CN108894581A - Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method - Google Patents
Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method Download PDFInfo
- Publication number
- CN108894581A CN108894581A CN201810685143.9A CN201810685143A CN108894581A CN 108894581 A CN108894581 A CN 108894581A CN 201810685143 A CN201810685143 A CN 201810685143A CN 108894581 A CN108894581 A CN 108894581A
- Authority
- CN
- China
- Prior art keywords
- elevator
- engineering
- haze tower
- driver
- parking stall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 18
- 230000009286 beneficial effect Effects 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 2
- 241000209094 Oryza Species 0.000 description 5
- 235000007164 Oryza sativa Nutrition 0.000 description 5
- 235000009566 rice Nutrition 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H14/00—Buildings for combinations of different purposes not covered by any single one of main groups E04H1/00-E04H13/00 of this subclass, e.g. for double purpose; Buildings of the drive-in type
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H6/00—Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
- E04H6/08—Garages for many vehicles
- E04H6/12—Garages for many vehicles with mechanical means for shifting or lifting vehicles
- E04H6/18—Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
It is a kind of help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method:On the basis of not changing arc except haze tower engineering structure, around except on the outside of haze tower engineering wall expand build annular three-dimensional garage engineering again;Except the application method of haze tower does not become, and the application method of stereo garage changes:When automobile enters garage:Firstly, driver drives certainly from spiral shape, (1) drives from lower to upper to parking stall (8) to park, and then, driver takes elevator and downstairs leaves;When automobile is to be left:First, driver oneself goes to multiply and go upstairs by an elevator, and walk to oneself parking stall (8), then, driver drives towards the direction of upper layer, direction of travel when being previously entered drives to reach at floor indicator (2) and until elevator is in place afterwards i.e. into elevator, after under elevator to can drive to leave after bottom.--- it is obvious except haze tower engineering is designed with stereo garage engineering whole body structure with the mutual supply urban construction bring beneficial effect of mutual foundation land for building these two aspects obviously.
Description
Technical field
The present invention relates to removing haze tower engineering, more particularly to it is a kind of help to solve simultaneously Urban Parking Difficulty except haze
The Structure Improvement Design scheme and its application method of tower engineering.
Background technique
Currently, having the haze tower engineering of 10 rice diameters, more than 60 meters high of vertical high-altitude exhaust pipe not long ago in China
Xi'an comes out, and through testing, each such haze tower engineering can solve about 10 square kilometres centered on the engineering
The haze in city overhead handles work, it is clear that and tens such engineerings are built in the provincial capital as Xi'an, city again,
The city solves the problems, such as that the cardinal task of haze is just expected to shortly be resolved.--- however, the master as the engineering
Body is that have 10 rice diameters, more than 60 meters high of vertical high-altitude exhaust pipe (haze tower body), although only having 10 rice diameters, because
Very weak for its anti-transverse vibration forces (wind-force or seismic force), therefore, the area on the land occupation basis consumed in it is likely to 10
A lot of times of rice diameter occupied area.
And high-level stereo garage is the engineering that people are frequently seen, structure design has also been the very familiar thing of people
Preferably, its anti-transverse vibration forces of steel structure structure are extremely strong, and its basic land used is few, however, in city, it is especially noisy in city
Urban district is intended to build the small three-dimensional garage of exactly only tens parking stalls to be typically also very difficult matters.
Obviously:If the engineering of above-mentioned two different function is carried out co-design, one piece of basic land for building is shared, from land occupation
Angle for (be beneficial to stereo garage engineering with except haze tower engineering --- the basic land used of the latter is likely to cover the former
All basic lands used) and the stability (being beneficial to except haze tower engineering) of engineering structure for, will all generate unexpected
Effect, wouldn't be more OK?
Summary of the invention
The purpose of the present invention:Exactly in order to solve the problems, such as above-mentioned " wouldn't be more OK ".
Key of the invention is:Just under the premise of firstly the need of building in urban district somewhere except haze tower engineering, basic
On do not need separately to ward off land for building, or on the basis of increasing batch minute quantity land for building, completing under the premise of removing haze tower engineering of above-mentioned scale,
Nearly thousand parking stalls can be increased again, how great and achieve a solution in passing this will be for solving the problems, such as city parking hardly possible
Happy event!
The present invention compared with the prior art the characteristics of:
Due to not needing separately to ward off land for building under the premise of firstly the need of building in urban district somewhere except haze tower engineering, or increase
On the basis of criticizing minute quantity land for building, it can both complete to remove the haze tower engineering (data built up according to above-mentioned Xi'an:10 rice diameters with
More than 60 meters of height) stereo garage engineering (calculating that the library parking stall is 384 or 192 according in rear data) can be completed again, this is just
When carrying out co-design for the engineering of two different function, it can get unexpected beneficial effect and create conditions condition.——
Under the premise of not increasing an engineering foundation land for building substantially, and it more than enough can build the solid for having several hundred a parking stalls
Garage creates condition, and devote land for building except shock resistance of the haze tower engineering oneself in structure also due to incidentally building
Stereo garage engineering and (security insurance coefficient is substantially increased) is significantly increased.
Detailed description of the invention
Fig. 1 illustrates structural design scheme overview of the invention.
Fig. 2 is the top view of Fig. 1.
1:Spiral shape is driven certainly;2:Vertical floor indicator;3:Spiral shape is arranged side by side from driving road and spiral shape
The line of demarcation of parking stall between the two;4:The automobile to berth on parking stall;5:Except the round long cylinder of haze tower engineering;6:It is three-dimensional
The outer enclosure wall of garage engineering;7:In the automobile that spiral shape is travelled from driving road; 8:With spiral shape be arranged side by side mode distribution lattice
The parking stall of office.
Specific embodiment
In order to realize the above-mentioned present invention, proposed adoption technical solution below:
The present invention is in structure:
Have:Except haze tower engineering,
It is characterized in that, on the basis of not changing arc except haze tower engineering structure, around except wall on the outside of haze tower engineering
Expand again and builds the design scheme requirement of annular three-dimensional garage engineering and be:
Setting outer ring spiral shape driver is separate from driving road 1 at this from driving road 1 in above-mentioned annular three-dimensional garage engineering
The outer side in the center of circle is arranged the parking stall 8 that a circle is capable of adjacent parking side by side again on the way, also, in spiral shape driver from driving
The outer side in line of demarcation 3 of the parking stall 8 that 1 spiral shape being arranged with outer side is arranged side by side between the two, at least stops at one
Setting is used for the vertical floor indicator 2 of elevator on the position of position 8;
The ground on the parking stall 8 be with it is consistent or horizontal from 1 gradient of driving road.
Elevator in the floor indicator 2 can also have simultaneously during carrier vehicle take into account it is manned
Space.--- about ten people of receiving personnel should be allowed to record in elevator.
Described is not to be exceeded 2.5 meters from the spacing between two layers that the ring spiral shape in driving road 1 is capable of forming.--- it examines
Worry allows not allowing motor bus to enter by medium and small automobile and berth.
Emphasis of the invention is to remove the periphery of haze tower engineering and building annular three-dimensional garage again in the form of around it
Engineering, the specific design scheme of the supplement of the engineering are as follows:
In the present invention except the distance in round long cylinder 5 exterior wall to the line of demarcation 3 of haze tower engineering is 3 meters, that is, it is horizontal
The width in round driver from driving road 1 is 3 meters.
The length on parking stall 8 is 6 meters, and width is 2.5 meters;Therefore, 6 inner wall of enclosure wall outside line of demarcation 3 to stereo garage engineering
Distance be 6 meters, that is, the wide of toroidal zone that parking stall 8 is arranged side by side with circular manner is 6 meters, and automobile is on parking stall 8
Headstock when inside parking should be towards stereo garage engineering inner side of outer wall, and the tailstock is close to line of demarcation 3.
Use method of the invention:
The present invention is due to zoarium design and after overall structure variation, as except haze tower engineering project is except the use of haze
It is consistent in method with former application method.
The present invention due to zoarium design and overall structure variation after, had occurred in the application method as stereo garage with
Many different variations:
Constitute the specifically used method of stereo garage engineering part of the invention:
When automobile is intended to enter the present invention:
Parking stall 8 is reached from lower to upper firstly, being picked up in person by driver from spiral shape from driving road 1, and is illustrated according to Fig. 2
The direction for allowing automobile head towards enclosure wall 6 outside stereo garage engineering park, the tailstock is close to line of demarcation 3;
Then, driver leaves automobile, oneself at floor indicator 2 and until elevator take afterwards in place the elevator downstairs from
Format invention.
When driver, which is intended to pick up the car, leaves the present invention:
Firstly, driver oneself reaches oneself vapour at floor indicator 2 and until elevator takes the elevator afterwards in place upstairs
Floor where vehicle simultaneously walks to the parking stall 8 where oneself automobile;
Then, into the direction after the automobile of oneself towards upper layer (along from driving when being previously entered the present invention
Road 1 advance direction) by car steering to floor indicator 2 at and until elevator take afterwards in place the elevator go downstairs arrival bottom
After can drive to leave the present invention.
Furthermore:
In the case where passing in and out the general situation of automobile quantity, when automobile enters the present invention, it is necessary to be utilized using driver's self-driving automobile
Spiral shape, must be according to the direction short distance of driving to go up a slope when coming in when driving to reach parking stall 8 and park, and leaving from driving road 1
From the position for reaching floor indicator 2 and elevator carrier vehicle is allowed downstairs to drive to leave elevator again, that is, leaves the present invention and sail for it
Place;--- however, working as the unusual time, when a large amount of automobile queuings are intended to enter the present invention, also it is available with elevator carrier vehicle upstairs, then
It is parked by driver parking stall 8 of driving.
Another situation is that:For example, the place that is located at of the present invention just near stadium or meeting-place, utilizes present invention parking
Concentrated very much into the time gone out, at this moment, so that it may make full use of a spiral shape in the present invention from driving road 1, Ke Yi
In a period of time (such as:Half an hour) only import but no export, and within another a period of time (such as:It is also half an hour) only go out not
Into.The elevator runing time of this period is also consistent from driving road 1 with a spiral shape.--- other times, that is, enter with go out
Time multiplicity, then handled according to regular situation.
According to above-mentioned application method, estimating that about 20 can be parked a car by spiral each circle, (elevator is equal to one
The parking stall 8 of automobile), then:After having deducted elevator occupy-place, every layer can stop 16, automobile, 4 of each every first floor of elevator pipe
Automobile on parking stall 8 is left away (upstairs regardless of carrier vehicle), if just having 96 vapour with 24 layers of the parking stall 8 that can reach totally
Vehicle, 384 automobiles in 384 parking stalls 8 in 4 entire stereo garages of elevator condominium.It is fair when stopping idle, when
, may be just problematic when parking is full, therefore, the elevator number of service can also exponentially can be increased as the case may be
Amount is.--- if it is considered that the level of stereo garage engineering of the present invention part is halved, as 12 layers, 8 sum of parking stall
Halving is 192, and such quantity collocation that the quantity and four elevators of every floor that may be such that parking stall 8 is arranged may be more
It can be reasonable.
Obviously, the floor indicator 2 in the present invention is mainly used for carrier vehicle and goes downstairs, but also must take into account it is manned up and down
Vehicle, this spy's card are absolutely not same with crowd.However, this is absolutely not same, perhaps bring is can to solve city in passing, special
It is not the parking difficulty problem of city hive.
--- in general urban district, business district especially therein can squeeze out land for building in passing and create a stereo garage engineering
It is not just the matters for being easy to accomplish, this has great significance for solving the problems, such as that city parking is difficult.
Obviously:If the occupied area based on will be above-mentioned is not only to complete the land used for removing haze tower engineering, also
Covering can be taken into account and complete the stereo garage engineering for for example there are 384 or 192 parking stalls 8, stereo garage engineering is allowed to use on basis
Benefit has been obtained on the ground, it should be a completely desirable matters.--- it, can at least when for individually implementing except haze tower engineering
To save many many investments that must be spent and engineering entirety for long tower body (more than 60 meters long) stable structure problem
Many investments that basic land used must be spent in terms of occupying land for building.
It is not difficult to find out that should be except both haze tower engineering and stereo garage engineering be in the design of fit common structure and fit shared base
Marked improvement brought by the complementarity of plinth land for building these two aspects on fit engineering construction is obvious;It is suitable for
Hot spot zone is implemented in city or city;It is suitable for the hot spot zone in city or city and implements.
Claims (4)
1. it is a kind of help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme,
Have:Except haze tower engineering,
It is characterized in that, expanding again on the basis of not changing arc except haze tower engineering structure around wall on the outside of haze tower engineering is removed
It fills and builds the design scheme requirement of annular three-dimensional garage engineering and be:
Outer ring spiral shape driver is set in above-mentioned annular three-dimensional garage engineering and drives (1) certainly, it is separate round from driving road (1) at this
The outer side of the heart is arranged the parking stall (8) that a circle is capable of adjacent parking side by side again on the way, also, in spiral shape driver from driving
(1) line of demarcation (3) the outer side of the parking stall (8) being arranged side by side with the spiral shape of outer side setting between the two, at least one
Setting is used for the vertical floor indicator (2) of elevator on the position of a parking stall (8);
The ground on the parking stall (8) be with it is consistent or horizontal from driving road (1) gradient.
2. it is according to claim 1 help to solve simultaneously Urban Parking Difficulty except the structure improvement of haze tower engineering is set
Meter scheme, it is characterised in that:Elevator in the floor indicator (2) can also can simultaneously during carrier vehicle
With taking into account manned space.
3. it is according to claim 1 facilitate solve Urban Parking Difficulty except haze tower engineering knot design scheme,
It is characterized in that:Spacing between the ring spiral shape from driving road (1) be capable of forming two layers is no more than 2.5 meters.
4. it is a kind of help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme user
Method,
It is characterized in that:
Due to zoarium design and overall structure variation after, as except haze tower engineering project the application method except haze on original
Application method is consistent.
Unusual change after overall structure variation, is had occurred in the application method as stereo garage due to zoarium design
Change:
Constitute the specifically used method of stereo garage engineering below part:
When automobile stereo garage to be entered:
Firstly, picked up in person by driver from spiral shape from drive (1) reach parking stall (8) from lower to upper, allow automobile head court
It voluntarily parks to the direction in the center of circle;
Then, driver and appliance crew leave automobile, oneself is at floor indicator (2) and until seating should afterwards in place for elevator
Elevator downstairs leaves.
When driver, which is intended to pick up the car, to be left:
Firstly, driver and appliance crew oneself are at floor indicator (2) and until elevator takes the elevator upstairs in place afterwards
The floor where oneself automobile is reached, and walks to the parking stall 8 where oneself automobile;
Then, driver and appliance crew's driving are towards the direction of upper layer, i.e., towards when being previously entered stereo garage
Along the direction travelled upwardly from driving road (1), by car steering to floor indicator (2) and until elevator in place after, then
It drives to enter the elevator, after elevator downstairs reaches bottom, can drive to leave.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810685143.9A CN108894581A (en) | 2018-06-19 | 2018-06-19 | Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810685143.9A CN108894581A (en) | 2018-06-19 | 2018-06-19 | Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108894581A true CN108894581A (en) | 2018-11-27 |
Family
ID=64346499
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810685143.9A Pending CN108894581A (en) | 2018-06-19 | 2018-06-19 | Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108894581A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111119557A (en) * | 2018-06-19 | 2020-05-08 | 中国计量大学 | Relates to haze tower removing engineering and a composite structure design scheme of stereo garage engineering built around haze tower removing engineering |
CN112878791A (en) * | 2021-01-21 | 2021-06-01 | 乙凸 | Double-helix annular mansion |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04247129A (en) * | 1991-02-01 | 1992-09-03 | Nkk Corp | Three dimensional composite structure |
CN2809104Y (en) * | 2005-07-19 | 2006-08-23 | 王建滨 | Multi-deck screw type slope car-parking building |
CN201802098U (en) * | 2010-07-01 | 2011-04-20 | 王益胜 | Automatic going-out and coming-in type three-dimensional garage |
CN102505886A (en) * | 2011-10-11 | 2012-06-20 | 山东省自主创新促进中心 | Ring-shaped three-dimensional garage |
CN202359853U (en) * | 2011-12-14 | 2012-08-01 | 上海市杨浦区控江二村小学 | Multilayer parking lot |
CN203626318U (en) * | 2013-11-28 | 2014-06-04 | 许芳林 | Novel park |
CN203769375U (en) * | 2014-03-12 | 2014-08-13 | 航天建设集团深圳工程设计有限公司 | Parking building |
-
2018
- 2018-06-19 CN CN201810685143.9A patent/CN108894581A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04247129A (en) * | 1991-02-01 | 1992-09-03 | Nkk Corp | Three dimensional composite structure |
CN2809104Y (en) * | 2005-07-19 | 2006-08-23 | 王建滨 | Multi-deck screw type slope car-parking building |
CN201802098U (en) * | 2010-07-01 | 2011-04-20 | 王益胜 | Automatic going-out and coming-in type three-dimensional garage |
CN102505886A (en) * | 2011-10-11 | 2012-06-20 | 山东省自主创新促进中心 | Ring-shaped three-dimensional garage |
CN202359853U (en) * | 2011-12-14 | 2012-08-01 | 上海市杨浦区控江二村小学 | Multilayer parking lot |
CN203626318U (en) * | 2013-11-28 | 2014-06-04 | 许芳林 | Novel park |
CN203769375U (en) * | 2014-03-12 | 2014-08-13 | 航天建设集团深圳工程设计有限公司 | Parking building |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111119557A (en) * | 2018-06-19 | 2020-05-08 | 中国计量大学 | Relates to haze tower removing engineering and a composite structure design scheme of stereo garage engineering built around haze tower removing engineering |
CN112878791A (en) * | 2021-01-21 | 2021-06-01 | 乙凸 | Double-helix annular mansion |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105350804B (en) | A kind of rotary type tower sky parking | |
CN102587706A (en) | Structural style of solid garage crossing above roads | |
CN108894581A (en) | Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method | |
CN105545029A (en) | Novel public-bike stereo garage system | |
CN205063479U (en) | Capstan head formula sky parking field | |
CN102877674A (en) | Structural form of stereo garage and pedestrian overpass combination crossing road | |
CN201835564U (en) | Elevated multi-layer parking lot | |
CN206107404U (en) | Vertical rotatable bicycle storage rack | |
CN105507630A (en) | Spiral three-dimensional parking lot | |
CN113323494A (en) | Structural design of elevator car-carrying stereo garage in annular arrangement and with haze removal function | |
CN108894583A (en) | The example of whole body structure design scheme of complementary effect can be reached by being related to both environmental project and traffic engineering | |
CN103226666B (en) | Sophisticated functions intercommunication road crossing system efficacy assessments method | |
CN202441091U (en) | Compound parking building for car in and out through vertical lifting | |
CN201605854U (en) | Three-dimensional automatic parking device | |
CN103195276A (en) | Stereo garage crossing over vehicle riding road and combining pedestrian bridge function | |
CN205577529U (en) | Parking platform is maked somebody a mere figurehead to road | |
CN205172086U (en) | Drum formula stereo garage | |
CN108894582A (en) | Help to solve simultaneously Urban Parking Difficulty except haze tower engineering subsidiary garage design scheme | |
CN108661414A (en) | It is driven by driver when being built except haze tower engineering and stereo garage engineering zoarium the high-level structure design scheme of disengaging public parking position | |
CN204139677U (en) | The underground garage that roadside strip people car is upper and lower altogether | |
CN101761255B (en) | Combination methods for three-dimensional garage groups | |
CN107697206A (en) | Light electrical salf-walking convertible car | |
CN203285119U (en) | Low-energy-consumption annular stereo garage | |
CN108222578B (en) | Movable multistory parking garage | |
CN113323495A (en) | Integrated structure design scheme of haze tower removing engineering and self-driving lane and elevator car carrying stereo garage engineering in city |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181127 |