CN110485618A - A kind of Fast Installation structure of Super High abnormity furred ceiling - Google Patents

A kind of Fast Installation structure of Super High abnormity furred ceiling Download PDF

Info

Publication number
CN110485618A
CN110485618A CN201910850018.3A CN201910850018A CN110485618A CN 110485618 A CN110485618 A CN 110485618A CN 201910850018 A CN201910850018 A CN 201910850018A CN 110485618 A CN110485618 A CN 110485618A
Authority
CN
China
Prior art keywords
shaped part
keel
furred ceiling
shaped
plate body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910850018.3A
Other languages
Chinese (zh)
Inventor
朱俊峰
向成林
王文晋
黄华
骆曲彬
潘秦文
杨万泉
唐肖俊
马晓华
石冬兵
尹继祥
杨小平
周达
王敏
张卫东
马介明
钱晋芳
葛孙翔
杨天武
赵春
凌晓芳
陈玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Merud Building Decoration Co Ltd
Original Assignee
Suzhou Merud Building Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Merud Building Decoration Co Ltd filed Critical Suzhou Merud Building Decoration Co Ltd
Priority to CN201910850018.3A priority Critical patent/CN110485618A/en
Publication of CN110485618A publication Critical patent/CN110485618A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • E04B9/0407Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like being stiff and curved
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention provides a kind of Fast Installation structures of Super High abnormity furred ceiling, it is provided with special-shaped furred ceiling ontology first, it includes at least one cascaded surface, the side of cascaded surface is the first plate body, and the other side of cascaded surface is the second plate body, first connecting plate is fixedly installed on ceiling, and the first connecting plate of muti-piece is equidistantly arranged on ceiling, at least one first U-shaped part is connected between first connecting plate and the first plate body, at least one second U-shaped part is connected between first connecting plate and the second plate body, balance keel is set on the first U-shaped part and the second U-shaped part, balancing keel includes the first keel and the second keel, the opposite end of first keel is respectively fixedly connected in the opposite end of the second keel.The present invention uses U-shaped square tube substitution sunpender and counter support compared to the prior art, reduces installation difficulty while improving furred ceiling base layer structure stability, improves construction efficiency.

Description

A kind of Fast Installation structure of Super High abnormity furred ceiling
Technical field
The present invention relates to the mounting structures of special-shaped furred ceiling, in particular to a kind of quick peace of Super High abnormity furred ceiling Assembling structure.
Background technique
Skyscraper not only represents the mark in a city or area, and in the limited city of land resource, can only seek Upward development is asked, in this case, skyscraper comes into being.Currently, many markets are to save money, in negative one layer or The high higher floor of layer is designed to the decoration style on hollow naked top, two sides abnormity furred ceiling, not only beautiful but also give comfortable feeling.
And in practice of construction, the high special-shaped furred ceiling of Super High then will affect the stability of furred ceiling, when high altitude operation, utilize The furred ceiling form of counter support will affect construction efficiency again, it is therefore desirable to which a kind of new construction that can replace counter support is next while solving steady Qualitative and two problems of construction efficiency.
Summary of the invention
In consideration of it, using U compared to the prior art the present invention provides a kind of Fast Installation structure of Super High abnormity furred ceiling Shape square tube substitutes sunpender and counter support, reduces installation difficulty while improving furred ceiling base layer structure stability, improves and apply Work efficiency rate.
For this purpose, the present invention provides a kind of Fast Installation structures of Super High abnormity furred ceiling, it is provided with special-shaped furred ceiling first Ontology comprising at least one cascaded surface, the side of cascaded surface is the first plate body, and the other side of cascaded surface is the second plate body, First connecting plate is fixedly installed on ceiling, and the first connecting plate of muti-piece is equidistantly arranged on ceiling, the first connecting plate and At least one first U-shaped part is connected between first plate body, be connected between the first connecting plate and the second plate body at least one Two U-shaped parts, balance keel are set on the first U-shaped part and the second U-shaped part, and balance keel includes the first keel and second Keel, the opposite end of the first keel are respectively fixedly connected in the opposite end of the second keel.
Further, it is provided with the first clamping part and the second clamping part in the first keel, is set in the second keel It is equipped with third clamping part and the 4th clamping part.
Further, the first clamping part is connected in the first side wall of the first U-shaped part, and the second clamping part is connected in second The first side wall of U-shaped part, third clamping part are connected in the second sidewall of the first U-shaped part, and the 4th clamping part is connected in the 2nd U The second sidewall of shape part.
Further, the first side wall of the first U-shaped part offers the first card slot, and the first side wall of the second U-shaped part offers Second card slot, the second sidewall of the first U-shaped part offer third card slot, and the second sidewall of the second U-shaped part offers the 4th card slot, First clamping part is connected in the first card slot, and the second clamping part is connected in the second card slot, and third clamping part is connected in In third card slot, the 4th clamping part is connected in the 4th card slot.
Further, the first clamping part, the second clamping part, third clamping part and the 4th clamping part are all cylindricality Chock plug.
Further, the opposite end of the first keel is bolted to the opposite end of the second keel respectively.
Further, by the first Bolted angle connection in the first plate body, the second U-shaped part is connected the first U-shaped part by the second angle steel It is connected to the second plate body.
Further, the first end face of the first angle steel is bolted in the first U-shaped part, and the second end face of the first angle steel is bolted in One plate body, the first end face of the second angle steel are bolted in the second U-shaped part, and the second end face of the second angle steel is bolted in the second plate body.
Further, the first U-shaped part and the second U-shaped part are all U-shaped square tube.
A kind of Fast Installation structure of Super High abnormity furred ceiling provided by the present invention, it is main to be provided with special-shaped furred ceiling sheet Body, the first connecting plate, U-shaped part and balance keel, the first connecting plate are first installation steps, and the first connecting plate is in smallpox Position and installation strength on plate directly influence the stability of special-shaped furred ceiling ontology in the future, and the present invention is substituted with U-shaped square tube Sunpender and counter support are directly connected to special-shaped furred ceiling ontology, and Super High top surface base is improved while simplifying structure and bears high-altitude The ability of wind-force, balance keel play the role of correcting U-shaped part positional relationship, and the first connector of auxiliary carries out U-shaped part strong Change and fixes.
Thus, this structure uses U-shaped square tube substitution sunpender and counter support compared to the prior art, is improving furred ceiling base layer structure Installation difficulty is reduced while stability, improves construction efficiency.
Detailed description of the invention
By reading the following detailed description of the preferred embodiment, various other advantages and benefits are common for this field Technical staff will become clear.The drawings are only for the purpose of illustrating a preferred embodiment, and is not considered as to the present invention Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is a kind of structural schematic diagram of the Fast Installation structure of Super High abnormity furred ceiling provided in an embodiment of the present invention.
Fig. 2 is a kind of structural schematic diagram of the Fast Installation structure of Super High abnormity furred ceiling provided in an embodiment of the present invention.
Fig. 3 is the knot of U-shaped square tube in a kind of Fast Installation structure of Super High abnormity furred ceiling provided in an embodiment of the present invention Structure schematic diagram.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure It is fully disclosed to those skilled in the art.
Embodiment one:
Referring to Fig. 1 to Fig. 3, a kind of Fast Installation structure of Super High abnormity furred ceiling is present embodiments provided, is arranged first Special-shaped furred ceiling ontology 1 comprising at least one cascaded surface 13, the side of cascaded surface 13 are first plate body 11, and cascaded surface 13 The other side be the second plate body 12, the first connecting plate 2 is fixedly installed on ceiling, and the first connecting plate of muti-piece 2 is equidistantly arranged In on ceiling, being connected at least one first U-shaped part 21,2 He of the first connecting plate between the first connecting plate 2 and the first plate body 11 At least one second U-shaped part 22 is connected between second plate body 12, balance keel 3 is set in the first U-shaped part 21 and the second U-shaped On part 22, balance keel 3 includes the first keel 31 and the second keel 32, and the first keel 31 is removably installed in the The first side wall 221 of the first side wall 211 of one U-shaped part 21 and the second U-shaped part 22, the second keel 32 are removably installed in The second sidewall 222 of the second sidewall 212 of one U-shaped part 21 and the second U-shaped part 22, and the opposite end difference of the first keel 31 It is fixedly connected on the opposite end of the second keel 32.
With continued reference to Fig. 1 to Fig. 3, the first clamping part 311 and the second clamping part are provided in the first keel 31 312, third clamping part 321 and the 4th clamping part 322, the clamping of the first clamping part 311 are provided in the second keel 32 In the first side wall 211 of the first U-shaped part 21, the second clamping part 312 is connected in the first side wall 221 of the second U-shaped part 22, third Clamping part 321 is connected in the second sidewall 212 of the first U-shaped part 21, and the 4th clamping part 322 is connected in the second U-shaped part 22 Second sidewall 222, the first side wall 211 of the first U-shaped part 21 offer the first card slot, and the first side wall 221 of the second U-shaped part 22 is opened Equipped with the second card slot, the second sidewall 212 of the first U-shaped part 21 offers third card slot, the second sidewall 222 of the second U-shaped part 22 The 4th card slot is offered, the first clamping part 311 is connected in the first card slot, and the second clamping part 312 is connected in the second card slot Interior, third clamping part 321 is connected in third card slot, and the 4th clamping part 322 is connected in the 4th card slot, the first clamping portion Part 311, the second clamping part 312, third clamping part 321 and the 4th clamping part 322 are all cylindricality chock plug, the first keel 31 opposite end passes through the opposite end that bolt 33 is connected to the second keel 32 respectively.
With continued reference to Fig. 1 to Fig. 3, the first U-shaped part 21 is connected to the first plate body 11, the second U-shaped part by the first angle steel 41 22 are connected to the second plate body 12 by the second angle steel 42, and the first end face of the first angle steel 41 is bolted in the first U-shaped part 21, and first jiao The second end face of steel 41 is bolted in the first plate body 11, and the first end face of the second angle steel 42 is bolted in the second U-shaped part 22, the second angle steel 42 second end face is bolted in the second plate body 12, and the first U-shaped part 21 and the second U-shaped part 22 are all U-shaped square tube.
A kind of Fast Installation structure of Super High abnormity furred ceiling provided by the present invention, it is main to be provided with special-shaped furred ceiling sheet Body, the first connecting plate, U-shaped part and balance keel, the first connecting plate are first installation steps, and the first connecting plate is in smallpox Position and installation strength on plate directly influence the stability of special-shaped furred ceiling ontology in the future, and the present invention is substituted with U-shaped square tube Sunpender and counter support are directly connected to special-shaped furred ceiling ontology, and Super High top surface base is improved while simplifying structure and bears high-altitude The ability of wind-force, balance keel play the role of correcting U-shaped part positional relationship, and the first connector of auxiliary carries out U-shaped part strong Change and fixes.
Keel is balanced simultaneously with, using by the way of being connected in and being spirally connected and combine, main purpose is to contract between U-shaped square tube Short construction time, the concrete mode of clamping select the snap fit of cylindricality chock plug and card slot, install convenient and clamping structure stabilization.
Thus, this structure uses U-shaped square tube substitution sunpender and counter support compared to the prior art, is improving furred ceiling base layer structure Installation difficulty is reduced while stability, improves construction efficiency.
Embodiment two:
Referring to Fig. 1 to Fig. 3, a kind of quick peace of Super High abnormity furred ceiling provided by Embodiment 2 of the present invention is shown in figure Assembling structure, the present embodiment be also further made that on the basis of the various embodiments described above it is following as an improved technical scheme: First connecting plate 2 is fixedly installed on ceiling, and the first connecting plate of muti-piece 2 is equidistantly arranged on ceiling, the first connecting plate 2 And first be connected at least one first U-shaped part 21 between plate body 11, be connected between the first connecting plate 2 and the second plate body 12 to A few second U-shaped part 22, the opposite sides of the first connecting plate 2 are respectively equipped with one piece of stiffening plate, on the one hand improve the first connection On the other hand the installation strength of plate 2 on the ceiling improves the bonding strength between the first connecting plate 2 and U-shaped part.
Embodiment three:
Referring to Fig. 1 to Fig. 3, a kind of quick peace of Super High abnormity furred ceiling of the offer of the embodiment of the present invention three is shown in figure Assembling structure, the present embodiment be also further made that on the basis of the various embodiments described above it is following as an improved technical scheme: Balance keel 3 is set on the first U-shaped part 21 and the second U-shaped part 22, and balance keel 3 includes the first keel 31 and second Keel 32, the first keel 31 be removably installed in the first U-shaped part 21 the first side wall 211 and the second U-shaped part 22 One side wall 221, the second keel 32 be removably installed in the first U-shaped part 21 second sidewall 212 and the second U-shaped part 22 Two side walls 222, and the opposite end of the first keel 31 is respectively fixedly connected in the opposite end of the second keel 32, balance dragon There are multiple gaps between osteomere 3 and U-shaped part, foam is filled in gap, and then improve balance keel 3 and U-shaped part junction Structural strength, improve balance keel 3 service life.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (9)

1. a kind of Fast Installation structure of Super High abnormity furred ceiling characterized by comprising
Special-shaped furred ceiling ontology (1) comprising at least one cascaded surface (13), the side of the cascaded surface (13) are the first plate body (11), and the other side of the cascaded surface (13) is the second plate body (12);
First connecting plate (2), is fixedly installed on ceiling, and the first connecting plate of the muti-piece (2) be equidistantly arranged in it is described On ceiling, at least one first U-shaped part (21) is connected between first connecting plate (2) and first plate body (11), At least one second U-shaped part (22) is connected between first connecting plate (2) and second plate body (12);
It balances keel (3), is set on the first U-shaped part (21) and the second U-shaped part (22), the balance keel Part (3) includes the first keel (31) and the second keel (32), and first keel (31) is removably installed in described The first side wall (221) of the first side wall (211) of first U-shaped part (21) and the second U-shaped part (22), second keel (32) second sidewall (212) of the first U-shaped part (21) and second side of the second U-shaped part (22) are removably installed in Wall (222), and the opposite end of first keel (31) is respectively fixedly connected in the opposite of second keel (32) Both ends.
2. a kind of Fast Installation structure of Super High abnormity furred ceiling according to claim 1, which is characterized in that described first It is provided with the first clamping part (311) and the second clamping part (312) in keel (31), is set on second keel (32) It is equipped with third clamping part (321) and the 4th clamping part (322).
3. a kind of Fast Installation structure of Super High abnormity furred ceiling according to claim 2, which is characterized in that described first Clamping part (311) is connected in the first side wall (211) of the first U-shaped part (21), the second clamping part (312) clamping In the first side wall (221) of the second U-shaped part (22), the third clamping part (321) is connected in the first U-shaped part (21) second sidewall (212), the 4th clamping part (322) are connected in the second sidewall of the second U-shaped part (22) (222)。
4. a kind of Fast Installation structure of Super High abnormity furred ceiling according to claim 3, which is characterized in that described first The first side wall (211) of U-shaped part (21) offers the first card slot, and the first side wall (221) of the second U-shaped part (22) offers Second card slot, the second sidewall (212) of the first U-shaped part (21) offer third card slot, and the of the second U-shaped part (22) Two side walls (222) offer the 4th card slot, and first clamping part (311) is connected in first card slot, and described second Clamping part (312) is connected in second card slot, and the third clamping part (321) is connected in the third card slot, 4th clamping part (322) is connected in the 4th card slot.
5. a kind of Fast Installation structure of Super High abnormity furred ceiling according to claim 2-4, which is characterized in that described First clamping part (311), second clamping part (312), the third clamping part (321) and the 4th clamping portion Part (322) is all cylindricality chock plug.
6. a kind of Fast Installation structure of Super High abnormity furred ceiling according to claim 5, which is characterized in that described first The opposite end of keel (31) passes through the opposite end that bolt (33) is connected to second keel (32) respectively.
7. a kind of Fast Installation structure of Super High abnormity furred ceiling according to claim 1, which is characterized in that described first U-shaped part (21) is connected to first plate body (11) by the first angle steel (41), and the second U-shaped part (22) passes through the second angle steel (42) it is connected to second plate body (12).
8. a kind of Fast Installation structure of Super High abnormity furred ceiling according to claim 7, which is characterized in that described first The first end face of angle steel (41) is bolted in the first U-shaped part (21), and the second end face of first angle steel (41) is bolted in institute It states the first plate body (11), the first end face of second angle steel (42) is bolted in the second U-shaped part (22), second angle steel (42) second end face is bolted in second plate body (12).
9. a kind of Fast Installation structure of Super High abnormity furred ceiling according to claim 8, which is characterized in that described first U-shaped part (21) and the second U-shaped part (22) are all U-shaped square tube.
CN201910850018.3A 2019-09-09 2019-09-09 A kind of Fast Installation structure of Super High abnormity furred ceiling Pending CN110485618A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910850018.3A CN110485618A (en) 2019-09-09 2019-09-09 A kind of Fast Installation structure of Super High abnormity furred ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910850018.3A CN110485618A (en) 2019-09-09 2019-09-09 A kind of Fast Installation structure of Super High abnormity furred ceiling

Publications (1)

Publication Number Publication Date
CN110485618A true CN110485618A (en) 2019-11-22

Family

ID=68557118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910850018.3A Pending CN110485618A (en) 2019-09-09 2019-09-09 A kind of Fast Installation structure of Super High abnormity furred ceiling

Country Status (1)

Country Link
CN (1) CN110485618A (en)

Citations (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB897747A (en) * 1960-04-21 1962-05-30 Leonard Tibby Improvements in or relating to suspended ceilings
US6374564B1 (en) * 2000-05-31 2002-04-23 Usg Interiors, Inc. Suspended curved ceiling system
CN101466904A (en) * 2006-04-07 2009-06-24 金权熙 Device for fixing objects to ceiling
US20090165417A1 (en) * 2007-12-28 2009-07-02 Jankovec Scott G Suspended ceiling grid assembly with separation joints
CN101575893A (en) * 2008-05-06 2009-11-11 沃辛顿阿姆斯特朗风险投资公司 Suspended ceiling cloud with flexible panel
CN201713978U (en) * 2010-07-10 2011-01-19 中铁六局集团有限公司 Molded metal strip plate ceiling-connecting system
US20110011023A1 (en) * 2009-07-16 2011-01-20 Usg Interiors, Inc. Secure locking attachment device useful with suspended ceiling systems
JP2012012912A (en) * 2010-07-05 2012-01-19 Tokyo Electric Power Co Inc:The Earthquake proof reinforcement structure for ceiling
KR20120111825A (en) * 2011-03-31 2012-10-11 손태창 Fixing device of lightweight steel for underground double wall
US8453392B1 (en) * 2011-02-25 2013-06-04 Ralph G. Hurst System for positioning and holding ceiling panels
JP2014034872A (en) * 2012-08-10 2014-02-24 Nifco Inc Clip
CN203499212U (en) * 2013-09-06 2014-03-26 德才装饰股份有限公司 Hoisting structure for curved aluminum circular tube
CN204983340U (en) * 2015-07-31 2016-01-20 苏州金螳螂建筑装饰股份有限公司 Assembled curve lacing film suspended ceiling system
CN105297988A (en) * 2015-10-23 2016-02-03 苏州美瑞德建筑装饰有限公司 Ceiling structure suitable for large-area changeable space
CN205063143U (en) * 2015-09-17 2016-03-02 北京华宇潞丰建材有限公司 Aluminium square tube furred ceiling structure
CN205653948U (en) * 2016-04-20 2016-10-19 北新集团建材股份有限公司 A furred ceiling system
CN205688645U (en) * 2016-06-22 2016-11-16 陈其兰 Full room furred ceiling suspension member
CN205840098U (en) * 2016-06-30 2016-12-28 上海志豪实业有限公司 Clamp-type light-weight steel keel aluminum square tube furred ceiling
CN206941942U (en) * 2017-07-01 2018-01-30 大红点商业装饰工程(深圳)有限公司 A kind of grid ceiling structure
CN107724588A (en) * 2017-12-08 2018-02-23 北京城建道桥建设集团有限公司 A kind of integrated form curved surface ceiling structure and its construction method
CN207620196U (en) * 2017-12-16 2018-07-17 深圳市中鑫建筑装饰工程集团有限公司 A kind of furred ceiling structure of disturbance rejection
CN207647002U (en) * 2017-12-23 2018-07-24 深圳市中嘉建科股份有限公司 A kind of ceiling combination mounting structure
CN207672844U (en) * 2017-12-08 2018-07-31 北京城建道桥建设集团有限公司 A kind of integrated form curved surface ceiling structure
CN109138258A (en) * 2018-08-24 2019-01-04 绿山高科建设科技有限公司 A kind of house assembled PC top structure with furred ceiling
CN109184064A (en) * 2018-08-23 2019-01-11 浙江绿宇装饰有限公司 Installation of ceiling component and the construction method for leading to installation of ceiling applied to waveform aluminium side
CN208934232U (en) * 2018-08-08 2019-06-04 佛山市皓信达建设工程有限公司 Indoor suspended ceiling structure
CN209145128U (en) * 2018-10-29 2019-07-23 深圳谷涛装饰设计工程有限公司 A kind of assembled ceiling structure
CN211646916U (en) * 2019-09-09 2020-10-09 苏州美瑞德建筑装饰有限公司 Quick mounting structure of super high-rise special-shaped suspended ceiling

Patent Citations (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB897747A (en) * 1960-04-21 1962-05-30 Leonard Tibby Improvements in or relating to suspended ceilings
US6374564B1 (en) * 2000-05-31 2002-04-23 Usg Interiors, Inc. Suspended curved ceiling system
CN101466904A (en) * 2006-04-07 2009-06-24 金权熙 Device for fixing objects to ceiling
US20090165417A1 (en) * 2007-12-28 2009-07-02 Jankovec Scott G Suspended ceiling grid assembly with separation joints
CN101575893A (en) * 2008-05-06 2009-11-11 沃辛顿阿姆斯特朗风险投资公司 Suspended ceiling cloud with flexible panel
US20110011023A1 (en) * 2009-07-16 2011-01-20 Usg Interiors, Inc. Secure locking attachment device useful with suspended ceiling systems
JP2012012912A (en) * 2010-07-05 2012-01-19 Tokyo Electric Power Co Inc:The Earthquake proof reinforcement structure for ceiling
CN201713978U (en) * 2010-07-10 2011-01-19 中铁六局集团有限公司 Molded metal strip plate ceiling-connecting system
US8453392B1 (en) * 2011-02-25 2013-06-04 Ralph G. Hurst System for positioning and holding ceiling panels
KR20120111825A (en) * 2011-03-31 2012-10-11 손태창 Fixing device of lightweight steel for underground double wall
JP2014034872A (en) * 2012-08-10 2014-02-24 Nifco Inc Clip
CN203499212U (en) * 2013-09-06 2014-03-26 德才装饰股份有限公司 Hoisting structure for curved aluminum circular tube
CN204983340U (en) * 2015-07-31 2016-01-20 苏州金螳螂建筑装饰股份有限公司 Assembled curve lacing film suspended ceiling system
CN205063143U (en) * 2015-09-17 2016-03-02 北京华宇潞丰建材有限公司 Aluminium square tube furred ceiling structure
CN105297988A (en) * 2015-10-23 2016-02-03 苏州美瑞德建筑装饰有限公司 Ceiling structure suitable for large-area changeable space
CN205653948U (en) * 2016-04-20 2016-10-19 北新集团建材股份有限公司 A furred ceiling system
CN205688645U (en) * 2016-06-22 2016-11-16 陈其兰 Full room furred ceiling suspension member
CN205840098U (en) * 2016-06-30 2016-12-28 上海志豪实业有限公司 Clamp-type light-weight steel keel aluminum square tube furred ceiling
CN206941942U (en) * 2017-07-01 2018-01-30 大红点商业装饰工程(深圳)有限公司 A kind of grid ceiling structure
CN207672844U (en) * 2017-12-08 2018-07-31 北京城建道桥建设集团有限公司 A kind of integrated form curved surface ceiling structure
CN107724588A (en) * 2017-12-08 2018-02-23 北京城建道桥建设集团有限公司 A kind of integrated form curved surface ceiling structure and its construction method
CN207620196U (en) * 2017-12-16 2018-07-17 深圳市中鑫建筑装饰工程集团有限公司 A kind of furred ceiling structure of disturbance rejection
CN207647002U (en) * 2017-12-23 2018-07-24 深圳市中嘉建科股份有限公司 A kind of ceiling combination mounting structure
CN208934232U (en) * 2018-08-08 2019-06-04 佛山市皓信达建设工程有限公司 Indoor suspended ceiling structure
CN109184064A (en) * 2018-08-23 2019-01-11 浙江绿宇装饰有限公司 Installation of ceiling component and the construction method for leading to installation of ceiling applied to waveform aluminium side
CN109138258A (en) * 2018-08-24 2019-01-04 绿山高科建设科技有限公司 A kind of house assembled PC top structure with furred ceiling
CN209145128U (en) * 2018-10-29 2019-07-23 深圳谷涛装饰设计工程有限公司 A kind of assembled ceiling structure
CN211646916U (en) * 2019-09-09 2020-10-09 苏州美瑞德建筑装饰有限公司 Quick mounting structure of super high-rise special-shaped suspended ceiling

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
曾惠敏;: "浅析异型工艺铝板天花的施工", 广东建材, no. 11, 28 November 2006 (2006-11-28), pages 40 - 41 *
覃有钞: "勾搭铝板和曲面异型铝板吊顶安装技术优化研究——桂林机场项目", 中国建筑装饰装修, 15 December 2018 (2018-12-15), pages 112 - 113 *

Similar Documents

Publication Publication Date Title
CN104975670B (en) A kind of not contour elliptic plane combined type cable dome structure in border
CN108691416A (en) Cast-in-place special-shaped beam plain form system with arc-shaped side edges
US9809978B2 (en) Structural system and method using monolithic beams having improved strength
US10087628B2 (en) Structural system and method using monolithic beams having improved strength
CN110485618A (en) A kind of Fast Installation structure of Super High abnormity furred ceiling
CN211646916U (en) Quick mounting structure of super high-rise special-shaped suspended ceiling
CN110409686A (en) Spliced furred ceiling and installation method
CN203742052U (en) Ceiling and keel assembling structure
CN210263599U (en) Improved energy-saving ceiling mounting structure
CN205653963U (en) Keel hanging piece
CN211114267U (en) Novel curtain wall keel device
CN209274706U (en) Semi-trailer longitudinal beam structure and semitrailer
CN209469021U (en) A kind of moulding bed
CN215166907U (en) Novel assembled outer decorative metal curtain wall component
CN218176630U (en) Building templates of adjustable anti bending strength
CN102828595B (en) Mounting method of floating floor or wallboard, and application thereof
CN111734071A (en) Leveling connection structure of assembled light gauge steel
CN212405675U (en) Assembly type mounting structure of stepped ceiling
CN205917962U (en) Withhold device and furred ceiling
CN217557218U (en) Combined jacking connecting piece
CN210087764U (en) Connecting plate structure
CN214461642U (en) Detachable closed floor support plate
CN112832430A (en) Novel assembled outer decorative metal curtain wall component
CN214461541U (en) Connecting structure of glass curtain wall and main body
CN220954307U (en) Steel beam fireproof plate connecting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination