CN110528863A - A kind of nacelle device and construction method for outer slope bearing layer - Google Patents

A kind of nacelle device and construction method for outer slope bearing layer Download PDF

Info

Publication number
CN110528863A
CN110528863A CN201910796196.2A CN201910796196A CN110528863A CN 110528863 A CN110528863 A CN 110528863A CN 201910796196 A CN201910796196 A CN 201910796196A CN 110528863 A CN110528863 A CN 110528863A
Authority
CN
China
Prior art keywords
basket body
wirerope
bearing layer
bracket
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910796196.2A
Other languages
Chinese (zh)
Other versions
CN110528863B (en
Inventor
朱永
张纯为
许峰
应黎钢
施晓哲
郭天志
楼波龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Sanjian Construction Group Co Ltd
Original Assignee
Zhejiang Sanjian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Sanjian Construction Group Co Ltd filed Critical Zhejiang Sanjian Construction Group Co Ltd
Priority to CN201910796196.2A priority Critical patent/CN110528863B/en
Publication of CN110528863A publication Critical patent/CN110528863A/en
Application granted granted Critical
Publication of CN110528863B publication Critical patent/CN110528863B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/34Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of nacelle devices and construction method for outer slope bearing layer, including basket body and are mounted on two brackets of roof, connect the both ends of basket body by the first and second wirerope respectively;The first and second elevators are had in basket body, are connected respectively with the first and second wirerope;It further include the third bracket for being erected at roof, third elevator is located in basket body, and external pulley mechanism is located at except outer inclined-plane and on third bracket;Third wirerope is then passed through two external pulley mechanisms after third bracket, is then formed a Y shape bifurcated, end is separately fixed at basket body both ends by third hoister control folding and unfolding.When needing to carry out the movement of horizontal direction, tighten third wirerope, then basket body can be pulled away from outer inclined-plane, loosen wirerope then basket body under the effect of gravity close to outer inclined-plane.

Description

A kind of nacelle device and construction method for outer slope bearing layer
Technical field
The invention belongs to technical field of building construction, more particularly to a kind of nacelle device for outer slope bearing layer and apply Work method.
Background technique
When the alien invasion to building is constructed, generally requires and worker is sent to construction location with hanging basket.Existing skill Nacelle device in art generally comprises two brackets that roof is arranged in, and connects the both ends of hanging basket by wirerope respectively;Hanging basket There are two elevators for upper band, are connected respectively with two wirerope, electric cabinet is additionally provided in hanging basket, are controlled by the worker in hanging basket, Make the synchronous folding and unfolding of two wirerope, enables hanging basket rise or fall, reach predetermined altitude.
This nacelle device can preferably be applied to the building of vertical facade, but can not be suitable for building for oblique facade Build object.When alien invasion is inclined-plane, this nacelle device can collide facade, bring unnecessary pressure or loss;Especially, when In the case where inclined-plane out-of-flatness, this hanging basket can not clear the jumps and rise or fall.
Summary of the invention
The object of the present invention is to provide a kind of nacelle devices that can be used for outer slope bearing layer, and the construction party on outer inclined-plane Method.
To realize that first goal of the invention, used technical solution are such that a kind of hanging for outer slope bearing layer Basket device including basket body and is mounted on two brackets of roof, connects hanging basket master by the first and second wirerope respectively The both ends of body;The first and second elevators are had in basket body, are connected respectively with the first and second wirerope, in basket body It is additionally provided with electric cabinet, controls two the first and second wirerope of elevator folding and unfolding;It is characterized by also including third brackets, Three wirerope, third elevator and external pulley mechanism, third branch are erected at roof, and third elevator is located in basket body, External pulley mechanism is located at except outer inclined-plane and on third bracket;Third wirerope passes through the by third hoister control folding and unfolding It is then passed through two external pulley mechanisms after three brackets, then forms a Y shape bifurcated, end is separately fixed at basket body two End.
Further, there are also the second electric cabinet, independent control third elevators in basket body.
Basket body is taken turns close to the side on outer inclined-plane equipped with several protections, and the protection wheel uses pneumatic tire.
Also there is a safety rope in basket body, be separately attached on roof.
The external pulley mechanism can be set on the ground, also can be set on other firm buildings.
To realize second goal of the invention, the technical solution adopted is that such: a method of for outer slope bearing layer, It is characterized by: operator is located in basket body using nacelle device above-mentioned, electronic control unit, synchronous folding and unfolding first are operated Basket body is enabled to rise or fall with the second wirerope, folding and unfolding third wirerope enables basket body close to or far from outer inclined-plane;Together Both operations of Shi Jinhang, control basket body reach construction location.
Using technical solution of the present invention, when controlling basket body and moving up and down still as traditional nacelle device; And when needing to carry out the movement of horizontal direction, third wirerope is tightened, then basket body can be pulled away to outer inclined-plane, loosens steel Cord then basket body under the effect of gravity close to outer inclined-plane.By combination of the two, basket body can be accurately controlled Motion profile, realize goal of the invention.
Detailed description of the invention
It is described in further detail below in conjunction with attached drawing and embodiments of the present invention
Fig. 1 is scheme of installation of the invention;
Fig. 2 is installation side view of the invention
Fig. 3 is the structural schematic diagram of hanging basket of the present invention;
Fig. 4 is the side view of hanging basket of the present invention;
Fig. 5 is the scheme of installation of bracket of the present invention.
In the figure, it is marked as basket body 1, bracket 2, first support 21, second support 22, third bracket 23, tripod 24, Counter-balanced carriage 25, the first wirerope 31, the second wirerope 32, third wirerope 33, the first elevator 41, the second elevator 42, Three elevators 43, the first electric cabinet 51, the second electric cabinet 52, the first fixed pulley 61, the second fixed pulley 62, wall wheel 7, safety rope 8。
Specific embodiment
Referring to attached drawing.The present embodiment includes basket body 1 and three brackets 2 for being mounted on roof, and bracket uses standard side Formula is set up in roof, and the tripod 24 and counter-balanced carriage 25 of bracket are all made of chemical bolt and angle steel is fixed on floor;First Frame 21 and second support 22 connect the both ends of basket body 1, hanging basket master by the first wirerope 31 and the second wirerope 32 respectively The first elevator 41 and the second elevator 42 are had on body 1, are connected respectively with the first wirerope 31 and the second wirerope 32, hanging basket It is additionally provided with the first electric cabinet 51 in main body 1, controls two elevator folding and unfolding the first wirerope 31 and the second wirerope 32.
And third bracket 23 is equally erected at roof, and the first fixed pulley 61 is fixed on third bracket 23, in hanging basket master One the second fixed pulley 62 is set on the ground of the lower section of body 1, the second fixed pulley 62 setting position on ground in the horizontal direction with building The distance L of alien invasion should be greater than 15m, and the second fixed pulley 62 also can be set on other firm buildings.In basket body 1 With third elevator 43, basket body 1 is interior, and there are also the second electric cabinet 52, independent control third elevator 43, third wirerope 33 control folding and unfolding by third elevator 43, the first fixed pulley 61 and the second fixed pulley 62 are then passed through after third bracket 23, so A Y shape bifurcated is formed afterwards, and end is separately fixed at 1 both ends of basket body.In order to prevent construction in basketry collision wall and Finished surface is destroyed, wall wheel 7 is set by wall side in basket body 1, wall wheel uses expandable plastic tire.Meanwhile in order to pacify For the sake of complete, also there is a safety rope 8 in basket body 1, be separately attached on roof.
When installation:
1) it before bracket installation, checks the integrality of bracket, is fixed on roofing floor using chemical bolt and angle steel;Setscrew Using M12, gasket uses L50*5mm;
2) three elevators are installed altogether, it is automatically controlled to increase a third elevator 43 and second on the left of basket body 1 in basket body 1 Case 52, for adjusting basket body at a distance from metope;
3) wall wheel 7 is set by wall side in basket body 1, wall wheel uses expandable plastic tire;
4) roof adds a third bracket 23, the same side is in the third elevator 43 of basket body, in third branch First fixed pulley 61 is hung on frame 23, second fixed pulley 62 is arranged in ground below basket body.
When use:
1) respectively there are two pole brackets for every hanging basket, keep between basket body and construction metope not less than 0.3 m or so, hanging basket Spacing is maintained between 0.5-1 m between hanging basket;
2) wirerope used in meets the requirement of national standard, provides that the safety coefficient of wirerope is not less than 9 times in national standard;
3) the second fixed pulley setting position on ground should be greater than 15m away from building alien invasion in the horizontal direction;
4) hanging basket is set up using conventional erection method, sunpender extension elongation up to 1.5m before hanging basket, fore-stock and after-poppet It is 4.6m that it is most short, which to set up distance, and workbench and curtain wall finished surface distance are 200mm or so, hanging basket spacing 800mm or so;
5) wirerope is reinforced in installation, adjusts the screw rod of screw-button, tightens reinforcement wirerope, front-axle beam is made slightly to upwarp 3-5 centimetres, Prestressing force is generated, front-axle beam rigidity is improved;
6) hoist installation is paid attention to making safe lock support towards platform outside at hanging basket both ends, installation, it is uniformly tight after dressing up Gu whole attachment bolts;
7) it by hoist installation on the mounting rack of suspension platform, is fixed with handle, lock pin, bolt, safety lock is mounted on peace On the safety lock mounting plate shelved, bolt fastening is used;
8) it hangs down an independent safety rope from roof, safety rope should be fixed on the fabric structure for having sufficient intensity;
9) before the working of construction teams and groups, this engineering hanging basket safety rope, electric appliance, bracket are checked.

Claims (6)

1. a kind of nacelle device for outer slope bearing layer, including basket body and two brackets of roof are mounted on, are led to respectively Cross the both ends of the first and second wirerope connection basket body;The first and second elevators are had in basket body, respectively with the One is connected with the second wirerope, and electric cabinet is additionally provided in basket body, controls two the first and second wirerope of elevator folding and unfolding; It is characterized by also including third bracket, third wirerope, third elevator and external pulley mechanism, third branch to be erected at building Top, third elevator are located in basket body, and external pulley mechanism is located at except outer inclined-plane and on third bracket;Third wirerope By third hoister control folding and unfolding, it is then passed through two external pulley mechanisms after third bracket, then forms Y shape point Fork, end is separately fixed at basket body both ends.
2. a kind of nacelle device for outer slope bearing layer as described in claim 1, it is characterised in that: in basket body also Second electric cabinet, independent control third elevator.
3. a kind of nacelle device for outer slope bearing layer as described in claim 1, it is characterised in that: basket body is close to outer The side on inclined-plane is taken turns equipped with several protections, and the protection wheel uses pneumatic tire.
4. a kind of nacelle device for outer slope bearing layer as described in claim 1, it is characterised in that: also have in basket body There is a safety rope, is separately attached on roof.
5. a kind of nacelle device for outer slope bearing layer as described in claim 1, it is characterised in that: the external pulley Mechanism can be set on the ground, also can be set on other firm buildings.
6. a kind of method for outer slope bearing layer, it is characterised in that: filled using the described in any item hanging baskets of claim 1 ~ 5 Set, operator is located in basket body, operate electronic control unit, synchronous the first and second wirerope of folding and unfolding enable basket body rise or Decline, folding and unfolding third wirerope enable basket body close to or far from outer inclined-plane;Both operations are carried out simultaneously, control basket body Reach construction location.
CN201910796196.2A 2019-08-27 2019-08-27 Hanging basket device for outer inclined plane construction and construction method Active CN110528863B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910796196.2A CN110528863B (en) 2019-08-27 2019-08-27 Hanging basket device for outer inclined plane construction and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910796196.2A CN110528863B (en) 2019-08-27 2019-08-27 Hanging basket device for outer inclined plane construction and construction method

Publications (2)

Publication Number Publication Date
CN110528863A true CN110528863A (en) 2019-12-03
CN110528863B CN110528863B (en) 2024-05-14

Family

ID=68664463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910796196.2A Active CN110528863B (en) 2019-08-27 2019-08-27 Hanging basket device for outer inclined plane construction and construction method

Country Status (1)

Country Link
CN (1) CN110528863B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021705A (en) * 2019-12-23 2020-04-17 上海建工五建集团有限公司 Hanging basket applied to curved surface and construction method thereof
CN111747355A (en) * 2020-06-12 2020-10-09 中国长江电力股份有限公司 Telescopic balance arm of aerial work hanging basket and using method thereof
CN112854723A (en) * 2021-01-13 2021-05-28 邓阿清 Hanging flower basket device that non-perpendicular facade of building construction was used
CN113090000A (en) * 2021-05-26 2021-07-09 华电重工股份有限公司 Hanging basket construction device for curved surface appearance building
CN114197850A (en) * 2022-01-25 2022-03-18 中建八局天津建设工程有限公司 Rail type sliding hanging basket equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08131373A (en) * 1994-11-14 1996-05-28 Sansei Kk Gondola apparatus for cleaning inversely inclined surface of external wall of building
KR100841820B1 (en) * 2007-03-28 2008-06-26 대우조선해양 주식회사 Painting work table for deck part of trunk of lng vessel
CN104444977A (en) * 2014-11-14 2015-03-25 中建三局装饰有限公司 Adjustable vertical material transporting cableway system and construction method thereof
CN106006425A (en) * 2016-07-01 2016-10-12 广东省工业设备安装有限公司 Method of hoisting and transporting large-sized equipment arranged in underground machine rooms of super high-rise buildings
CN205742958U (en) * 2016-05-12 2016-11-30 陈子睿 A kind of building hanging basket of energy translation-angle
CN207469711U (en) * 2017-11-03 2018-06-08 北京中易房建筑工程有限公司 A kind of construction hanging basket
CN208586885U (en) * 2018-07-05 2019-03-08 中建八局第一建设有限公司 A kind of novel hanging basket lateral traction bracket
CN213204926U (en) * 2020-08-21 2021-05-14 上海凌泰建筑科技有限公司 Inclined current hanging basket mounting system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08131373A (en) * 1994-11-14 1996-05-28 Sansei Kk Gondola apparatus for cleaning inversely inclined surface of external wall of building
KR100841820B1 (en) * 2007-03-28 2008-06-26 대우조선해양 주식회사 Painting work table for deck part of trunk of lng vessel
CN104444977A (en) * 2014-11-14 2015-03-25 中建三局装饰有限公司 Adjustable vertical material transporting cableway system and construction method thereof
CN205742958U (en) * 2016-05-12 2016-11-30 陈子睿 A kind of building hanging basket of energy translation-angle
CN106006425A (en) * 2016-07-01 2016-10-12 广东省工业设备安装有限公司 Method of hoisting and transporting large-sized equipment arranged in underground machine rooms of super high-rise buildings
CN207469711U (en) * 2017-11-03 2018-06-08 北京中易房建筑工程有限公司 A kind of construction hanging basket
CN208586885U (en) * 2018-07-05 2019-03-08 中建八局第一建设有限公司 A kind of novel hanging basket lateral traction bracket
CN213204926U (en) * 2020-08-21 2021-05-14 上海凌泰建筑科技有限公司 Inclined current hanging basket mounting system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021705A (en) * 2019-12-23 2020-04-17 上海建工五建集团有限公司 Hanging basket applied to curved surface and construction method thereof
CN111747355A (en) * 2020-06-12 2020-10-09 中国长江电力股份有限公司 Telescopic balance arm of aerial work hanging basket and using method thereof
CN111747355B (en) * 2020-06-12 2021-08-17 中国长江电力股份有限公司 Telescopic balance arm of aerial work hanging basket and using method thereof
CN112854723A (en) * 2021-01-13 2021-05-28 邓阿清 Hanging flower basket device that non-perpendicular facade of building construction was used
CN113090000A (en) * 2021-05-26 2021-07-09 华电重工股份有限公司 Hanging basket construction device for curved surface appearance building
CN113090000B (en) * 2021-05-26 2023-02-17 华电重工股份有限公司 Hanging basket construction device for curved surface appearance building
CN114197850A (en) * 2022-01-25 2022-03-18 中建八局天津建设工程有限公司 Rail type sliding hanging basket equipment

Also Published As

Publication number Publication date
CN110528863B (en) 2024-05-14

Similar Documents

Publication Publication Date Title
CN110528863A (en) A kind of nacelle device and construction method for outer slope bearing layer
CN103924777B (en) The decorating outer wall of building special suspension platform of construction
CN104295080A (en) External wall hanging basket installing structure
CN104929355B (en) Shaped form hanging basket
CN108643541A (en) A kind of adjustable multi-use architecture operation platform
CN106906994A (en) Saddle climbing type Work platform system and its construction method with lossless wall-attaching equipment
CN106801508A (en) A kind of way curved surface builds exterior trim surface construction hanging basket
CN113738089A (en) Hanging basket integral installation construction method of specially-made hanging mechanism device
CN105952134A (en) Travel type automatic positioning hanging basket device
CN211037771U (en) Hanging basket device for outer slope construction
CN105776092B (en) A kind of extended position nacelle device
JP4958861B2 (en) Construction scaffolding
CN105752897A (en) Variable span hanging basket suspension mechanism
CN204081440U (en) Semifixed exterior wall hanging basket mounting structure
CN204111122U (en) Optimize the composition component without scaffold lift-mounting
CN206494694U (en) A kind of Multi-layer electric hanging basket
CN206625529U (en) A kind of way curved surface builds exterior trim surface construction hanging basket
CN110056176A (en) A kind of elevator mobile platform and application method
CN107724663A (en) It is a kind of to be automatically positioned the nacelle device not shaken
CN209989034U (en) A hoisting frame for factory building piping erection
CN204781890U (en) Curve type hanging flower basket
CN113356556A (en) Steel structure-based counterweight-free hanging basket installation method
CN208934449U (en) A kind of vertical face of outer wall of building curtain protective device
CN207609158U (en) A kind of movable altitude job engineering hanging basket
CN207110427U (en) A kind of construction hanging basket protector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant