CN110593286A - Removable cofferdam rapid construction geotechnical formwork bag net hanging structure and construction method thereof - Google Patents

Removable cofferdam rapid construction geotechnical formwork bag net hanging structure and construction method thereof Download PDF

Info

Publication number
CN110593286A
CN110593286A CN201910832100.3A CN201910832100A CN110593286A CN 110593286 A CN110593286 A CN 110593286A CN 201910832100 A CN201910832100 A CN 201910832100A CN 110593286 A CN110593286 A CN 110593286A
Authority
CN
China
Prior art keywords
hooks
geotechnical
net
construction
cofferdam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910832100.3A
Other languages
Chinese (zh)
Other versions
CN110593286B (en
Inventor
张飞
周源
高玉峰
何乃福
舒爽
王占彬
戴光宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201910832100.3A priority Critical patent/CN110593286B/en
Publication of CN110593286A publication Critical patent/CN110593286A/en
Application granted granted Critical
Publication of CN110593286B publication Critical patent/CN110593286B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention provides a removable cofferdam rapid construction geotechnical model bag net hanging structure and a construction method thereof. The geomembrane bag net hanging structure consists of a longitude and latitude vertical net and a geomembrane bag with hooks. The longitude and latitude upright hanging net is woven by high-strength corrosion-resistant nylon ropes, the geotechnical mould bag with hooks is a cuboid sand-filled mould bag, the mould bag is made of geotechnical materials with friction particles on the surface, the two ends of the geotechnical mould bag are fastened after sand filling is finished, and the hanging net hooks are bound at the fastened positions. When cofferdam construction is carried out, the geotechnical model bags with hooks are laid layer by layer, the geotechnical model bags with hooks are connected end to end, the vertical net hanging of longitude and latitude is arranged at the crack between the two rows of geotechnical model bags with hooks, the vertical net hanging of longitude and latitude is hooked by the net hanging hooks on the geotechnical model bags with hooks on each layer, and the mode of stacking is extended outwards according to the order until cofferdam construction is completed. The construction of the invention adopts a splicing mode, the operation is simple and convenient, the construction efficiency is high, when the cofferdam engineering needs to be dismantled, the whole cofferdam can be conveniently dismantled, and the materials can be repeatedly used.

Description

Removable cofferdam rapid construction geotechnical formwork bag net hanging structure and construction method thereof
Technical Field
The invention relates to a removable cofferdam rapid construction geotechnical mould bag net hanging structure and a construction method thereof. The geomembrane bag net hanging structure consists of a longitude and latitude vertical net and a geomembrane bag with hooks. When cofferdam construction is carried out, the geotechnical model bags with hooks are laid layer by layer, the geotechnical model bags with hooks are connected end to end, the vertical net hanging of longitude and latitude is arranged at the crack between the two rows of geotechnical model bags with hooks, the vertical net hanging of longitude and latitude is hooked by the net hanging hooks on the geotechnical model bags with hooks on each layer, and the mode of stacking is extended outwards according to the order until cofferdam construction is completed. The invention strengthens the anti-sliding force between the geotechnical model bags by a physical method, improves the integrity of the cofferdam structure by the longitude and latitude upright hanging net, strengthens the anti-sliding force of the cofferdam structure and improves the construction efficiency. The construction adopts the mode of concatenation, and is easy and simple to handle, and the efficiency of construction is high, when cofferdam engineering need demolish, also can very convenient monoblock demolish, and the material can used repeatedly. The invention belongs to the relevant technical fields of geotechnical engineering, environmental engineering and the like.
Background
The cofferdam is a temporary enclosure structure constructed for constructing permanent water conservancy facilities in the water conservancy project construction. The cofferdam has the functions of preventing water and soil from entering the building position of the building so as to drain water in the cofferdam, excavate a foundation pit and build the building. The cofferdam is mainly used in hydraulic buildings in general, and the cofferdam is dismantled after being used up except for being used as a part of a formal building. The cofferdam height is higher than the highest water level that may occur during construction. In the bridge foundation construction, when bridge piers and platform foundations are positioned below the ground surface water level, earth weirs in various forms are built according to local materials; in rivers with deep water and large flow velocity, sheet-pile or steel-sheet pile (single-layer or double-layer) cofferdams and many double-layer thin-wall steel cofferdams can be adopted. The cofferdam can be used for preventing water and enclosing water and can also be used for supporting the pit wall of the foundation pit. The invention provides a removable cofferdam rapid construction geotechnical model bag hanging net structure and a construction method thereof, aiming at the problem of rapid construction and dismantling of a cofferdam.
Disclosure of Invention
The invention provides a removable cofferdam rapid construction geotechnical model bag net hanging structure and a construction method thereof. The geomembrane bag net hanging structure consists of a longitude and latitude vertical net and a geomembrane bag with hooks. The longitude and latitude upright hanging net is woven by high-strength corrosion-resistant nylon ropes, the geotechnical mould bag with hooks is a cuboid sand-filled mould bag, the mould bag is made of geotechnical materials with friction particles on the surface, the two ends of the geotechnical mould bag are fastened after sand filling is finished, and the hanging net hooks are bound at the fastened positions. When cofferdam construction is carried out, the geotechnical model bags with hooks are laid layer by layer, the geotechnical model bags with hooks are connected end to end, the vertical net hanging of longitude and latitude is arranged at the crack between the two rows of geotechnical model bags with hooks, the vertical net hanging of longitude and latitude is hooked by the net hanging hooks on the geotechnical model bags with hooks on each layer, and the mode of stacking is extended outwards according to the order until cofferdam construction is completed.
Solution of the invention
The invention provides a removable cofferdam rapid construction geotechnical mould bag net hanging structure, the whole structure of which comprises 2 parts: 1) longitude and latitude upright net hanging, 2) a geotechnical model bag with hooks.
Wherein 1) the longitude and latitude upright net is a latticed structure woven by high-strength corrosion-resistant nylon ropes, and has higher tensile strength and aging resistance;
wherein 2) area hook geotechnological mould bag is the mould bag that the cuboid filled the sand, and the mould bag adopts the geotechnological material of surface area friction granule to make, fills sand and accomplishes the back both ends and tighten to bind at the department of tightening and have the net hook, the net hook can firmly hook longitude and latitude upright net.
The construction method for quickly constructing the geomembrane bag suspended net structure by the removable cofferdam comprises the following steps:
1) leveling the ground according to the design requirements of the cofferdam structure, and determining the number of rows and layers of the hook-provided earthwork model bags;
2) the geotechnical model bags with the hooks are stacked up layer by layer from the center of the bottom in two rows, the geotechnical model bags with the hooks are connected end to end, longitude and latitude vertical hanging nets are vertically arranged at a gap between the two rows of geotechnical model bags with the hooks, and the longitude and latitude vertical hanging nets are hooked by the net hanging hooks on the geotechnical model bags with the hooks on each layer;
3) the geotechnical model bags with hooks extend outwards from the center, are stacked row by row layer by layer, and a longitude and latitude vertical hanging net is arranged between every two rows of geotechnical model bags with hooks to hook the adjacent two rows of geotechnical model bags with hooks together;
4) the cofferdam structure is built in the length direction in the stacking mode until the construction is finished;
5) and after the construction is finished, performing waterproof covering construction on the cofferdam structure, and generally covering the cofferdam structure by adopting a temporary plastic film.
THE ADVANTAGES OF THE PRESENT INVENTION
The invention provides a removable cofferdam rapid construction geotechnical model bag net hanging structure and a construction method thereof. The geomembrane bag net hanging structure consists of a longitude and latitude vertical net and a geomembrane bag with hooks. The longitude and latitude upright hanging net is woven by high-strength corrosion-resistant nylon ropes, the geotechnical mould bag with hooks is a cuboid sand-filled mould bag, the mould bag is made of geotechnical materials with friction particles on the surface, the two ends of the geotechnical mould bag are fastened after sand filling is finished, and the hanging net hooks are bound at the fastened positions. The invention strengthens the anti-sliding force between the geotechnical model bags by a physical method, improves the integrity of the cofferdam structure by the longitude and latitude upright hanging net, strengthens the anti-sliding force of the cofferdam structure and improves the construction efficiency. The construction adopts the mode of concatenation, and is easy and simple to handle, and the efficiency of construction is high, when cofferdam engineering need demolish, also can very convenient monoblock demolish, and the material can used repeatedly. .
Drawings
Fig. 1 is a schematic view of a longitude and latitude upright net, fig. 2 is a schematic view of a hooked earth mould bag, fig. 3 is a schematic view of a cofferdam piling: 1) longitude and latitude upright net hanging, 2) a geotechnical model bag with a hook, and 3) net hooks.
The specific implementation mode is as follows:
a removable cofferdam rapid construction geotechnical model bag suspended net structure and construction method thereof, the whole structure comprises 2 parts: longitude and latitude upright net hanging and a geotechnical model bag with hooks.
The longitude and latitude upright net 1) in the structure is a latticed structure woven by high-strength corrosion-resistant nylon ropes, and has higher tensile strength and aging resistance;
the geotechnical model bag with hooks 2) in the structure is a model bag filled with sand in a cuboid, the model bag is made of geotechnical materials with friction particles on the surfaces, two ends of the model bag are fastened after sand filling is completed, and net hanging hooks 3) are bound at the fastening positions, and the net hanging hooks 3) can firmly hook longitude and latitude vertical nets.
The construction method for quickly constructing the geomembrane bag suspended net structure by the removable cofferdam comprises the following steps:
1) leveling the ground according to the design requirements of the cofferdam structure, and determining the number of rows and layers of the piles of the geotechnical model bags 2) with hooks;
2) the geotechnical model bags 2) with the hooks are stacked layer by layer from the center of the bottom in two rows upwards), the geotechnical model bags 2) with the hooks are connected end to end, longitude and latitude vertical hanging nets 1 are vertically arranged at a gap between the geotechnical model bags 2) with the hooks, and the net hooks 3) on the geotechnical model bags 2) with the hooks on each layer hook the longitude and latitude vertical hanging nets 1);
3) extending outwards from the center, and stacking the geotechnical model bags 2) with hooks row by row one by layer, arranging a longitude and latitude upright hanging net 1) between every two rows of geotechnical model bags 2) with hooks, and hooking the adjacent two rows of geotechnical model bags 2) with hooks together;
4) the cofferdam structure is built in the length direction in the stacking mode until the construction is finished;
5) and after the construction is finished, performing waterproof covering construction on the cofferdam structure, and generally covering the cofferdam structure by adopting a temporary plastic film.

Claims (2)

1. A removable cofferdam rapid construction geotechnical model bag suspended net structure, the whole structure of which comprises 2 parts: longitude and latitude upright net hanging and hook-equipped geotechnical model bag, which is characterized in that:
1) the longitude and latitude upright net is in a grid structure formed by weaving high-strength corrosion-resistant nylon ropes;
2) the geotechnical model bag with the hooks is a model bag filled with sand in a cuboid, the model bag is made of geotechnical materials with friction particles on the surfaces, two ends of the model bag are fastened after sand filling is completed, and the fastening positions are bound with the net hooks.
2. The construction method for quickly constructing the geotechnical mold bag suspended net structure with the removable cofferdam as claimed in claim 1, wherein the construction method comprises the following steps:
1) leveling the ground according to the design requirements of the cofferdam structure, and determining the number of rows and layers of the hook-provided earthwork model bags;
2) the geotechnical model bags with the hooks are stacked up layer by layer from the center of the bottom in two rows, the geotechnical model bags with the hooks are connected end to end, longitude and latitude vertical hanging nets are vertically arranged at a gap between the two rows of geotechnical model bags with the hooks, and the longitude and latitude vertical hanging nets are hooked by the net hanging hooks on the geotechnical model bags with the hooks on each layer;
3) the geotechnical model bags with hooks extend outwards from the center, are stacked row by row layer by layer, and a longitude and latitude vertical hanging net is arranged between every two rows of geotechnical model bags with hooks to hook the adjacent two rows of geotechnical model bags with hooks together;
4) the cofferdam structure is built in the length direction in the stacking mode until the construction is finished;
5) and after the construction is finished, performing waterproof covering construction on the cofferdam structure, and covering the cofferdam structure by adopting a temporary plastic film.
CN201910832100.3A 2019-09-04 2019-09-04 Removable cofferdam rapid construction geotechnical formwork bag net hanging structure and construction method thereof Active CN110593286B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910832100.3A CN110593286B (en) 2019-09-04 2019-09-04 Removable cofferdam rapid construction geotechnical formwork bag net hanging structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910832100.3A CN110593286B (en) 2019-09-04 2019-09-04 Removable cofferdam rapid construction geotechnical formwork bag net hanging structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN110593286A true CN110593286A (en) 2019-12-20
CN110593286B CN110593286B (en) 2021-04-13

Family

ID=68857536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910832100.3A Active CN110593286B (en) 2019-09-04 2019-09-04 Removable cofferdam rapid construction geotechnical formwork bag net hanging structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN110593286B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831688A (en) * 2015-05-14 2015-08-12 广西梧州运龙港船机械制造有限公司 Method for cofferdam construction
CN105507205A (en) * 2015-12-24 2016-04-20 天津大学 Temporary flood barrier constructed by soil engineering filling bags and gate-shaped steel frames
JP5913701B1 (en) * 2015-08-06 2016-04-27 前田工繊株式会社 Temporary dual-use main soil structure and its construction method
CN208441045U (en) * 2018-06-08 2019-01-29 沧州中渤重工机械装备有限公司 A kind of flood control that easy lift to move is anti-slip emergency sandbag

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831688A (en) * 2015-05-14 2015-08-12 广西梧州运龙港船机械制造有限公司 Method for cofferdam construction
JP5913701B1 (en) * 2015-08-06 2016-04-27 前田工繊株式会社 Temporary dual-use main soil structure and its construction method
CN105507205A (en) * 2015-12-24 2016-04-20 天津大学 Temporary flood barrier constructed by soil engineering filling bags and gate-shaped steel frames
CN208441045U (en) * 2018-06-08 2019-01-29 沧州中渤重工机械装备有限公司 A kind of flood control that easy lift to move is anti-slip emergency sandbag

Also Published As

Publication number Publication date
CN110593286B (en) 2021-04-13

Similar Documents

Publication Publication Date Title
CN102900088B (en) Cast-in-place ecological slope protection and construction method thereof
CN210482200U (en) Ecological bank protection structure of high and steep river course bank slope
CN110777806B (en) Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
JPH0756140B2 (en) Retaining wall structure construction method and retaining wall structure
CN108999142A (en) The construction method of dome rectangular light-duty caisson and pile foundation combined type deep water breakwater
CN113250240A (en) Combined side slope protection structure and process of layered net type gabion and concrete
CN112627208B (en) Assembled cofferdam suitable for rock foundation and construction method thereof
CN108867547A (en) The construction method of semi-circular caisson and pile foundation combined type breakwater
CN110593286B (en) Removable cofferdam rapid construction geotechnical formwork bag net hanging structure and construction method thereof
CN209873814U (en) A construction structures for handling foundation ditch inter-pile soil collapses
CN111549789A (en) Reinforcing structure for foundation pit support and construction method thereof
JP6676462B2 (en) Embankment reinforcement method
CN208965494U (en) The rectangular light-duty caisson of dome and pile foundation combined type breakwater
CN208857762U (en) Semi-circular caisson and pile foundation combined type breakwater
KR102138839B1 (en) Cast-in-place concrete blocks using large scales and revetment methods using them
JP2001032231A (en) Lattice type installation material, wave absorbing structure using it, hume pipe used for the structure, and construction method of wave absorbing structure
CN210737555U (en) Underground pipeline in-situ protection mechanism for foundation pit supporting system
CN210216318U (en) Ecological river course side slope protective structure
CN110106930B (en) Iron tower foundation reinforcement protection method
CN110656576A (en) Pier structure and construction method thereof
CN109024470A (en) The rectangular light-duty caisson of dome and pile foundation combined type breakwater
CN114086505A (en) River course slope protection structure for hydraulic engineering and laying construction method
KR101074267B1 (en) A revetment
CN108867546A (en) Semi-circular caisson and pile foundation combined type breakwater
CN220035456U (en) Island-building cofferdam slope protection reinforcing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant