CN208122075U CN201721906025.3U CN201721906025U CN208122075U CN 208122075 U CN208122075 U CN 208122075U CN 201721906025 U CN201721906025 U CN 201721906025U CN 208122075 U CN208122075 U CN 208122075U
Authority
CN
China
Prior art keywords
plate
hanging
hole
furred ceiling
sunpender
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721906025.3U
Other languages
Chinese (zh)
Inventor
钟诚
周东珊
余文钊
步挺
薛猛
王瑾
郑波波
鄢凌云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201721906025.3U priority Critical patent/CN208122075U/en
Application granted granted Critical
Publication of CN208122075U publication Critical patent/CN208122075U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of tops to hang drop level furred ceiling.It includes top surface that top, which hangs drop level furred ceiling, and two suspending assemblies, suspending assembly includes two suspender members, and suspender member includes sunpender, connecting plate and hanging plate;The first end of sunpender is connected on connecting plate, and second end extends to top surface;Hanging plate is slippingly arranged on connecting plate perpendicular to sunpender and along the direction perpendicular to sunpender;Two support keels, the both ends of support keel are overlapped on respectively on two hanging plates on a suspending assembly;Central location is installed, the both ends of ceiling joist are overlapped on respectively on two support keels on ceiling joist.Top provided by the utility model hangs drop level furred ceiling, reduces the quantity of hanging bar, and the stability after improving central location mounting improves construction quality, increases the cleaning of construction environment, improve construction efficiency, shorten construction period, reduces labor intensity.

Description

Top hangs drop level furred ceiling
Technical field
The utility model relates to building decoration technology fields more particularly to a kind of top to hang drop level furred ceiling.
Background technique
Furred ceiling is the indispensable part of interior decoration to decoration is played the role of at the top of interior architecture.
In the prior art, furred ceiling includes central location and hanging unit, and wherein hanging unit includes multiple hanging bars, hanging One end of bar is fixed on top surface, and the other end for hanging bar is mounted on the keel of central location, and central location is hung by multiple Hanging rod is hung on top surface.Inventor has found that hanging unit described above has the following disadvantages during realizing invention:The One, the weight of central location is larger, larger to the destruction of the original concrete on top surface using hanging bar hanging central location;Drop The stability of low central location mounting, construction quality not can guarantee;Second, need the position at the construction field (site) according to hitch bar Top surface is punched, the cleaning of construction environment is reduced, extends construction period;Third, once the position of hanging bar is true After fixed, the position of central location can not be adjusted, after central location installation need to dismantle lower adjustment position when going wrong again It installs again, increases labor intensity;4th, the length for hanging bar needs to be processed according to the height scene of central location, time-consuming to take Power.
Therefore, it is necessary to solve above-mentioned technical problem.
Utility model content
The utility model provides a kind of top extension drop level furred ceiling, to solve problems of the prior art, reduces hanging bar Quantity, improve central location mounting after stability, improve construction quality, increase the cleaning of construction environment, improve and apply Work efficiency rate shortens construction period, reduces labor intensity.
The utility model provides a kind of top extension drop level furred ceiling, including top surface, the top surface are located at building interior, also wrap It includes:Two suspending assemblies, each suspending assembly include two suspender members, and each suspender member includes sunpender, connects Fishplate bar and hanging plate;The first end of the sunpender is connected on the connecting plate, and the second end of the sunpender extends to described Top surface;The connecting plate is slippingly arranged in perpendicular to the sunpender and along the direction for being parallel to the sunpender in the hanging plate On;Two support keels extended in the same direction, the both ends of every support keel are overlapped on respectively on the suspending assembly Two hanging plates on;Ceiling joist is equipped with central location, the both ends point of the ceiling joist on the ceiling joist It is not overlapped on two support keels.
Optionally, each suspender member further includes the mounting plate that slip is arranged on the connecting plate, the installation Plate is oppositely arranged with the hanging plate, and the hanger erection is on the mounting plate.
Optionally, the mounting plate and the hanging plate are each perpendicular to the connecting plate.
Optionally, each suspender member further includes the first sliding plate and the second sliding plate, first sliding plate and institute It states mounting plate vertically to connect, second sliding plate is vertical with the hanging plate to be connect;The mounting plate is sliding by described first It moves plate sliding to be connected on the connecting plate, the hanging plate is connected to the connecting plate by second sliding plate sliding On.
Optionally, the first connecting hole and the second connecting hole are offered on the connecting plate, are opened up on first sliding plate There is the first slip hole, offers the second slip hole on second sliding plate;First connecting hole and first slip hole It is bolted after alignment;Second connecting hole is bolted after being aligned with second slip hole.
Optionally, the connecting plate includes reinforcing side, the extending direction reinforced side and be parallel to second connecting hole; Stiffening plate is connected on the reinforcement side.
Optionally, each suspender member further includes fastening stud, and location hole, the support are offered on the hanging plate Mounting hole is offered on keel, one end of the fastening stud is fixed on after being successively fed through the location hole and the mounting hole In the spine support.
Optionally, the central location includes top plate and stile, and the front of the top plate is connected with the ceiling joist, The back side of the top plate is connected with the stile.
Optionally, the stile includes sequentially connected first plate, vertical plate and the second plate, first plate Be parallel to second plate, first plate is connected to the top plate.
Top provided by the utility model hangs drop level furred ceiling, and suspending assembly is two, two hangings on each suspending assembly It include a hanging plate on part, extending direction of the hanging plate on each suspender member perpendicular to sunpender;Every support keel Both ends are overlapped on respectively on two hanging plates of a suspender member, and central location is mounted on ceiling joist, and the two of ceiling joist End is overlapped on respectively on two support keels, and suspender member has biggish intensity, can reduce suspender member when supporting central location Quantity, improve central location mounting after stability, improve construction quality, increase the cleaning of construction environment, improve and apply Work efficiency rate, shortens construction period.And by hanging plate in the enterprising line slip of connecting plate, the level of adjustable support keel is high Degree makes central location that can carry out position adjustment without disassembly, reduces labor intensity.
Detailed description of the invention
Preferred embodiment in the utility model will be described in detail by attached drawing below, it will help understand the utility model Objects and advantages, wherein:
Fig. 1 is the structural schematic diagram that the top that the utility model alternative embodiment provides hangs drop level furred ceiling.
Fig. 2 is the structural schematic diagram for the suspender member for being equipped with support keel that the utility model alternative embodiment provides.
Fig. 3 is the structural schematic diagram for the suspender member that the utility model alternative embodiment provides.
Fig. 4 is the structural schematic diagram for the stile that the utility model alternative embodiment provides.
Fig. 5 is the partial enlarged view of A in Fig. 4.
Fig. 6 is the structural representation of the first plate, vertical plate and the second plate that the utility model alternative embodiment provides Figure.
Fig. 7 is the partial structural diagram of Fig. 6.
Fig. 8 is the structural schematic diagram of the section B-B of Fig. 7.
Specific embodiment
It mentions in the present specification or up, down, left, right, before and after, front, the back side, top, the bottom that may mention etc. Positional terms are defined relative to each construction shown in the drawings, and word "inner" and "outside" refer respectively to direction or remote From the direction of geometric center of specific component, they are opposite concepts, and it is therefore possible to can different location, difference according to locating for it Use state and correspondingly changed.So also these or other positional terms should not be construed to restricted use Language.
Fig. 1 is the structural schematic diagram that the top that the utility model alternative embodiment provides hangs drop level furred ceiling.Fig. 2 is that this is practical new The structural schematic diagram for the suspender member for being equipped with support keel that type alternative embodiment provides.Fig. 3 is the optional implementation of the utility model The structural schematic diagram for the suspender member that example provides.As shown in Figure 1 to Figure 3, the utility model embodiment provides a kind of top extension drop level Furred ceiling, including the suspending assembly of top surface 1, two, two support keels 3 and ceiling joist 4 extended in the same direction.
Referring to Fig. 1 to Fig. 3, the top surface 1 is located at building interior, and each suspending assembly includes two and hangs Pendant 2, each suspender member 2 include sunpender 24, connecting plate 21 and hanging plate 23;The first end of the sunpender 24 connects It connects on the connecting plate 21, the second end of the sunpender 24 extends to the top surface 1;The hanging plate 23 is hung perpendicular to described The direction that bar 24 and edge are parallel to the sunpender 24 is slippingly arranged on the connecting plate 21;Every support keel 3 Two hanging plates 23 being overlapped on the suspending assembly respectively of both ends on;It is equipped on the ceiling joist 4 Central location, the both ends of the ceiling joist 4 are overlapped on respectively on described two support keels 3.
Top provided by the embodiment of the utility model hangs drop level furred ceiling, and suspending assembly is two, and two on each suspending assembly It include a hanging plate 23 on a suspender member 2, extending direction of the hanging plate 23 on each suspender member 2 perpendicular to sunpender 24; The both ends of every support keel 3 are overlapped on respectively on two hanging plates 23 of a suspender member 2, and central location is mounted on furred ceiling dragon On bone 4, the both ends of ceiling joist 4 are overlapped on respectively on two support keels 3, and suspender member 2 has biggish intensity, support center The quantity of suspender member 2 can be reduced when unit, the stability after improving central location mounting improves construction quality, increases construction The cleaning of environment, improves construction efficiency, shortens construction period.And it is slided on connecting plate 21 by hanging plate 23 It moves, the level height of adjustable support keel 3, makes central location that can carry out position adjustment without disassembly, reduce labour Intensity.
Further, the suspender member 2 further includes the mounting plate 22 that slip is arranged on the connecting plate 21, the peace Loading board 22 is oppositely arranged with the hanging plate 23, and the sunpender 24 is mounted on the mounting plate 22.Mounting plate 22, which increases, to be hung The bending resistance of pendant 2 and tensile characteristics, it is easier to control installation quality, it is possible to reduce to the broken of the original concrete where top surface 1 It is bad.After support keel 3 is overlapped on hanging plate 23, hanging plate 23 and mounting plate 22 is driven to slide on connecting plate 21, adjusted The distance between hanging plate 23 and mounting plate 22, i.e., the level height of fine-tuning support keel 3, reduce central location installation and The difficulty of debugging, shortens construction period, is conducive to standardize rapid construction.
Optionally, mounting plate 22 and hanging plate 23 are each perpendicular to connecting plate 21, it is ensured that mounting plate 22 and hanging plate 23 Levelness.After central location is articulated on top surface 1 by suspender member 2, support keel 3 and ceiling joist 4 are each parallel to top Face 1, sunpender 24 can further increase the stability of central location mounting perpendicular to top surface 1.
Optionally, the suspender member 2 further includes the first sliding plate 25 and the second sliding plate 26, first sliding plate 25 with The vertically connection of mounting plate 22, second sliding plate 26 is vertical with the hanging plate 23 to be connect;The mounting plate 22 passes through First sliding plate 25 is connected on the connecting plate 21, and the hanging plate 23 is connected to institute by second sliding plate 26 It states on connecting plate 21.First sliding plate 25 can increase the contact area between mounting plate 22 and connecting plate 21, improve installation The stability connected between plate 22 and connecting plate 21;Second sliding plate 26 can increase connecing between hanging plate 23 and connecting plate 21 Contacting surface product, improves the stability connected between hanging plate 23 and connecting plate 21.
Preferably, the first connecting hole 211 and the second connecting hole 212 are offered on the connecting plate 21, first sliding The first slip hole is offered on plate 25, offers the second slip hole on second sliding plate 26;First connecting hole 211 with It is bolted after the first slip hole alignment;Second connecting hole 212 passes through after being aligned with second slip hole It is bolted.It is bolted with advantage easy to disassemble and install, is assembled convenient for transporting after factory forms to construction site Molding, shortens construction period.
Further, second connecting hole 212 is strip-shaped hole.When the position of support keel 3 needs to adjust, by second Connection bolt between connecting hole 212 and the second slip hole unscrews;Make hanging plate 23 along the extending direction of the second connecting hole 212 Sliding fastens the connection bolt between the second connecting hole 212 and the second slip hole when hanging plate 23 moves to scheduled position ?.
Optionally, the mounting plate 22 is parallel to the hanging plate 23.So that the support keel 3 being overlapped on hanging plate 23 With good stationarity, and then guarantee the smoothness of central location.As an optional implementation process, second connection Hole 212 extends perpendicularly to the hanging plate 23, it is possible to reduce mounting plate 22 and 23 position of hanging plate required cunning when adjusting The distance of shifting reduces the difficulty of adjusting.
Further, the connecting plate 21 includes reinforcing side, and the reinforcement side is parallel to prolonging for second connecting hole 212 Stretch direction;Stiffening plate 214 is connected on the reinforcement side.Stiffening plate 214 increases the bending resistance of connecting plate 21 and the characteristic of tension, Improve the stability of connection.On the basis of the above embodiments, the stiffening plate 214 is located at institute with the hanging plate 23 State the two sides of connecting plate 21.Stiffening plate 214 can balance the stress of connecting plate 21, after support keel 3 is overlapped on hanging plate 23, Be conducive to keep the horizontality of support keel 3.
Preferably, the suspender member 2 further includes fastening stud 27, location hole 231 is offered on the hanging plate 23, it is described Mounting hole is offered on support keel 3, one end of the fastening stud 27 is successively fed through the location hole 231 and the installation It is fixed on behind hole in the support keel 3.Support keel 3 can be not only mounted on hanging plate 23 by above-mentioned set-up mode, also Position of the adjustable support keel 3 on hanging plate 23.
Optionally, the adjustment hole 221 of bar shaped is offered on the mounting plate 22, the second end of the sunpender 24 is fed through institute Extend after stating adjustment hole 221 towards the direction far from the hanging plate 23.The first end of the sunpender 24 can be along adjustment hole 221 Extending direction slid, adjust position of the support keel 3 on hanging plate 23 after the level height of support keel 3 determines It sets, it is convenient effective.
Fig. 5 be Fig. 4 in A partial enlarged view, Fig. 6 be the utility model alternative embodiment provide the first plate, vertical plate, And second plate structural schematic diagram, Fig. 7 be Fig. 6 partial structural diagram, Fig. 8 be Fig. 7 section B-B structural representation Figure.
As shown in Figures 1 to 8, preferably, the central location includes top plate 51 and stile 52, the front of the top plate 51 It is connected with the ceiling joist 4, the back side of the top plate 51 is connected with the stile 52.Stile 52 passes through ceiling joist 47 It is mounted on the wall, it is possible to reduce the quantity of suspender member 2 simplifies installation steps.
Further, the stile 52 includes sequentially connected first plate 53, vertical plate 55 and the second plate 54, institute It states the first plate 53 and is parallel to second plate 54, first plate 53 is connected with the top plate 51.First plate 53 and second plate 54 can increase by the stability of 55 structure of vertical plate.
Four 55 head and the tail of vertical plate are sequentially connected with the rectangular-shaped stile 52 for limiting enclosing type, and four described first flat 53 head and the tail of plate are sequentially connected with the upper overturning for limiting the stile 52, and four 54 head and the tail of the second plate are sequentially connected with and limit The lower flange of the stile 52.Upper overturning herein refers to that is formed after the splicing of four the first plates 53 routs up outside stile 52 Structure, the structure be located at stile 52 mount after top;Lower flange herein refers to shape after four the second plate 54 splicings At the structure routed up outside stile 52, the structure be located at stile 52 mount after bottom.Adjacent 52 board group part of stile splicing When, after adjacent first plate 53 alignment splicing, adjacent the second plate 54 alignment splicing, the upper edge of adjacent vertical plate 55 and Lower edge is similarly in the state of alignment splicing, improves the precision of splicing, realizes the seamless spliced of stile 52.Compared to existing Technology reduces the difficulty docked between adjacent vertical plate 55, simplifies the splicing of stile 52 without being adjusted alignment to vertical plate 55 Operating procedure, accelerate construction efficiency.
Optionally, first plate 53 and second plate 54 are trapezoidal plate, the upper bottom of first plate 53 Side is connected with the vertical plate 55, and the upper bottom edge of second plate 54 is connected with the vertical plate 55, can make the first plate 53 On along its length on the distance between the both sides that are oppositely arranged and the second plate 54 along its length on be oppositely arranged The distance between both sides are gradually increased along the direction far from vertical plate 55, and the first plate 53 and the second plate 54 protrude from vertical plate 55.So that stile 52 splice when, two neighboring first plate 53 can preferably splice, two neighboring second plate 54 can be more Splice well.
Preferably, first plate 53 and second plate 54 are arranged in parallel and are each perpendicular to the vertical plate 55.It is vertical Between plate 55 and the first plate 53, between vertical plate 55 and the second plate 54 be right angle, it is flat can to increase by the first plate 53, second Supporting role of the plate 54 to vertical plate 55 improves the bending resistance of vertical plate 55.
Optionally, two interior angles of the bottom of first plate 53 are 45° angle;The bottom of second plate 54 Two interior angles on side are 45° angle, when stile 52 can be made to splice, two neighboring first plate, 53 seamless interfacing;Two first flat 53 seamless interfacing of plate;Two same seamless interfacings of vertical plate 55 make adjacent 52 board group part of stile in the firm docking of edge joint position, splicing It is more accurate, it ensure that the stability of furred ceiling.
Preferably, the stile 52 further includes interfacing part 8, the interfacing part 8 includes 81 He of the first buttcover plate being connected Second buttcover plate 82, first buttcover plate 81 are bonded respectively with second buttcover plate 82 and are fixed on what any two were mutually spliced On the vertical plate 55.When two adjacent vertical plates 55 are connected to each other, the first buttcover plate 81 and the second buttcover plate 82 are separately fixed at pair On two vertical plates 55 after connecing, the stability after vertical plate 55 docks is improved, guarantees that ceiling structure is firm.
Optionally, stile 52 further includes the first fixed plate 91 and the second fixed plate 92 being connected, first fixed plate 91 are fixed on the vertical plate 55, and second fixed plate 92 is fixed on second plate 54.First fixed plate 91 and Two fixed plates 92 increase the stability connected between vertical plate 55 and the second plate 54.
As an optional implementation process, the stile 52 further includes reinforcing keel 6, and the reinforcement keel 6 are mounted on It is extended in the same direction on the vertical plate 55 and with the vertical plate 55.The stability of vertical plate 55 can further be increased by reinforcing keel 6, be prevented Only vertical plate 55 bends.
Further, the reinforcement keel 6 include sequentially connected first keel plate 61, the second keel plate 62, Yi Ji Three keel plates 63, first keel plate 61 are oppositely arranged with the third keel plate 63, and second keel plate 62 is fitted in On the vertical plate 55.The first keel plate 61 and third keel plate 63 can be made to be located remotely from the position of vertical plate 55, convenient for subsequent fixed Support square steel 7.
Further, the stile 52 further includes support square steel 7, and the both ends of the support square steel 7 are connected to phase respectively To on two metopes of setting;The part being located between support 7 both ends of square steel on the support square steel 7 is fed through described the The supporting and space that one keel plate 61, second keel plate 62 and the third keel plate 63 limit.By supporting square steel 7 Supporting role, realize that stile 52 is not necessarily to through the hanging of sunpender 24 on metope, realize no sunpender 24 and mount, simplify stile The mounting process of 52 board group parts.
It is offered on the surface of the vertical plate 55 as an optional implementation process, on second plate 54 recessed Slot 56 is equipped with caulking strip 57 in the groove 56.The caulking strip 57 is the strip structure of T-type, the setting of caulking strip 57 The second plate 54 can be made to connect another flat top plate 51 with fixed gap, form drop level furred ceiling, improve stability.
As shown in Figures 1 to 8, the utility model is hung the above top by the installation method that a kind of top hangs drop level furred ceiling Drop level installation of ceiling on top surface 1, including:By two groups of hangings of suspender member 2 on the top surface 1, make each suspending assembly It include two suspender members 2, each suspender member 2 includes sunpender 24, connecting plate 21 and hanging plate 23;It is described The first end of sunpender 24 is connected on the connecting plate 21, and the second end of the sunpender 24 extends to the top surface 1;The mounting Plate 23 is slippingly arranged on the connecting plate 21 perpendicular to the sunpender 24 and along the direction perpendicular to the sunpender 24;Even Two support keels 3 are connect, two institutes for being overlapped on the both ends of every support keel 3 respectively on the suspending assembly It states on hanging plate 23, two support keels 3 extend in the same direction;Central location is hung, the central location is mounted on furred ceiling On keel 4, it is overlapped on the both ends of the ceiling joist 4 respectively on described two support keels 3.
Top provided by the embodiment of the utility model hangs drop level furred ceiling, and suspending assembly is two, and two on each suspending assembly It include a hanging plate 23 on a suspender member 2, extending direction of the hanging plate 23 on each suspender member 2 perpendicular to sunpender 24; The both ends of every support keel 3 are overlapped on respectively on two hanging plates 23 of a suspender member 2, and central location is mounted on furred ceiling dragon On bone 4, the both ends of ceiling joist 4 are overlapped on respectively on two support keels 3, and suspender member 2 has biggish intensity, support center The quantity of suspender member 2 can be reduced when unit, the stability after improving central location mounting improves construction quality, increases construction ring The cleaning in border, improves construction efficiency, shortens construction period.And by hanging plate 23 in the enterprising line slip of connecting plate 21, The level height of adjustable support keel 3 makes central location that can carry out position adjustment without disassembly, and it is strong to reduce labour Degree.
Finally it should be noted that:Above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that: It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc. With replacement;And these are modified or replaceed, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (9)

1. a kind of top hangs drop level furred ceiling, including top surface, the top surface are located at building interior, which is characterized in that further include:
Two suspending assemblies, each suspending assembly include two suspender members, and each suspender member includes sunpender, connects Fishplate bar and hanging plate;The first end of the sunpender is connected on the connecting plate, and the second end of the sunpender extends to described Top surface;The connecting plate is slippingly arranged in perpendicular to the sunpender and along the direction for being parallel to the sunpender in the hanging plate On;
Two support keels extended in the same direction, the both ends of every support keel are overlapped on respectively on the suspending assembly Two hanging plates on;
Ceiling joist is equipped with central location on the ceiling joist, and the both ends of the ceiling joist are overlapped on described two respectively On support keel described in item.
2. top according to claim 1 hangs drop level furred ceiling, which is characterized in that each suspender member further includes that slip is set The mounting plate on the connecting plate is set, the mounting plate is oppositely arranged with the hanging plate, and the hanger erection is in the peace In loading board.
3. top according to claim 2 hangs drop level furred ceiling, which is characterized in that the mounting plate and the hanging plate are vertical In the connecting plate.
4. top according to claim 3 hangs drop level furred ceiling, which is characterized in that each suspender member further includes the first sliding Plate and the second sliding plate, first sliding plate is vertical with the mounting plate to be connect, second sliding plate and the hanging plate Vertical connection;The mounting plate is connected on the connecting plate by first sliding plate sliding, and the hanging plate passes through institute The sliding of the second sliding plate is stated to be connected on the connecting plate.
5. top according to claim 4 hangs drop level furred ceiling, which is characterized in that offer the first connecting hole on the connecting plate With the second connecting hole, the first slip hole is offered on first sliding plate, offers the second sliding on second sliding plate Hole;First connecting hole is bolted after being aligned with first slip hole;Second connecting hole and described second It is bolted after slip hole alignment.
6. top according to claim 5 hangs drop level furred ceiling, which is characterized in that the connecting plate includes reinforcing side, described to add Strong side is parallel to the extending direction of second connecting hole;Stiffening plate is connected on the reinforcement side.
7. top according to claim 6 hangs drop level furred ceiling, which is characterized in that each suspender member further includes fastening spiral shell Column offers location hole on the hanging plate, mounting hole is offered on the support keel, one end of the fastening stud is successively It is fixed in the spine support after being fed through the location hole and the mounting hole.
8. top described in -7 any one hangs drop level furred ceiling according to claim 1, which is characterized in that the central location includes top The front of plate and stile, the top plate is connected with the ceiling joist, and the back side of the top plate is connected with the stile.
9. top according to claim 8 hangs drop level furred ceiling, which is characterized in that the stile includes sequentially connected first flat Plate, vertical plate and the second plate, first plate and are parallel to second plate, first plate and the top plate It is connected.
CN201721906025.3U 2017-12-30 2017-12-30 Top hangs drop level furred ceiling Active CN208122075U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721906025.3U CN208122075U (en) 2017-12-30 2017-12-30 Top hangs drop level furred ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721906025.3U CN208122075U (en) 2017-12-30 2017-12-30 Top hangs drop level furred ceiling

Publications (1)

Publication Number Publication Date
CN208122075U true CN208122075U (en) 2018-11-20

Family

ID=64209293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721906025.3U Active CN208122075U (en) 2017-12-30 2017-12-30 Top hangs drop level furred ceiling

Country Status (1)

Country Link
CN (1) CN208122075U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397211A (en) * 2019-07-17 2019-11-01 金点石(北京)建筑设计咨询服务有限责任公司 Furred ceiling component, grid system and building body
CN111576717A (en) * 2020-05-27 2020-08-25 广东中都建筑集团有限公司 Assembly type ceiling mounting component and mounting method
CN111576717B (en) * 2020-05-27 2021-06-01 广东中都建筑集团有限公司 Assembly type ceiling mounting component and mounting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397211A (en) * 2019-07-17 2019-11-01 金点石(北京)建筑设计咨询服务有限责任公司 Furred ceiling component, grid system and building body
CN111576717A (en) * 2020-05-27 2020-08-25 广东中都建筑集团有限公司 Assembly type ceiling mounting component and mounting method
CN111576717B (en) * 2020-05-27 2021-06-01 广东中都建筑集团有限公司 Assembly type ceiling mounting component and mounting method

Similar Documents

Publication Publication Date Title
WO2012158909A1 (en) Mounting hardware and mounting system for vertical panels
CN104612241A (en) Civil building prefabricated member set and assembly method thereof
CN102947519A (en) Variable fastener for fixing curtain wall
JP2009275476A (en) Vertical beam system of movement work vehicle for cantilever construction
CA2512054A1 (en) Concealed accessible suspended ceiling system
US6427410B1 (en) Device for fixing facing slabs
KR101462202B1 (en) Form traveller for through bridge
KR20100123232A (en) Mold panel easy construction and dismantle
US10612246B2 (en) Anchor-free system for fastening of cladding panels and a method of fastening thereof
US2793720A (en) Scaffolding and other structural elements
CN109594784A (en) A kind of assembled wall auxiliary installation device and application method
CN109989330B (en) Continuous track and erection method thereof
US20180100305A1 (en) Strut with non-structural infill
CN104018675B (en) A kind of construction method of shear wall concrete blinding
CN103953119A (en) Three-dimensional adjustable mounting connecting structure of assembled wallboard and laminated beam
CN105040591B (en) A kind of positioner of Wavelike steel webplate and its localization method
CN104562913B (en) The only tower oblique pull of a kind of ribbon shape-just structure composite bridge and construction technology thereof
RU2712295C1 (en) Bed collapsible base
CN103225427A (en) Plug and fast mounting clean operation room assisted room and mounting technology thereof
CN104315256A (en) Attached cantilever load-bearing support for vertical large-aperture perpendicular pipelines
CN104929297B (en) A kind of decoration panel installation of ceiling technique
CN101560802B (en) Elastic forming method for panel of curtain wall and curved-surface building curtain wall
CN107558723B (en) Method for manufacturing and installing hanging bracket of hanging basket for inclined roof
WO2020143222A1 (en) Fabricated suspended ceiling structure and installation method therefor
CN104061369A (en) Assembling type movable cable holder for laying medium/high-voltage cable line in long-distance channel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant