CN203188224U - Geomembrane bag sand blowing cofferdam - Google Patents

Geomembrane bag sand blowing cofferdam Download PDF

Info

Publication number
CN203188224U
CN203188224U CN 201320116906 CN201320116906U CN203188224U CN 203188224 U CN203188224 U CN 203188224U CN 201320116906 CN201320116906 CN 201320116906 CN 201320116906 U CN201320116906 U CN 201320116906U CN 203188224 U CN203188224 U CN 203188224U
Authority
CN
China
Prior art keywords
cofferdam
geomembrane bag
geomembrane
steel pipe
surrounds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320116906
Other languages
Chinese (zh)
Inventor
朱益平
张旱英
闵晓阳
朱叶军
罗刚
王薇
强家宽
周联英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Provincial Transporation Eningeering & Construction Group Co Ltd
Original Assignee
Zhejiang Provincial Transporation Eningeering & Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Transporation Eningeering & Construction Group Co Ltd filed Critical Zhejiang Provincial Transporation Eningeering & Construction Group Co Ltd
Priority to CN 201320116906 priority Critical patent/CN203188224U/en
Application granted granted Critical
Publication of CN203188224U publication Critical patent/CN203188224U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a geomembrane bag sand blowing cofferdam which comprises geomembrane bags with different lengths, and a positioning steel pipe support, wherein the bottom end of the positioning steel pipe support is inserted into the river bed surface around a bearing platform planned to be constructed, and the geomembrane bags are sequentially stacked in sequence from long to short to form an enclosed body which is closed and provided with a trapezoid transverse end face in the space inside the positioning steel pipe support. The requirement for cofferdam construction accuracy is not high, a plurality of underwater foundations can be defined and formed at a time, applicability is strong, the technology is simple, the environment is protected, the geomembrane bag sand blowing cofferdam can be widely applied to underwater structural objects which are placed where the depth of water is less than 5 meters, ripraps and boulders exist in the river bed, topographic change is large and environmental protection requirements are high.

Description

Geomembrane bag blast cofferdam
Technical field
The utility model relates to a kind of underwater foundation construction supplementary structure, particularly a kind of cofferdam of bearing platform construction under water.
Background technology
Along with expanding economy, it is more and more to cross over buildings such as rivers, island bridge harbour.The cofferdam scheme is the key of underwater foundation smooth construction.At present, the cofferdam mode of underwater foundation construction has fore shaft steel sheet-pile cofferdam, Larsen steel sheet-pile cofferdam, open caisson, builds several different methods such as cofferdam, island, precast-boxed cofferdam, but piece stone, erratic boulder geology and landform change greatly at having in the works depth bounds, the shallow water area cofferdam of the high complicated hydrologic condition of environmental requirement, above-mentioned cofferdam construction all has its limitation, exist set difficulty, have high input, long in time limit or be difficult to satisfy shortcoming such as environmental requirement.
The utility model content
The purpose of this utility model provides a kind of geomembrane bag blast cofferdam, solve the depth of water less than 5m, have aouatic structure things such as jackstone erratic boulder riverbed and landform change greatly, environmental requirement height to adopt that conventional cofferdam method existence sets difficulty, has high input, the technical problem of long in time limit, cofferdam difficult quality guarantee.
For achieving the above object, the utility model adopts following technical scheme:
A kind of geomembrane bag blast cofferdam, comprise geomembrane bag and positioning steel tube support that length differs, described positioning steel tube support bottom is inserted and is planned to build below the cushion cap riverbed face on every side, in the space of positioning steel tube internal stent, the geomembrane bag stacks gradually by from long to short order and forms the body that surrounds that horizontal end face is trapezoidal closure.
The described height H that surrounds body is that water depth+total deflection+maximum of geomembrane bag is surged+safe altitude.
The described interior hypotenuse gradient that surrounds body is 1:1.5~2; The outer hypotenuse gradient is 1:1.
The described top width B1 that surrounds body is 3m ~ 5m.
The described bottom width B2 that surrounds body surrounds the hypotenuse gradient in the height H * of body+the surround outer hypotenuse gradient of height H * of body for top width B1+.
Described positioning steel tube support passes through vertically to connect the steel pipe drawknot by vertically squeezing into steel pipe and laterally being connected some circle intersecting parallels steelframes that steel pipe is enclosed between the Internal and external cycle intersecting parallels steelframe.Distance between the intersecting parallels steelframe of two adjacent rings equals to surround the bottom width B2 of body.
The described steel pipe of vertically squeezing into inserts more than the degree of depth 2.0m that plans to build cushion cap riverbed face on every side.
Compared with prior art the utlity model has following characteristics and beneficial effect:
Less demanding, a plurality of underwater foundation of the utility model construction precision can be shaped in a cofferdam, and applicability is strong, technology is simple, and it is few to drop into main equipment, and sand can be gathered materials on the spot, low, the remarkable in economical benefits of construction cost.Simultaneously, during cofferdam demolition, only need scratch the geomembrane bag, sand can return in the Nature with current, but the film bag is natural decomposition, the construction environmental protection.
The utility model can be widely used in the depth of water less than 5m, the cofferdam of aouatic structure things such as jackstone erratic boulder riverbed and landform change greatly, environmental requirement height arranged.
Description of drawings
The utility model is described in more detail below in conjunction with accompanying drawing.
Fig. 1 is the utility model geomembrane bag blast cofferdam plan view.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is positioning steel tube support layout plan.
Fig. 4 is the B-B sectional view of Fig. 3.Fig. 5 is the C-C sectional view of Fig. 3.
Reference numeral: 1-positioning steel tube support, 1.1-vertically squeeze into steel pipe, 1.2-and vertically connect steel pipe, 1.3-and laterally connect steel pipe, 2-geomembrane bag, 3-and plan to build cushion cap, 4-precipitation well point, 5-riverbed face.
The specific embodiment
Embodiment is extremely shown in Figure 5 referring to Fig. 1, a kind of geomembrane bag blast cofferdam, comprise geomembrane bag 2 and positioning steel tube support 1 that length differs, described positioning steel tube support 1 bottom is inserted and is planned to build cushion cap 3 riverbed face on every side below 5, in positioning steel tube support 1 volume inside, geomembrane bag 2 stacks gradually by from long to short order and forms the body that surrounds that horizontal end face is trapezoidal closure.
The described height H that surrounds body is that water depth+total deflection+maximum of geomembrane bag is surged+safe altitude.
The described interior hypotenuse gradient that surrounds body is 1:1.5~2; The outer hypotenuse gradient is 1:1.
The described top width B1 that surrounds body is 3m ~ 5m.
The described bottom width B2 that surrounds body surrounds the hypotenuse gradient in the height H * of body+the surround outer hypotenuse gradient of height H * of body for top width B1+.
Described positioning steel tube support 1 passes through vertically to connect steel pipe 1.2 drawknots by vertically squeezing into steel pipe 1.1 and laterally being connected some circle intersecting parallels steelframes that steel pipe 1.3 is enclosed between the Internal and external cycle intersecting parallels steelframe.
The described steel pipe 1.1 of vertically squeezing into inserts more than the degree of depth 2.0m that plans to build cushion cap 3 riverbed face 5 on every side.
Cofferdam inner edge size=structure size+excavation of foundation pit degree of depth * is put ratio of slope 1.5 ~ 2+ foundation ditch gras generally recognized as safe distance 10 ~ 20m, outside, cofferdam size=inner edge size+weir bottom width degree.
The outer ring steel pipe of described positioning steel tube support 1 is supported with oblique steel pipe outward.
Implementation process of the present utility model is:
Step 1, the cofferdam design parameters is determined, finger is according to underwater structure size, the depth of water and riverbed geological conditions, is sidelong design parameterss such as ratio of slope, cofferdam scope and cofferdam embankment structure form, dam crest, dam bottom width degree inside and outside taking into full account the cofferdam height determined after the construction operation space, cofferdam.Described cofferdam design parameters, comprise cofferdam height, top width, bottom width and inside and outside be sidelong ratio of slope, need satisfy antiscour, anti-stable requirement.
Step 2 positions steel pipe support 1 and sets.Positioning steel tube support 1 sets :Every row's steel pipe support is vertically squeezed into the pipe level with steel pipe with 5 and is connected, laterally use greater than the wide steel pipe of bottom geotechnique bag and connect every 5m, the steel pipe level of fixing bottom geotechnique bag is connected to intersecting parallels, and outer layer pipe is aided with oblique supporting steel pipe, guarantees that whole steel pipe frame is firm.If the cofferdam levee body is filled out the heart for many row's film sackholder soil and is laid, then the inboard two row's steel pipes set up of geotechnique's bag the centre banket finish after, pull out immediately.
Step 3, layering are laid geomembrane bag 2 to the cofferdam design height: geomembrane bag 2 blasts, the underlying membrane bag fill sand draining to sand pillow and centre banket finish and fixed after, carry out the construction of last layer sand pocket again, so circulation is until top layer, top layer sand pocket width and end face form the blast cofferdam with wide.Can carry out follow-up draw water precipitation and underwater structure foundation excavation and construction by precipitation well point 4 subsequently.

Claims (7)

1. geomembrane bag blast cofferdam, it is characterized in that: comprise geomembrane bag (2) and positioning steel tube support (1) that length differs, described positioning steel tube support (1) bottom is inserted and is planned to build below cushion cap (3) the riverbed face (5) on every side, in positioning steel tube support (1) volume inside, geomembrane bag (2) stacks gradually by from long to short order and forms the body that surrounds that horizontal end face is trapezoidal closure.
2. geomembrane bag blast according to claim 1 cofferdam, it is characterized in that: the described height H that surrounds body is that water depth+total deflection+maximum of geomembrane bag is surged+safe altitude.
3. geomembrane bag blast according to claim 1 cofferdam, it is characterized in that: the described interior hypotenuse gradient that surrounds body is 1:1.5~2; The outer hypotenuse gradient is 1:1.
4. geomembrane bag blast according to claim 1 cofferdam, it is characterized in that: the described top width B1 that surrounds body is 3m ~ 5m.
5. geomembrane bag blast according to claim 1 cofferdam is characterized in that: the described bottom width B2 that surrounds body surrounds the hypotenuse gradient in the height H * of body+the surround outer hypotenuse gradient of height H * of body for top width B1+.
6. geomembrane bag blast according to claim 1 cofferdam, it is characterized in that: described positioning steel tube support (1) passes through vertically to connect steel pipe (1.2) drawknot by vertically squeezing into steel pipe (1.1) and laterally being connected some circle intersecting parallels steelframes that steel pipe (1.3) is enclosed between the Internal and external cycle intersecting parallels steelframe.
7. geomembrane bag blast according to claim 6 cofferdam is characterized in that: the described steel pipe (1.1) of vertically squeezing into inserts and plans to build more than the degree of depth 2.0m of cushion cap (3) riverbed face (5) on every side.
CN 201320116906 2013-03-15 2013-03-15 Geomembrane bag sand blowing cofferdam Expired - Lifetime CN203188224U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320116906 CN203188224U (en) 2013-03-15 2013-03-15 Geomembrane bag sand blowing cofferdam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320116906 CN203188224U (en) 2013-03-15 2013-03-15 Geomembrane bag sand blowing cofferdam

Publications (1)

Publication Number Publication Date
CN203188224U true CN203188224U (en) 2013-09-11

Family

ID=49105093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320116906 Expired - Lifetime CN203188224U (en) 2013-03-15 2013-03-15 Geomembrane bag sand blowing cofferdam

Country Status (1)

Country Link
CN (1) CN203188224U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831688A (en) * 2015-05-14 2015-08-12 广西梧州运龙港船机械制造有限公司 Method for cofferdam construction
CN105839653A (en) * 2016-05-18 2016-08-10 中铁隧道集团二处有限公司 Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel
CN106836246A (en) * 2016-12-20 2017-06-13 杭州江润科技有限公司 Open trench tunnel crosses the construction method of section building enclosure
CN107675717A (en) * 2017-09-09 2018-02-09 中建八局第三建设有限公司 Phytal zone green jumbo bag cofferdam construction method
CN106284081B (en) * 2016-08-12 2018-07-13 中建三局基础设施建设投资有限公司 A kind of blast cofferdam is as cast-in-place box beam bracket foundation construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831688A (en) * 2015-05-14 2015-08-12 广西梧州运龙港船机械制造有限公司 Method for cofferdam construction
CN105839653A (en) * 2016-05-18 2016-08-10 中铁隧道集团二处有限公司 Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel
CN105839653B (en) * 2016-05-18 2018-06-08 中铁隧道集团二处有限公司 A kind of immersed tube tunnel rebuilds the construction method of seepage prevention of cofferdam system
CN106284081B (en) * 2016-08-12 2018-07-13 中建三局基础设施建设投资有限公司 A kind of blast cofferdam is as cast-in-place box beam bracket foundation construction method
CN106836246A (en) * 2016-12-20 2017-06-13 杭州江润科技有限公司 Open trench tunnel crosses the construction method of section building enclosure
CN106836246B (en) * 2016-12-20 2018-10-23 杭州江润科技有限公司 Open trench tunnel crosses the construction method of section building enclosure
CN107675717A (en) * 2017-09-09 2018-02-09 中建八局第三建设有限公司 Phytal zone green jumbo bag cofferdam construction method

Similar Documents

Publication Publication Date Title
CN203188224U (en) Geomembrane bag sand blowing cofferdam
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN100557147C (en) The job practices of steel cavity stranded caisson-pile inverse-way composite base
CN102926328B (en) Bridge waterside foundation pit excavation and support method and support wall structure
CN208650073U (en) Cut and cover method subaqueous tunnel steel sheet-pile cofferdam construction
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN207032267U (en) A kind of Geotechnical Engineering slope seepage control water-bound
CN104790410B (en) A kind of Support of Foundation Pit Excavation method that is applicable to shallow water mud river course
CN205134193U (en) Bridge main pier cushion cap foundation pit supporting structure on gentle slope riverbed bedrock
CN106640091A (en) Shallow-buried tunnel section construction method
CN208949902U (en) A kind of river channel bridge bearing platform foundation pit antiseepage cofferdam
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN203429664U (en) Grout blocking and locking device of immersed tube section grouting foundation
CN204551500U (en) Novel cofferdam in a kind of super thick soft foundation
CN103898915B (en) Building small-area deep foundation pit anti-floating water stop construction method
CN203007961U (en) Gabion cofferdam structure
CN202359565U (en) Steel sheet pile cofferdam structure
CN209669900U (en) Tunnel construction cofferdam structure in water-bed highly permeable sandy soil layer
CN104652357A (en) Cylindrical-pile and insertion-plate revetment structure
CN215887944U (en) Island platform is built in advancing of deep water high flow velocity river course embankment
CN104895088A (en) A method of reducing foundation pit asymmetrical pressure
CN205907673U (en) Steel sheet pile structure for bridge main pier bearing platform foundation pit on river channel steep slope bedrock
CN204875807U (en) Bridge main pier cushion cap foundation pit supporting structure on river channel abrupt slope basement rock
CN212772402U (en) Hierarchical fender structure of huge wriggling accumulation body
CN109610412B (en) Blocking structure and blocking method for underground river in karst area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130911