CN104831688A - Method for cofferdam construction - Google Patents

Method for cofferdam construction Download PDF

Info

Publication number
CN104831688A
CN104831688A CN201510245086.9A CN201510245086A CN104831688A CN 104831688 A CN104831688 A CN 104831688A CN 201510245086 A CN201510245086 A CN 201510245086A CN 104831688 A CN104831688 A CN 104831688A
Authority
CN
China
Prior art keywords
film bag
cofferdam
film
bag
catchwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510245086.9A
Other languages
Chinese (zh)
Inventor
陈盛梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI WUZHOU YUNLONG PORT & SHIP MACHINERY MANUFACTURING Co Ltd
Original Assignee
GUANGXI WUZHOU YUNLONG PORT & SHIP MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI WUZHOU YUNLONG PORT & SHIP MACHINERY MANUFACTURING Co Ltd filed Critical GUANGXI WUZHOU YUNLONG PORT & SHIP MACHINERY MANUFACTURING Co Ltd
Priority to CN201510245086.9A priority Critical patent/CN104831688A/en
Publication of CN104831688A publication Critical patent/CN104831688A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a method for cofferdam construction, which relates to the technical field of water conservancy dam construction. The method comprises the following steps of 1, clearing and levelling; 2, laying and fixing a film bag; 3, filling the film bag; 4, laying an upstream impermeable membrane; 5, draining the film bag. In comparison with the prior art, the method has the advantages of simple structure and convenient construction.

Description

The method of cofferdam construction
Technical field
The present invention relates to water resources dam technical field of construction, especially a kind of method of cofferdam construction.
Background technology
At present, the form of construction work in cofferdam has fore shaft steel sheet-pile cofferdam, Larsen steel sheet-pile cofferdam, open caisson, build cofferdam, island, the multiple method such as precast-boxed cofferdam, but for having block stone, erratic boulder geology and topography variation is large, the shallow water area cofferdam of the high complicated hydrologic condition of environmental requirement in works depth bounds, above-mentioned cofferdam construction all has its limitation, shortcomings such as there is laying difficulty, have high input, be long in time limit.Utility application numbers 201320116906.0 discloses a kind of geomembrane bag blast cofferdam, comprise geomembrane bag and positioning steel tube support that length differs, below the face, riverbed around cushion cap is planned to build in the insertion of described positioning steel tube support bottom, in the space of positioning steel tube internal stent, geomembrane bag stacks gradually by order from long to short that to form horizontal end face be trapezoidal closed enclose body, but this utility application lacks the upstream and downstream treatment technology for film bag.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of method of cofferdam construction, and it can solve laying difficulty, the problem long in time limit that prior art exists.
In order to solve the problem, the technical solution adopted in the present invention is: the method for this cofferdam construction, comprises the following steps:
A. clear up smooth: by needing, the region arranging cofferdam is smooth;
B. film bag is laid and is fixed: lay film bag to peak level bottom dam body, described film bag has mesh, bottom described dam body, arrange wire hawser, and described wire hawser fixes described film bag both sides from the bottom of described dam body to film bag top;
C. film bag is filled: with waterpower hydraulic reclamation silt in film bag, described film bag is filled up by the mesh on described film bag by described silt;
D. upstream antiseepage film is laid: lay antiseepage film at described film bag upstream side;
E. film bag draining: back side digs catchwater in cofferdam, described catchwater lays non-woven fabrics, in described catchwater, arrange collecting well, and at described collecting well place installing submersible pump, the water in film bag pumps out by described submersible pump.
In technique scheme, technical scheme can also be more specifically: the film bag described in step C is geotextile, and described mesh size is 0.07 ~ 0.2 millimeter.
Further: antiseepage film described is in step D made up of thermoplastic resin material-polyvinyl resin.
Owing to have employed technique scheme, the present invention compared with prior art has following beneficial effect:
1, fill the construction of silt as cofferdam with film bag, lay simple, easy construction.
2, lay antiseepage film in the film bag upstream filling up silt, can effectively will water permeation be prevented in film bag, and submersible pump is set at the back side in cofferdam the water in film bag is pumped out, make the easy dewatering and coagulating of the silt in film bag, form firmly water-retaining cofferdam.
Detailed description of the invention
Below in conjunction with specific embodiment, the invention will be further described:
Embodiment 1:
The method of this cofferdam construction, comprises the following steps:
A. clear up smooth: by needing, the region arranging cofferdam is smooth;
B. film bag is laid and is fixed: lay film bag to peak level bottom dam body, described film bag has mesh, bottom described dam body, arrange wire hawser, and described wire hawser fixes described film bag both sides from the bottom of described dam body to film bag top;
C. film bag is filled: with waterpower hydraulic reclamation silt in film bag, described film bag is filled up by the mesh on described film bag by described silt, and this film bag is geotextile, and this mesh size is 0.07 millimeter;
D. upstream antiseepage film is laid: lay antiseepage film at described film bag upstream side, this antiseepage film is made up of thermoplastic resin material-polyvinyl resin;
E. film bag draining: back side digs catchwater in cofferdam, described catchwater lays non-woven fabrics, in described catchwater, arrange collecting well, and at described collecting well place installing submersible pump, the water in film bag pumps out by described submersible pump.
Embodiment 2:
The method of this cofferdam construction, comprises the following steps:
A. clear up smooth: by needing, the region arranging cofferdam is smooth;
B. film bag is laid and is fixed: lay film bag to peak level bottom dam body, described film bag has mesh, bottom described dam body, arrange wire hawser, and described wire hawser fixes described film bag both sides from the bottom of described dam body to film bag top;
C. film bag is filled: with waterpower hydraulic reclamation silt in film bag, described film bag is filled up by the mesh on described film bag by described silt, and this film bag is geotextile, and this mesh size is 0.2 millimeter;
D. upstream antiseepage film is laid: lay antiseepage film at described film bag upstream side, this antiseepage film is made up of thermoplastic resin material-polyvinyl resin;
E. film bag draining: back side digs catchwater in cofferdam, described catchwater lays non-woven fabrics, in described catchwater, arrange collecting well, and at described collecting well place installing submersible pump, the water in film bag pumps out by described submersible pump.
Adopt film bag to fill silt as the construction in cofferdam, can gather materials on the spot, and lay simple, easy construction; Lay antiseepage film in the film bag upstream filling up silt, can effectively will water permeation be prevented in film bag, and submersible pump is set at the back side in cofferdam the water in film bag is pumped out, make the easy dewatering and coagulating of the silt in film bag, form firmly water-retaining cofferdam.

Claims (3)

1. a method for cofferdam construction, is characterized in that comprising the following steps:
A. clear up smooth: by needing, the region arranging cofferdam is smooth;
B. film bag is laid and is fixed: lay film bag to peak level bottom dam body, described film bag has mesh, bottom described dam body, arrange wire hawser, and described wire hawser fixes described film bag both sides from the bottom of described dam body to film bag top;
C. film bag is filled: with waterpower hydraulic reclamation silt in film bag, described film bag is filled up by the mesh on described film bag by described silt;
D. upstream antiseepage film is laid: lay antiseepage film at described film bag upstream side;
E. film bag draining: back side digs catchwater in cofferdam, described catchwater lays non-woven fabrics, in described catchwater, arrange collecting well, and at described collecting well place installing submersible pump, the water in film bag pumps out by described submersible pump.
2. cofferdam construction method according to claim 1, is characterized in that: film bag described is in step geotextile, and described mesh size is 0.07 ~ 0.2 millimeter.
3. cofferdam construction method according to claim 1, is characterized in that: antiseepage film described is in step D made up of thermoplastic resin material-polyvinyl resin.
CN201510245086.9A 2015-05-14 2015-05-14 Method for cofferdam construction Pending CN104831688A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510245086.9A CN104831688A (en) 2015-05-14 2015-05-14 Method for cofferdam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510245086.9A CN104831688A (en) 2015-05-14 2015-05-14 Method for cofferdam construction

Publications (1)

Publication Number Publication Date
CN104831688A true CN104831688A (en) 2015-08-12

Family

ID=53809859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510245086.9A Pending CN104831688A (en) 2015-05-14 2015-05-14 Method for cofferdam construction

Country Status (1)

Country Link
CN (1) CN104831688A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059523A (en) * 2017-06-20 2017-08-18 天津大学 A kind of construction method that road is built on reclaimed ground and the subgrade strengthening structure of construction method formation
CN107675717A (en) * 2017-09-09 2018-02-09 中建八局第三建设有限公司 Phytal zone green jumbo bag cofferdam construction method
CN110593286A (en) * 2019-09-04 2019-12-20 河海大学 Removable cofferdam rapid construction geotechnical formwork bag net hanging structure and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2319805C2 (en) * 2006-04-11 2008-03-20 Общество с ограниченной ответственностью Научно-производственная фирма "БЕРЕГ" Method for bio-positive spur dike erection
CN101967785A (en) * 2010-09-17 2011-02-09 唐山市滨海大道建设指挥部 High-grade highway structure of soaked sand dredger filling embankment in coastal region
CN202347497U (en) * 2011-12-16 2012-07-25 王鸿鹏 Dam body anti-seepage structure
CN203188224U (en) * 2013-03-15 2013-09-11 浙江省交通工程建设集团有限公司 Geomembrane bag sand blowing cofferdam
JP2014218847A (en) * 2013-05-09 2014-11-20 大成建設株式会社 Temporary cofferdam wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2319805C2 (en) * 2006-04-11 2008-03-20 Общество с ограниченной ответственностью Научно-производственная фирма "БЕРЕГ" Method for bio-positive spur dike erection
CN101967785A (en) * 2010-09-17 2011-02-09 唐山市滨海大道建设指挥部 High-grade highway structure of soaked sand dredger filling embankment in coastal region
CN202347497U (en) * 2011-12-16 2012-07-25 王鸿鹏 Dam body anti-seepage structure
CN203188224U (en) * 2013-03-15 2013-09-11 浙江省交通工程建设集团有限公司 Geomembrane bag sand blowing cofferdam
JP2014218847A (en) * 2013-05-09 2014-11-20 大成建設株式会社 Temporary cofferdam wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
魏效凤: "膜袋围堰在十三陵水库除险加固工程中的应用", 《北京水务》, no. 05, 31 October 2007 (2007-10-31), pages 32 - 34 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059523A (en) * 2017-06-20 2017-08-18 天津大学 A kind of construction method that road is built on reclaimed ground and the subgrade strengthening structure of construction method formation
CN107675717A (en) * 2017-09-09 2018-02-09 中建八局第三建设有限公司 Phytal zone green jumbo bag cofferdam construction method
CN110593286A (en) * 2019-09-04 2019-12-20 河海大学 Removable cofferdam rapid construction geotechnical formwork bag net hanging structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN102587352B (en) Hot-water draining consolidation processing device and hot-water draining consolidating processing method for soft soil foundation
CN103233454B (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
CN100480472C (en) Quick reinforcing method and reinforcing device for super soft weak soil
CN2911010Y (en) Fast reinforcing apparatus for blowing-filling sludge ground
CN103628468B (en) A kind of water penetration pile combined vacuum prepressing ground foundation treatment method
CN102767157B (en) Diking method through filling sludge into mold bags and vacuum preloading
CN102995620B (en) Vacuum/electroosmosis/magnetic field/stack joint preloading consolidation method of soft foundation
CN104711967A (en) Method for carrying out combined vacuum preloading treatment on soft foundation by gravel piles
CN205636721U (en) Strain equipment that well vacuum preloading consolidated deep soft soil foundation
CN104831688A (en) Method for cofferdam construction
CN204849781U (en) Lay prevention of seepage geomembrane perpendicularly and press excavation supporting system of irritating stake and combining together with superfluidity
CN215669631U (en) Deep overburden foundation structure
CN204370372U (en) The ecological bank protection device of junked tire resistance to erosion
CN202595725U (en) Water discharge structure for vacuum preloading soft soil foundation treatment
CN101666099B (en) Layer-by-layer foundation consolidating method based on barrel-type foundation negative pressure technology
CN208949902U (en) A kind of river channel bridge bearing platform foundation pit antiseepage cofferdam
Liu et al. Ground improvement of dredged fills with two improved vacuum preloading methods: Case study
CN105804045A (en) Equipment for strengthening deep soft soil foundation by vacuum preloading of filter well and method
CN201981551U (en) Supporting and retaining structure by combining iron-rib ecological retaining wall with concrete retaining wall
CN104652409A (en) Continuous forced drainage and compaction combined soft foundation treatment technical method
CN204551500U (en) Novel cofferdam in a kind of super thick soft foundation
CN103243725A (en) Offshore foundation pit cofferdam construction technology
CN108385654A (en) A method of with electrosol combination vacuum-electric osmose reinforcing flexible foundation
CN103741682B (en) The construction method of a kind of carbon fiber cloth bag cast-in-place antiarch surface composition shaped pile
CN207538055U (en) A kind of thin section broken line type cofferdam structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150812