupied area based on will be above-mentioned is not only to complete the land used for removing haze tower engineering, also Covering can be taken into account and complete the stereo garage engineering for for example there are 384 or 192 parking stalls 8, stereo garage engineering is allowed to use on basis Benefit has been obtained on the ground, it should be a completely desirable matters.--- it, can at least when for individually implementing except haze tower engineering To save many many investments that must be spent and engineering entirety for long tower body (more than 60 meters long) stable structure problem Many investments that basic land used must be spent in terms of occupying land for building.
It is not difficult to find out that should be except both haze tower engineering and stereo garage engineering be in the design of fit common structure and fit shared base Marked improvement brought by the complementarity of plinth land for building these two aspects on fit engineering construction is obvious;It is suitable for Hot spot zone is implemented in city or city;It is suitable for the hot spot zone in city or city and implements.

Claims (4)

1. it is a kind of help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme,
Have:Except haze tower engineering,
It is characterized in that, expanding again on the basis of not changing arc except haze tower engineering structure around wall on the outside of haze tower engineering is removed It fills and builds the design scheme requirement of annular three-dimensional garage engineering and be:
Outer ring spiral shape driver is set in above-mentioned annular three-dimensional garage engineering and drives (1) certainly, it is separate round from driving road (1) at this The outer side of the heart is arranged the parking stall (8) that a circle is capable of adjacent parking side by side again on the way, also, in spiral shape driver from driving (1) line of demarcation (3) the outer side of the parking stall (8) being arranged side by side with the spiral shape of outer side setting between the two, at least one Setting is used for the vertical floor indicator (2) of elevator on the position of a parking stall (8);
The ground on the parking stall (8) be with it is consistent or horizontal from driving road (1) gradient.
2. it is according to claim 1 help to solve simultaneously Urban Parking Difficulty except the structure improvement of haze tower engineering is set Meter scheme, it is characterised in that:Elevator in the floor indicator (2) can also can simultaneously during carrier vehicle With taking into account manned space.
3. it is according to claim 1 facilitate solve Urban Parking Difficulty except haze tower engineering knot design scheme, It is characterized in that:Spacing between the ring spiral shape from driving road (1) be capable of forming two layers is no more than 2.5 meters.
4. it is a kind of help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme user Method,
It is characterized in that:
Due to zoarium design and overall structure variation after, as except haze tower engineering project the application method except haze on original Application method is consistent.
Unusual change after overall structure variation, is had occurred in the application method as stereo garage due to zoarium design Change:
Constitute the specifically used method of stereo garage engineering below part:
When automobile stereo garage to be entered:
Firstly, picked up in person by driver from spiral shape from drive (1) reach parking stall (8) from lower to upper, allow automobile head court It voluntarily parks to the direction in the center of circle;
Then, driver and appliance crew leave automobile, oneself is at floor indicator (2) and until seating should afterwards in place for elevator Elevator downstairs leaves.
When driver, which is intended to pick up the car, to be left:
Firstly, driver and appliance crew oneself are at floor indicator (2) and until elevator takes the elevator upstairs in place afterwards The floor where oneself automobile is reached, and walks to the parking stall 8 where oneself automobile;
Then, driver and appliance crew's driving are towards the direction of upper layer, i.e., towards when being previously entered stereo garage Along the direction travelled upwardly from driving road (1), by car steering to floor indicator (2) and until elevator in place after, then It drives to enter the elevator, after elevator downstairs reaches bottom, can drive to leave.
CN201810685143.9A 2018-06-19 2018-06-19 Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method Pending CN108894581A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810685143.9A CN108894581A (en) 2018-06-19 2018-06-19 Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810685143.9A CN108894581A (en) 2018-06-19 2018-06-19 Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method

Publications (1)

Publication Number Publication Date
CN108894581A true CN108894581A (en) 2018-11-27

Family

ID=64346499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810685143.9A Pending CN108894581A (en) 2018-06-19 2018-06-19 Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method

Country Status (1)

Country Link
CN (1) CN108894581A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119557A (en) * 2018-06-19 2020-05-08 中国计量大学 Relates to haze tower removing engineering and a composite structure design scheme of stereo garage engineering built around haze tower removing engineering
CN112878791A (en) * 2021-01-21 2021-06-01 乙凸 Double-helix annular mansion

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04247129A (en) * 1991-02-01 1992-09-03 Nkk Corp Three dimensional composite structure
CN2809104Y (en) * 2005-07-19 2006-08-23 王建滨 Multi-deck screw type slope car-parking building
CN201802098U (en) * 2010-07-01 2011-04-20 王益胜 Automatic going-out and coming-in type three-dimensional garage
CN102505886A (en) * 2011-10-11 2012-06-20 山东省自主创新促进中心 Ring-shaped three-dimensional garage
CN202359853U (en) * 2011-12-14 2012-08-01 上海市杨浦区控江二村小学 Multilayer parking lot
CN203626318U (en) * 2013-11-28 2014-06-04 许芳林 Novel park
CN203769375U (en) * 2014-03-12 2014-08-13 航天建设集团深圳工程设计有限公司 Parking building

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04247129A (en) * 1991-02-01 1992-09-03 Nkk Corp Three dimensional composite structure
CN2809104Y (en) * 2005-07-19 2006-08-23 王建滨 Multi-deck screw type slope car-parking building
CN201802098U (en) * 2010-07-01 2011-04-20 王益胜 Automatic going-out and coming-in type three-dimensional garage
CN102505886A (en) * 2011-10-11 2012-06-20 山东省自主创新促进中心 Ring-shaped three-dimensional garage
CN202359853U (en) * 2011-12-14 2012-08-01 上海市杨浦区控江二村小学 Multilayer parking lot
CN203626318U (en) * 2013-11-28 2014-06-04 许芳林 Novel park
CN203769375U (en) * 2014-03-12 2014-08-13 航天建设集团深圳工程设计有限公司 Parking building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119557A (en) * 2018-06-19 2020-05-08 中国计量大学 Relates to haze tower removing engineering and a composite structure design scheme of stereo garage engineering built around haze tower removing engineering
CN112878791A (en) * 2021-01-21 2021-06-01 乙凸 Double-helix annular mansion

Similar Documents

Publication Publication Date Title
CN105350804B (en) A kind of rotary type tower sky parking
CN102587706A (en) Structural style of solid garage crossing above roads
CN108894581A (en) Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method
CN105545029A (en) Novel public-bike stereo garage system
CN205063479U (en) Capstan head formula sky parking field
CN102877674A (en) Structural form of stereo garage and pedestrian overpass combination crossing road
CN201835564U (en) Elevated multi-layer parking lot
CN206107404U (en) Vertical rotatable bicycle storage rack
CN105507630A (en) Spiral three-dimensional parking lot
CN113323494A (en) Structural design of elevator car-carrying stereo garage in annular arrangement and with haze removal function
CN108894583A (en) The example of whole body structure design scheme of complementary effect can be reached by being related to both environmental project and traffic engineering
CN103226666B (en) Sophisticated functions intercommunication road crossing system efficacy assessments method
CN202441091U (en) Compound parking building for car in and out through vertical lifting
CN201605854U (en) Three-dimensional automatic parking device
CN103195276A (en) Stereo garage crossing over vehicle riding road and combining pedestrian bridge function
CN205577529U (en) Parking platform is maked somebody a mere figurehead to road
CN205172086U (en) Drum formula stereo garage
CN108894582A (en) Help to solve simultaneously Urban Parking Difficulty except haze tower engineering subsidiary garage design scheme
CN108661414A (en) It is driven by driver when being built except haze tower engineering and stereo garage engineering zoarium the high-level structure design scheme of disengaging public parking position
CN204139677U (en) The underground garage that roadside strip people car is upper and lower altogether
CN101761255B (en) Combination methods for three-dimensional garage groups
CN107697206A (en) Light electrical salf-walking convertible car
CN203285119U (en) Low-energy-consumption annular stereo garage
CN108222578B (en) Movable multistory parking garage
CN113323495A (en) Integrated structure design scheme of haze tower removing engineering and self-driving lane and elevator car carrying stereo garage engineering in city

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127