CN110528814A - The integrally dry-type floor system and its construction method of heating coil and water pipe - Google Patents

The integrally dry-type floor system and its construction method of heating coil and water pipe Download PDF

Info

Publication number
CN110528814A
CN110528814A CN201810515206.6A CN201810515206A CN110528814A CN 110528814 A CN110528814 A CN 110528814A CN 201810515206 A CN201810515206 A CN 201810515206A CN 110528814 A CN110528814 A CN 110528814A
Authority
CN
China
Prior art keywords
supporter
floor
support platform
water pipe
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810515206.6A
Other languages
Chinese (zh)
Inventor
杨泓斌
李缙
陈祥祥
安娜
刘博�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bozhilin Robot Co Ltd
Original Assignee
Guangdong Bozhilin Robot Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Bozhilin Robot Co Ltd filed Critical Guangdong Bozhilin Robot Co Ltd
Priority to CN201810515206.6A priority Critical patent/CN110528814A/en
Publication of CN110528814A publication Critical patent/CN110528814A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/024Sectional false floors, e.g. computer floors
    • E04F15/02447Supporting structures
    • E04F15/02458Framework supporting the panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/024Sectional false floors, e.g. computer floors
    • E04F15/02447Supporting structures
    • E04F15/02464Height adjustable elements for supporting the panels or a panel-supporting framework

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Floor Finish (AREA)

Abstract

The embodiment of the present invention is suitable for technical field of building construction, provides the dry-type floor system and its construction method of a kind of integrally heating coil and water pipe.The floor system includes the prefabricated components, water pipe and floor heating pipe mutually spliced, prefabricated components include floor and supporter, the upper surface of supporter opens up fluted, the floor heating pipe is laid in groove, floor is layed in the upper surface of supporter, the lower end of supporter is supported on ground, and the lower end of supporter has cavity structure, and water pipe is laid in cavity structure.The floor system with main structure by separating water pipe and floor heating pipe, so as to which water pipe and floor heating pipe are repaired and replaced in the case where not destroying main structure, reduces difficulty of construction and has saved cost.The construction method construction technology of the floor system is dry construction technique, reduces building waste, is good for the environment.

Description

The integrally dry-type floor system and its construction method of heating coil and water pipe
Technical field
The invention belongs to technical field of building construction, more particularly to a kind of dry-type floor system of integrally heating coil and water pipe And its construction method.
Background technique
Building industry modernization is pushed most importantly to promote the transformation of development mode, it is necessary to get rid of tradition and build The mode made, seeking a kind of building industry modern times turns to evolution of objective path.
Currently, floor is affixed with, traditional thick painting is wet to paste method and plaster application two ways;Wherein, traditional thick painting is wet pastes method It needs there are wet construction, to be also easy to produce a large amount of building wastes, and construction period is slow using cement mortar screeding;And wet construction needs It is required that ceramic tile impregnates in advance, working procedure is cumbersome, and speed of application is slow, waste water resource, and pollutes environment.Although and plaster application The adhesive used is less, and ceramic tile can save water resource, but still remain wet construction, be also easy to produce building waste without immersion, Pollute environment.
Domestic floor heating form of construction work is mostly wet construction, although and wet type floor heating cost is relatively low, application is relatively broad, But the shortcomings that wet type floor heating, is that construction operation process is relatively complicated, and speed of application is slow, and wet type floor heating needs a large amount of wet constructions Backfill layer is formed, building waste is also easy to produce, is unfavorable for environmental protection.
In addition, domestic water pipe construction mostly uses pre-buried mode that water pipe is laid in ground, then paving floor on the ground; However, water pipe service life generally needs to dig ground in water pipe damage and is replaced, caused repeatedly in 10-20 or so The main structure of building is destroyed, the house's vives are reduced.As it can be seen that conventional water hose built-in process needs to destroy main body in maintenance Structure, and maintenance difficulty is larger, at high cost, maintenance efficiency is lower;Meanwhile a large amount of building wastes and noise dirt are generated when maintenance Dye.
Summary of the invention
The technical problem to be solved by the embodiment of the invention is that providing a kind of integrally dry-type floor of heating coil and water pipe System and its construction method, it is intended to which solving paving mode in floor in the prior art, there are a large amount of wet constructions, cumbersome, construction of constructing At high cost, pollution environment and water pipe, which are embedded in advance in floor, leads to the problem of destroying main structure in line maintenance.
The embodiments of the present invention are implemented as follows, provides the dry-type floor system of a kind of integrally heating coil and water pipe, this is System includes several prefabricated components mutually spliced, water pipe and floor heating pipe, and the prefabricated components include floor and supporter, described The upper surface of supporter opens up fluted, and the floor heating pipe is laid in the groove, and the floor is layed in the supporter Upper surface, the lower end of the supporter is supported on ground, and the lower end of the supporter has cavity structure, the water Pipe is laid in the cavity structure.
Further, masking foil is provided between the floor and supporter.
Further, the supporter includes supporting element, support platform and extruded sheet, and the extruded sheet is layed in described The upper surface of support platform opens up the groove on the extruded sheet, and the floor is layed on the extruded sheet, the support The lower end of platform has the cavity structure, and the lower end of the supporting element is supported on ground, and the upper end of the supporting element can stretch Contracting it is connected to the lower end of the support platform.
Further, the upper end of the supporting element is connect with the lower thread of the support platform.
Further, mutually spliced between the prefabricated components by sealing strip or sealant.
The embodiment of the invention also provides a kind of construction method of above-mentioned dry-type floor system, which includes as follows Construction procedure:
S1, several supporters in factory preparation upper surface with groove and lower end with cavity structure, purchase or preparation Several floors to match with supporter upper surface size;
S2, several water pipes of purchase and floor heating pipe;
S3, the supporter, floor, water pipe and floor heating pipe are transported to construction site;
S4, according to construction requirement, the water pipe is layed on ground by position is pre-positioned;
S5, the on the ground successively assembled supporter, and the water pipe is made to be placed in the cavity knot of the supporter lower end In structure, by water pipe described in the supporter housing;
S6, the floor heating pipe is laid in the groove of the supporter upper surface;
S7, the floor is layed in supporter upper surface, makes floor heating pipe described in the floor housing;
S8, the assembling part using sealing strip or gluing on floor are sealed processing.
Further, the supporter includes supporting element, support platform and extruded sheet;In the step S1, it prepares Lower end is reserved with the support platform of threaded hole, the threaded connection if threaded hole in preparation and the support platform matches Dry support arm, preparation matches with support platform upper surface size and is reserved with the extruded sheet of the groove, by the branch The upper end of support member is threadedly coupled with the threaded hole of the support platform lower end, and the lower surface of extruded sheet is sticked in the branch The upper surface of platform is supportted, to constitute the supporter;
In the step S5, first by the supports support on the supporter on bottom surface, according to the height of construction And flatness requirement, adjust the supporting element by rotation is made on the supporter with adjusting the height of the support platform Extruded sheet is smooth and is mutually aligned.
Further, in the step S1, prepare the support platform method be it is previously prepared go out with the support Then the mold that the shape of platform matches injects the mold injection using concrete and goes out the support platform.
Further, in the step a, the previously prepared mold matched out with the shape of the extruded sheet, then The mold injection is injected using polystyrene foam plastics and goes out the extruded sheet.
Further, in the step S7, one layer of masking foil is laid in the supporter upper surface first, then by ground Plate is layed on the masking foil.
Compared with prior art, beneficial effect is the embodiment of the present invention: the floor system of invention is by by supporter branch It supports on bottom surface, water pipe is laid in the cavity structure of supporter lower end, by supporter housing water pipe, floor heating pipe is laid In in the groove of supporter upper surface, floor is sticked in the upper surface of supporter, by floor housing floor heating pipe, so that water pipe And floor heating pipe can be separated with main structure, ground need to be dug in line maintenance by overcoming traditional preheating embedding line mode Drawback, so as to which in the case where not destroying main structure, floor and supporter are dismantled can be easily to water pipe and ground Heating coil is repaired and is replaced, and greatly reduces the building waste generated when later period maintenance and transformation and noise pollution, reduction pair The destruction of natural environment improves the security reliability of building;And the form of construction work of the floor system, which greatly reduces, to be applied Work process reduces difficulty of construction and has saved construction cost, is easily installed and reused with disassembly, be conducive to ring It protects.
Meanwhile the construction technology of the floor system is dry construction technique, eliminating tradition, there are the floors of wet construction to apply Work method is good for the environment with reducing building waste, and the construction technology greatly reduces on-site construction time and construction work Sequence reduces difficulty of construction and has saved construction cost.
Detailed description of the invention
Fig. 1 is the dry-type floor system structure diagram of the integrally heating coil that the embodiment of the present invention one provides and water pipe;
Fig. 2 is that the embodiment of the present invention provides two integrally heating coil and the dry-type floor system structure diagram of water pipe;
Fig. 3 is the construction method flow chart of dry-type floor system shown in FIG. 1;
Fig. 4 is the construction method flow chart of dry-type floor system shown in Fig. 2.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
As shown in Figure 1, being the dry-type floor system of integrally heating coil and water pipe that the embodiment of the present invention one provides, the dry type Floor system includes several prefabricated components 1 mutually spliced, water pipe 2 and floor heating pipe 3.Pass through sealing strip between prefabricated components 1 Or the modes such as sealant are mutually spliced, each prefabricated components 1 include floor 11 and supporter 12, and the upper surface of supporter 12 opens up There are several grooves 4, floor heating pipe 3 is laid in groove 4, and floor 11 is layed in the upper surface of supporter 12, and floor heating pipe 3 is covered Cover, the lower end of supporter 12 are supported on ground, and the lower end of supporter 12 has cavity structure 5, and water pipe 2 is laid in cavity In structure 5.Specially the supporter 12 includes support platform 121 and extruded sheet 122, and extruded sheet 122 sticks in support platform 121 On, groove 4 is opened on extruded sheet 122;Floor 11 can be marble tile, diamond floor tile, Ceramic Tiles, timber floor or compound Floor etc. is provided with masking foil (not shown) between floor 11 and supporter 12, so as to which warm heat reflectingly, is reduced The waste of heat.
As shown in Fig. 2, the dry-type floor system of integrally heating coil provided by Embodiment 2 of the present invention and water pipe, the dry type Plate system includes several prefabricated components 1, water pipe 2 and floor heating pipe 3.Gap between prefabricated components 1 passes through sealing strip or close Sealing sealing, each prefabricated component 1 include floor 11 and supporter 12, and the upper surface of supporter 12 opens up fluted 4, floor heating Pipe 3 is laid in the groove 4, and floor 11 is layed in the upper surface of supporter 12, and the lower end of supporter 12 is supported on ground, And the lower end of the supporter 12 has cavity structure 5, and water pipe 2 is laid in cavity structure 5.Specifically, above-mentioned support Body 12 includes supporting element 123, support platform 121 and extruded sheet 122, and extruded sheet 122 is layed in the upper table of support platform 121 Face opens up the groove 4 on extruded sheet 122, and floor heating pipe 3 is layed in the groove 4 of extruded sheet 122, and floor 11 is layed in extrusion molding On the surface of plate 122, by 3 housing of floor heating pipe;The lower end of supporting element 123 has the cavity structure 5, the upper end of supporting element 123 Telescopically it is connected to the lower end for stating support platform 121.Water pipe 2 is layed in the cavity structure 5 of support platform 121, makes to support 121 housing water pipe 2 of platform.In the present embodiment, supporting element 123 is bolt, and the lower end of supporting element 123 is supported on ground, is propped up The upper end of support member 123 is connect with the lower thread of support platform 121, can adjust support platform 123 by rotation bolt Height and flatness, and then adjust floor flatness.It in other embodiments, can also be in the bottom end of support platform 121 Groove is set, by supporting element 123 be designed to can mutual sliding plug the first rod piece and the second rod piece, and on second rod piece Fastener for fixing the first rod piece is installed, the second rod piece is supported on ground, one end of the first rod piece is planted and is fixed In in the groove of support platform, the other end of the first rod piece is inserted in the upper end of the second rod piece, by carrying out to the first rod piece It stretches to adjust the height of support platform 121.It is provided with masking foil between extruded sheet 122 and floor 11, floor is layed in On masking foil, scattering and disappearing for heat is reduced.
As shown in figure 3, the present invention also provides the construction method of the dry-type floor system of the present embodiment one, the construction method Including following construction procedure:
S1, several supporters 12 that in factory's preparation upper surface there is groove 4 and lower end to have cavity structure 5, buy or Several floors 11 that preparation matches with 12 upper surface size of supporter.Specially the supporter 12 includes having reserved cavity knot The support platform 121 of structure 5 and the extruded sheet 122 for reserving fluted 4, the specific method of preparation support platform 121 are in factory's system The standby mold matched out with the shape of support platform 121, injects injection molding in the mold for concrete and goes out the support platform 121;The specific method for preparing extruded sheet 122 is to prepare the mold matched with the shape of extruded sheet 122 in factory, is then adopted The mold injection molding is injected with polystyrene foam plastics and goes out the extruded sheet 122, and extruded sheet 122 is then sticked in into support On platform 121, the supporter 12 is constituted.
S2, it buys the water pipe 2 in several cavity structures 5 for being adapted to be mounted to support platform 121 and is adapted to be mounted to crowded Floor heating pipe 3 in the groove 4 of mould plate 122.
S3, supporter 12, floor 11, water pipe 2 and floor heating pipe 3 are transported to construction site;
S4, according to construction requirement, water pipe 2 is layed on ground by position is pre-positioned;
S5, reference level instrument, by being laid with mortar in the underfooting of supporter 12, to adjust the height of supporter 12 and smooth Degree, then successively assembled supporter 12, and it is placed in water pipe 2 in the cavity structure 5 of 121 lower end of support platform, by supporter 12 housing water pipes 2.
S6, floor heating pipe 3 is laid in the 122 upper surface groove 4 of extruded sheet of supporter 12.
S7, the upper surface that floor 11 is layed in extruded sheet 122 make 11 housing floor heating pipe 3 of floor.
S8, the assembling part using modes such as sealing strip or gluings on floor 11 are sealed processing, to complete dry-type floor The construction of system.
In above-mentioned step S1, after sticking in extruded sheet 122 in support platform 121, floor 11 can be laid with An integrated member is formed after on extruded sheet 122, then the integrated member is transported to construction site;In subsequent laying floor heating When pipe 3, floor heating pipe 3 is inserted into the groove 4 of the integrated member.
As shown in figure 4, the present invention also provides the construction method of the dry-type floor system of the present embodiment two, the construction method Including following construction procedure:
S1, preparation lower end are reserved with the support platform 121 of threaded hole, preparation and the threaded hole phase in support platform 121 Several supporting elements 123 with threaded connection, preparation match with 121 upper surface size of support platform and reserve reeded extrusion molding The upper end of supporting element 123 is threadedly coupled by plate 122 with the threaded hole of 121 lower end of support platform, will be under extruded sheet 122 Surface sticks in the upper surface of support platform 121, to constitute supporter 12.Specific preparation method is to prepare and prop up in factory The mold that support 121 shape of platform matches, injects injection molding in the mold for concrete and goes out support platform 121;Prepare with Then the mold that 122 shape of extruded sheet matches injects the mold injection molding using polystyrene foam plastics and goes out extruded sheet 122, then extruded sheet 122 is sticked in support platform 121 by bonding agent, it is flat that one end of supporting element 123 is screwed in support In the threaded hole of 121 lower end of platform, to constitute supporter 12.
S2, it buys the water pipe 2 in several cavity structures 5 for being adapted to be mounted to support platform 121 and is adapted to be mounted to crowded Floor heating pipe 3 in the groove 4 of mould plate 122.
S3, supporter 12, floor 11, water pipe 2 and floor heating pipe 3 are transported to construction site;
S4, according to construction requirement, water pipe 2 is layed on ground by position is pre-positioned;
S5, reference level instrument adjust supporting element 123 by rotation, are met with adjusting height and the flatness of supporter 123 It is required that then successively assembled supporter 12, and it is placed in water pipe 2 in the cavity structure 5 of 121 lower end of support platform, make supporter 12 housing water pipes 2.
S6, floor heating pipe 3 is laid in the 122 upper surface groove 4 of extruded sheet of supporter 12.
S7, the upper surface that floor 11 is layed in extruded sheet 122 make 11 housing floor heating pipe 3 of floor.
S8, the assembling part using modes such as sealing strip or gluings on floor are sealed processing, to complete dry-type floor system The construction of system.
It is easy to assembly in conclusion floor system structure of the invention is simple, meet wanting for quick-assembling in existing construction It asks, and overcomes the drawbacks of traditional preheating embedding line mode need to dig ground in line maintenance, main body can not destroyed In the case where structure, floor 11 and the disassembly of supporter 12 easily can be repaired and be replaced to water pipe 2 and floor heating pipe 3, The building waste generated when later period maintenance and transformation and noise pollution are greatly reduced, the destruction to natural environment is reduced, is improved The security reliability of building.
The construction method of floor system of the invention is dry construction technique, and eliminating tradition, there are the floors of wet construction to apply Work method is good for the environment with reducing building waste, and the construction technology greatly reduces on-site construction time and construction work Sequence reduces difficulty of construction and has saved construction cost.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of dry-type floor system of integrally heating coil and water pipe, which is characterized in that including several prefabricated structures mutually spliced Part, water pipe and floor heating pipe, the prefabricated components include floor and supporter, the upper surface of the supporter open up it is fluted, The floor heating pipe is laid in the groove, and the floor is layed in the upper surface of the supporter, the lower end of the supporter It is supported on ground, and the lower end of the supporter has cavity structure, the water pipe is laid in the cavity structure.
2. dry-type floor system as described in claim 1, which is characterized in that be provided with tinfoil paper between the floor and supporter Paper.
3. dry-type floor system as described in claim 1, which is characterized in that the supporter includes supporting element, support platform And extruded sheet, the extruded sheet are layed in the upper surface of the support platform, and the groove is opened up on the extruded sheet, it is described Floor is layed on the extruded sheet, and the lower end of the support platform has the cavity structure, the lower end branch of the supporting element It supports on ground, the upper end of the supporting element is telescopically connected to the lower end of the support platform.
4. dry-type floor system as claimed in claim 3, which is characterized in that the upper end of the supporting element and the support platform Lower thread connection.
5. dry-type floor system as described in claim 1, which is characterized in that pass through sealing strip or close between the prefabricated components Sealing is mutually spliced.
6. a kind of construction method of dry-type floor system as described in claim 1, which is characterized in that the construction method includes Following construction procedure:
S1, several supporters in factory preparation upper surface with groove and lower end with cavity structure, purchase or preparation and institute State several floors that supporter upper surface size matches;
S2, several water pipes of purchase and floor heating pipe;
S3, the supporter, floor, water pipe and floor heating pipe are transported to construction site;
S4, according to construction requirement, the water pipe is layed on ground by position is pre-positioned;
S5, the on the ground successively assembled supporter, and it is placed in the water pipe in the cavity structure of the supporter lower end, With by water pipe described in the supporter housing;
S6, the floor heating pipe is laid in the groove of the supporter upper surface;
S7, the floor is layed in supporter upper surface, makes floor heating pipe described in the floor housing;
S8, the assembling part using sealing strip or gluing on floor are sealed processing.
7. construction method as claimed in claim 6, which is characterized in that the supporter include supporting element, support platform and Extruded sheet;
In the step S1, preparation lower end is reserved with the support platform of threaded hole, preparation in the support platform Threaded hole matches several supporting elements of threaded connection, preparation match with support platform upper surface size and it is reserved The upper end of the supporting element is threadedly coupled with the threaded hole of the support platform lower end, will squeeze by the extruded sheet for stating groove The lower surface of mould plate sticks in the upper surface of the support platform, to constitute the supporter;
In the step S5, the supports support on the supporter according to the height of construction and is put down on bottom surface first Whole degree requirement, adjusting the supporting element by rotation makes the extrusion molding on the supporter to adjust the height of the support platform Plate is smooth and is mutually aligned.
8. construction method as claimed in claim 7, which is characterized in that in the step S1, prepare the support platform Method is the previously prepared mold matched out with the shape of the support platform, then injects the mold note using concrete Mould out the support platform.
9. construction method as claimed in claim 7, which is characterized in that in the step a, it is previously prepared go out with the extrusion molding Then the mold that the shape of plate matches injects the mold injection using polystyrene foam plastics and goes out the extruded sheet.
10. construction method as claimed in claim 6, which is characterized in that in the step S7, first on the supporter One layer of masking foil is laid on surface, and then floor is layed on the masking foil.
CN201810515206.6A 2018-05-25 2018-05-25 The integrally dry-type floor system and its construction method of heating coil and water pipe Pending CN110528814A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810515206.6A CN110528814A (en) 2018-05-25 2018-05-25 The integrally dry-type floor system and its construction method of heating coil and water pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810515206.6A CN110528814A (en) 2018-05-25 2018-05-25 The integrally dry-type floor system and its construction method of heating coil and water pipe

Publications (1)

Publication Number Publication Date
CN110528814A true CN110528814A (en) 2019-12-03

Family

ID=68656882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810515206.6A Pending CN110528814A (en) 2018-05-25 2018-05-25 The integrally dry-type floor system and its construction method of heating coil and water pipe

Country Status (1)

Country Link
CN (1) CN110528814A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201438003U (en) * 2009-05-20 2010-04-14 山东美亚建材制品有限公司 Hydropower dual-purpose instant assembled dry-wet thin ground heating module
CN205783278U (en) * 2016-07-18 2016-12-07 北京新源国基建筑工程有限公司 Module is maked somebody a mere figurehead in a kind of heat superconducting floor heating
CN206556124U (en) * 2017-03-06 2017-10-13 绍兴市凯利装饰工程有限公司 A kind of floor heating module device for being easy to load and unload
CN208563865U (en) * 2018-05-25 2019-03-01 深圳市君盈建筑科技有限公司 A kind of dry-type floor system of integrally heating coil and water pipe

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201438003U (en) * 2009-05-20 2010-04-14 山东美亚建材制品有限公司 Hydropower dual-purpose instant assembled dry-wet thin ground heating module
CN205783278U (en) * 2016-07-18 2016-12-07 北京新源国基建筑工程有限公司 Module is maked somebody a mere figurehead in a kind of heat superconducting floor heating
CN206556124U (en) * 2017-03-06 2017-10-13 绍兴市凯利装饰工程有限公司 A kind of floor heating module device for being easy to load and unload
CN208563865U (en) * 2018-05-25 2019-03-01 深圳市君盈建筑科技有限公司 A kind of dry-type floor system of integrally heating coil and water pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
苏惠林等: "SI体系专用M系列地面架空系统在装修产业化中的应用", 城市住宅, 29 February 2016 (2016-02-29), pages 45 - 48 *

Similar Documents

Publication Publication Date Title
CN208563865U (en) A kind of dry-type floor system of integrally heating coil and water pipe
CN102852332B (en) A kind of pouring type fire prevention outer wall heat preservation system and construction method
CN103397790A (en) Assembled bathroom and installation process
CN106836516B (en) A kind of integrated water-proof chassis of toilet pipeline
CN215483761U (en) Assembled concrete building heat preservation integration wallboard
CN108331263B (en) Self-locking mechanical connects sleeve
CN110528813A (en) A kind of the dry-type floor system and its construction method of integrated pipeline
CN106958358A (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN104912273A (en) Construction method of integrated outer wall of insulation facing structure and outer wall
CN110528814A (en) The integrally dry-type floor system and its construction method of heating coil and water pipe
CN203394108U (en) Fabricated bathroom
CN208870342U (en) A kind of floor system of integrated water pipe
CN110284686B (en) Waterproof construction process for kitchen and toilet
CN208563863U (en) A kind of floor system of integrated pipeline
CN107514150A (en) A kind of construction technology of utilization space displacement method reconstruction Durable Water Repellant
CN206681418U (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN206607873U (en) A kind of pre-buried structure of anti-dropout
CN103835421A (en) Anti-seepage floor slab and anti-seepage construction method
CN208870343U (en) A kind of floor system of integrated wire
CN2937295Y (en) Improved special thermal insulation board for wall
CN110528819A (en) A kind of floor system of integrated water pipe and the construction method of the floor system
CN206220270U (en) A kind of Side fascia waterproofing node
CN208533949U (en) A kind of type dry ground heating system
CN110528818A (en) A kind of floor system of integrated wire and the construction method of the floor system
CN206408766U (en) The CCA plate rock wool-steel plywood outer heat preservation systems fixed with fixture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination