Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910817172.0A
Other languages
Chinese (zh)
Inventor
孙立仓
邢贵坡
张建保
王义民
张宝峰
李世存
陈贺
董春贵
孙胄胄
董善良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KEILUAN BUILDING (GROUP) CO Ltd TANGSHAN
Original Assignee
KEILUAN BUILDING (GROUP) CO Ltd TANGSHAN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KEILUAN BUILDING (GROUP) CO Ltd TANGSHAN filed Critical KEILUAN BUILDING (GROUP) CO Ltd TANGSHAN
Priority to CN201910817172.0A priority Critical patent/CN110436367A/en
Publication of CN110436367A publication Critical patent/CN110436367A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/12Chain or like hand-operated tackles with or without power transmission gearing between operating member and lifting rope, chain or cable

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The present invention provides a kind of tunnel component installation pole, including pole pillar, pole post top portion set platform sling, and bottom sets rotating base, and transport vehicle is additionally provided with firm banking, and an axis hole is designed on rotating base and firm banking, installs rotating pin in two pedestal axis holes;A pin hole is set on firm banking, several pin holes are set on rotating base, easy-to-mount fixed pin shaft is installed in two pedestal pin holes, additionally provides the construction method using above-mentioned tunnel component installation pole, and pole pillar is poured on transport vehicle naturally;After vehicle loading component to be transported arrives at component loading position, holding pole handrail, which removes pole pillar, to be gone to vertically, and the pin hole of rotating base, firm banking is made to coincide, and insertion fixed pin shaft fixes pole pillar;It is supported using the pole of setting by lifting and fortune component is loaded and unloaded;It extracts fixed pin shaft to fall pole, returns to component access adit loading component, this scheme component This vehicle stops frequently handling, implementation cost is low, and charge and discharge operations are limited without position.

Description

Tunnel component installs pole and its construction method
Technical field
The present invention relates to a kind of tunnel component mounting techniques.
Background technique
In recent years, due to the fast development of mine construction, the scale of mine construction is also constantly expanding, matched lane Road pick, which is built, increased significantly, and then transportation loading and unloading workload is also being multiplied in tunnel, be hung using safer efficient transport Dress scheme, it appears especially prominent and important.
For transporting and hoisting operation in tunnel, there are numerous different operational methods.Lifting operation side in existing tunnel There are mainly two types of methods: first is that set up interim mast-up in tunnel, using transport vehicle by after in component conveying to tunnel, in conjunction with hanging It shelves and carries out component handling;Second is that play anchor cable at the top of tunnel, after component is transported in tunnel by transport vehicle, using hoist cable lift into Row operation.
Existing lifting operation method is primarily present following problem: interim mast-up group tears that process is tedious, time-consuming open.Especially Mast-up, adheres to the propulsion constructed in tunnel, and mast-up will often re-work production.And mast-up dimensional problem, often As soon as also needing to be transported exclusively with mine car, this greatly limits transporting and hoisting speed.Using playing anchor cable at the top of tunnel The method for doing suspension centre need to have special operation, and troop carries out construction operation in advance, because the slight variations of setting are likely to make Discarded at the anchor cable installation point for completion of having constructed, suspension centre recycling rate of waterused is at a fairly low, can not adapt to motor-driven flexible transporting and hoisting Operation.Process is tedious for both the above operational method, construction intensity is big, manpower and material resources investment is big, construction cost is high.In use process In can even occur because of mast-up or anchor cable position is improper also needs to set up or separately build the rework problems such as anchor cable again, give tunnel Construction and maintenance bring big inconvenience.
Summary of the invention
The object of the invention is to the deficiency in order to solve equipment hoisting technology in existing tunnel, component conveying and lifting peace Installing, which is applied, sets up the problems such as speed is slow, and structure is not flexible.
In order to solve the above technical problems, the invention adopts the following technical scheme:
A kind of tunnel component installation pole, including pole pillar, the affixed platform sling of pole post top portion;It is set among pole pillar There is pole handrail;The affixed rotating base of pole posts bottom further includes the firm banking being fixed on component transportation vehicle, rotates bottom It is designed with an axis hole on seat and firm banking, rotating pin is installed in two pedestal axis holes;A pin hole is set on firm banking, is turned It moves and sets several pin holes on pedestal, at the pin hole on rotating base on the same circumference, installed in two pedestal pin holes easy-to-mount Fixed pin shaft.
The present invention is fixed on component transportation vehicle, is moved in tunnel after transport vehicle loading component with transport vehicle, this scheme It does not need to set up upending frame in tunnel or do suspension centre to carry out handling operation, component installs Shi Yiben pole and replaces mast-up knot Structure achievees the purpose that This vehicle stops frequently during transportation is loaded and unloaded, and this programme implementation cost is low, and charge and discharge operations are limited without position.
Using the construction method of above-mentioned tunnel component installation pole, construction procedure is as follows:
Step 1: the outer dimension of each component is successively designed according to the weight and shape of required hoisting transportation component;
Step 2: platform sling, pole pillar, pole handrail, rotating base are successively welded into one;Firm banking is pacified Loaded on transport vehicle;
Step 3: rotating base is connect with firm banking by rotary pin shaft, pole pillar is made to be poured over transport naturally Che Shang;
Step 4: transport vehicle loading component after vehicle to be transported arrives at component loading position, holds pole handrail for pole branch Column, which is removed, to be gone to vertically, and the pin hole of rotating base, firm banking is made to coincide, and insertion fixed pin shaft fixes pole pillar;
Step 5: it is supported using the pole of setting by lifting and fortune component is loaded and unloaded;
Step 6: extracting fixed pin shaft after the completion of handling, lifting pole is put upside down again on transport vehicle;
Step 7: continue for transport vehicle to be transported to next handling point repetition step 4~six.
By adopting the above technical scheme compared with prior art, the present invention using with vehicle lifting pole carry out lifting operation solution Traditional Transportation lifting operation of having determined is not flexible, mast-up is set up and removes that speed is slow, anchor cable suspension centre recycling rate of waterused is low and operation Process is tedious, construction intensity is big, manpower and material resources put into the problem of big, at high cost etc., overcomes because of erection or hoisting point position Mistake and cause the drawbacks of doing over again.Keep transporting and hoisting operation more quick, conveniently.Effectively reduce operation intensity, saved at This.
In above-mentioned steps five, to the charge and discharge operations of component specifically: chain block and hoisting rig are installed on pole, First left member side is lifted by crane and is placed on the trustship beam of downside, recurrence is hung right member side and is placed on the trustship beam of upside, most Component is carried out on trustship beam afterwards to fix.
Detailed description of the invention
Fig. 1 is schematic diagram after pole completes in inclined shaft pipeline installing engineering;
Fig. 2 is pole top platform sling and sunpender connection schematic diagram in inclined shaft pipeline installing engineering;
Fig. 3 is rotating base and firm banking structure chart;
Fig. 4 is pole well head entrucking schematic diagram in inclined shaft pipeline installing engineering;
Fig. 5 is that pole transports in inclined shaft pipeline installing engineering to schematic view of the mounting position;
Fig. 6 removes for pole turns to have holded up pole, pin fixed pin schematic diagram;
Fig. 7 is that pole pipeline in inclined shaft pipeline installing engineering lifts by crane scheme of installation;
In figure: 1-platform sling;2-pole pillars;3-pole handrails;4-rotating bases;5-axis holes;6-pin holes;7— Firm banking;8-transport vehicles;9-components;10-trustship beams;11-hoisting rigs.
Specific embodiment
1 to attached drawing 7, the present invention is further elaborated with reference to the accompanying drawing, but these embodiments do not constitute the present invention and appoint What is limited.
A kind of tunnel component installs pole, referring to attached drawing 1 to attached drawing 6, including platform sling 1, pole pillar 2, pole handrail 3, Rotating base 4, rotating pin 5, fixed pin shaft 6, firm banking 7, transport vehicle 8, there are also the components 9 of pre-installation.
Transport vehicle 8 is transport vehicle used in existing construction, it includes traveling wheel and car bottom plate, transport vehicle two sides set side board and Handle.
Pole pillar 2 of the invention is the main structure for supporting installation component 9, and the length of pole pillar 2 is according to same period need 9 place installation position height of component to be mounted design, 2 diameter of pole pillar is according to the load-carrying of one group of component 9 contained on transport vehicle 8 Setting.
Platform sling 1 is fixedly mounted at the top of pole pillar 2, and the stress intensity of itself intensity and installation point should ensure that and can hold The construction weight lifted by single.
Firm banking 7 of the invention is mounted on the car bottom plate of transport vehicle 8, and specific installation site can be on bottom plate four points One of on line.
Rotating base 4 can be two blocks of square steel plates with 7 same shape of firm banking.Two are made in the plate face of firm banking Hole, one is axis hole 5 for installing rotating pin, the other is the pin hole 6 for installing fixed pin shaft;And on rotating base Equipped with an axis hole 5 and five pin holes 6, each pin hole is on same circumference.Axis hole, pin hole and firm banking on rotating base On axis hole, pin hole it is corresponding.Easy-to-mount fixed pin shaft is installed in pin hole.Rotating pin of the present invention refers to rotating base 4 and the shaft of firm banking 7 are a back contacts.Fixed pin shaft of the present invention refer to when the pin hole 6 of rotating base 4 go to When firm banking pin hole is overlapped, for being fixed temporarily the fixed pin of pole, it is a contact in short-term.Each installation component will A fixed pin shaft is dismounted, therefore fixed pin shaft should be easy for the structure of dismounting.
A kind of tunnel component installation pole construction method is as follows in conjunction with the specific construction procedure of attached drawing:
Step 1: the outer dimension of each component is successively designed according to the weight and shape of required hoisting transportation component.
Step 2: as shown in Figure 1-3, be successively welded into platform sling 1, pole pillar 2, pole handrail 3, rotating base 4 One;Firm banking 7 is installed on transport vehicle 8.Platform sling of the invention is vertically fixed on pole column top center, on platform sling If hole for hoist.
Step 3: it is shown in Figure 4, rotating base 4 is connect with firm banking 7 by rotating pin, pole pillar 2 is made Naturally it is poured on transport vehicle 8.
Step 4: the embodiment of the present invention is tubular element installation, and component 9 is loaded on transport vehicle 8 in tunnel well head, (such as Fig. 3).Component 9 is transported to loading position in tunnel by transport vehicle 8, and there are two trustship beam 10 on loading position, transport vehicle is reached Stop below two trustship beam 10.It holds pole handrail 3 referring next to Fig. 4 and removes pole pillar 2 and turn, until pole is vertical and rotates The a certain pin hole of pedestal 4 and the pin hole of firm banking 7 coincide, and insertion fixed pin shaft fixes pole pillar.
Step 5: being support with vertical pole as illustrated in figs. 5-7, and chain block and lifting rope are installed on platform sling 1 Tool 11, loads and unloads transported component.Specifically suspension centre is arranged in chain block on component 9, and 9 left end of component is first put into downside Trustship beam 10 on, be then lifted out member right end and be put on upside trustship beam 10.(left end, right end are illustrated orientation here, are not Indication or suggestion component 9 must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to this hair Bright limitation.)
Step 6: extracting fixed pin shaft after the completion of handling, lifting pole is put upside down again on transport vehicle;
Step 7: continue for transport vehicle to be transported to next handling point repetition step 4~six.
Those skilled in the art do not depart from essence and spirit of the invention, can there are many deformation scheme realize the present invention, The foregoing is merely preferably feasible case study on implementation of the invention, not thereby limiting the scope of the invention, all utilizations The variation of equivalent structure made by description of the invention and accompanying drawing content, is intended to be included within the scope of the present invention.

Claims (3)

1. a kind of tunnel component installs pole, it is characterized in that: including pole pillar, the affixed platform sling of pole post top portion;Pole branch Pole handrail is equipped among column;The affixed rotating base of pole posts bottom further includes the fixation bottom being fixed on component transportation vehicle , it is designed with an axis hole on rotating base and firm banking, rotating pin is installed in two pedestal axis holes;One is set on firm banking A pin hole, sets several pin holes on rotating base, at the pin hole on rotating base on the same circumference, installs just in two pedestal pin holes In the fixed pin shaft of dismounting.
2. a kind of construction method using the installation pole of tunnel component described in claim 1, construction procedure are as follows:
Step 1: the outer dimension of each component is successively designed according to the weight and shape of required hoisting transportation component;
Step 2: platform sling, pole pillar, pole handrail, rotating base are successively welded into one;Firm banking is installed on On transport vehicle;
Step 3: rotating base is connect with firm banking by rotary pin shaft, is poured over pole pillar on transport vehicle naturally;
Step 4: transport vehicle loading component after vehicle to be transported arrives at component loading position, holds pole handrail and removes pole pillar It goes to vertically, the pin hole of rotating base, firm banking is made to coincide, insertion fixed pin shaft fixes pole pillar;
Step 5: it is supported using the pole of setting by lifting and fortune component is loaded and unloaded;
Step 6: extracting fixed pin shaft after the completion of handling, lifting pole is put upside down again on transport vehicle;
Step 7: continue for transport vehicle to be transported to next handling point repetition step 4~six.
3. the construction method of tunnel component installation pole as claimed in claim 2, it is characterized in that: in step 5, to the dress of component Unload operation specifically: chain block and hoisting rig are installed on pole, first left member side is lifted by crane and is placed on downside support On Guan Liang, recurrence is hung right member side and is placed on the trustship beam of upside, finally carries out component on trustship beam and fixes.
CN201910817172.0A 2019-08-30 2019-08-30 Tunnel component installs pole and its construction method Pending CN110436367A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910817172.0A CN110436367A (en) 2019-08-30 2019-08-30 Tunnel component installs pole and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910817172.0A CN110436367A (en) 2019-08-30 2019-08-30 Tunnel component installs pole and its construction method

Publications (1)

Publication Number Publication Date
CN110436367A true CN110436367A (en) 2019-11-12

Family

ID=68438507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910817172.0A Pending CN110436367A (en) 2019-08-30 2019-08-30 Tunnel component installs pole and its construction method

Country Status (1)

Country Link
CN (1) CN110436367A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113154974A (en) * 2021-05-20 2021-07-23 唐山开滦建设(集团)有限责任公司 Tunnel roof pressing smooth blasting method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003095580A (en) * 2001-09-25 2003-04-03 Hitachi Constr Mach Co Ltd Construction machine
CN201473229U (en) * 2009-08-28 2010-05-19 中国葛洲坝集团股份有限公司 Mobile lamp post assembling device
CN202346650U (en) * 2011-10-28 2012-07-25 湖北省输变电工程公司 Suspension arm for 400 KN crane
CN202400754U (en) * 2011-12-14 2012-08-29 南京梅山冶金发展有限公司 Mast crane
CN204057766U (en) * 2014-07-23 2014-12-31 辽宁省送变电工程公司 Mast hanging device
CN104609318A (en) * 2015-01-30 2015-05-13 中国化学工程第三建设有限公司 Herringbone mast hoisting system convenient to move
CN106429936A (en) * 2016-11-15 2017-02-22 长沙新气象自动化技术有限公司 Adjustable grain lifting transportation cart
CN210559074U (en) * 2019-08-30 2020-05-19 唐山开滦建设(集团)有限责任公司 Holding pole for mounting tunnel component

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003095580A (en) * 2001-09-25 2003-04-03 Hitachi Constr Mach Co Ltd Construction machine
CN201473229U (en) * 2009-08-28 2010-05-19 中国葛洲坝集团股份有限公司 Mobile lamp post assembling device
CN202346650U (en) * 2011-10-28 2012-07-25 湖北省输变电工程公司 Suspension arm for 400 KN crane
CN202400754U (en) * 2011-12-14 2012-08-29 南京梅山冶金发展有限公司 Mast crane
CN204057766U (en) * 2014-07-23 2014-12-31 辽宁省送变电工程公司 Mast hanging device
CN104609318A (en) * 2015-01-30 2015-05-13 中国化学工程第三建设有限公司 Herringbone mast hoisting system convenient to move
CN106429936A (en) * 2016-11-15 2017-02-22 长沙新气象自动化技术有限公司 Adjustable grain lifting transportation cart
CN210559074U (en) * 2019-08-30 2020-05-19 唐山开滦建设(集团)有限责任公司 Holding pole for mounting tunnel component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113154974A (en) * 2021-05-20 2021-07-23 唐山开滦建设(集团)有限责任公司 Tunnel roof pressing smooth blasting method

Similar Documents

Publication Publication Date Title
KR100468106B1 (en) Method and apparatus for short-term relining or construction of blast furnace
CN102127972B (en) Hoisting method
CN109097516A (en) The construction method of blast furnace overhaul engineering replacement last furnace shell
AU2016204008A1 (en) Hopper Handling Kit and Apparatus
CN110436367A (en) Tunnel component installs pole and its construction method
JP2001200700A (en) Segment conveying method and device for small-diameter shield
CN105971654A (en) Process for rapidly assembling shield-type hydraulic support underground
CN213976805U (en) Automatic assembly line for PCCP spiral welding and water pressure inspection
CN210559074U (en) Holding pole for mounting tunnel component
CN104418240B (en) The lifting of a kind of flue and group are to method
JP4984493B2 (en) Blast furnace demolition method and blast furnace construction method
CN113896089B (en) Construction method of oversized blast furnace
CN112431465A (en) Rapid construction method for large-diameter steel bin placed in limited space
CN112357821B (en) PCCP spiral welding and water pressure inspection automatic assembly line and application method thereof
JP2006232489A (en) Inclined passenger conveyor facility, its installation method and its conveying out method
CN208326713U (en) Opencut across stope transport steel construction belt conveyor bridge
CN107777589A (en) A kind of 1600T masts arm frame always spells technique
CN108100898B (en) Dismounting device and dismounting method for A-shaped frame of offshore platform crane
CN208814079U (en) A kind of electric pole conveyer
JPH08260571A (en) Rotary lift-up construction method for dome roof
CN110615359B (en) Continuous hoisting operation device and method for vertical section of S-shaped tunnel
CN111792002A (en) Assembling method for bow main section of bulk carrier
CN206129292U (en) Novel landing stage platform truck
CN219136153U (en) Heavy-duty steel member in-situ transfer support
JP3717911B2 (en) Steel tower dismantling method and work jig by helicopter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination