CN109184064A - Installation of ceiling component and the construction method for leading to installation of ceiling applied to waveform aluminium side - Google Patents

Installation of ceiling component and the construction method for leading to installation of ceiling applied to waveform aluminium side Download PDF

Info

Publication number
CN109184064A
CN109184064A CN201810968765.2A CN201810968765A CN109184064A CN 109184064 A CN109184064 A CN 109184064A CN 201810968765 A CN201810968765 A CN 201810968765A CN 109184064 A CN109184064 A CN 109184064A
Authority
CN
China
Prior art keywords
aluminium side
aluminium
installation
leads
docking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810968765.2A
Other languages
Chinese (zh)
Other versions
CN109184064B (en
Inventor
夏念升
夏晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Green Decoration Co Ltd
Original Assignee
Zhejiang Green Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green Decoration Co Ltd filed Critical Zhejiang Green Decoration Co Ltd
Priority to CN201810968765.2A priority Critical patent/CN109184064B/en
Publication of CN109184064A publication Critical patent/CN109184064A/en
Application granted granted Critical
Publication of CN109184064B publication Critical patent/CN109184064B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/34Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles
    • E04B9/36Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles consisting of parallel slats
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/003Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with movable parts, e.g. pivoting panels, access doors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/061Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members supporting construction for curved ceilings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • E04B9/127Connections between non-parallel members of the supporting construction one member being discontinuous and abutting against the other member
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • E04B9/183Means for suspending the supporting construction having a lower side adapted to be connected to a channel of the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/34Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles
    • E04B9/36Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles consisting of parallel slats
    • E04B9/363Grid-like or open-work ceilings, e.g. lattice type box-like modules, acoustic baffles consisting of parallel slats the principal plane of the slats being horizontal

Abstract

The present invention provides a kind of installation of ceiling components to be applied to the construction method that waveform aluminium side leads to installation of ceiling, it is related to aluminium side and leads to furred ceiling technical field, aim to solve the problem that aluminium side is installed in large space in the prior art leads to the slow problem of furred ceiling comprising following steps: S1: wall top part construction;S2: attaching rack;S3: the logical sizing in aluminium side;S4: the logical lifting in aluminium side;S5: synchronous, continuous installation.The present invention realizes that aluminium side leads to the configuration of module on the ground by positioning device, the aluminium side that cooperation driving device drives configuration to finish leads to module global displacement, and utilize the grafting of docking block and U-shaped block, realize that aluminium side leads to module hanging in wall top and connects, facilitate construction personnel's continual mass installation aluminium side logical, construction efficiency is provided, installation progress is accelerated.

Description

Installation of ceiling component and the construction method for leading to installation of ceiling applied to waveform aluminium side
Technical field
Lead to furred ceiling technical field more particularly to a kind of installation of ceiling component the present invention relates to aluminium side and is applied to waveform aluminium The construction method of the logical installation of ceiling in side.
Background technique
It is one of ceiling material emerging in recent years that aluminium side is logical, and aluminium side leads to the visual field that furred ceiling has opening, ventilation, thoroughly Gas, lines are lucid and lively neat, well arranged, embody brief clear smartness, become fashionable decoration market in recent years Major product;And the logical installation in traditional aluminium side is simple, maintenance equally also easily, be since every aluminium side is logical individually, can be with Meaning installation and removal, are not necessarily to special tool, maintain easily and maintain, but after being developed along with some design requirements, it assigns Aluminium side leads to architectural surface material more decorative art senses, such as logical in order to reach the wavy moulding aluminium side of dynamic effect, Common construction technology is unable to satisfy requirement, specifically essentially consists in more difficult in the positioning led to for wavy moulding aluminium side reach It is required to accurate, so that the installation accuracy that wavy moulding aluminium side leads to is not generally high.
Therefore, to solve the above-mentioned problems, the Chinese invention patent of publication number CN108316537A discloses one kind and does not advise Then aluminium side leads to wavy moulding suspended ceiling mounting structure comprising more waveform aluminium sides are logical, and waveform aluminium side is logical to be lifted on wall top On face, movable hanging is equipped with multiple positioning rings on wall top face, and logical be provided in positioning ring, positioning ring in waveform aluminium side blocks wave The logical clamping portion in shape wave aluminium side, clamping portion are connected on adjustable shelf, and adjustable shelf is lifted on wall top face.
Most of waveform aluminium side that this irregular aluminium side leads to wavy moulding suspended ceiling mounting structure is logical directly by hanging Muscle movable hanging is arranged loaded on wall top face, need at the construction field (site) one by one installation and adjustment aluminium side it is logical, have when constructing in small space There is the advantage of install convenient, still, when logical in face of large space, big aluminium side, when by the way of lifting one by one, due to installation fiber crops Tired, docking is difficult, merging precision is low, causes construction efficiency lower, installation speed is slow.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of installation of ceiling component, high with construction efficiency, Rapid advantage is installed.
To realize the above-mentioned technical purpose, a kind of installation of ceiling component provided by the invention, including it is pre- solid according to design drawing The multiple fixed hanging pieces being scheduled in wall top, the fixed hanging piece includes fixed derrick, and the fixed derrick bottom end is connected with opening Down-set C-shaped block, the C-shaped block opening are connected with the U-shaped block of opening upwards setting, and U-shaped block bottom end is along C-shaped block It opens up direction perforation and is provided with recessing groove, further include being connected to aluminium side leads to, one-to-one correspondence in pair of fixed hanging piece setting Hanging piece is connect, the docking hanging piece includes docking sunpender, and the docking sunpender top is connected with the docking block for the setting that is in U-shape, described It docks block top to extend to two sides equipped with attachment strap, the docking block, which can slide, to be clamped into U-shaped block, and the attachment strap can overlap In C-shaped block bottom, and the recessing groove is wider than docking sunpender outer diameter setting;Further include be arranged on ground for be pre-positioned it is several Aluminium side leads to the positioning device of configuration, further includes driving device, and it is logical that the driving device can hang the aluminium side that several configurations finish Along the vertical direction or horizontal direction synchronization-sliding.
By adopting the above technical scheme, two parts are set by the logical connection structure with wall top in aluminium side, a part is affixed Fixation hanging piece in wall top, another part are the docking hanging piece for being connected to aluminium side and leading to, and during installation, aluminium side crosses all and drives Dynamic device, which is hung, connects shifting, after the docking block alignment U-shaped block for docking hanging piece top, then horizontal sliding, it realizes docking hanging piece and consolidates Determine hanging for hanging piece and connects cooperation;It is arranged due to needing aluminium side to lead to for waveform, and aluminium side leads to furred ceiling for the demand of decorating, different aluminium Side is logical to be not necessarily located in sustained height, therefore, upper positioning device is arranged on the ground, in advance leads to several aluminium sides in positioning device It is upper it is assembled form pre-designed configuration, and make driving device transfer aluminium side it is logical move up hang connect when, it is logical to can be realized multiple aluminium sides Synchronize to hang and connect and be formed, connect without hanging to connect and hang repeatedly one by one, to improve construction efficiency, accelerate installation speed.
In some embodiments, the positioning device includes several locating racks, and the locating rack includes being arranged in bar shaped Chassis, sliding is equipped with several U-shaped frames along its length on the chassis, and the U-shaped frame both-side opening is postponed long in chassis Direction setting is spent, and sliding is equipped with cross bar along the vertical direction in the U-shaped frame.
By adopting the above technical scheme, supporting point is selected by sliding the U-shaped frame of setting on chassis along its length, passed through The cross bar for sliding setting in U-shaped frame along the vertical direction is butted on corresponding aluminium side and leads to bottom, thus the distortion and length led to according to aluminium side Degree selects suitable U-shaped frame, cross bar position, and it is logical to erect aluminium side, meanwhile, the mutual cooperation of multiple locating racks and to each locating rack Upper aluminium side leads to the adjusting of height, can construct the logical configuration hung after connecing in aluminium side in design drawing on the ground, and then conveniently Staff's single completes the logical installation in multiple aluminium sides, accelerates speed of application.
In some embodiments, the crossbar tip, which is provided with, adapts to the bayonet that aluminium side leads to normal section.
By adopting the above technical scheme, part is led to by the aluminium side that the setting of bayonet blocks corresponding position out, can not only stablized Support aluminium side logical, moreover it is possible to avoid aluminium side from leading on cross bar length direction and slide.
In some embodiments, the U-shaped frame includes two sides vertical bar relatively disposed in parallel, is passed through along cross bar length direction It wears the vertical bar and is provided with slip hole, the slip hole is extended along vertical bar length direction, and at the cross bar both ends to two sides Each extend over the positioning screw being equipped with across corresponding slip hole setting, the vertical bar far from cross bar side, be located on positioning screw Screw thread is socketed with location nut.
By adopting the above technical scheme, by the cooperation of the positioning screw of grafting in slip hole, slip hole, realize cross bar perpendicular The upward sliding of histogram facilitates staff to adjust cross bar height, so that the stable aluminium side that resists leads to;And positioning screw both ends point Other thread bush connects location nut, by the adjusting of two location nuts position on positioning screw, clamps U-shaped frame, thus fixed The position of cross bar after firmly adjusting avoids cross bar from losing the bridge joint effect led to aluminium side.
In some embodiments, the driving device includes rack, and several aluminium sides lead to and are connected to rack setting, And it is equipped with slide rail group along the direction perpendicular to the elongated degree in aluminium side in wall top, the docking block and the plugging direction of U-shaped block postpone It is arranged in the length direction of slide rail group, and slide rail group leads to length direction interval along aluminium side and is set as multiple groups, along it at the slide rail group Length direction sliding is equipped with motor-driven carrier, and the motor-driven carrier is equipped with hoist engine, and the hoist engine is hung on by wirerope Setting at the top of rack.
By adopting the above technical scheme, by the setting of sliding rail, motor-driven carrier and hoist engine are mounted on wall top, and slides and sets It colludes step and moves up in several aluminium sides that the cooperation of the trolley and hoist engine set can not only drive rack that configuration is pulled to finish, moreover it is possible to band Dynamic aluminium side leads to horizontal sliding, realizes the docking of docking block and U-shaped block, completes synchronous lifting work.
In some embodiments, the docking sunpender is postponed close to the logical one end in aluminium side leads to length direction to two sides in aluminium side Extend to be equipped with and hangs fishplate bar, and the logical fishplate bar that hangs in adjacent aluminium side be in same plane and is arranged, the rack is including being parallel to sliding rail The keel group of group setting, the keel group include two respectively bridge joint in the two of a docking sunpender hang keel below fishplate bar, institute It states keel group and is set to multiple groups along aluminium side's corresponding docking sunpender of logical length direction.
By adopting the above technical scheme, it is hung oneself fishplate bar by being extended on docking sunpender to two sides, and by the dragon of rack Bone, which is bridged on to hang, forms bridging arrangement below fishplate bar, so that rack can pull aluminium side under the action of motor-driven carrier and hoist engine Logical displacement, and the logical subsequent lifting work of progress in aluminium side can be detached from after rigging out.
In some embodiments, bridge joint has connecting rod, the company between two adjacent keel groups, two keel close to each other Extension bar is set as multiple groups along keel length direction.
By adopting the above technical scheme, the setting of connecting rod can link into an integrated entity adjacent keel group, facilitate electronic small Vehicle and the entire rack displacement of hoist engine synchronous drive.
In some embodiments, multiple groups connection dress is equipped at intervals with along keel length direction between two keel of a keel group It sets, the attachment device includes the link block being rotationally connected with respectively by torsional spring on corresponding keel, the rotation of the link block Axis vertical setting, and the two link blocks one end fits close to each other of an attachment device are equipped with stepped groove, the torsional spring is in Under normal conditions, the two of the attachment device link blocks are mutually clamped setting;Meanwhile an attachment device in the keel group with The unequal setting of the distance between the adjacent attachment device in two sides.
By using above-mentioned technical proposal, can be beaten under external force in setting between two keel of a keel group The attachment device opened, so that rack is moved down in rigging out aluminium Fang Tonghou, and outside slide direction when seine frame, in rack Link block can rotate resigning when touching docking sunpender, to facilitate construction personnel that rack is pulled away to the aluminium side installed Logical part, and sunpender is docked by the way that after attachment device, link block can return to initial position under the effect of torsion spring, cross two link blocks Clamping realize two keel synchronous shift.
The present invention also provides a kind of installation of ceiling components to be applied to the construction method that waveform aluminium side leads to installation of ceiling, Have the advantages that easy for installation, construction is rapid.
A kind of installation of ceiling component is applied to the construction method of the logical installation of ceiling in waveform aluminium side, comprising the following steps:
S1: the construction of wall top part according to the design needs using the fixed upper fixed derrick of expansion bolt in wall top, then is avoided fixing Upper multiple slide rail groups are arranged in boom location, and motor-driven carrier is attached in slide rail group;
S2: entire aluminium side is led to furred ceiling part and is divided into multiple modules by attaching rack, and each module includes that the aluminium side of equivalent is logical, Lead to quantity setting rack size according to the aluminium side that single needs to lift, and using the cooperation of multiple motor-driven carriers that rack is integrally steady Surely ground is hung;
S3: the logical sizing in aluminium side, according to the logical quantity selective positioning frame quantity in the aluminium side of single lifting, by multiple locating racks on ground It is assembled side by side on face to form positioning device, it recycles the adjusting of U-shaped frame and cross bar on locating rack to block aluminium side and leads to, realize several aluminium The fixation of the logical relative position in side, in ground complete design configuration;
S4: the logical lifting in aluminium side starts hoist engine, transfers rack, and construction personnel pulls a keel group along connecting rod length direction Two keel are located remotely from each other, to step down for docking sunpender, transfer rack part to hanging below fishplate bar;It is bridged on to keel group more After the hanging below fishplate bar of the logical multiple docking sunpenders on slide rail group length direction in a aluminium side, starts hoist engine, pull aluminium side logical Module moves up, until docking sunpender bottom end and fixed derrick hanging, start motor-driven carrier, drive docking block grafting into In U-shaped block;
S5: synchronous, continuous installation transfers rack, and start trolley, is pulled horizontally off rack along slide direction and has installed Aluminium side leads to module, and when the upper aluminium side of lifting leads to module, the lower aluminium side of attaching leads to module to construction personnel on the ground simultaneously, and It pulls out to be moved to after a upper aluminium side leads to module at the logical module in next aluminium side that configuration finishes in rack and continues to lift.
By adopting the above technical scheme, logical several aluminium sides that are divided into of all aluminium sides are led into module, and by single aluminium Fang Tongmo The aluminium side of block is logical on the ground by positioning device into shape configuration, to using rack and can hang fishplate bar after configuration The aluminium side that snap action pulls configuration to finish leads to template and integrally moves up, and carries out positioning adjusting without subsequent, and can be realized The logical mass installation in aluminium side, it is very convenient, and installation speed is very fast.
In conclusion compared with prior art, the present invention having the advantage that
1. realizing that aluminium side leads to the configuration of module on the ground, the aluminium side that cooperation driving device drives configuration to finish by positioning device Logical module global displacement, and using the grafting of docking block and U-shaped block, it realizes that aluminium side leads to module hanging in wall top and connects, conveniently applies Worker person's continual mass installation aluminium side is logical, provides construction efficiency, accelerates installation progress;
2. passing through the cross bar for sliding setting in the U-shaped frame and U-shaped frame that slide setting on chassis along its length along the vertical direction It realizes the configuration for leading to module to aluminium side, is not necessarily to subsequent adjustment, it is very convenient.
Detailed description of the invention
Fig. 1 is the overall structure diagram that installation of ceiling component of the present invention is applied to that waveform aluminium side leads to installation of ceiling;
Fig. 2 is the structural schematic diagram that socket part point is hung in fixed hanging piece and docking;
Fig. 3 is the structural schematic diagram of positioning device part;
Fig. 4 is the structural schematic diagram that driving device lifts that an aluminium side leads to module;
Fig. 5 is the enlarged drawing of part A in Fig. 4.
In figure, 1, aluminium side it is logical;11, aluminium side leads to module;2, fixed hanging piece;21, fixed derrick;22, C-shaped block;221, fixed Slot;23, U-shaped block;231, recessing groove;3, hanging piece is docked;31, sunpender is docked;311, fishplate bar is hung;32, block is docked;33, attachment strap; 331, fixed block;4, positioning device;41, locating rack;411, chassis;412, U-shaped frame;4121, vertical bar;4122, slip hole;413, Cross bar;4131, bayonet;414, positioning screw;4141, location nut;5, driving device;51, slide rail group;511, motor-driven carrier; 512, hoist engine;5121, wirerope;6, rack;61, keel group;611, keel;62, connecting rod;63, attachment device;631, even Connect block;6311, torsional spring;6312, stepped groove.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment:
A kind of installation of ceiling component, as shown in Figure 1, include the multiple fixed hanging pieces 2 pre-fixed according to design drawing in wall top, Here, all 2 equal length of fixed hanging piece settings, and its bottom end is located in same level, and as shown in Fig. 2, fixed hanging piece 2 Including the fixed derrick 21 being vertically arranged, 21 top of fixed derrick is fixed in wall top by expansion bolt and is arranged, in fixed derrick 21 bottom ends are connected with the C-shaped block 22 that Open Side Down is arranged, and are connected with the U-shaped block 23 of opening upwards setting in 22 opening of C-shaped block, And 23 bottom end of U-shaped block opens up direction perforation along C-shaped block 22 and is provided with recessing groove 231, and recessing groove 231 is wider than docking sunpender 31 Outer diameter setting;Further include the docking hanging piece 3 for being connected in aluminium side logical 1, one-to-one correspondence and being arranged in fixed hanging piece 2, docks hanging piece 3 Including docking sunpender 31 being vertically arranged, being fixed in logical 1 top in aluminium side, and docking sunpender 31 leads between 1 length direction along aluminium side Every being set as multiple, here, the top for the docking sunpender 31 in all aluminium sides logical 1 that configuration finishes in design, which is in, is same as level It is arranged in face, and is connected with the docking block 32 for the setting that is in U-shape on docking 31 top of sunpender, extends on docking 32 top of block to two sides There is horizontally disposed attachment strap 33, wherein docking block 32, which can slide, to be clamped into U-shaped block 23, and attachment strap 33 can be overlapped in C-shaped 22 bottom of block;Further include the positioning device 4 for leading to 1 configuration for being pre-positioned several aluminium sides being arranged on ground, further includes driving dress Set 5, driving device 5 can hang aluminium side logical 1 that several configurations finish along the vertical direction or horizontal direction synchronization-sliding.
In this way, installation length is longer in large space, when the biggish aluminium side of wave bending degree leads to 1 furred ceiling, by aluminium side logical 1 Furred ceiling is divided into several aluminium sides and leads to module 11, on the one hand, positions several aluminium sides logical 1 by positioning device 4, realizes aluminium The configuration of the logical module 11 in side, is adjusted without hanging in termination process, and very convenient, on the other hand, driving device 5 is able to drive It is whole along the vertical direction or horizontal direction sliding that aluminium side leads to module 11, and due to the bottom end of all fixation hanging pieces 2 and all The top of docking hanging piece 3 is located in same level, the driving of driving device 5 be able to drive aluminium side lead to module 11 it is whole realize and The docking of fixed derrick 21, easy for construction, installation is rapid.
And lead to the configuration of module 11 in order to realize positioning device 4 to aluminium side, as shown in figure 3, positioning device 4 includes several Lead to the locating rack 41 that aluminium side in module 11 leads to the splicing setting of 1 quantity according to aluminium side, and locating rack 41 includes elongated setting Chassis 411, here, the width of chassis 411 are arranged no more than the shortest distance between two aluminium sides logical 1, and along it on chassis 411 Length direction sliding is connected with multiple U-shaped frames 412 being vertically arranged, and 412 both-side opening of U-shaped frame is postponed in 411 length of chassis Direction setting, sliding is connected with cross bar 413 along the vertical direction in U-shaped frame 412.In this way, aluminium side logical 1 is placed in locating rack 41 On, mobile U-shaped frame 412 selects supporting point according to the curved configuration of aluminium side logical 1, and cooperation slides the cross bar of setting along the vertical direction 413 erect aluminium side logical 1, and by the cooperation of multiple locating racks 41, U-shaped frame is adjusted according to the configuration that the aluminium side of design leads to module 11 412 and 413 position of cross bar, realize that different aluminum side leads to the adjusting of 1 height, to complete the structure for leading to module 11 to aluminium side on the ground Type can be carried out the configuration work that subsequent aluminium side leads to module 11 when lifting a upper aluminium side and leading to module 11, accelerate speed of application.
When supporting aluminium side to lead to 1 using cross bar 413, in order to improve cross bar 413 to the bridge joint effect of aluminium side logical 1, such as Fig. 3 institute Show, on the one hand, U-shaped frame 412 includes two sides vertical bar 4121 relatively disposed in parallel, and runs through vertical bar along 413 length direction of cross bar 4121 are provided with slip hole 4122, and here, slip hole 4122 is extended along 4121 length direction of vertical bar, and at 413 both ends of cross bar The positioning screw 414 being arranged across corresponding slip hole 4122 is each extended over to two sides, here, the length of cross bar 413 is less than U-shaped The shortest distance between two vertical bars 4121 of frame 412, and vertical bar 4121 far from 413 side of cross bar, be located at positioning screw 414 on Thread bush connects location nut 4141;On the other hand, the card for adapting to aluminium side and leading to 1 normal section is provided in 413 top middle portion of cross bar Mouth 4131.Construction personnel's adjusting cross bar 413 can be facilitated high in this way, being threaded through the positioning screw 414 being arranged in slip hole 4122 Degree, and the shortest distance setting for being positioned, and being less than between two vertical bars 4121 of U-shaped frame 412 using location nut 4141 Cross bar 413 can adjust in its longitudinal direction the position of bayonet 4131, so that aluminium side logical 1 be enable to be connected to bayonet 4131 In, stablize its position.
And in order to realize the lifting function of driving device 5, as shown in figure 4, driving device 5 includes in wall top along perpendicular to aluminium Fixed slide rail group 51 on the direction of logical 1 length in side, and slide rail group 51 leads to 1 length direction along aluminium side and is set to multiple groups, and It avoids fixed hanging piece 2 to be arranged, here, docks the length direction that the plugging direction of block 32 and U-shaped block 23 postpones in slide rail group 51 and set It sets, and driving device 5 further includes rack 6, and the logical module 11 in an aluminium side is connected to below rack 6 and is arranged, the edge in slide rail group 51 The sliding of its length direction is connected with motor-driven carrier 511, and hoist engine 512 is fixed on motor-driven carrier 511, and hoist engine 512 6 top of rack is hanging connected in by wirerope 5121.In this way, the hoist engine 512 on motor-driven carrier 511 can pull rack 6 perpendicular Histogram shifts up, and is displaced so that aluminium side be driven to lead to module 11 from ground to wall top, and inserts along fixed hanging piece 2 and docking hanging piece 3 The motor-driven carrier 511 for connecing direction setting is able to drive rack 6 and aluminium side leads to module 11 and slides, and completes aluminium side and leads to hanging for module 11 Dress, it is very convenient.
Wherein, in order to realize the connection of aluminium side logical 1 and rack 6, as shown in figure 5, leading to 1 close to aluminium side in docking sunpender 31 One end postpone in aluminium side lead to 1 length direction to two sides be extended with it is horizontally disposed hang fishplate bar 311, and all aluminium sides logical 1 are being hung After being connected to wall top, hangs fishplate bar 311 and be in same level;Meanwhile rack 6 includes the keel group for being parallel to guide rail setting 61, keel group 61 includes two keel 611 that bridge joint hangs 311 lower section of fishplate bar in the two of a docking sunpender 31 respectively, and keel group 61, which lead to 1 length direction along aluminium side, is set as multiple groups.In this way, drawing high rack 6 by keel 611 and the overlap joint for hanging fishplate bar 311 When, due to gravity, what the logical module 11 in aluminium side can be stable is overlapped on rack 6, until below lifting to fixed hanging piece 2, And shift to install corresponding docking hanging piece 3 with fixed hanging piece 2, facilitate construction personnel to drive rack 6 along sliding rail sliding realization pair Connect the grafting of 23 part of block 32 and U-shaped block.
Since rack 6 is in netted setting, in order to avoid netted rack 6 leads to module 11 in into and out corresponding aluminium side When be stuck, therefore, as shown in figure 4, bridge joint has connecting rod 62 between two adjacent keel groups 61, two keel 611 close to each other, And connecting rod 62 is set as multiple groups along 611 length direction of keel;As shown in figure 5, and edge between two keel 611 of a keel group 61 611 length direction of keel is arranged at intervals with multiple groups attachment device 63, and attachment device 63 includes being connected respectively by the rotation of torsional spring 6311 The link block 631 being connected on corresponding keel 611, here, the pivot center of link block 631 is vertically arranged, and an attachment device 63 Two link blocks 631 one end fits close to each other be provided with stepped groove 6312, when torsional spring 6311 is in the normal state, a connection dress Set the 63 two mutually clampings of link block 631;Meanwhile the connection that an attachment device 63 in the keel group 61 is adjacent with two sides The unequal setting of the distance between device 63.In this way, the setting of connecting rod 62 and attachment device 63, different keel groups 61 is connected It is connected in an entirety, realizes the whole lifting of rack 6, and connects the attachment device 63 of folding setting into and out corresponding When aluminium side leads to module 11, docking sunpender 31 slides between two keel 611, pushes link block 631 to open and is avoided that attachment device 63 block the into and out of rack 6, and in lifting, attachment device 63 can be mutually clamped under the effect of torsional spring 6311, shape Integral structure;In addition, setting two adjacent two attachment devices 63 are unequal at a distance from adjacent another attachment device 63 It sets, can be avoided all attachment devices 63 of docking sunpender 31 opening synchronous with when 6 Relative sliding of rack, and make 6 stress of rack It is unstable.
In addition, upper connecting rod can be arranged in one end of two keel 611 in order to stablize two keel 611 of a keel group 61, pass through Connecting rod (not shown) connects two keel 611 integral, and the other end is still open setting, for docking sunpender 31 into Out.
And the stability in order to stablize fixed hanging piece 2 with dock the sliding docking of hanging piece 3, as shown in Fig. 2, in C-shaped block 22 Two sides bottom walls in the middle part of be provided with fixing groove 221, and be equipped with fixed block 331 downwards in 33 bottom end of attachment strap, here, fixed block 331, which are shorter than attachment strap 33 on sliding rail length direction, is arranged.In this way, sliding grafting into U-shaped block in driving docking block 32 and attachment strap 33 23 and C-shaped block 22 in when, further lifting docking hanging piece 3 line slip again, avoids fixed block 331 from blocking mating, and in cunning Moving to corresponding position back lower place docking hanging piece 3 can make 331 grafting of fixed block into fixing groove 221, realizing docking hanging piece 3 and solid Determine being stably connected with for hanging piece 2, aluminium side logical 1 is avoided to slide in a horizontal plane under external force.
In addition, construction personnel can rubber block (be schemed in interference grafting in the rest of C-shaped block 22 after attaching In be not shown), so that stablizing aluminium side leads to 1 position, it is avoided to be detached from wall top under strong shock effect, improves aluminium side logical 1 and hang The shock resistance on top.
Above-mentioned installation of ceiling component is applied to the construction method that waveform aluminium side leads to 1 installation of ceiling, comprising the following steps:
S1: the construction of wall top part according to the design needs using the fixed upper fixed derrick 21 of expansion bolt in wall top, then is avoided solid Determine 21 position of sunpender and upper multiple slide rail groups 51 are set, and motor-driven carrier 511 is attached in slide rail group 51.
S2: entire aluminium side is led to 1 furred ceiling part and is divided into multiple modules by attaching rack 6, and each module includes the aluminium of equivalent Side logical 1 leads to 1 quantity setting 6 size of rack according to the aluminium side that single needs to lift, and utilizes the cooperation of multiple motor-driven carriers 511 6 monolithic stability of rack is hung into ground.
S3: logical 1 sizing in aluminium side, according to 41 quantity of quantity selective positioning frame of the aluminium side logical 1 of single lifting, by multiple fixed Position frame 41 is assembled side by side on the ground to form positioning device 4, and welds upper reinforcing bar on the ground of 4 four corners of positioning device and carry out Limit, avoids positioning device 4 from deviating when in use, recycles the adjusting card of U-shaped frame 412 and cross bar 413 on locating rack 41 Firmly aluminium side logical 1 realizes that several aluminium sides lead to the fixation of 1 relative position, in ground complete design configuration.
S4: logical 1 lifting in aluminium side starts hoist engine 512, transfers rack 6, construction personnel pulls along 62 length direction of connecting rod Two keel 611 of one keel group 61 are located remotely from each other (when being provided with connecting rod, i.e., from a side slip into hanging the lower section of fishplate bar 311), from And be that docking sunpender 31 is stepped down, transfer 6 part of rack to hanging the lower section of fishplate bar 311;Multiple aluminium sides logical 1 are bridged on to keel group 61 Multiple docking sunpenders 31 on 51 length direction of slide rail group hang 311 lower section of fishplate bar after, start hoist engine 512, pull aluminium side Logical module 11 moves up, until the hanging of the bottom end of docking sunpender 31 and fixed derrick 21, starts motor-driven carrier 511, drives 32 grafting of block is docked into U-shaped block 23.
S5: synchronous, continuous installation transfers rack 6, and start motor-driven carrier 511, along 51 direction of slide rail group by 6 water of rack Horizontal drawing leads to module 11 from the aluminium side installed, and when the upper aluminium side of lifting leads to module 11, construction personnel is simultaneously on ground The upper lower aluminium side of attaching leads to module 11, and the next aluminium for being moved to configuration after a upper aluminium side leads to module 11 and finishing is pulled out in rack 6 Continue to lift at the logical module 11 in side.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of installation of ceiling component, it is characterised in that: hung including pre-fixing multiple fixations in wall top according to design drawing Part (2), the fixed hanging piece (2) includes fixed derrick (21), setting that fixed derrick (21) bottom end is connected with that Open Side Down C-shaped block (22), C-shaped block (22) opening be connected with opening upwards setting U-shaped block (23), U-shaped block (23) bottom End opens up direction perforation along C-shaped block (22) and is provided with recessing groove (231), further includes being connected to aluminium side to lead on (1), a pair It should include docking sunpender (31), the docking sunpender in the docking hanging piece (3) of fixed hanging piece (2) setting, the docking hanging piece (3) (31) top is connected with the docking block (32) for the setting that is in U-shape, and the docking block (32) top extends to two sides is equipped with attachment strap (33), The docking block (32), which can slide, to be clamped into U-shaped block (23), and the attachment strap (33) can be overlapped in C-shaped block (22) bottom, And the recessing groove (231) is wider than docking sunpender (31) outer diameter setting;It further include being arranged on ground for being pre-positioned several aluminium The positioning device (4) of logical (1) configuration in side, further includes driving device (5), it is complete that the driving device (5) can hang several configurations Complete aluminium side leads to (1) along the vertical direction or horizontal direction synchronization-sliding.
2. installation of ceiling component according to claim 1, which is characterized in that the positioning device (4) includes several positioning Frame (41), the locating rack (41) include the chassis (411) being arranged in bar shaped, are slided along its length on the chassis (411) It moves and is equipped with several U-shaped frames (412), U-shaped frame (412) both-side opening is postponed to be arranged in chassis (411) length direction, and described Sliding is equipped with cross bar (413) along the vertical direction in U-shaped frame (412).
3. installation of ceiling component according to claim 2, which is characterized in that cross bar (413) top, which is provided with, to be adapted to Aluminium side leads to the bayonet (4131) of (1) normal section.
4. installation of ceiling component according to claim 3, which is characterized in that the U-shaped frame (412) includes that two sides are relatively flat The vertical bar (4121) of row setting is provided with slip hole (4122) along cross bar (413) length direction through the vertical bar (4121), described Slip hole (4122) is extended along vertical bar (4121) length direction, and is each extended at the cross bar (413) both ends to two sides Equipped with the positioning screw (414) across corresponding slip hole (4122) setting, separate cross bar (413) side of the vertical bar (4121), Screw thread is socketed with location nut (4141) on positioning screw (414).
5. installation of ceiling component according to claim 4, which is characterized in that the length of the cross bar (413) is less than U-shaped frame (412) shortest distance setting between two vertical bars (4121).
6. installation of ceiling component according to claim 5, which is characterized in that the driving device (5) includes rack (6), And several aluminium sides lead to (1) and are connected to rack (6) setting, and set in wall top along the direction for leading to (1) length perpendicular to aluminium side Have slide rail group (51), the plugging direction of docking block (32) and U-shaped block (23) length direction in slide rail group (51) of postponing is set It sets, and slide rail group (51) leads to (1) length direction interval along aluminium side and is set as multiple groups, slides along its length at the slide rail group (51) It moves and is equipped with motor-driven carrier (511), the motor-driven carrier (511) is equipped with hoist engine (512), and the hoist engine (512) passes through steel Cord (5121) is hung on setting at the top of rack (6).
7. installation of ceiling component according to claim 6, which is characterized in that the docking sunpender (31) is logical close to aluminium side (1) one end is postponed for extending to be equipped with to two sides in logical (1) length direction in aluminium side and be hung fishplate bar (311), and adjacent aluminium side leads to hanging for (1) and connects Plate (311), which is in same plane, to be arranged, and the rack (6) includes the keel group (61) for being parallel to slide rail group (51) setting, institute It states keel group (61) and hangs the keel (611) below fishplate bar (311), institute in the two of docking sunpender (31) including two difference bridge joints It states keel group (61) and is set to multiple groups along aluminium side's corresponding docking sunpender (31) of logical (1) length direction.
8. installation of ceiling component according to claim 7, which is characterized in that two adjacent keel groups (61) it is close to each other two There is connecting rod (62) bridge joint between keel (611), the connecting rod (62) is set as multiple groups along keel (611) length direction.
9. installation of ceiling component according to claim 8, which is characterized in that two keel (611) of a keel group (61) it Between be equipped at intervals with multiple groups attachment device (63) along keel (611) length direction, the attachment device (63) include pass through torsion respectively Spring (6311) is rotationally connected with the link block (631) on corresponding keel (611), and the pivot center of the link block (631) is vertical Setting, and two link blocks (631) one end fits close to each other of an attachment device (63) are equipped with stepped groove (6312), the torsion When spring (6311) is in the normal state, the mutually clamping setting of the link block (631) of the two of an attachment device (63);Meanwhile described in one The unequal setting of a distance between attachment device (63) in keel group (61) attachment device (63) adjacent with two sides.
10. a kind of installation of ceiling component as claimed in claim 9 is applied to the construction method that waveform aluminium side leads to installation of ceiling, It is characterized in that, comprising the following steps:
S1: the construction of wall top part, it is fixed upper fixed derrick (21) using expansion bolt according to the design needs in wall top, then avoid Upper multiple slide rail groups (51) are arranged in fixed derrick (21) position, and motor-driven carrier (511) is attached on slide rail group (51);
S2: entire aluminium side is led to (1) furred ceiling part and is divided into multiple modules by attaching rack (6), and each module includes the aluminium of equivalent Side is logical (1), leads to (1) quantity setting rack (6) size according to the aluminium side that single needs to lift, and utilize multiple motor-driven carriers (511) rack (6) monolithic stability is hung ground by cooperation;
S3: aluminium side leads to (1) sizing, quantity selective positioning frame (41) quantity of (1) is led to according to the aluminium side of single lifting, by multiple Locating rack (41) is assembled side by side on the ground to form positioning device (4), recycles U-shaped frame (412) and cross bar on locating rack (41) (413) adjusting blocks aluminium side and leads to (1), realizes that several aluminium sides lead to the fixation of (1) relative position, in ground complete design configuration;
S4: aluminium side leads to (1) lifting, starts hoist engine (512), transfers rack (6), construction personnel is along connecting rod (62) length direction It pulls two keel (611) of a keel group (61) to be located remotely from each other, to step down for docking sunpender (31), makes under rack (6) part It puts to hanging below fishplate bar (311);It is more on slide rail group (51) length direction that multiple aluminium sides logical (1) are bridged on to keel group (61) After the hanging below fishplate bar (311) of a docking sunpender (31), starts hoist engine (512), pull aluminium side to lead to module (11) and move up, until The bottom end of sunpender (31) and the hanging of fixed derrick (21) are docked, is started motor-driven carrier (511), docking block (32) is driven to insert It taps into U-shaped block (23);
S5: synchronous, continuous installation is transferred rack (6), and start motor-driven carrier (511), along slide direction that rack (6) is horizontal It is pulled away from the aluminium side installed and leads to module (11), and when the upper aluminium side of lifting leads to module (11), construction personnel is simultaneously on ground The lower aluminium side of attaching leads to module (11) on face, and is moved to configuration after rack (6) pull out a upper aluminium side logical module (11) and finishes Next aluminium side lead to module (11) at continue to lift.
CN201810968765.2A 2018-08-23 2018-08-23 Ceiling mounting component and construction method applied to mounting of wavy aluminum square tube ceiling Active CN109184064B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810968765.2A CN109184064B (en) 2018-08-23 2018-08-23 Ceiling mounting component and construction method applied to mounting of wavy aluminum square tube ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810968765.2A CN109184064B (en) 2018-08-23 2018-08-23 Ceiling mounting component and construction method applied to mounting of wavy aluminum square tube ceiling

Publications (2)

Publication Number Publication Date
CN109184064A true CN109184064A (en) 2019-01-11
CN109184064B CN109184064B (en) 2020-01-17

Family

ID=64919275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810968765.2A Active CN109184064B (en) 2018-08-23 2018-08-23 Ceiling mounting component and construction method applied to mounting of wavy aluminum square tube ceiling

Country Status (1)

Country Link
CN (1) CN109184064B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110219412A (en) * 2019-06-29 2019-09-10 广州康普顿至高建材有限公司 A kind of bar shaped smallpox
CN110485618A (en) * 2019-09-09 2019-11-22 苏州美瑞德建筑装饰有限公司 A kind of Fast Installation structure of Super High abnormity furred ceiling
CN113668756A (en) * 2021-08-25 2021-11-19 苏州金螳螂建筑装饰股份有限公司 Large-span aluminum square tube multiple-drop-level modeling assembly type installation design structure
CN115419206A (en) * 2022-09-22 2022-12-02 安徽福瑞尔铝业科技有限公司 Aluminum honeycomb plate hanging type mounting structure and mounting process thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101514586B (en) * 2009-01-14 2010-10-13 北京江河幕墙股份有限公司 Hanger rail type electric hanging boat and construction method thereof
JP2013238064A (en) * 2012-05-16 2013-11-28 Riken Light Metal Ind Co Ltd Attachment structure for ceiling louver
CN104420564A (en) * 2013-08-28 2015-03-18 阿姆斯特郎世界工业公司 Ceiling system with ceiling element mounting brackets
CN106368367A (en) * 2016-11-01 2017-02-01 苏州美瑞德建筑装饰有限公司 Tall and big space aluminum plate integrated suspended ceiling installing structure
CN206245694U (en) * 2016-10-28 2017-06-13 新昌县知达科技咨询有限公司 A kind of construction and decoration ceiling mounting bracket
CN206941942U (en) * 2017-07-01 2018-01-30 大红点商业装饰工程(深圳)有限公司 A kind of grid ceiling structure
CN207277661U (en) * 2017-09-20 2018-04-27 天津市东泽天润建筑有限公司 A kind of side leads to ceiling structure
CN207714596U (en) * 2017-12-14 2018-08-10 江苏中南建设装饰有限公司 A kind of furred ceiling assembled lightgage steel joist frame

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101514586B (en) * 2009-01-14 2010-10-13 北京江河幕墙股份有限公司 Hanger rail type electric hanging boat and construction method thereof
JP2013238064A (en) * 2012-05-16 2013-11-28 Riken Light Metal Ind Co Ltd Attachment structure for ceiling louver
CN104420564A (en) * 2013-08-28 2015-03-18 阿姆斯特郎世界工业公司 Ceiling system with ceiling element mounting brackets
CN206245694U (en) * 2016-10-28 2017-06-13 新昌县知达科技咨询有限公司 A kind of construction and decoration ceiling mounting bracket
CN106368367A (en) * 2016-11-01 2017-02-01 苏州美瑞德建筑装饰有限公司 Tall and big space aluminum plate integrated suspended ceiling installing structure
CN206941942U (en) * 2017-07-01 2018-01-30 大红点商业装饰工程(深圳)有限公司 A kind of grid ceiling structure
CN207277661U (en) * 2017-09-20 2018-04-27 天津市东泽天润建筑有限公司 A kind of side leads to ceiling structure
CN207714596U (en) * 2017-12-14 2018-08-10 江苏中南建设装饰有限公司 A kind of furred ceiling assembled lightgage steel joist frame

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110219412A (en) * 2019-06-29 2019-09-10 广州康普顿至高建材有限公司 A kind of bar shaped smallpox
CN110485618A (en) * 2019-09-09 2019-11-22 苏州美瑞德建筑装饰有限公司 A kind of Fast Installation structure of Super High abnormity furred ceiling
CN113668756A (en) * 2021-08-25 2021-11-19 苏州金螳螂建筑装饰股份有限公司 Large-span aluminum square tube multiple-drop-level modeling assembly type installation design structure
CN115419206A (en) * 2022-09-22 2022-12-02 安徽福瑞尔铝业科技有限公司 Aluminum honeycomb plate hanging type mounting structure and mounting process thereof
CN115419206B (en) * 2022-09-22 2023-12-19 安徽福瑞尔铝业科技有限公司 Aluminum honeycomb panel hanging type mounting structure and mounting process thereof

Also Published As

Publication number Publication date
CN109184064B (en) 2020-01-17

Similar Documents

Publication Publication Date Title
CN109184064A (en) Installation of ceiling component and the construction method for leading to installation of ceiling applied to waveform aluminium side
CN100587939C (en) Clamper for cleaning and degumming silicon chip
CN110578108B (en) Detachable plate-arranging hanger for hot galvanizing and use method
CN104847048A (en) Ceiling keel structure and mounting method thereof
CN207974504U (en) Climbing type hanging basket system for tilting decoration of exterior wall construction
CN103422599B (en) A kind of stone curtain-wall hanging part structure
CN203245066U (en) Door spraying production line hook device
CN110820571A (en) Adjustable track beam frame beam platform and track beam frame beam method
CN204778365U (en) Bell housing plays tongs
CN202017337U (en) Efficient elevator mechanism adhered to electric lifting scaffold
CN218320247U (en) Advertisement construction hoisting accessory
CN208122075U (en) Top hangs drop level furred ceiling
CN213388937U (en) Electrophoresis equipment
CN216235517U (en) Elevator car decorates furred ceiling
CN212174336U (en) Auxiliary air pipe installation equipment
CN204781541U (en) Smallpox keel structure
CN211444694U (en) Mobile hoisting device for target processing
CN209076979U (en) A kind of auto parts spray transport device automatically
CN217840827U (en) Hanging basket
CN220590431U (en) Special-shaped pipe hanger for coating
CN113529571A (en) Positioning device for rhombic wire-separating pipe cable saddle of short-tower cable-stayed bridge
CN113279536A (en) Wallboard mounting structure, mounting method and dismounting method
JP5660499B2 (en) Net or sheet suspension moving system using winch
CN217475931U (en) Hook formula bent axle rack
CN111671251A (en) Hanger adopting wedge surface driving mode to adjust hook to rotate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Suspended ceiling installation components and construction methods applied to the installation of corrugated aluminum square through suspended ceilings

Effective date of registration: 20231012

Granted publication date: 20200117

Pledgee: Agricultural Bank of China Limited Taishun County sub branch

Pledgor: ZHEJIANG LUYU DECORATION Co.,Ltd.

Registration number: Y2023330002301

PE01 Entry into force of the registration of the contract for pledge of patent right