CN108894582A - Help to solve simultaneously Urban Parking Difficulty except haze tower engineering subsidiary garage design scheme - Google Patents
Help to solve simultaneously Urban Parking Difficulty except haze tower engineering subsidiary garage design scheme Download PDFInfo
- Publication number
- CN108894582A CN108894582A CN201810685144.3A CN201810685144A CN108894582A CN 108894582 A CN108894582 A CN 108894582A CN 201810685144 A CN201810685144 A CN 201810685144A CN 108894582 A CN108894582 A CN 108894582A
- Authority
- CN
- China
- Prior art keywords
- engineering
- haze tower
- except
- garage
- tower engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H14/00—Buildings for combinations of different purposes not covered by any single one of main groups E04H1/00-E04H13/00 of this subclass, e.g. for double purpose; Buildings of the drive-in type
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H6/00—Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
- E04H6/08—Garages for many vehicles
- E04H6/12—Garages for many vehicles with mechanical means for shifting or lifting vehicles
- E04H6/18—Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Residential Or Office Buildings (AREA)
Abstract
It is a kind of help to solve simultaneously Urban Parking Difficulty except haze tower engineering subsidiary garage design scheme, have:Except haze tower engineering, which is characterized in that on the basis of not changing arc except haze tower engineering structure, around except on the outside of haze tower engineering wall expand again and build the design scheme requirement of annular three-dimensional garage engineering and be:It is provided with horizontal round driver in annular three-dimensional garage engineering and drives (1) certainly, it is provided with the parking stall (8) being circumferentially arranged side by side on the inside of the wall of enclosure wall (6) between the two outside the boundary line (3) to stereo garage engineering from driving road (1), setting is used for the vertical floor indicator (2) of elevator at least on the position of a parking stall (8).--- obviously, except both haze tower engineering and stereo garage engineering are obvious to there is beneficial effect brought by general urban construction in the complementarity of the design of fit common structure and zoarium mutual foundation land for building these two aspects.It is particularly suitable for implementing in city or city hot spot zone.
Description
Technical field
The present invention relates to haze tower engineering is removed, especially it is a kind of help to solve simultaneously Urban Parking Difficulty except haze tower work
The subsidiary garage design scheme of journey.
Background technique
Currently, having the haze tower engineering of 10 rice diameters, more than 60 meters high of vertical high-altitude exhaust pipe not long ago in China
Xi'an comes out, and through testing, each such haze tower engineering can solve about 10 square kilometres centered on the engineering
The haze in city overhead handles work, it is clear that and tens such engineerings are built in the provincial capital as Xi'an, city again,
The city solves the problems, such as that the cardinal task of haze is just expected to shortly be resolved.--- however, the master as the engineering
Body is that have 10 rice diameters, more than 60 meters high of vertical high-altitude exhaust pipe (haze tower body), although only having 10 rice diameters, because
Very weak for its anti-transverse vibration forces (wind-force or seismic force), therefore, the area on the land occupation basis consumed in it is likely to 10
A lot of times of rice diameter occupied area.
And high-level stereo garage is the engineering that people are frequently seen, structure design has also been the very familiar thing of people
Preferably, its anti-transverse vibration forces of steel structure structure are extremely strong, and its basic land used is few, however, in city, it is especially noisy in city
Urban district is intended to build the small three-dimensional garage of exactly only tens parking stalls to be typically also very difficult matters.
Obviously:If the engineering of above-mentioned two different function is carried out co-design, one piece of basic land for building is shared, from land occupation
Angle for (be beneficial to stereo garage engineering with except haze tower engineering --- the basic land used of the latter is likely to cover the former
All basic lands used) and the stability (being beneficial to except haze tower engineering) of engineering structure for, will all generate unexpected
Effect, wouldn't be more OK?
Summary of the invention
The purpose of the present invention:Exactly in order to solve the problems, such as above-mentioned " wouldn't be more OK ".
Key of the invention is:Just under the premise of firstly the need of building in urban district somewhere except haze tower engineering, basic
On do not need separately to ward off land for building, or on the basis of increasing batch minute quantity land for building, completing under the premise of removing haze tower engineering of above-mentioned scale,
A parking stall more than nearly thousand can be increased again, how great and solved in passing this will be for solving the problems, such as city parking hardly possible
Happy event certainly!
The present invention compared with the prior art the characteristics of:
Due to not needing separately to ward off land for building under the premise of firstly the need of building in urban district somewhere except haze tower engineering, or increase
On the basis of criticizing minute quantity land for building, it can both complete to remove the haze tower engineering (data built up according to above-mentioned Xi'an:10 rice diameters with
More than 60 meters of height) stereo garage engineering (calculating that the garage parking stall is 144 according in rear data) can be completed again, this is just two
When the engineering of different function carries out co-design, it can get unexpected beneficial effect and create conditions condition.--- basic
On do not increase an engineering foundation land for building under the premise of, and more than enough can build the stereo garage that one has several hundred a parking stalls and create
Made condition, and devote land for building except shock resistance of the haze tower engineering oneself in structure also due to incidentally having built stereoscopic vehicle
Library engineering and (security insurance coefficient is substantially increased) is significantly increased.
Detailed description of the invention
Fig. 1 illustrates structural design scheme overview of the invention.
Fig. 2 is the top view of Fig. 1.
1:Spiral shape is driven certainly;2:Vertical floor indicator;3:Spiral shape is arranged side by side from driving road and spiral shape
The line of demarcation of parking stall between the two;4:The automobile to berth on parking stall;5:Except the round long cylinder of haze tower engineering;6:It is three-dimensional
The peripheral wall of garage engineering;7:In the automobile that spiral shape is travelled from driving road;8:With spiral shape be arranged side by side mode distribution
The parking stall of pattern.
Specific embodiment
In order to realize the above-mentioned present invention, proposed adoption technical solution below:
The present invention is in structure:
Have:Except haze tower engineering,
It is characterized in that, on the basis of not changing arc except haze tower engineering structure, around except wall on the outside of haze tower engineering
Expand again and builds the design scheme requirement of annular three-dimensional garage engineering and be:
It is round from driving road 1 that the level driven by driver is provided in annular three-dimensional garage engineering, this from driving road 1
The parking being circumferentially arranged side by side is provided on the inside of boundary line 3 to the wall of stereo garage engineering peripheral wall 6 between the two
Position 8, setting is used for the vertical floor indicator 2 of elevator at least on the position on a parking stall 8.
Elevator in the floor indicator 2 can also have simultaneously during carrier vehicle take into account it is manned
Space, and the elevator can allow automobile therefrom to pass through on its length direction.--- it should allow to accommodate people
About five people of member, which multiply, to be carried in elevator.
Described is not to be exceeded 2.5 meters from the spacing between two layers that the ring spiral shape in driving road 1 is capable of forming.--- it examines
Worry allows not allowing motor bus to enter by medium and small automobile and berth.
The quantity of the 8 place floor of parking stall is set equal to or less than 12 layers.
Emphasis of the invention is to remove the periphery of haze tower engineering and building annular three-dimensional garage again in the form of around it
Engineering, the specific design scheme of the supplement of the engineering are as follows:
Use method of the invention:
The present invention is due to zoarium design and after overall structure variation, as except haze tower engineering project is except the use of haze
It is consistent in method with former application method.
The present invention due to zoarium design and overall structure variation after, had occurred in the application method as stereo garage with
Many different variations:
Constitute the specifically used method of stereo garage engineering part of the invention:
When automobile is intended to enter garage of the present invention:
Firstly, driving to take the elevator to floor indicator 2 and after waiting until elevator in place upstairs, reach certainly by driver
After floor where own parking stall 8, that is, elevator is left according to specified direction and sails for parking stall 8 and with vehicle head towards the garage
The direction of peripheral wall 6 park.
Then, driver leaves automobile, after walking at floor indicator 2 and waiting until elevator in place, multiplied by under the seat elevator
Leave garage of the present invention in building.
When driver, which is intended to pick up the car, leaves garage of the present invention:
Firstly, driver oneself takes the elevator and reaches oneself vapour upstairs at floor indicator 2 and after waiting until elevator in place
Floor where vehicle simultaneously walks to the parking stall 8 where oneself automobile parking;
Then, into driving after the automobile of oneself along being previously entered the direction driven when the garage is parked for automobile
After being driven at floor indicator 2 and waiting until elevator in place, it can drive to leave this multiplied by sitting after the elevator downstairs reaches bottom
Elsewhere is gone in garage of the present invention.
In the present invention except the distance in round long cylinder 5 exterior wall to the line of demarcation 3 of haze tower engineering is 3 meters, that is, it is horizontal
The width in circle from driving road 1 is 3 meters;The length on parking stall 8 is 6 meters, and width is 2.5 meters;Therefore, line of demarcation 3 is to stereoscopic vehicle
The distance of library engineering 6 inner wall of outer enclosure wall is 6 meters, that is, the wide of toroidal zone that parking stall 8 is arranged side by side with circular manner is 6
Rice;Headstock when automobile is parked in parking stall 8 should towards the inside of stereo garage engineering external wall 6, the tailstock close to point
Boundary line 3.
According to the signal of Fig. 2, every circle of floor one can stop 20 vehicles, be calculated with 18, however, an elevator is equal to a vapour
The parking stall 8 of vehicle shares six elevators, then:After having deducted elevator occupy-place, every layer can stop 12, automobile, and every elevator pipe is each
Automobile on 2 parking stalls 8 of floor, if with 24 layers of the parking stall 8 that can reach just have totally 288 automobiles can stop
In the present invention;It is fair when stopping idle, it, may be just problematic when parking is full.--- if it is considered that the present invention is vertical
The level of body garage engineering part halves, and as 12 layers, it is 144 that 8 sum of parking stall, which also halves, and such setting may make
The quantity collocation possibility for obtaining six elevators of quantity and every floor on parking stall 8 but will be rationally.
--- in general urban district, business district especially therein can squeeze out newly-built one of land for building in passing 144 parkings
The stereo garage engineering of position 8 is not just the matters for being easy to accomplish, this is to have emphatically for solving the problems, such as city parking hardly possible
Big meaning.
Obviously:If the occupied area based on will be above-mentioned is not only to complete the land used for removing haze tower engineering, also
Covering can be taken into account and complete the stereo garage engineering for for example there are 144 parking stalls 8, stereo garage engineering is allowed to be obtained on basis with ground
Benefit, it should be a completely desirable matters.--- when for individually implementing except haze tower engineering, it can save and many be
Long tower body (more than 60 meters long) stable structure problem and engineering mass-type foundation land used must spend many in terms of occupying land for building
It invests (the main contradiction in city is that the supply on land for building is extremely short of).
It is not difficult to find out that should be except both haze tower engineering and stereo garage engineering be in the design of fit common structure and fit shared base
Marked improvement brought by the complementarity of plinth land for building these two aspects on fit engineering construction is obvious;It is suitable for
Hot spot zone is implemented in city or city;It is suitable for the hot spot zone in city or city and implements.
Claims (3)
1. it is a kind of help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme, have:Except haze
Tower engineering,
It is characterized in that, expanding again on the basis of not changing arc except haze tower engineering structure around wall on the outside of haze tower engineering is removed
It fills and builds the design scheme requirement of annular three-dimensional garage engineering and be:
It is round from driving road (1) that the level driven by driver is provided in annular three-dimensional garage engineering, this from driving road (1)
It is provided on the inside of boundary line (3) to the wall of stereo garage engineering peripheral wall (6) and is circumferentially arranged side by side between the two
Parking stall (8), setting is used for the vertical floor indicator (2) of elevator at least on the position of a parking stall (8);
Elevator in the floor indicator (2) can also have simultaneously during carrier vehicle take into account it is manned
Space, and the elevator can allow automobile therefrom to pass through in its longitudinal direction.
2. it is according to claim 1 help to solve simultaneously Urban Parking Difficulty except the structure improvement of haze tower engineering is set
Meter scheme, it is characterised in that:The level is round to be no more than 2.5 meters from vertical spacing between the level where driving road (1).
3. it is according to claim 1 help to solve simultaneously Urban Parking Difficulty except the structure improvement of haze tower engineering is set
Meter scheme, it is characterised in that:The quantity of floor where the parking stall (8) is set equal to or less than 12 layers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810685144.3A CN108894582A (en) | 2018-06-19 | 2018-06-19 | Help to solve simultaneously Urban Parking Difficulty except haze tower engineering subsidiary garage design scheme |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810685144.3A CN108894582A (en) | 2018-06-19 | 2018-06-19 | Help to solve simultaneously Urban Parking Difficulty except haze tower engineering subsidiary garage design scheme |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108894582A true CN108894582A (en) | 2018-11-27 |
Family
ID=64346754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810685144.3A Pending CN108894582A (en) | 2018-06-19 | 2018-06-19 | Help to solve simultaneously Urban Parking Difficulty except haze tower engineering subsidiary garage design scheme |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108894582A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04247129A (en) * | 1991-02-01 | 1992-09-03 | Nkk Corp | Three dimensional composite structure |
CN1306142A (en) * | 2001-03-08 | 2001-08-01 | 乙凸 | Mansion with spiral walkway |
CN102505886A (en) * | 2011-10-11 | 2012-06-20 | 山东省自主创新促进中心 | Ring-shaped three-dimensional garage |
CN202359853U (en) * | 2011-12-14 | 2012-08-01 | 上海市杨浦区控江二村小学 | Multilayer parking lot |
CN203097409U (en) * | 2013-03-26 | 2013-07-31 | 李放明 | Ancient-tower-shaped multifunctional parking building |
CN204326687U (en) * | 2014-10-10 | 2015-05-13 | 张敏 | A kind of spring steel work mansion |
CN205908097U (en) * | 2016-07-14 | 2017-01-25 | 福建平潭伯利恒科技有限公司 | Parking tower |
-
2018
- 2018-06-19 CN CN201810685144.3A patent/CN108894582A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04247129A (en) * | 1991-02-01 | 1992-09-03 | Nkk Corp | Three dimensional composite structure |
CN1306142A (en) * | 2001-03-08 | 2001-08-01 | 乙凸 | Mansion with spiral walkway |
CN102505886A (en) * | 2011-10-11 | 2012-06-20 | 山东省自主创新促进中心 | Ring-shaped three-dimensional garage |
CN202359853U (en) * | 2011-12-14 | 2012-08-01 | 上海市杨浦区控江二村小学 | Multilayer parking lot |
CN203097409U (en) * | 2013-03-26 | 2013-07-31 | 李放明 | Ancient-tower-shaped multifunctional parking building |
CN204326687U (en) * | 2014-10-10 | 2015-05-13 | 张敏 | A kind of spring steel work mansion |
CN205908097U (en) * | 2016-07-14 | 2017-01-25 | 福建平潭伯利恒科技有限公司 | Parking tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Peterson | Peterson | |
CN104118430A (en) | Parallel parking system and method based on sliding-mode active-disturbance-rejection control | |
CN104631892A (en) | High-rise intelligent stereo garage with carriers and vehicle storage and pick-up method | |
CN108894583A (en) | The example of whole body structure design scheme of complementary effect can be reached by being related to both environmental project and traffic engineering | |
CN108894581A (en) | Help to solve simultaneously Urban Parking Difficulty except haze tower engineering Structure Improvement Design scheme and application method | |
CN108894582A (en) | Help to solve simultaneously Urban Parking Difficulty except haze tower engineering subsidiary garage design scheme | |
CN110103823B (en) | Vehicle rollover advance early warning method based on enhanced digital map | |
CN202431033U (en) | Multi-storey parking lot with spiral lanes | |
CN201605854U (en) | Three-dimensional automatic parking device | |
CN108661414A (en) | It is driven by driver when being built except haze tower engineering and stereo garage engineering zoarium the high-level structure design scheme of disengaging public parking position | |
CN113323494A (en) | Structural design of elevator car-carrying stereo garage in annular arrangement and with haze removal function | |
CN105507630A (en) | Spiral three-dimensional parking lot | |
Koitrand et al. | 18 An Investigation of Wheel Aerodynamic Effects for a Saloon Car | |
CN205326907U (en) | Maintain integrative car with cleaning function | |
CN104512481A (en) | Automobile mudguard | |
CN103195276A (en) | Stereo garage crossing over vehicle riding road and combining pedestrian bridge function | |
CN108678536A (en) | Architectural engineering of different nature can reach the whole body structure design scheme of complementary effect | |
CN202448769U (en) | Large electric tour vehicle | |
CN205577529U (en) | Parking platform is maked somebody a mere figurehead to road | |
Hollar et al. | A new low cost, efficient, self-driving personal rapid transit system | |
CN205348893U (en) | Stereo garage crane | |
CN107697206A (en) | Light electrical salf-walking convertible car | |
CN204139677U (en) | The underground garage that roadside strip people car is upper and lower altogether | |
CN104330140A (en) | Method and device for identifying vehicle axle | |
CN113898242A (en) | Integrated construction scheme of haze tower removing engineering and subminiature stereo garage engineering formed by height-limiting self-driving lane and elevator car in city |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |