CN206625529U - A kind of way curved surface builds exterior trim surface construction hanging basket - Google Patents
A kind of way curved surface builds exterior trim surface construction hanging basket Download PDFInfo
- Publication number
- CN206625529U CN206625529U CN201720145854.8U CN201720145854U CN206625529U CN 206625529 U CN206625529 U CN 206625529U CN 201720145854 U CN201720145854 U CN 201720145854U CN 206625529 U CN206625529 U CN 206625529U
- Authority
- CN
- China
- Prior art keywords
- steel
- basket
- frame
- building
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种双向曲面建筑外饰面施工用吊篮,包括纵向平面与建筑物曲面形状相吻合的篮筐,篮筐的底框的左右两侧分别支撑固定在两个矩形第一钢架的底部横杆上并且所述的两个第一钢架的前后立杆分别通过连接件与所述的篮筐的防护栏固定相连,在两个第一钢架上各安装有两个爬升式提升机和两个安全锁,在篮筐左右两侧各设置有两道钢丝绳,沿钢丝绳走向在曲面建筑的钢结构骨架上设置有多个用于支撑钢丝绳的中间滑轮,在每一个第一钢架的内侧分别设置有一个矩形第二钢架,在所述的两个第二钢架靠近建筑物侧的立杆的上部和下部分别安装有贴靠在建筑物钢结构竖向骨架上的导向轮。本装置适合不规则平面形状和各种尺寸施工作业面的外饰面施工。
The utility model discloses a hanging basket for the construction of a two-way curved building exterior surface, which comprises a basket whose longitudinal plane matches the shape of the building's curved surface. The left and right sides of the bottom frame of the basket are respectively supported and fixed on two rectangular first On the bottom cross bar of the steel frame and the front and rear vertical bars of the two first steel frames are respectively fixedly connected with the guard rails of the basket through connecting pieces, two first steel frames are respectively installed with two Climbing hoist and two safety locks. There are two wire ropes on the left and right sides of the basket. Along the direction of the wire ropes, a number of intermediate pulleys are used to support the wire ropes on the steel structure skeleton of the curved building. A rectangular second steel frame is arranged on the inner side of a steel frame, and the upper and lower parts of the vertical poles on the side of the building are installed respectively on the upper and lower parts of the two second steel frames, which are attached to the vertical frame of the steel structure of the building. guide wheels. The device is suitable for the construction of exterior finishes on irregular plane shapes and construction work surfaces of various sizes.
Description
技术领域technical field
本实用新型涉及施工用吊篮,特别是涉及双向曲面建筑外饰面施工用吊篮。The utility model relates to a hanging basket for construction, in particular to a hanging basket for construction of two-way curved building exterior decoration.
背景技术Background technique
随着现代建筑设计发展,相继涌现出许多造型奇特,结构复杂的建筑,双向曲面建筑便是其中之一。双向曲面建筑的特点是平面、立面均为弧形,外墙与顶面融合,其多采用钢结构骨架,外饰面安装玻璃或板材,其复杂的建筑结构给工程施工带来挑战,其中外饰面施工操作平台选择更是困扰施工企业的一大难题。这是因为传统外墙装修电动吊篮只适用于平直墙面,不适于曲面施工。如果采取搭设外脚手架施工,会遇到以下问题:当墙、顶面随标高上升沿弧线向里收进时,在外脚手架上无法够到;若采取内脚手架,则需投入大量架材和搭、拆人工,且对于上升立面外倾斜段,仍需同时搭设外架,工作量大,施工周期长,加之墙面(屋面)板安装在钢结构外面,施工人员仍需爬到钢结构骨架上进行高空作业,难以保证施工安全。此外,材料运输还得另配设井架等垂直运输设备。With the development of modern architectural design, many buildings with peculiar shapes and complex structures have emerged one after another, and the two-way curved surface building is one of them. Two-way curved buildings are characterized by arc-shaped planes and elevations, and fusion of exterior walls and top surfaces. Most of them use steel structure skeletons, and glass or panels are installed on exterior surfaces. Their complex building structures bring challenges to engineering construction. Among them The selection of the operation platform for exterior decoration construction is a major problem that plagues construction companies. This is because the traditional electric gondola for exterior wall decoration is only suitable for straight walls and is not suitable for curved surfaces. If the construction of external scaffolding is adopted, the following problems will be encountered: when the wall and the top surface are retracted along the arc with the elevation, they cannot be reached on the external scaffolding; , dismantling labor, and for the inclined section of the rising facade, the outer frame still needs to be erected at the same time, the workload is heavy, and the construction period is long. In addition, the wall (roof) board is installed outside the steel structure, and the construction personnel still need to climb to the steel structure skeleton It is difficult to ensure construction safety when working at heights. In addition, vertical transportation equipment such as derricks must be equipped for material transportation.
申请号为201220013897.8,申请日为2012-01-13的中国专利公开了“一种曲面上的吊篮导向装置”,包括钢索、曲面两端的固定架、吊篮和吊篮动力装置,所述钢索与固定架、吊篮和吊篮动力装置环绕连接,曲面中部安装有突出部固定架,吊篮上设有导向轮卡槽和滚动轮卡槽,导向轮与导向轮卡槽活动连接,滚动轮与滚动轮卡槽活动连接。该结构采用钢丝绳作柔性轨道,由于吊篮运行过程中钢丝绳会发生颤动,因而导致吊篮工作不稳定。另外柔性轨道易变形,会影响吊篮方位,或造成吊篮歪斜。The application number is 201220013897.8, and the Chinese patent with the application date of 2012-01-13 discloses "a hanging basket guide device on a curved surface", which includes steel cables, fixing frames at both ends of the curved surface, a hanging basket and a hanging basket power device. The steel cable is connected with the fixed frame, the hanging basket and the hanging basket power device in a circle. The protrusion fixing frame is installed in the middle of the curved surface. The scroll wheel is movably connected with the scroll wheel slot. The structure uses steel wire ropes as flexible tracks. Since the steel wire ropes vibrate during the operation of the hanging basket, the working of the hanging basket is unstable. In addition, the flexible track is easy to deform, which will affect the orientation of the hanging platform, or cause the hanging platform to be skewed.
发明内容Contents of the invention
本实用新型的目的在于克服已有技术的缺点,提供一种适用于各种曲面建筑外装饰施工并且施工安全、高效和快速的双向曲面建筑外饰面施工用吊篮。The purpose of the utility model is to overcome the shortcomings of the prior art, and to provide a hanging basket for construction of two-way curved building exterior decoration, which is suitable for construction of various curved surface building exterior decorations and has safe, efficient and fast construction.
一种双向曲面建筑外饰面施工用吊篮,包括纵向平面与建筑物曲面形状相吻合的篮筐,所述的篮筐包括底框,在所述的底框的四周安装有防护栏,在所述的底框上安装有操作平台,所述的底框与防护栏及操作平台之间均采用连接螺栓连接,所述的篮筐的底框的左右两侧分别支撑固定在两个矩形第一钢架的底部横杆上并且所述的两个第一钢架的前后立杆分别通过连接件与所述的篮筐的防护栏固定相连,在所述的两个第一钢架上各安装有两个爬升式提升机和两个安全锁,在所述的篮筐左右两侧各设置有两道钢丝绳,沿所述的钢丝绳走向在曲面建筑的钢结构骨架上设置有多个用于支撑钢丝绳的中间滑轮,每侧的每道钢丝绳均缠绕在建筑物顶部横杆上,通过卡扣固定后分为两段钢丝绳垂下,所述的两段钢丝绳分别顺次卡在各中间滑轮的滑轮槽内并穿过一个安全锁的上下夹钳腭板之间,穿过上下夹钳腭板之间的一段钢丝绳的端部与一个爬升式提升机的卷带固定相连,穿过上下夹钳腭板之间的另一段钢丝绳的端部与一个固定点相连,所述的爬升式提升机带动钢丝绳输送机构使提升机沿着钢丝绳上下运动,在每一个第一钢架的内侧分别设置有一个矩形第二钢架,所述的篮筐的底框支撑固定在两个矩形第二钢架的底部横杆上并且所述的两个第二钢架的前后立杆分别通过连接件与所述的篮筐的防护栏固定相连,在所述的两个第二钢架靠近建筑物侧的立杆的上部和下部分别安装有贴靠在建筑物钢结构竖向骨架上的导向轮,在所述的导向轮的内侧设置有轮缘,控制导向轮沿竖向钢骨架运行,在所述的篮筐上安装有控制器,所述的控制器通过控制线与四个爬升式提升机的电机相连以控制吊篮两端的爬升式提升机同步升降以及制动。A hanging basket for the construction of a two-way curved building exterior surface, comprising a basket whose longitudinal plane matches the shape of the building's curved surface, the basket includes a bottom frame, and guardrails are installed around the bottom frame. An operation platform is installed on the bottom frame, and the bottom frame, the guardrail and the operation platform are all connected by connecting bolts, and the left and right sides of the bottom frame of the basket are respectively supported and fixed on two rectangular first On the bottom cross bar of a steel frame and the front and rear upright bars of the two first steel frames are respectively fixedly connected with the protective rails of the basket through connecting pieces, and each of the two first steel frames is Two climbing hoists and two safety locks are installed, and two steel wire ropes are respectively arranged on the left and right sides of the basket, and along the direction of the steel wire ropes, a plurality of wire ropes are arranged on the steel structure skeleton of the curved surface building. The middle pulley supporting the wire rope, each wire rope on each side is wound on the top cross bar of the building, and after being fixed by buckles, it is divided into two sections of steel wire ropes to hang down, and the two sections of steel wire rope are respectively stuck on the pulleys of each middle pulley in sequence The end of a section of wire rope that passes between the upper and lower clamp palates of a safety lock is fixedly connected with a winding belt of a climbing hoist, and passes through the upper and lower clamp palates. The end of another section of wire rope between the plates is connected to a fixed point, and the climbing hoist drives the wire rope conveying mechanism to make the hoist move up and down along the wire rope, and a rectangular The second steel frame, the bottom frame of the basket is supported and fixed on the bottom cross bars of the two rectangular second steel frames, and the front and rear vertical bars of the two second steel frames are respectively connected to the said two second steel frames through connectors The guardrails of the basket are fixedly connected, and the upper and lower parts of the two second steel frames close to the vertical poles on the side of the building are respectively equipped with guide wheels that are attached to the vertical frame of the steel structure of the building. The inside of the guide wheel is provided with a rim, which controls the guide wheel to run along the vertical steel frame. A controller is installed on the basket, and the controller is connected to the motors of the four climbing hoists through control lines. To control the climbing hoist at both ends of the hanging basket to lift and brake synchronously.
本实用新型的有益效果是:The beneficial effects of the utility model are:
(1)篮筐可以采取分片、分段预制,在施工现场按照建筑物平面形状和施工作业面需要尺寸组装(通过在防护栏立杆连接缝处塞垫钢垫板调整篮筐平面形状;通过加减单元节调节篮筐长度),适合弧线、直线,乃至任何不规则平面形状和各种尺寸施工作业面的外饰面施工。(1) The basket can be prefabricated in pieces and sections, and assembled at the construction site according to the plane shape of the building and the required size of the construction work surface (adjust the plane shape of the basket by plugging steel backing plates at the joints of the guardrail poles; Adjust the length of the basket by adding or subtracting unit sections), suitable for the construction of arcs, straight lines, and even any irregular plane shapes and construction surfaces of various sizes.
(2)在第二钢架上安装有导向轮,利用已完成的钢结构骨架作为运行轨道,实现有轨升降,使弧形吊篮稳定地附贴在结构上移动作业,满足各种钢结构曲面、斜面、垂直墙面外装饰施工。(2) Guide wheels are installed on the second steel frame, and the completed steel structure skeleton is used as the running track to realize rail lifting, so that the arc-shaped hanging basket can be stably attached to the structure for moving operations, meeting various steel structures Curved surface, sloped surface, vertical wall exterior decoration construction.
(3)在吊篮两端设置第一钢架,用于安装提升机构,承担吊篮的全部荷载。其采取套装兜底的安装方式,大大增加吊篮工作安全稳定性。(3) The first steel frame is arranged at both ends of the hanging basket, which is used to install the lifting mechanism and bear all the loads of the hanging basket. It adopts the installation method of the bottom of the suit, which greatly increases the safety and stability of the hanging platform.
(4)钢架与篮筐连接采用卡固式连接件,可根据钢结构竖向骨架(轨道)布置调整第二钢架安装位置,灵活方便。(4) The connection between the steel frame and the basket adopts clamping connectors, and the installation position of the second steel frame can be adjusted according to the layout of the vertical skeleton (track) of the steel structure, which is flexible and convenient.
(5)钢丝绳上端固定在钢结构顶部,坚固,牢靠,稳定。(5) The upper end of the steel wire rope is fixed on the top of the steel structure, which is strong, reliable and stable.
(6)通过中间滑轮保持钢丝绳沿弧形走向架空,不与钢结构相碰。(6) Keep the steel wire rope overhead along the arc through the middle pulley, without colliding with the steel structure.
(7)解决了钢结构双向曲面外饰面施工难题,其适用于高空双向大变坡曲面墙面(屋面)装饰板安装和饰面施工作业。使用该装置,施工人员在吊篮中即可完成整段曲面墙面(屋面)装饰施工,施工安全,高效,快速。相比钢管脚手操作架,可大量节省架材和搭、拆人工,且吊篮同时承担材料运输,节省了垂直运输设备投入。本装置结构简单,取材便利,加工、安装、使用方便,适用于各种曲面建筑外装饰施工。(7) It solves the construction problem of the two-way curved surface of the steel structure, which is suitable for the installation of the decorative board and the construction of the high-altitude two-way large-slope curved wall (roof) surface. Using the device, construction personnel can complete the entire section of curved wall (roof) decoration construction in the hanging basket, and the construction is safe, efficient and fast. Compared with the steel pipe scaffolding operation frame, it can save a lot of frame materials, erection and dismantling labor, and the hanging basket undertakes material transportation at the same time, saving the investment in vertical transportation equipment. The device has simple structure, convenient material acquisition, convenient processing, installation and use, and is suitable for exterior decoration construction of various curved surfaces.
附图说明Description of drawings
图1是本实用新型的一种双向曲面建筑外饰面施工用吊篮安装使用示意图;Fig. 1 is a schematic diagram of installation and use of a hanging basket for the construction of a two-way curved building exterior surface of the present invention;
图2是本实用新型图1所示的吊篮安装使用侧视图;Fig. 2 is a side view of the installation and use of the hanging basket shown in Fig. 1 of the utility model;
图3是本实用新型图2所示的吊篮使用侧视局部示意图;Fig. 3 is a partial schematic diagram of a side view of the hanging basket shown in Fig. 2 of the utility model;
图4是本实用新型的一种双向曲面建筑外饰面施工用吊篮的结构示意图;Fig. 4 is a structural schematic diagram of a hanging basket for the construction of a two-way curved building exterior surface of the present invention;
图5是图4所示的吊篮的节点A处的放大示意图;Fig. 5 is the enlarged schematic view of node A of the hanging basket shown in Fig. 4;
图6是图4所示的吊篮的篮筐示意图;Fig. 6 is a schematic diagram of the basket of the hanging basket shown in Fig. 4;
图7是图6所示的吊篮的篮筐节点B处的示意图;Fig. 7 is a schematic diagram at the basket node B of the hanging basket shown in Fig. 6;
图8是图4所示的吊篮的导向轮与钢结构竖向骨架交接处节点示意图;Fig. 8 is a schematic diagram of nodes at the intersection of the guide wheels of the hanging basket shown in Fig. 4 and the vertical skeleton of the steel structure;
图9是图5所示的吊篮中的连接件的示意图。Fig. 9 is a schematic diagram of the connecting parts in the hanging basket shown in Fig. 5 .
具体实施方式detailed description
下面结合附图,对本实用新型的具体实施方式进行详细说明。Below in conjunction with accompanying drawing, the specific embodiment of the utility model is described in detail.
如附图所示的本实用新型的一种双向曲面建筑外饰面施工用吊篮,包括纵向平面与建筑物曲面形状相吻合的篮筐1,所述的篮筐1包括底框2,在所述的底框2的四周安装有防护栏3,在所述的底框2上安装有操作平台4,所述的底框与防护栏及操作平台4之间均采用连接螺栓5连接。优选的,所述的篮筐由多节通过连接螺栓彼此左右相连的中间单元节以及通过连接螺栓连接在多节中间单元节左右两端的左右端部节组成,在相邻的两节中间单元节的相邻的两根外侧防护栏3的连接拼缝处塞有钢垫板6,相邻的两节中间单元节通过穿过钢垫板6的连接螺栓5相连以使篮筐纵向平面形成与建筑物曲面相吻合的折线形。As shown in the accompanying drawings, a hanging basket of the utility model for the construction of a two-way curved building exterior surface includes a basket 1 whose longitudinal plane matches the shape of the curved surface of the building. The basket 1 includes a bottom frame 2. A guardrail 3 is installed around the bottom frame 2, an operating platform 4 is installed on the bottom frame 2, and connecting bolts 5 are used to connect the bottom frame, the guardrail and the operating platform 4. Preferably, the basket is composed of multiple intermediate unit sections connected left and right by connecting bolts and left and right end sections connected to the left and right ends of the multi-section intermediate unit sections by connecting bolts, and the two adjacent intermediate unit sections Steel backing plates 6 are plugged into the joints between the two adjacent outer guardrails 3, and the two adjacent intermediate unit sections are connected by connecting bolts 5 passing through the steel backing plates 6 so that the longitudinal plane of the basket forms a A polyline that matches the building's curved surface.
所述的篮筐的底框2的左右两侧分别支撑固定在两个矩形第一钢架7的底部横杆上并且所述的两个第一钢架的前后立杆分别通过连接件8与所述的篮筐的防护栏固定相连,在所述的两个第一钢架7上各安装有两个爬升式提升机9和两个安全锁10,在所述的篮筐1左右两侧各设置有两道钢丝绳11。沿所述的钢丝绳走向在曲面建筑的钢结构骨架上设置有多个用于支撑钢丝绳的中间滑轮18,每侧的每道钢丝绳均缠绕在建筑物顶部横杆上,通过卡扣固定后分为两段钢丝绳垂下,所述的两段钢丝绳分别顺次卡在各中间滑轮的滑轮槽内并穿过一个安全锁的上下夹钳腭板之间,穿过上下夹钳腭板之间的一段钢丝绳的端部与一个爬升式提升机的卷带固定相连,穿过上下夹钳腭板之间的另一段钢丝绳的端部与一个固定点相连,爬升式提升机用于牵引悬挂吊篮,承受吊篮的全部荷载。中间滑轮18用于将钢丝绳支离建筑物表面并保持钢丝绳的方向。所述的爬升式提升机带动钢丝绳上下运动,从而带动吊篮升降。所述的爬升式提升机和安全锁10为购置。当其中一根钢丝绳突然断裂或悬吊平台倾斜到一定角度时,安全锁能自动快速地锁牢另一根钢丝绳,从而保证吊篮不坠落或继续倾斜。The left and right sides of the bottom frame 2 of the basket are respectively supported and fixed on the bottom cross bars of the two rectangular first steel frames 7, and the front and rear vertical bars of the two first steel frames are respectively connected to each other through the connecting piece 8. The guard rails of the basket are fixedly connected, and two climbing hoists 9 and two safety locks 10 are respectively installed on the two first steel frames 7, and on the left and right sides of the basket 1 Each is provided with two steel wire ropes 11. Along the wire rope direction, a plurality of middle pulleys 18 for supporting the wire ropes are arranged on the steel structure skeleton of the curved building. Two sections of steel wire rope hang down, and the two sections of steel wire rope are respectively stuck in the pulley grooves of the middle pulleys and pass between the upper and lower clamp palates of a safety lock, and a section of steel wire rope between the upper and lower clamp palates The end of the rope is fixedly connected to a winding belt of a climbing hoist, and the end of another section of wire rope that passes between the upper and lower clamp palates is connected to a fixed point. The climbing hoist is used to pull the hanging basket and bear the load The full load of the basket. The intermediate pulley 18 is used to branch the wire rope away from the building surface and maintain the direction of the wire rope. The climbing hoist drives the steel wire rope to move up and down, thereby driving the hanging basket to go up and down. Described climbing hoist and safety lock 10 are purchased. When one of the wire ropes breaks suddenly or the suspension platform tilts to a certain angle, the safety lock can automatically and quickly lock the other wire rope, so as to ensure that the hanging platform does not fall or continue to tilt.
在每一个第一钢架7的内侧分别设置有一个矩形第二钢架12,所述的篮筐的底框2支撑固定在两个矩形第二钢架12的底部横杆上并且所述的两个第二钢架的前后立杆分别通过连接件8与所述的篮筐的防护栏固定相连,在所述的两个第二钢架12靠近建筑物侧的立杆的上部和下部分别安装有贴靠在建筑物钢结构竖向骨架19上的导向轮13,用于实现吊篮的有轨升降。可根据需要,对应钢结构竖向骨架位置调整该第二钢架12的安装位置,在所述的导向轮的内侧设置有轮缘,控制导向轮沿竖向钢骨架运行。A rectangular second steel frame 12 is respectively arranged on the inner side of each first steel frame 7, and the bottom frame 2 of the basket is supported and fixed on the bottom cross bars of the two rectangular second steel frames 12 and the described The front and rear poles of the two second steel frames are fixedly connected with the guard rails of the basket respectively through the connectors 8, and the upper and lower parts of the two second steel frames 12 close to the poles on the side of the building are respectively fixed. The guide wheel 13 that is attached to the vertical frame 19 of the steel structure of the building is installed, and is used to realize the rail lifting of the hanging basket. The installation position of the second steel frame 12 can be adjusted corresponding to the vertical frame position of the steel structure as required, and a rim is arranged inside the guide wheel to control the guide wheel to run along the vertical steel frame.
在所述的篮筐上安装有控制器14。所述的控制器通过控制线与爬升式提升机的电机相连以控制吊篮两端的四个爬升式提升机同步升降以及制动。A controller 14 is installed on the basket. The controller is connected with the motor of the climbing hoist through the control line to control the synchronous lifting and braking of the four climbing hoists at both ends of the hanging basket.
优选的,所述的连接件8包括分别设置在防护栏与第一钢架的交接处以及防护栏与第二钢架的交接处的内连接钢板15和外连接钢板16,所述的内连接钢板和外连接钢板将交接处的防护栏的杆件以及第一钢架的立杆或者第二钢架的立杆夹在中间,所述内连接钢板和外连接钢板之间通过螺栓17相连并紧固,从而将第一钢架或者第二钢架与防护栏连接固定。Preferably, the connector 8 includes an inner connecting steel plate 15 and an outer connecting steel plate 16 respectively arranged at the junction of the guardrail and the first steel frame and the junction of the guardrail and the second steel frame. The steel plate and the outer connecting steel plate sandwich the bars of the guardrail at the junction and the vertical rod of the first steel frame or the vertical rod of the second steel frame, and the inner connecting steel plate and the outer connecting steel plate are connected by bolts 17 and fastening, so as to connect and fix the first steel frame or the second steel frame with the guardrail.
本吊篮的使用方法为:The usage method of this hanging basket is as follows:
将吊篮牵引钢丝绳上端系挂固定在钢结构顶部上;在对应钢丝绳位置的钢结构竖向骨架上沿钢丝绳走向安装若干中间滑轮,将钢丝绳卡在中间滑轮的滑轮槽内;将吊篮的导向轮卡钳在与之对应的钢结构竖向骨架上,以竖向骨架作为提升轨道,通过提升机构牵引,吊篮沿钢结构竖向骨架升降移动,依附在结构上进行曲面墙面(屋面)装饰板安装和饰面施工。Fix the upper end of the hanging basket traction wire rope on the top of the steel structure; install several intermediate pulleys along the direction of the steel wire rope on the vertical frame of the steel structure corresponding to the position of the steel wire rope, and clamp the steel wire rope in the pulley groove of the intermediate pulley; guide the hanging basket The wheel caliper is on the corresponding vertical frame of the steel structure, and the vertical frame is used as the lifting track. The hanging basket moves up and down along the vertical frame of the steel structure through the traction of the lifting mechanism, and is attached to the structure for curved wall (roof) decoration. Panel installation and finish construction.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720145854.8U CN206625529U (en) | 2017-02-17 | 2017-02-17 | A kind of way curved surface builds exterior trim surface construction hanging basket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720145854.8U CN206625529U (en) | 2017-02-17 | 2017-02-17 | A kind of way curved surface builds exterior trim surface construction hanging basket |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206625529U true CN206625529U (en) | 2017-11-10 |
Family
ID=60210461
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720145854.8U Expired - Fee Related CN206625529U (en) | 2017-02-17 | 2017-02-17 | A kind of way curved surface builds exterior trim surface construction hanging basket |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206625529U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106801508A (en) * | 2017-02-17 | 2017-06-06 | 中国建筑第六工程局有限公司 | A kind of way curved surface builds exterior trim surface construction hanging basket |
| CN116254990A (en) * | 2022-07-12 | 2023-06-13 | 江苏武进建工集团有限公司 | Rail type movable scaffold for large-space suspended ceiling |
| CN118582036A (en) * | 2024-08-07 | 2024-09-03 | 河南省第二建筑工程发展有限公司 | A combined hanging basket for high-altitude hanging bottom decoration and construction method thereof |
-
2017
- 2017-02-17 CN CN201720145854.8U patent/CN206625529U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106801508A (en) * | 2017-02-17 | 2017-06-06 | 中国建筑第六工程局有限公司 | A kind of way curved surface builds exterior trim surface construction hanging basket |
| CN116254990A (en) * | 2022-07-12 | 2023-06-13 | 江苏武进建工集团有限公司 | Rail type movable scaffold for large-space suspended ceiling |
| CN116254990B (en) * | 2022-07-12 | 2023-11-24 | 江苏武进建工集团有限公司 | Rail type movable scaffold for large-space suspended ceiling |
| CN118582036A (en) * | 2024-08-07 | 2024-09-03 | 河南省第二建筑工程发展有限公司 | A combined hanging basket for high-altitude hanging bottom decoration and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106801508A (en) | A kind of way curved surface builds exterior trim surface construction hanging basket | |
| CN101514586B (en) | Hanger rail type electric hanging boat and construction method thereof | |
| CN102877637B (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
| CN113443535B (en) | Downward lifting equipment for shaft construction and its installation method | |
| CN104989094B (en) | Installing method of walking hanging basket | |
| CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
| CN201649678U (en) | Semi-automatic safety protective shed for high-rise building construction | |
| CN103422663B (en) | Attached lift scaffold | |
| CN206722429U (en) | A kind of roofing color corrugated sheet steel transportation system | |
| WO2014015757A1 (en) | Bridge maintenance vehicle with hinge-connected type hanging bracket and capable of avoiding bridge-side obstacles | |
| CN113789948A (en) | A large-span roofed atrium side wall slide rail hanging basket and its construction method | |
| CN117868453A (en) | A hanging system for the construction of super high-rise core tube inclined wall | |
| CN109653481A (en) | A kind of hanging rail formula high-altitude operation platform and production method | |
| CN103912128B (en) | The construction method of high-altitude disjunctor steel truss | |
| CN213062878U (en) | Construction lifting operation protection platform | |
| CN203669328U (en) | Quick-disassembly high-altitude working hanging basket | |
| CN105776092B (en) | A kind of extended position nacelle device | |
| CN111762690B (en) | Device and method for vertically hanging and horizontally moving multiple metal net curtains in place in large space | |
| CN111749452A (en) | Suspension work platform and construction method for building inclined structural column construction | |
| CN203257106U (en) | Multifunctional power-driven walking type walking system | |
| CN215670944U (en) | A operation platform that is used for high altitude to encorbelment roofing framework beam veneer construction | |
| CN215331380U (en) | Rail type suspension platform | |
| CN2578461Y (en) | Liftable scaffold | |
| CN103899078A (en) | Mounting method of attached automatic lifting protection shield | |
| CN204435824U (en) | Elevator frock lift platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171110 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |