CN203188224U - Geomembrane bag sand blowing cofferdam - Google Patents
Geomembrane bag sand blowing cofferdam Download PDFInfo
- Publication number
- CN203188224U CN203188224U CN 201320116906 CN201320116906U CN203188224U CN 203188224 U CN203188224 U CN 203188224U CN 201320116906 CN201320116906 CN 201320116906 CN 201320116906 U CN201320116906 U CN 201320116906U CN 203188224 U CN203188224 U CN 203188224U
- Authority
- CN
- China
- Prior art keywords
- cofferdam
- geomembrane bag
- geomembrane
- steel pipe
- surrounds
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to a geomembrane bag sand blowing cofferdam which comprises geomembrane bags with different lengths, and a positioning steel pipe support, wherein the bottom end of the positioning steel pipe support is inserted into the river bed surface around a bearing platform planned to be constructed, and the geomembrane bags are sequentially stacked in sequence from long to short to form an enclosed body which is closed and provided with a trapezoid transverse end face in the space inside the positioning steel pipe support. The requirement for cofferdam construction accuracy is not high, a plurality of underwater foundations can be defined and formed at a time, applicability is strong, the technology is simple, the environment is protected, the geomembrane bag sand blowing cofferdam can be widely applied to underwater structural objects which are placed where the depth of water is less than 5 meters, ripraps and boulders exist in the river bed, topographic change is large and environmental protection requirements are high.
Description
Technical field
The utility model relates to a kind of underwater foundation construction supplementary structure, particularly a kind of cofferdam of bearing platform construction under water.
Background technology
Along with expanding economy, it is more and more to cross over buildings such as rivers, island bridge harbour.The cofferdam scheme is the key of underwater foundation smooth construction.At present, the cofferdam mode of underwater foundation construction has fore shaft steel sheet-pile cofferdam, Larsen steel sheet-pile cofferdam, open caisson, builds several different methods such as cofferdam, island, precast-boxed cofferdam, but piece stone, erratic boulder geology and landform change greatly at having in the works depth bounds, the shallow water area cofferdam of the high complicated hydrologic condition of environmental requirement, above-mentioned cofferdam construction all has its limitation, exist set difficulty, have high input, long in time limit or be difficult to satisfy shortcoming such as environmental requirement.
The utility model content
The purpose of this utility model provides a kind of geomembrane bag blast cofferdam, solve the depth of water less than 5m, have aouatic structure things such as jackstone erratic boulder riverbed and landform change greatly, environmental requirement height to adopt that conventional cofferdam method existence sets difficulty, has high input, the technical problem of long in time limit, cofferdam difficult quality guarantee.
For achieving the above object, the utility model adopts following technical scheme:
A kind of geomembrane bag blast cofferdam, comprise geomembrane bag and positioning steel tube support that length differs, described positioning steel tube support bottom is inserted and is planned to build below the cushion cap riverbed face on every side, in the space of positioning steel tube internal stent, the geomembrane bag stacks gradually by from long to short order and forms the body that surrounds that horizontal end face is trapezoidal closure.
The described height H that surrounds body is that water depth+total deflection+maximum of geomembrane bag is surged+safe altitude.
The described interior hypotenuse gradient that surrounds body is 1:1.5~2; The outer hypotenuse gradient is 1:1.
The described top width B1 that surrounds body is 3m ~ 5m.
The described bottom width B2 that surrounds body surrounds the hypotenuse gradient in the height H * of body+the surround outer hypotenuse gradient of height H * of body for top width B1+.
Described positioning steel tube support passes through vertically to connect the steel pipe drawknot by vertically squeezing into steel pipe and laterally being connected some circle intersecting parallels steelframes that steel pipe is enclosed between the Internal and external cycle intersecting parallels steelframe.Distance between the intersecting parallels steelframe of two adjacent rings equals to surround the bottom width B2 of body.
The described steel pipe of vertically squeezing into inserts more than the degree of depth 2.0m that plans to build cushion cap riverbed face on every side.
Compared with prior art the utlity model has following characteristics and beneficial effect:
Less demanding, a plurality of underwater foundation of the utility model construction precision can be shaped in a cofferdam, and applicability is strong, technology is simple, and it is few to drop into main equipment, and sand can be gathered materials on the spot, low, the remarkable in economical benefits of construction cost.Simultaneously, during cofferdam demolition, only need scratch the geomembrane bag, sand can return in the Nature with current, but the film bag is natural decomposition, the construction environmental protection.
The utility model can be widely used in the depth of water less than 5m, the cofferdam of aouatic structure things such as jackstone erratic boulder riverbed and landform change greatly, environmental requirement height arranged.
Description of drawings
The utility model is described in more detail below in conjunction with accompanying drawing.
Fig. 1 is the utility model geomembrane bag blast cofferdam plan view.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is positioning steel tube support layout plan.
Fig. 4 is the B-B sectional view of Fig. 3.Fig. 5 is the C-C sectional view of Fig. 3.
Reference numeral: 1-positioning steel tube support, 1.1-vertically squeeze into steel pipe, 1.2-and vertically connect steel pipe, 1.3-and laterally connect steel pipe, 2-geomembrane bag, 3-and plan to build cushion cap, 4-precipitation well point, 5-riverbed face.
The specific embodiment
Embodiment is extremely shown in Figure 5 referring to Fig. 1, a kind of geomembrane bag blast cofferdam, comprise geomembrane bag 2 and positioning steel tube support 1 that length differs, described positioning steel tube support 1 bottom is inserted and is planned to build cushion cap 3 riverbed face on every side below 5, in positioning steel tube support 1 volume inside, geomembrane bag 2 stacks gradually by from long to short order and forms the body that surrounds that horizontal end face is trapezoidal closure.
The described height H that surrounds body is that water depth+total deflection+maximum of geomembrane bag is surged+safe altitude.
The described interior hypotenuse gradient that surrounds body is 1:1.5~2; The outer hypotenuse gradient is 1:1.
The described top width B1 that surrounds body is 3m ~ 5m.
The described bottom width B2 that surrounds body surrounds the hypotenuse gradient in the height H * of body+the surround outer hypotenuse gradient of height H * of body for top width B1+.
Described positioning steel tube support 1 passes through vertically to connect steel pipe 1.2 drawknots by vertically squeezing into steel pipe 1.1 and laterally being connected some circle intersecting parallels steelframes that steel pipe 1.3 is enclosed between the Internal and external cycle intersecting parallels steelframe.
The described steel pipe 1.1 of vertically squeezing into inserts more than the degree of depth 2.0m that plans to build cushion cap 3 riverbed face 5 on every side.
Cofferdam inner edge size=structure size+excavation of foundation pit degree of depth * is put ratio of slope 1.5 ~ 2+ foundation ditch gras generally recognized as safe distance 10 ~ 20m, outside, cofferdam size=inner edge size+weir bottom width degree.
The outer ring steel pipe of described positioning steel tube support 1 is supported with oblique steel pipe outward.
Implementation process of the present utility model is:
Claims (7)
1. geomembrane bag blast cofferdam, it is characterized in that: comprise geomembrane bag (2) and positioning steel tube support (1) that length differs, described positioning steel tube support (1) bottom is inserted and is planned to build below cushion cap (3) the riverbed face (5) on every side, in positioning steel tube support (1) volume inside, geomembrane bag (2) stacks gradually by from long to short order and forms the body that surrounds that horizontal end face is trapezoidal closure.
2. geomembrane bag blast according to claim 1 cofferdam, it is characterized in that: the described height H that surrounds body is that water depth+total deflection+maximum of geomembrane bag is surged+safe altitude.
3. geomembrane bag blast according to claim 1 cofferdam, it is characterized in that: the described interior hypotenuse gradient that surrounds body is 1:1.5~2; The outer hypotenuse gradient is 1:1.
4. geomembrane bag blast according to claim 1 cofferdam, it is characterized in that: the described top width B1 that surrounds body is 3m ~ 5m.
5. geomembrane bag blast according to claim 1 cofferdam is characterized in that: the described bottom width B2 that surrounds body surrounds the hypotenuse gradient in the height H * of body+the surround outer hypotenuse gradient of height H * of body for top width B1+.
6. geomembrane bag blast according to claim 1 cofferdam, it is characterized in that: described positioning steel tube support (1) passes through vertically to connect steel pipe (1.2) drawknot by vertically squeezing into steel pipe (1.1) and laterally being connected some circle intersecting parallels steelframes that steel pipe (1.3) is enclosed between the Internal and external cycle intersecting parallels steelframe.
7. geomembrane bag blast according to claim 6 cofferdam is characterized in that: the described steel pipe (1.1) of vertically squeezing into inserts and plans to build more than the degree of depth 2.0m of cushion cap (3) riverbed face (5) on every side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320116906 CN203188224U (en) | 2013-03-15 | 2013-03-15 | Geomembrane bag sand blowing cofferdam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320116906 CN203188224U (en) | 2013-03-15 | 2013-03-15 | Geomembrane bag sand blowing cofferdam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203188224U true CN203188224U (en) | 2013-09-11 |
Family
ID=49105093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320116906 Expired - Lifetime CN203188224U (en) | 2013-03-15 | 2013-03-15 | Geomembrane bag sand blowing cofferdam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203188224U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104831688A (en) * | 2015-05-14 | 2015-08-12 | 广西梧州运龙港船机械制造有限公司 | Method for cofferdam construction |
CN105839653A (en) * | 2016-05-18 | 2016-08-10 | 中铁隧道集团二处有限公司 | Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel |
CN106836246A (en) * | 2016-12-20 | 2017-06-13 | 杭州江润科技有限公司 | Open trench tunnel crosses the construction method of section building enclosure |
CN107675717A (en) * | 2017-09-09 | 2018-02-09 | 中建八局第三建设有限公司 | Phytal zone green jumbo bag cofferdam construction method |
CN106284081B (en) * | 2016-08-12 | 2018-07-13 | 中建三局基础设施建设投资有限公司 | A kind of blast cofferdam is as cast-in-place box beam bracket foundation construction method |
-
2013
- 2013-03-15 CN CN 201320116906 patent/CN203188224U/en not_active Expired - Lifetime
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104831688A (en) * | 2015-05-14 | 2015-08-12 | 广西梧州运龙港船机械制造有限公司 | Method for cofferdam construction |
CN105839653A (en) * | 2016-05-18 | 2016-08-10 | 中铁隧道集团二处有限公司 | Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel |
CN105839653B (en) * | 2016-05-18 | 2018-06-08 | 中铁隧道集团二处有限公司 | A kind of immersed tube tunnel rebuilds the construction method of seepage prevention of cofferdam system |
CN106284081B (en) * | 2016-08-12 | 2018-07-13 | 中建三局基础设施建设投资有限公司 | A kind of blast cofferdam is as cast-in-place box beam bracket foundation construction method |
CN106836246A (en) * | 2016-12-20 | 2017-06-13 | 杭州江润科技有限公司 | Open trench tunnel crosses the construction method of section building enclosure |
CN106836246B (en) * | 2016-12-20 | 2018-10-23 | 杭州江润科技有限公司 | Open trench tunnel crosses the construction method of section building enclosure |
CN107675717A (en) * | 2017-09-09 | 2018-02-09 | 中建八局第三建设有限公司 | Phytal zone green jumbo bag cofferdam construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203188224U (en) | Geomembrane bag sand blowing cofferdam | |
CN1837511B (en) | Double-rowed cofferdam and method for manufacturing the same | |
CN100557147C (en) | The job practices of steel cavity stranded caisson-pile inverse-way composite base | |
CN102926328B (en) | Bridge waterside foundation pit excavation and support method and support wall structure | |
CN208650073U (en) | Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction | |
CN204199335U (en) | A kind of pressure release well reducing PHC tube pile construction soil compaction effect | |
CN207032267U (en) | A kind of Geotechnical Engineering slope seepage control water-bound | |
CN104790410B (en) | A kind of Support of Foundation Pit Excavation method that is applicable to shallow water mud river course | |
CN205134193U (en) | Bridge main pier cushion cap foundation pit supporting structure on gentle slope riverbed bedrock | |
CN106640091A (en) | Shallow-buried tunnel section construction method | |
CN208949902U (en) | A kind of river channel bridge bearing platform foundation pit antiseepage cofferdam | |
CN203939036U (en) | A kind of steel sheet pile cofferdam structure that is applicable to river course | |
CN203429664U (en) | Grout blocking and locking device of immersed tube section grouting foundation | |
CN204551500U (en) | Novel cofferdam in a kind of super thick soft foundation | |
CN103898915B (en) | Building small-area deep foundation pit anti-floating water stop construction method | |
CN203007961U (en) | Gabion cofferdam structure | |
CN202359565U (en) | Steel sheet pile cofferdam structure | |
CN209669900U (en) | Tunnel construction cofferdam structure in water-bed highly permeable sandy soil layer | |
CN104652357A (en) | Cylindrical-pile and insertion-plate revetment structure | |
CN215887944U (en) | Island platform is built in advancing of deep water high flow velocity river course embankment | |
CN104895088A (en) | A method of reducing foundation pit asymmetrical pressure | |
CN205907673U (en) | Steel sheet pile structure for bridge main pier bearing platform foundation pit on river channel steep slope bedrock | |
CN204875807U (en) | Bridge main pier cushion cap foundation pit supporting structure on river channel abrupt slope basement rock | |
CN212772402U (en) | Hierarchical fender structure of huge wriggling accumulation body | |
CN109610412B (en) | Blocking structure and blocking method for underground river in karst area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130911 |