CN110528767A - A kind of complex model furred ceiling closing in cell cube fabrication and installation method - Google Patents
A kind of complex model furred ceiling closing in cell cube fabrication and installation method Download PDFInfo
- Publication number
- CN110528767A CN110528767A CN201910770892.6A CN201910770892A CN110528767A CN 110528767 A CN110528767 A CN 110528767A CN 201910770892 A CN201910770892 A CN 201910770892A CN 110528767 A CN110528767 A CN 110528767A
- Authority
- CN
- China
- Prior art keywords
- cell cube
- installation
- cell
- furred ceiling
- installation method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
Abstract
The present invention relates to a kind of complex model furred ceiling closing in cell cube fabrication and installation methods, the installation method includes the following steps, complicated suspended ceiling modeling is decomposed into multiple cell cubes interconnected according to drawing, back court is according to drawing making aluminium mold, production unit body template by number adjusts the mould, determines version;Back court carries out preassembling using version mold batch making cell cube green body is determined, to the cell cube made, toning is painted;Transport qualified cell cube to construction site;Cell cube installation site line is popped up at the scene according to drawing, and cell cube is lifted by number, cell cube mounting finished product is debugged after the completion of lifting, the position of lock cell body is connect with other decorative covers;Complete the installation of cell cube;Total, the present invention has rational design, has the advantages that speed of application is fast, the easy control of quality, batch production degree are high.
Description
Technical field
The invention belongs to engineering design technology fields, and in particular to a kind of complex model furred ceiling closing in cell cube fabrication and installation
Method.
Background technique
The way of the installation of ceiling of industry universal moulding at present is essentially light steel keel gypsum board furred ceiling, adds gypsum line, GRC
Decoration of cement line, wood moulding, metal wire lamp additional materials directly molding are done in the outer layer groove milling polishing of the double-deck plasterboard
Method;The disadvantage is that construction quality is not easy to guarantee, construction investment is big, is also after the completion base's decoration, also needs later period emulsion paint, gold
Belong to the techniques facing decorations such as paint;Existing complexity furred ceiling, which closes up, makes mainly hand-made by worker at the scene, working efficiency
Low, construction quality is not easy to guarantee, the generally gypsum, wooden, cement products base to complete at the construction field (site), it is also necessary to
The techniques such as repairing, polishing, the spray painting in later period are decorated.These work are limited by moulding sometimes, constructional difficulties;Therefore, it is necessary to
Find the fabrication and installation of the high complex model furred ceiling closing in cell cube of a kind of fast speed of application, the easy control of quality, batch production degree
Method.
Summary of the invention
The present invention is mostly base layer construction for current complex model furred ceiling (such as complicated light trough) position plasterboard construction, after
The defects of phase is difficult to the Puttying of base, grinding process, and construction quality is not easy to guarantee, speed of application is at high cost slowly, provides one
Plant the fabrication and installation method of the high complex model furred ceiling closing in cell cube of fast speed of application, the easy control of quality, batch production degree.
The object of the present invention is achieved like this: a kind of complex model furred ceiling closing in cell cube fabrication and installation method, described
Installation method the following steps are included:
1) design drawing of furred ceiling is analyzed, complicated suspended ceiling modeling is decomposed by multiple units interconnected according to drawing
Body determines each unit frame body sectional material and size, and each unit body is numbered;
2) back court is according to drawing making aluminium mold, and production unit body template, the size on template and drawing is carried out by number
It checks, adjusts the mould, determines version;
3) back court carries out preassembling to the cell cube made, toning is painted using version mold batch making cell cube green body is determined;
It tries to spell and detected in back court using finished unit body;
4) qualified cell cube is numbered, is packed and stored, transport construction site on demand;
5) pop up cell cube installation site line at the scene according to drawing, by installation site line to installation horizontal, elevation location into
Row is checked;
6) cell cube is lifted by number, cell cube mounting finished product is debugged after the completion of lifting, lock cell body
Position is connect with other decorative covers;
7) installation of cell cube is completed.
Pass through plug connection between the cell cube.
Beneficial effects of the present invention: the present invention optimizes furred ceiling node drawing according to construction drawing design, complexity
The section of furred ceiling is converted into aluminum profile, is opened and is formed with metal, surface layer directly completes in factory, with plane furred ceiling interface
The process seam that can satisfy installation by Deepen Design setting can shift to an earlier date the most difficult part of the construction in complicated furred ceiling in work
Factory completes, and determines that colour table carries out spray painting and is fabricated to finished product and packs by user further according to the color of furred ceiling in drawing,
Scene only carries out simple component connection lifting construction, reduces the workload of site operation, guarantees the progress of site operation, from
And accelerate speed of application, guarantee complicated furred ceiling construction quality, cost of labor is greatly reduced, technology of the invention can cover building
Most complexity furred ceiling closing in position in decoration;Total, the present invention has rational design, fast, the quality easily handle with speed of application
The high advantage of control, batch production degree.
Specific embodiment
The present invention is described further below.
Embodiment 1
A kind of complex model furred ceiling closing in cell cube fabrication and installation method, the installation method the following steps are included:
1) design drawing of furred ceiling is analyzed, complicated suspended ceiling modeling is decomposed by multiple units interconnected according to drawing
Body determines each unit frame body sectional material and size, and each unit body is numbered;
2) back court is according to drawing making aluminium mold, and production unit body template, the size on template and drawing is carried out by number
It checks, adjusts the mould, determines version;
3) back court carries out preassembling to the cell cube made, toning is painted using version mold batch making cell cube green body is determined;
It tries to spell and detected in back court using finished unit body;
4) qualified cell cube is numbered, is packed and stored, transport construction site on demand;
5) pop up cell cube installation site line at the scene according to drawing, by installation site line to installation horizontal, elevation location into
Row is checked;
6) cell cube is lifted by number, cell cube mounting finished product is debugged after the completion of lifting, lock cell body
Position is connect with other decorative covers;
7) installation of cell cube is completed.
Pass through plug connection between the cell cube.
It is formed when it is implemented, the present invention is opened with metal, surface layer directly completes in factory, applying in complicated furred ceiling
The most difficult part of work can be prefabricated in the factory in advance and complete after drawing and phenomenon size come out, without waiting for field condition,
When equal scenes can be fitted up, the component made directly is attached lifting construction at the scene, saves live interim system
The time of work is made in back court using large scale equipment, and the quality for guaranteeing engineering is more advantageous to, compared to traditional mode, though material
Input cost has increased slightly, but construction quality is far superior to traditional mode, also saves a large amount of cost of labor, ensure that construction
Progress.
Claims (2)
1. a kind of complex model furred ceiling closing in cell cube fabrication and installation method, it is characterised in that: the installation method include with
Lower step:
(1) design drawing of furred ceiling is analyzed, complicated suspended ceiling modeling is decomposed by multiple lists interconnected according to drawing
First body determines each unit frame body sectional material and size, and each unit body is numbered;
(2) back court is according to drawing making aluminium mold, and production unit body template, the size on template and drawing is carried out by number
It checks, adjusts the mould, determines version;
(3) back court carries out preassembling to the cell cube made, toning is sprayed using version mold batch making cell cube green body is determined
Paint;It tries to spell and detected in back court using finished unit body;
(4) qualified cell cube is numbered, is packed and stored, transport construction site on demand;
(5) pop up cell cube installation site line at the scene according to drawing, by installation site line to installation horizontal, elevation location into
Row is checked;
(6) cell cube is lifted by number, cell cube mounting finished product is debugged after the completion of lifting, lock cell body
Position is connect with other decorative covers;
(7) installation of cell cube is completed.
2. a kind of complex model furred ceiling closing in cell cube fabrication and installation method as described in claim 1, it is characterised in that: institute
Pass through plug connection between the cell cube stated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910770892.6A CN110528767A (en) | 2019-08-20 | 2019-08-20 | A kind of complex model furred ceiling closing in cell cube fabrication and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910770892.6A CN110528767A (en) | 2019-08-20 | 2019-08-20 | A kind of complex model furred ceiling closing in cell cube fabrication and installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110528767A true CN110528767A (en) | 2019-12-03 |
Family
ID=68663944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910770892.6A Pending CN110528767A (en) | 2019-08-20 | 2019-08-20 | A kind of complex model furred ceiling closing in cell cube fabrication and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110528767A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113360993A (en) * | 2021-06-30 | 2021-09-07 | 浙江乔兴建设集团有限公司 | BIM technology-based construction method for large-area complex-modeling suspended ceiling |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005035174A1 (en) * | 2005-07-27 | 2007-02-01 | Greiner, Switbert, Dr.-Ing. | Covering a, in particular flat, surface with a flexible covering material, in particular textile material, and method for cladding |
CN204098319U (en) * | 2014-07-07 | 2015-01-14 | 深圳市晶宫设计装饰工程有限公司 | A kind of ceiling structure |
JP2016223074A (en) * | 2015-05-27 | 2016-12-28 | 株式会社能重製作所 | Joist support hanger |
CN106381948A (en) * | 2016-10-21 | 2017-02-08 | 孙国兵 | Mounting technique for GRC curtain wallboard |
CN107190900A (en) * | 2017-07-19 | 2017-09-22 | 江苏东保装饰集团有限公司 | A kind of passageway perforated plate aluminium sheet ceiling construction process |
CN108301551A (en) * | 2017-12-30 | 2018-07-20 | 浙江亚厦装饰股份有限公司 | Building ceiling industrializes decorative system and installation method |
CN109583145A (en) * | 2019-01-17 | 2019-04-05 | 唐山铭嘉建筑设计咨询有限公司 | A kind of assembled architecture design method |
-
2019
- 2019-08-20 CN CN201910770892.6A patent/CN110528767A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102005035174A1 (en) * | 2005-07-27 | 2007-02-01 | Greiner, Switbert, Dr.-Ing. | Covering a, in particular flat, surface with a flexible covering material, in particular textile material, and method for cladding |
CN204098319U (en) * | 2014-07-07 | 2015-01-14 | 深圳市晶宫设计装饰工程有限公司 | A kind of ceiling structure |
JP2016223074A (en) * | 2015-05-27 | 2016-12-28 | 株式会社能重製作所 | Joist support hanger |
CN106381948A (en) * | 2016-10-21 | 2017-02-08 | 孙国兵 | Mounting technique for GRC curtain wallboard |
CN107190900A (en) * | 2017-07-19 | 2017-09-22 | 江苏东保装饰集团有限公司 | A kind of passageway perforated plate aluminium sheet ceiling construction process |
CN108301551A (en) * | 2017-12-30 | 2018-07-20 | 浙江亚厦装饰股份有限公司 | Building ceiling industrializes decorative system and installation method |
CN109583145A (en) * | 2019-01-17 | 2019-04-05 | 唐山铭嘉建筑设计咨询有限公司 | A kind of assembled architecture design method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113360993A (en) * | 2021-06-30 | 2021-09-07 | 浙江乔兴建设集团有限公司 | BIM technology-based construction method for large-area complex-modeling suspended ceiling |
CN113360993B (en) * | 2021-06-30 | 2022-04-29 | 浙江乔兴建设集团有限公司 | BIM technology-based construction method for large-area complex-modeling suspended ceiling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108972975B (en) | Method for manufacturing cavity mold of landscape sculpture | |
CN111805696A (en) | Manufacturing process of building decoration component | |
CN107009804A (en) | A kind of manufacture craft of sculpture | |
CN110254112A (en) | A kind of artificial hillock modeling stone packaging construction method | |
CN104230250A (en) | Processing technique for artificial marble decorative surface by using GRC (Glass Fiber Rinforced Cement) material | |
CN110528767A (en) | A kind of complex model furred ceiling closing in cell cube fabrication and installation method | |
Ivashko et al. | Ways of performance and preservation of monumental art works on the facades of architectural monuments of the 19th-early 20th century | |
CN101769051A (en) | Method for manufacturing simulated stone covering layer by machine on building wall | |
CN104441199A (en) | Large cement flowerpot manufacturing process | |
CN106864144A (en) | A kind of iron picture draws the manufacture method and the iron picture vase including it of core | |
CN104418580A (en) | Method for preparing glass fiber composite decorative material | |
CN1141856A (en) | Photoelectric sculpturing method | |
CN105957443A (en) | Building model rapid forming method | |
CN108191297A (en) | A kind of simulated natural marbling quartzite slate and its manufacture craft | |
CN113863620A (en) | Water transfer printing method based on EPS lines and component finished products | |
CN102218764B (en) | Construction process of wood furniture provided with polyurethane (PU) hard material layer on surface | |
CN105216531A (en) | Moulded concrete decoration plate with relief sculpture is produced and installation method | |
CN105904908B (en) | A kind of processing method of dicoration bamboo clappers charcoal drawing | |
CN106799918A (en) | A kind of manufacture craft of pulp handicraft | |
CN102380928A (en) | Injection molded ceiling slab and manufacturing method thereof | |
CN109610832A (en) | A kind of pseudo-classic loam wall construction technology | |
CN105863252A (en) | Production technical process of combined construction mold with decoration function | |
CN106049867A (en) | Building method for special-shaped building model | |
CN103434320B (en) | A kind of technological process with water container glass | |
CN103144489B (en) | Manufacturing method for large azure stone wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191203 |