CN103924777B - The decorating outer wall of building special suspension platform of construction - Google Patents

The decorating outer wall of building special suspension platform of construction Download PDF

Info

Publication number
CN103924777B
CN103924777B CN201410157255.9A CN201410157255A CN103924777B CN 103924777 B CN103924777 B CN 103924777B CN 201410157255 A CN201410157255 A CN 201410157255A CN 103924777 B CN103924777 B CN 103924777B
Authority
CN
China
Prior art keywords
elevator
suspension platform
sucker
control chamber
workbench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410157255.9A
Other languages
Chinese (zh)
Other versions
CN103924777A (en
Inventor
蹇守卫
陈露
马保国
李相国
黄健
谭洪波
孔维
汪婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Technology WUT
Original Assignee
Wuhan University of Technology WUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Technology WUT filed Critical Wuhan University of Technology WUT
Priority to CN201410157255.9A priority Critical patent/CN103924777B/en
Publication of CN103924777A publication Critical patent/CN103924777A/en
Application granted granted Critical
Publication of CN103924777B publication Critical patent/CN103924777B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The invention discloses a kind of decorating outer wall of building special suspension platform of construction, including workbench, control chamber, elevator, steel wire rope, safety lock and sucker, described workbench is fixedly installed control chamber, described control chamber is connected with elevator to control the heave amplitude of elevator, elevator described in a pair is fixedly installed on the both sides of workbench, the upper end of described elevator is connected with steel wire rope, described steel wire rope is provided with safety lock, described control chamber is also connected with sucker to control the suction size of sucker, at least two pairs of described suckers are fixedly installed on the work surface of workbench.The present invention is by arranging sucker, suspension platform is made to be relatively fixed on decorated wall surface, such suspension platform will not be affected by the factor such as gravity or high altitude wind and swing, and fundamentally avoids suspension platform and collides with decorated wall surface, improves the quality of construction surface.

Description

The decorating outer wall of building special suspension platform of construction
Technical field
The invention belongs to construction equipment technical field, be specifically related to a kind of decorating outer wall of building special suspension platform of construction.
Background technology
In recent years, in external decoration of high-rise building is constructed, such as erection of doors and windows, finishing, decoration, Glass Curtain Wall Construction, in the operations such as the maintenance of old room and exterior wall cleaning, it is increasingly using aerial work basket (hereinafter referred to as hanging basket), after adopting nacelle construction, more quick for installation than traditional ground steel pipe scaffold, simple to operate, easy to use, safe and reliable, can effectively shorten construction period, alleviate labor strength, significantly improve labor efficiency, reduce construction cost more than 50%, it it is the ideal equipment of decoration of exterior wall construction both at home and abroad at present, widely used by construction enterprises.
Hanging basket, refer to that hitch is set up on building or structures, elevator drives the non-standing suspension equipment of one that suspension platform is run up and down along facade by steel wire rope, wherein, suspension platform is as the main platform of workmen's operation, and construction quality is had very big impact by its harmony with building.
But, in the middle of current engineer applied, suspension platform is bad with building adaptability, particularly when building is special shape or construction metope is non-upright, suspension platform is subject to action of gravity and altitude effect windage, cause that teeter is frequent, so not only have impact on the normal construction of workman, slow down efficiency of construction, reduce construction quality, but also cause that suspension platform very easily collides with construction surface, make decorative cover material breakage, thus it is attractive in appearance to affect building.The scheme taked currently for the problems referred to above is at cushions such as the work surface side cushioning solid wood of suspension platform or tires, it is prevented that decorative cover of wounding, or suspends sandbag below suspension platform in midair, as GRAVITY CONTROL, slows down the teeter of suspension platform.But, these methods are all passive counter-measures, all fundamentally can not effectively solve suspension platform teeter and the problem that collides with construction surface.
Summary of the invention
The technical problem to be solved in the present invention is in that for the defect that cannot effectively solve the suspension platform problem that causes construction surface impaired etc. with construction surface collision because of teeter in prior art, it is provided that a kind of decorating outer wall of building that can effectively solve above-mentioned technical problem is constructed special suspension platform.
The technical solution adopted for the present invention to solve the technical problems is:
nullA kind of decorating outer wall of building special suspension platform of construction is provided,Including workbench、Control chamber、Elevator、Steel wire rope、Safety lock and sucker,Described workbench is fixedly installed control chamber,Described control chamber is connected with elevator to control the heave amplitude of elevator,Elevator described in a pair is fixedly installed on the both sides of workbench,The upper end of described elevator is connected with steel wire rope,Described steel wire rope is provided with safety lock,Described control chamber is also connected with sucker to control the suction size of sucker,At least two pairs of described suckers are fixedly installed on the work surface of workbench,During work,First operation control box makes elevator work,This suspension platform is elevated to corresponding working region,Then operation control box makes elevator quit work,Operation control box makes sucker work again,By sucker against decorated wall surface until being adsorbed on completely on decorated wall surface,Then operation control box makes sucker quit work,Now,This suspension platform is relatively fixed on decorated wall surface.
By technique scheme, the arranged outside of described elevator has displacement transducer, and institute's displacement sensors is connected with control chamber.
By technique scheme, the work surface of described workbench being provided with infrared range-measurement system, described infrared range-measurement system is connected with control chamber.
By technique scheme, this suspension platform also includes adsorbed wall-climbing, described adsorbed wall-climbing includes vacuum cup and telescopic support struts, and described vacuum cup is fixedly installed on one end of telescopic support struts, and the other end of described telescopic support struts is hinged with the work surface of workbench.
By technique scheme, described control chamber includes display, control keyboard, electrical apparatus control circuit element and switch.
The beneficial effect comprise that: the present invention is by arranging sucker, after suspension platform arrives operating position, the suction of sucker is regulated by control chamber, make sucker steadily against decorated wall surface, suspension platform is namely made to be relatively fixed on decorated wall surface, such suspension platform will not be affected by the factor such as gravity or high altitude wind and swing, fundamentally avoid suspension platform to collide with decorated wall surface, improve the quality of construction surface, and due to the good stability of this suspension platform, facilitate workmen and carry out wall construction operation, improve work efficiency, shorten the duration, save cost.
Further, the present invention is by arranging displacement transducer, can effectively solve the problem that the problem that suspension platform promotes speed difference or the suspension platform fore-and-aft tilt that reason causes such as workbench load is uneven due to both sides elevator, in elevator lifting process, induced signal can be sent to control system by displacement transducer rapidly, feedback is provided after data process, control chamber adjusts the speed of both sides elevator according to feedback data, suspension platform is made to keep balance, meanwhile, control chamber is reported to the police, workmen can be reminded the very first time to process the tilt problem of suspension platform, avoid the danger ruptured because suspension platform tilts the steel cable unbalance stress that causes, it is effectively prevented the generation of falling from high altitude accident, prevent trouble before it happens.
Further, the present invention is by arranging infrared range-measurement system, in exterior wall decoration construction process, can effectively test the distance of decorative cover sheet material and suspension platform at any time, when this distance exceedes prescribed limit, the decoration construction out-of-flatness of sheet material is described, alarm can be sent, remind workmen to be adjusted in time, the planarization in decoration of exterior wall face can be greatly improved, effectively raise construction quality.
Further, the present invention is by arranging adsorbed wall-climbing, when carrying out external wall construction, workmen can according to the adjustment of construction area, the suction controlling vacuum cup is put, the moving telescopic of telescopic support struts to be to reach the purpose of movable suspension platform, can carry out climbing according to condition of construction, traversing or decline, specify regional work to arrive.
Further, control chamber is the maincenter of suspension platform, it is by the duty of display centralized displaying elevator, displacement transducer and sucker, by control input through keyboard control command, control the heave amplitude of elevator by electrical apparatus control circuit element, control the data that the suction of sucker, process displacement transducer and infrared range-measurement system collect.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is the structural representation of the embodiment of the present invention;
Fig. 2 is the side view of the present invention;
Fig. 3 is that present invention facade under stalk surface construction environment runs schematic diagram;
Fig. 4 is that present invention facade under negative angle wall construction environment runs schematic diagram;
Fig. 5 is that present invention facade under positive-angle wall construction environment runs schematic diagram.
In figure: 1-elevator, 2-safety lock, 3-wire clips, 4-steel wire rope, 5-safety rope, 6-displacement transducer, 7-workbench, 9-work surface, 10-infrared range-measurement system, 11-sucker, 12-control chamber, 13-vacuum cup, 14-telescopic support struts, I-stalk face environment, II-negative angle metope environment, III-positive-angle metope environment.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the present invention, is not intended to limit the present invention.
nullSuch as Fig. 1、Shown in Fig. 2,Suspension platform refers to that surrounding is equipped with guardrail,For carrying operating personnel、Instrument and material carry out the suspension arrangement of high-rise working,The present invention provides a kind of decorating outer wall of building special suspension platform of construction,Including workbench 7、Control chamber 12、Elevator 1、Steel wire rope 4、Safety lock 2 and sucker 11,Workbench 7 is fixedly installed control chamber 12,Control chamber 12 is connected the heave amplitude controlling elevator 1 with elevator 1,A pair elevator 1 is fixedly installed on the both sides of workbench 7,The upper end of elevator 1 is connected with steel wire rope 4,The two ends of steel wire rope 4 are fixed by wire clips 3,Generally often hold at least provided with 3 wire clips 3,Between adjacent wire clips 36 times that are smaller than steel wire rope 4 diameter,Steel wire rope 4 is provided with safety lock 2,Safety lock is for when suspension platform gliding speed reaches lock rope speed or suspension platform angle of inclination reaches lock rope angle,Automatic locking steel wire rope,Make suspension platform stop gliding or tilt,Steel wire rope 4 is additionally provided with safety rope 5,One end of safety rope 5 is fixing with workbench 7 to be connected,The other end is connected by wire clips 3 is fixing with steel wire rope 4,When because when surprisingly causing that workbench falls,Safety rope 5 is promptly locked,Avoid workmen to fall,Serve the effect of being effectively protected,Control chamber 12 is also connected the suction size controlling sucker 11 with sucker 11,At least two pairs of suckers 11 are fixedly installed on the work surface 9 of workbench 7,During work,First operation control box 12 makes elevator 1 work,This suspension platform is elevated to corresponding working region,Then operation control box 12 makes elevator 1 quit work,Operation control box 12 makes sucker 11 work again,By sucker 11 against decorated wall surface until being adsorbed on completely on decorated wall surface,Then operation control box 12 makes sucker 11 quit work,Now,This suspension platform is relatively fixed on decorated wall surface.
The control chamber 12 that the present embodiment adopts includes display, control keyboard, electrical apparatus control circuit element and switch, display and the control keyboard working region towards suspension platform, and switch is positioned at bottom control chamber.Display can be selected for commercially available industry touch LCD display HOPE-901P, and control keyboard can be selected for commercially available i-rocksIK3-WE mechanical keyboard.Control chamber 12 is the maincenter of suspension platform, the duty of centralized displaying elevator, displacement transducer and sucker, and accurately can be regulated by the order on control chamber, control chamber 12 can control the heave amplitude of elevator, sensing suspension platform fore-and-aft tilt in case carry out adjusting in time, controlling sucker captivation so that suspension platform and building against.
The sucker 11 that the present embodiment adopts can be selected for commercial standard and stands to buffering sucker group PFTS-10A-30, by control chamber 12 controlled suction size, it is ensured that suspension platform and building in working order time can be close to, it is prevented that platform rocks.
Preferably, the arranged outside of elevator 1 has displacement transducer 6, and displacement transducer 6 is connected with control chamber 12, and displacement transducer 6 can be selected for commercially available WY-DC displacement transducer.Displacement transducer 6 is for sensing the fore-and-aft tilt of suspension platform, and induced signal passes to control chamber 12, after control chamber 12 processes, carries out next step reaction.
Preferably, the work surface 9 of workbench 7 being provided with infrared range-measurement system 10, infrared range-measurement system 10 is connected with control chamber 12, and in the present embodiment, infrared range-measurement system 10 is arranged on the outside of control chamber 12.Infrared range-measurement system 10 can be selected for commercially available HT-307 infrared range-measurement system, and range accuracy is ± 2mm, according to the distance of decorated wall surface Yu suspension platform, can adjust the flatness of decorative cover.
Preferably, this suspension platform also includes adsorbed wall-climbing, adsorbed wall-climbing uses in pairs, it includes vacuum cup 13 and telescopic support struts 14, vacuum cup 13 is fixedly installed on one end of telescopic support struts 14, the other end of telescopic support struts 14 is hinged with the work surface 9 of workbench 7, and telescopic support struts 14 can 360 ° of rotations.Adsorbed wall-climbing by builder's control, can reach the purpose of movable suspension platform, can carry out climbing according to condition of construction mobile, to specifying regional work.
It is various in external decoration of high-rise building construction that the present invention is applicable to erection of doors and windows, finishing, decoration, Glass Curtain Wall Construction, the maintenance of old room and exterior wall cleaning etc., can be used for such as the external wall construction operation of the special shape buildings such as large tank, bridge and dam, it is suitable for various complicated construction environment, duty can be rapidly entered, work efficiency is made to significantly increase, convenient and practical, safe and reliable.The present invention is for the best results of building exterior wall heat preserving decorative integrated plate construction, because external thermal insulation decorative integrated plate is collided, and breakage, bending, scuffing etc. very easily occur, and after using the present invention, it is possible to fundamentally stop collision, improves construction quality.
As shown in Figure 3-Figure 5, for present invention schematic diagram under three kinds of construction environments, in the present embodiment, the T-shaped beam roofing of unified selection hangs pattern hanging basket, before construction, carries out, according to the unified code of nacelle construction operation, the installation and debugging that hanging basket is respectively equipped, ensure that metope is cleaned out, be suitable for construction.
nullAs shown in Figure 3,For the schematic diagram that the present invention constructs for I time at stalk face environment,Treat that hanging basket installation and debugging are complete,Workmen enters suspension platform,Operation control box 12 makes elevator 1 work,Suspension platform is risen to corresponding working region,Operation control box 12 makes elevator 1 quit work,After platform stable to be suspended,Start the sucker control knob in control chamber 12,By sucker 11 steadily be close to decorated wall surface,After treating that sucker 11 is adhering completely to metope,Stop suction,Open the displacement sensor operating system in control chamber 12,Construction can be operated,Once there is fore-and-aft tilt in operation work progress,Displacement transducer 6 works rapidly,Induced signal is sent to control chamber 12,After data are analyzed by control chamber 12,Once length travel gradient reaches warning value,Control chamber is reported to the police,Workmen quits work rapidly,Check possible safety problem,And be adjusted in time,After normal range to be achieved,Can proceed with construction,Carry out in the process constructed in working region,If decorated wall surface installs out-of-flatness,Infrared range-measurement system 10 can send alarm,Workmen can be modified in time,After working region has worked,The operable adsorbed wall-climbing of workmen,Suspension platform is climbed to next working region,Position fixed by recycling sucker 11,Constructing operation before repetition,So repeatedly,Until having constructed.
nullAs shown in Figure 4,For the schematic diagram that the present invention constructs under negative angle metope II environment,Treat that hanging basket installation and debugging are complete,Workmen enters suspension platform,Operation control box 12 makes elevator 1 work,Suspension platform is risen to corresponding working region,Operation control box 12 makes elevator 1 quit work,After platform stable to be suspended,Suspension platform is stable at P place,Suspension platform can slowly be moved to Q place by external assistance (in such as building workman's wire saws) by workmen,After platform to be suspended is stablized again,Start the sucker control knob in control chamber 12,By sucker 11 steadily be close to decorated wall surface,After treating that sucker 11 is adhering completely to metope,Stop suction,Workmen opens the displacement sensor operating system in control chamber 12,Construction can be operated,Once there is fore-and-aft tilt in operation work progress,Displacement transducer 6 works rapidly,Induced signal is sent to control chamber 12,After data are analyzed by control chamber 12,Once length travel gradient reaches warning value,Control chamber is reported to the police,Workmen quits work rapidly,Check possible safety problem,And be adjusted in time,After normal range to be achieved,Can proceed with construction,In this working region work progress,If out-of-flatness installed by decorated wall surface sheet material,Infrared range-measurement system 10 can send alarm,Workmen can be modified in time,After having constructed in this working region,Gradually relax control sucker 11 again,The operable adsorbed wall-climbing of workmen,Suspension platform is climbed to next working region,Position fixed by recycling sucker 11,Operate before repetition,So repeatedly,Until having constructed.
nullAs shown in Figure 5,For the schematic diagram that the present invention constructs for III time at positive-angle metope environment,The same with the step of construction under the environment of stalk face,Treat that hanging basket installation and debugging are complete,Workmen enters suspension platform,Operation control box 12 makes elevator 1 work,Suspension platform is risen to corresponding working region,Operation control box 12 makes elevator 1 quit work,After platform stable to be suspended,Start the sucker control knob in control chamber 12,By sucker 11 steadily be close to decorated wall surface,After treating that sucker 11 is adhering completely to metope,Stop suction,Open the displacement sensor operating system in control chamber 12,Construction can be operated,Once there is fore-and-aft tilt in operation work progress,Displacement transducer 6 works rapidly,Induced signal is sent to control chamber 12,After data are analyzed by control chamber 12,Once length travel gradient reaches warning value,Control chamber is reported to the police,Workmen quits work rapidly,Check possible safety problem,And be adjusted in time,After normal range to be achieved,Can proceed with construction,In this working region work progress,If out-of-flatness installed by decorated wall surface sheet material,Infrared range-measurement system 10 can send alarm,Workmen can be modified in time,After this working region has worked,The operable adsorbed wall-climbing of workmen,Suspension platform is climbed to next working region,Position fixed by recycling sucker 11,Operate before repetition,So repeatedly,Till having worked.
It should be appreciated that for those of ordinary skills, it is possible to improved according to the above description or converted, and all these are improved and convert the protection domain that all should belong to claims of the present invention.

Claims (4)

  1. null1. the decorating outer wall of building special suspension platform of construction,It is characterized in that: include workbench、Control chamber、Elevator、Steel wire rope、Safety lock and sucker,Described workbench is fixedly installed control chamber,Described control chamber is connected with elevator to control the heave amplitude of elevator,Elevator described in a pair is fixedly installed on the both sides of workbench,The upper end of described elevator is connected with steel wire rope,Described steel wire rope is provided with safety lock,Described control chamber is also connected with sucker to control the suction size of sucker,At least two pairs of described suckers are fixedly installed on the work surface of workbench,During work,First operation control box makes elevator work,This suspension platform is elevated to corresponding working region,Then operation control box makes elevator quit work,Operation control box makes sucker work again,By sucker against decorated wall surface until being adsorbed on completely on decorated wall surface,Then operation control box makes sucker quit work,Now,This suspension platform is relatively fixed on decorated wall surface;This suspension platform also includes adsorbed wall-climbing, described adsorbed wall-climbing includes vacuum cup and telescopic support struts, described vacuum cup is fixedly installed on one end of telescopic support struts, and the other end of described telescopic support struts is hinged with the work surface of workbench, and can 360 ° of rotations.
  2. 2. suspension platform according to claim 1, it is characterised in that: the arranged outside of described elevator has displacement transducer, and institute's displacement sensors is connected with control chamber.
  3. 3. suspension platform according to claim 1, it is characterised in that: being provided with infrared range-measurement system on the work surface of described workbench, described infrared range-measurement system is connected with control chamber.
  4. 4. suspension platform according to claim 1, it is characterised in that: described control chamber includes display, control keyboard, electrical apparatus control circuit element and switch.
CN201410157255.9A 2014-04-18 2014-04-18 The decorating outer wall of building special suspension platform of construction Expired - Fee Related CN103924777B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410157255.9A CN103924777B (en) 2014-04-18 2014-04-18 The decorating outer wall of building special suspension platform of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410157255.9A CN103924777B (en) 2014-04-18 2014-04-18 The decorating outer wall of building special suspension platform of construction

Publications (2)

Publication Number Publication Date
CN103924777A CN103924777A (en) 2014-07-16
CN103924777B true CN103924777B (en) 2016-07-06

Family

ID=51143154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410157255.9A Expired - Fee Related CN103924777B (en) 2014-04-18 2014-04-18 The decorating outer wall of building special suspension platform of construction

Country Status (1)

Country Link
CN (1) CN103924777B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104261322A (en) * 2014-08-12 2015-01-07 徐州重型机械有限公司 High-altitude operation vehicle, high-altitude operation platform and stabilizing method of high-altitude operation platform
CN104746864B (en) * 2015-03-27 2016-08-24 河北工业大学 A kind of high-altitude construction robot operation plateform system
CN108398961A (en) * 2017-02-05 2018-08-14 钱浙滨 A kind of suspended working platform control method, apparatus and system
CN107023190A (en) * 2017-05-19 2017-08-08 李彦希 Three-dimensional suspending parking device and its parking method
CN107268968B (en) * 2017-06-28 2019-03-12 湖南省翔宇工程有限公司 A kind of automation high altitude operation wind-proof device
CN108638681A (en) * 2018-04-02 2018-10-12 山东临沂新华印刷物流集团有限责任公司 Automatic printing-plate recepting device and method
CN108801560B (en) * 2018-08-08 2024-01-05 中建二局第三建筑工程有限公司 Automatic lifting water spraying test device for outer vertical surface of high-rise building
CN109372245A (en) * 2018-11-30 2019-02-22 浙江三丰建设有限公司 A kind of intelligence assembled wall-connecting piece system and its construction method
CN109779228A (en) * 2019-02-12 2019-05-21 广东省水利水电第三工程局有限公司 A kind of high-altitude operation platform with safeguard construction for construction
CN110894750B (en) * 2019-12-24 2024-05-24 古远和 High-rise building outer wall coating machine
CN111681486A (en) * 2020-06-17 2020-09-18 深圳供电局有限公司 Enterprise training equipment based on VR virtual simulation
CN112177296B (en) * 2020-08-21 2022-05-13 中冶天工集团有限公司 External wall heat insulation construction device and construction method
CN112938845A (en) * 2021-01-26 2021-06-11 彭述明 Mechanical limiting locking mechanism and aerial work platform
CN117449575B (en) * 2023-12-21 2024-03-19 山西一建集团有限公司 Hanging basket for constructional engineering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2302807A1 (en) * 1972-01-21 1973-07-26 Linden Alimak Ab DEVICE FOR WORKING ON A VERTICAL WALL
CN201416264Y (en) * 2009-06-16 2010-03-03 武汉一冶建筑安装工程有限责任公司 Overhead construction stabilizing device
JP4516800B2 (en) * 2004-08-20 2010-08-04 三井造船鉄構工事株式会社 How to build a suspended scaffold
CN102297762A (en) * 2011-07-06 2011-12-28 浙江华电器材检测研究所 Speed-different type safety catcher self-locking reliability performance test machine
CN102661856A (en) * 2012-02-28 2012-09-12 中国矿业大学 Simulation experiment platform and experiment method for motion of cord suspension parallel mechanism

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2302807A1 (en) * 1972-01-21 1973-07-26 Linden Alimak Ab DEVICE FOR WORKING ON A VERTICAL WALL
JP4516800B2 (en) * 2004-08-20 2010-08-04 三井造船鉄構工事株式会社 How to build a suspended scaffold
CN201416264Y (en) * 2009-06-16 2010-03-03 武汉一冶建筑安装工程有限责任公司 Overhead construction stabilizing device
CN102297762A (en) * 2011-07-06 2011-12-28 浙江华电器材检测研究所 Speed-different type safety catcher self-locking reliability performance test machine
CN102661856A (en) * 2012-02-28 2012-09-12 中国矿业大学 Simulation experiment platform and experiment method for motion of cord suspension parallel mechanism

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
D1 - 面向幕墙安装的高空悬挂作业平台系统研究;李红沛;《河北工业大学硕士学位论文》;20130331;第19-31页 *
李红沛.面向幕墙安装的高空悬挂作业平台系统研究.《河北工业大学硕士学位论文》.2013, *

Also Published As

Publication number Publication date
CN103924777A (en) 2014-07-16

Similar Documents

Publication Publication Date Title
CN103924777B (en) The decorating outer wall of building special suspension platform of construction
CN108545628A (en) A kind of Super High movement hanging device and its hanging method
CN110528863B (en) Hanging basket device for outer inclined plane construction and construction method
CN205637541U (en) Balanced automatic hanging flower basket
CN104477789A (en) Multifunctional tower crane for building construction and manufacturing and construction methods thereof
CN110173102A (en) The more work surface synchronous construction foot hand systems of super high-rise building and construction method
CN204454337U (en) A kind of building operation Multifunctional tower crane
CN111851981B (en) Radix control terminal is with construction curtain construction hanging flower basket
CN107165399B (en) A kind of high-altitude external wall maintenance unit
CN108888889A (en) A kind of control of high-rise building ground exterior wall lift fire-fighting spraying, hanging basket escape device
CN204251289U (en) Safety lock Intelligent Measurement platform
CN204802883U (en) Crane for construction
CN206494694U (en) A kind of Multi-layer electric hanging basket
CN207245145U (en) A kind of suspension type working at height operation console
CN104444873A (en) High-efficiency safety tower crane and manufacturing method thereof
CN113686870A (en) Self-climbing type outer wall defect detection device for high-rise building and operation method thereof
CN206053283U (en) Cradle for constructional engineering
CN211037771U (en) Hanging basket device for outer slope construction
CN104414581A (en) Intelligent detection system for safe lock
CN202139007U (en) Single hanging seat for overhead work
CN211891503U (en) Drilling support for building engineering
CN204703484U (en) A kind of Self-balancing swinging scaffold
CN206553164U (en) A kind of detection means of safety lock of high-rise working cradle
CN201631936U (en) High-rise building fire-fighting rescue device
CN105645319A (en) Intelligent detection platform for safety lock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160706

Termination date: 20170418

CF01 Termination of patent right due to non-payment of annual fee