Prior art keywords
steel tower
helicopter
transported
dismantling
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2003373896A
Other languages
Japanese (ja)
Other versions
JP2005139608A (en
Inventor
勇次 清水
英樹 坂野
一雄 山形
茂人 清水
晴夫 若林
淳一 吉田
英明 開発
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FTECH CO., LTD.
Kansai Electric Power Co Inc
Original Assignee
FTECH CO., LTD.
Kansai Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FTECH CO., LTD., Kansai Electric Power Co Inc filed Critical FTECH CO., LTD.
Priority to JP2003373896A priority Critical patent/JP3717911B2/en
Publication of JP2005139608A publication Critical patent/JP2005139608A/en
Application granted granted Critical
Publication of JP3717911B2 publication Critical patent/JP3717911B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Description

本発明は、送電線が架設された鉄塔を解体するためのヘリコプタを利用した鉄塔解体方法及び作業用治具に関する。   The present invention relates to a steel tower dismantling method using a helicopter for dismantling a steel tower on which a transmission line is installed, and a work jig.

従来、送電線が架設された鉄塔の解体は、設置場所の周辺に作業スペースを確保し、さらに山間地においては近隣の道路までの仮設の作業用道路を設営して、大型のクレーン等により工事を行っている。鉄塔解体作業は、上から順に鉄塔の構成部材をクレーンにより吊り上げるようにして、ボルトとナットを外し、上から順に解体して行くものである。
特開平9−137633号公報 特開2001−37030号公報
Conventionally, the dismantling of steel towers with power transmission lines has secured work space around the installation site, and also constructed temporary work roads to nearby roads in mountainous areas and constructed with large cranes, etc. It is carried out. The steel tower dismantling operation is such that the components of the steel tower are lifted by a crane in order from the top, the bolts and nuts are removed, and the steel tower is disassembled in order from the top.
JP-A-9-137633 JP 2001-37030 A

従来の鉄塔解体方法においては、鉄塔の周辺及び近くの道路までの作業スペースを広く必要とし、作業のための準備期間やクレーン等の大型の重機を長期間必要とし、さらに用地の確保にも多くのコストがかかり、全体として膨大な費用を要する上、解体作業自体も工数のかかるものであった。   The conventional steel tower dismantling method requires a large work space around the steel tower and the nearby road, requires a large period of preparation for work and large heavy machinery such as cranes, and also secures land. In addition, the cost of the entire process is enormous, and the dismantling work itself takes time.

この発明は上記従来の問題点に鑑みて成されたものであり、短期間に効率よく、しかも安全に鉄塔の解体作業を行うことができるようにしたヘリコプタによる鉄塔解体方法及び作業用治具を提供することを目的とする。   The present invention has been made in view of the above-described conventional problems, and includes a tower dismantling method and work jig using a helicopter that can efficiently and safely disassemble a tower in a short period of time. The purpose is to provide.

この発明は、既設の鉄塔の鉄塔構成部材の上部で上方に向かって取り外し自在に保持されていると共に、ヘリコプタに設けられたフックにより上空から上記ヘリコプタにより係合可能に設けられ、上記ヘリコプタにより上記鉄塔構成部材を吊り下げるための環状部材を取り付け、既設の鉄塔構成部材のうち上記ヘリコプタにより搬送する部分と残る部分との連結を解除すると共に、この部分の仮設の連結を、連結治具とこの連結治具を上記鉄塔構成部材に保持させる保持部材とで行い、この保持部材を地上側で解除可能とし、上記ヘリコプタを上記環状部材の上方に位置させ上記フックを上記環状部材に係合させて吊り下げが可能となった状態の後、地上側で上記保持部材を解除し、上記鉄塔構成部材の連結治具をその鉄塔構成部材から除去し、上記環状部材に連結された上記鉄塔構成部材を上記ヘリコプタにより吊り下げて搬送するヘリコプタによる鉄塔解体方法である。 The present invention is removably held upward at the upper part of the steel tower component of the existing steel tower , and is provided so as to be engageable by the helicopter from above by a hook provided on the helicopter. An annular member for suspending the steel tower constituent member is attached, and the connection between the part transported by the helicopter and the remaining part of the existing steel tower constituent member is released, and the temporary connection of this part is connected to the connecting jig and this The connecting jig is held by a holding member that holds the steel tower component, the holding member can be released on the ground side, the helicopter is positioned above the annular member, and the hook is engaged with the annular member. after the state down becomes possible hanging, and releasing the holding member on the ground side, removing the connecting jig of the tower structure member from the pylon component , The tower structure member coupled to said annular member is a steel tower disassembling method according to the helicopter for transporting hanging by the helicopter.

さらに、既設の鉄塔の鉄塔構成部材を解体する際に、上記鉄塔構成部材のうち上記ヘリコプタにより搬送する部分と残る部分の少なくともいずれかに取り付けられ、雄ねじ部材とナット部材により構成され、解体により搬送される部分の上記鉄塔構成部材を、それより下方の鉄塔構成部材に対してわずかに持ち上げる支持部材を設け、上記ナット部材の回動により搬送される上記鉄塔構成部材を僅かに持ち上げた後、解体搬送する部分と残る部分との連結を解除するヘリコプタによる鉄塔解体方法である Furthermore, when dismantling the steel tower component of the existing steel tower, it is attached to at least one of the part transported by the helicopter and the remaining part of the steel tower constituent member, and is constituted by a male screw member and a nut member and transported by dismantling A support member that slightly lifts the steel tower constituent member of the portion to be lowered relative to the steel tower constituent member below it, and lifts the steel tower constituent member conveyed by the rotation of the nut member, and then dismantles It is a steel tower dismantling method by a helicopter that releases the connection between the transporting part and the remaining part .

さらに、上記環状部材を上記既設の鉄塔構成部材に対して垂直状態で位置決めさせ、上記ヘリコプタのフックに係合可能に保持する位置決め部材を設け、上記位置決め部材に保持された上記環状部材を上記ヘリコプタのフックにより係合し、解体される上記鉄塔構成部材を連結部材を介して上記ヘリコプタにより吊り下げて搬送するものである Further, the annular member is positioned in a vertical state with respect to the existing steel tower component member, and a positioning member is provided to hold the helicopter so as to be engageable with the hook of the helicopter, and the annular member held by the positioning member is provided in the helicopter. The steel tower constituting member engaged and disassembled by the hook is suspended by the helicopter via a connecting member and conveyed .

またこの発明は、既設の鉄塔の鉄塔構成部材を解体する際に、上記鉄塔構成部材のうち上記ヘリコプタにより搬送する部分と残る部分の少なくともいずれかに取り付けられ、雄ねじ部材とナット部材により構成され、解体により搬送される部分の上記鉄塔構成部材を、それより下方の鉄塔構成部材に対してわずかに持ち上げる支持部材と、上記ヘリコプタにより搬送する部分と残る部分との連結を解除した後に上記既設の鉄塔構成部材のうち上記ヘリコプタにより搬送する部分と残る部分との連結を仮に保つための連結治具とを備え、この連結治具は、上記ヘリコプタにより搬送する部分と残る部分とに挿通される軸部材と、上記支持部材により上記鉄塔構成部材が支持された状態で、上記連結治具の軸部材を上記鉄塔構成部材から外す弾性部材とから成り、上記軸部材を上記弾性部材の付勢力に抗して上記鉄塔構成部材に保持させる保持部材と、上記保持部材を地上から除去して上記弾性部材により上記連結治具を上記鉄塔構成部材から外すための除去部材を備えたヘリコプタによる鉄塔解体作業治具である。 In addition, when disassembling a steel tower component of an existing steel tower, the present invention is attached to at least one of a part transported by the helicopter and a remaining part of the steel tower constituent member, and is constituted by a male screw member and a nut member, The existing steel tower after releasing the connection between the support member for slightly lifting the steel tower constituent member of the part conveyed by dismantling with respect to the steel tower constituent member below it and the part conveyed by the helicopter and the remaining part A connecting jig for temporarily maintaining the connection between the part transported by the helicopter and the remaining part of the constituent members, and the connecting jig is a shaft member inserted into the part transported by the helicopter and the remaining part And the elasticity that removes the shaft member of the connecting jig from the tower component in a state where the tower member is supported by the support member. A holding member that holds the shaft member against the urging force of the elastic member against the urging force of the elastic member, and the holding member is removed from the ground and the connecting jig is connected to the steel tower by the elastic member. It is a steel tower dismantling work jig by a helicopter provided with a removing member for removing from a constituent member .

本発明のヘリコプタによる鉄塔解体方法及び作業用治具は、鉄塔設置場所における作業スペースを最小限にして解体作業可能であり、大型のクレーン等の重機を必要とせず、鉄塔の解体作業も迅速に行うことができる。従って、従来のように作業スペースの確保ための費用や準備期間を必要とせず、コストも安価に作業を行うことができる。また、この発明のヘリコプタによる鉄塔解体方法に用いる作業用治具は、作業を確実且つ迅速に行うことができるとともに、解体作業を安全に遂行可能とするものである。   The steel tower dismantling method and work jig by the helicopter of the present invention can be dismantled while minimizing the work space at the steel tower installation site, does not require heavy machinery such as a large crane, and the steel tower dismantling work can be done quickly. It can be carried out. Therefore, it is possible to work at a low cost without requiring a cost and a preparation period for securing a work space as in the prior art. Moreover, the work jig used in the steel tower disassembly method using the helicopter according to the present invention can perform the work reliably and quickly and can safely perform the dismantling work.

以下、この発明の一実施形態のヘリコプタによる鉄塔解体方法と作業治具について、図面を基にして説明する。この実施形態は、既設の鉄塔10を解体する場合のものである。まず、図1に示すように、鉄塔10に架設された電線を除去した後、鉄塔10の頂部10aに、円形の金属リングである環状部材20を仮設置する。環状部材20は、図11,図12に示すように、その両側を保持する位置決め部材22により保持されて垂直状態に位置決めされる。環状部材20及び位置決め部材22の位置は、図1〜図4に示すように、鉄塔10の頂部10a、または既設の鉄塔10の中間部の鉄塔構成部材26に取り付けられる。   Hereinafter, a steel tower dismantling method and work jig using a helicopter according to an embodiment of the present invention will be described with reference to the drawings. In this embodiment, the existing steel tower 10 is disassembled. First, as shown in FIG. 1, after removing the electric wires installed on the steel tower 10, an annular member 20 that is a circular metal ring is temporarily installed on the top 10 a of the steel tower 10. As shown in FIGS. 11 and 12, the annular member 20 is held by a positioning member 22 that holds both sides thereof and is positioned in a vertical state. As shown in FIGS. 1 to 4, the positions of the annular member 20 and the positioning member 22 are attached to the top 10 a of the steel tower 10 or the steel tower component 26 in the middle of the existing steel tower 10.

環状部材20と解体される鉄塔構成部材26とを連結した連結部材であるワイヤ30は、例えば図13に示すように、環状部材20に金属リング32により繋がれ、ワイヤ30の他端も解体する鉄塔構成部材26に、金属リング32により連結される。位置決め部材22の両側の起立部23は、環状部材20の厚さよりも僅かに広い幅の間隔を空けて対向し、環状部材20を両側部で挟持する。位置決め部材22は、鉄塔構成部材26に固定する固定金具24を下部に備え、ボルト25により鉄塔構成部材26に固定する。   For example, as shown in FIG. 13, the wire 30 that is a connecting member that connects the annular member 20 and the steel tower component 26 to be disassembled is connected to the annular member 20 by a metal ring 32, and the other end of the wire 30 is also disassembled. It is connected to the steel tower component 26 by a metal ring 32. The standing portions 23 on both sides of the positioning member 22 face each other with a width slightly wider than the thickness of the annular member 20, and sandwich the annular member 20 between both sides. The positioning member 22 is provided with a fixing bracket 24 to be fixed to the steel tower constituent member 26 at the lower part, and is fixed to the steel tower constituent member 26 with a bolt 25.

鉄塔10の解体部分と残す部分との連結解除は、鉄塔構成部材26を連結したボルトの取り外しを容易にするための治具である支持部材34を用いて行う。支持部材34は、ヘリコプタ40により搬送する部分と残る鉄塔構成部材26の少なくともいずれかに取り付けられる。この実施形態では残る部分の鉄塔構成部材26に図示しないボルトとナットにより固定される。この支持部材34は、図6,図7に示すように、断面がL字状の支持部35と、支持部35の一側面の先端部が固定された雄ねじ部材36と、この雄ねじ部材36に螺合したナット部材37と、このナット部材37を受ける受部39とから成る。受け部39には、貫通孔が形成され、この貫通孔と同軸に、雄ねじ部材36が挿通され、安定にガイドする挿通支持部41を備える。受け部39の挿通支持部41が設けられた側面とは直角の側面には、鉄塔構成部材26に固定するための取付孔が形成されている。鉄塔構成部材26に対しては、図1、図8等に示すように、図示しないボルトとナットにより鉄塔構成部材26の側面に強固に固定する。   The disengagement between the dismantled part of the steel tower 10 and the remaining part is performed using a support member 34 that is a jig for facilitating removal of the bolt connecting the steel tower constituting member 26. The support member 34 is attached to at least one of the portion transported by the helicopter 40 and the remaining steel tower component member 26. In this embodiment, the remaining portion of the steel tower component 26 is fixed with bolts and nuts (not shown). As shown in FIGS. 6 and 7, the support member 34 includes a support portion 35 having an L-shaped cross section, a male screw member 36 to which a tip of one side surface of the support portion 35 is fixed, and the male screw member 36. It comprises a screwed nut member 37 and a receiving portion 39 for receiving the nut member 37. A through hole is formed in the receiving part 39, and the male screw member 36 is inserted coaxially with the through hole, and is provided with an insertion support part 41 that guides stably. An attachment hole for fixing to the steel tower component 26 is formed on a side surface of the receiving portion 39 that is perpendicular to the side surface on which the insertion support portion 41 is provided. As shown in FIGS. 1, 8, etc., the steel tower component 26 is firmly fixed to the side surface of the steel tower component 26 with bolts and nuts (not shown).

ヘリコプタ40で搬送される側の鉄塔構成部材26とそれに接続した下方の主柱材11の鉄塔構成部材26との連結部分には、搬送される側の鉄塔構成部材26の下端面26aに支持部材34の支持部35が当接し、ナット部材37の回動により、雄ねじ部材36が上昇し、支持部35により下端面26aが僅かに押し上げられる。これにより、鉄塔構成部材26同士を連結したボルト42を取り外しやすくなる。4本の主柱材11について、順にナット部材37により鉄塔構成部材26を押し上げて、ボルト42を外す。   A connecting member between the steel tower component 26 on the side transported by the helicopter 40 and the steel tower component 26 of the lower main pillar 11 connected thereto is supported on the lower end surface 26a of the steel tower component 26 on the transport side. The support portion 35 of 34 is brought into contact, and the male screw member 36 is raised by the rotation of the nut member 37, and the lower end surface 26 a is slightly pushed up by the support portion 35. Thereby, it becomes easy to remove the bolt 42 connecting the steel tower component members 26. About the four main pillar materials 11, the tower member 26 is pushed up with the nut member 37 in order, and the volt | bolt 42 is removed.

ボルト42を外した後は、図9,図10等に示すように、連結治具50の軸部材52をボルト挿通穴に挿通して、軸部材52の先端部に保持部材であるピン54を係止して抜け止めとする。連結治具50は、筒状の外装部材56に軸部材52が挿通され、軸部材52の基端部には持ち手58がT字状に取り付けられ、持ち手58が突出した側面部分には、長孔60が対面して形成されている。外装部材56内には、弾性部材であるコイルバネ62が挿入され、軸部材52を収納方向に付勢している。   After the bolt 42 is removed, as shown in FIGS. 9 and 10, the shaft member 52 of the connecting jig 50 is inserted into the bolt insertion hole, and the pin 54 that is a holding member is attached to the distal end portion of the shaft member 52. Lock to prevent it from coming off. In the connecting jig 50, a shaft member 52 is inserted into a cylindrical exterior member 56, and a handle 58 is attached to the base end portion of the shaft member 52 in a T shape. The long hole 60 is formed facing each other. A coil spring 62, which is an elastic member, is inserted into the exterior member 56, and urges the shaft member 52 in the storage direction.

この実施形態のヘリコプタにより鉄塔解体方法は、鉄塔10の頂部10a及び鉄塔10の所定の位置に、位置決め部材22を固定する。そして、環状部材20を位置決め部材22に挿入し、環状部材20から4本のワイヤ30を延ばし、吊り上げて搬送する鉄塔構成部材26の重心の上方に、4本のワイヤ30の下端部を各々連結する。   With the helicopter of this embodiment, the steel tower dismantling method fixes the positioning member 22 to the top portion 10a of the steel tower 10 and a predetermined position of the steel tower 10. Then, the annular member 20 is inserted into the positioning member 22, the four wires 30 are extended from the annular member 20, and the lower ends of the four wires 30 are respectively connected above the center of gravity of the steel tower component 26 that is lifted and conveyed. To do.

そして、4本の主柱材11の各側面に支持部材34を取り付け固定し、鉄塔10の搬送する部分を、ナット部材37を回して僅かに持ち上げる。そして、主柱材11について順番に、ボルト42を総て外して、外した透孔のうち1箇所に、持ち手58によりコイルバネ62の付勢力に抗して、連結治具50の軸部材52を挿入し、軸部材52の先端にピン54を挿入して抜け止めとする。この操作を、4本の主柱材11について順に行う。   And the supporting member 34 is attached and fixed to each side surface of the four main pillar materials 11, and the part which the steel tower 10 conveys is slightly lifted by turning the nut member 37. Then, all the bolts 42 are removed in order with respect to the main pillar material 11, and the shaft member 52 of the connecting jig 50 is against one side of the removed through holes against the urging force of the coil spring 62 by the handle 58. And a pin 54 is inserted into the tip of the shaft member 52 to prevent it from coming off. This operation is sequentially performed on the four main pillar members 11.

4本の主柱材11について、ボルト42の取り外し及び連結治具50の取り付けが終了すると、ヘリコプタ40が鉄塔10の上方に位置し、フック44に環状部材20を係合させる。係合が確実に成されたら、ヘリコプタ40は上昇を始め、ヘリコプタ40から地上の作業員に連絡する。ピン54には、除去部材である紐64が結び付けられ、下方から引くことによりピン54が軸部材52から抜け落ちるように形成されている。そして、図2に示すように、ヘリコプタ40からの連絡を受けて、地上で紐64を引いて、ピン54を軸部材52から引き抜く。すると、コイルバネ62の付勢力により、軸部材52が外装部材56内に退避し、主柱材11の鉄塔構成部材26から抜け落ちる。連結治具50は、紐66により支持部材34に繋がっているので、地上へ落下することはない。 When the removal of the bolts 42 and the attachment of the connecting jig 50 are finished for the four main pillars 11, the helicopter 40 is positioned above the steel tower 10, and the annular member 20 is engaged with the hooks 44. If the engagement is ensured, the helicopter 40 starts to rise, and the helicopter 40 contacts the worker on the ground. A string 64 as a removing member is tied to the pin 54, and the pin 54 is formed so as to fall off the shaft member 52 when pulled from below. Then, as shown in FIG. 2, in response to the communication from the helicopter 40, the string 64 is pulled on the ground, and the pin 54 is pulled out from the shaft member 52. Then, due to the urging force of the coil spring 62, the shaft member 52 is retracted into the exterior member 56, and falls off from the steel tower constituting member 26 of the main pillar 11. Since the connecting jig 50 is connected to the support member 34 by the string 66, it does not fall to the ground.

この状態で、搬送される側の鉄塔構成部材26は、その下端面26aが支持部材34の支持部35に載っているだけとなるが、ヘリコプタ40により吊り下げられているので、そのままヘリコプタ40の上昇とともに、空中に吊り上げられる。図3に示すように、吊り上げられた鉄塔構成部材26は、そのままヘリコプタ40により所定の場所へ搬送される。   In this state, the steel tower constituting member 26 on the transport side only has its lower end surface 26a resting on the support portion 35 of the support member 34, but since it is suspended by the helicopter 40, the helicopter 40 Ascended, it is lifted in the air. As shown in FIG. 3, the lifted steel tower component 26 is transported to a predetermined place by the helicopter 40 as it is.

さらに、同様にして図4,図5に示すように、次の搬送部分に取り付けられた位置決め部材22及び環状部材20により、ヘリコプタ40のフック44を環状部材20に係合させ、ヘリコプタ40により吊り下げて搬送する。   Further, similarly, as shown in FIGS. 4 and 5, the hook 44 of the helicopter 40 is engaged with the annular member 20 by the positioning member 22 and the annular member 20 attached to the next conveyance portion, and is suspended by the helicopter 40. Carry it down.

この実施形態の鉄塔解体方法によれば、既設の鉄塔10の周囲に多くの場所を取らなくてもよく、解体コストを大幅に抑えることができる。しかも、環状部材20、位置決め部材22、支持部材34、及び連結治具50などの解体用治具を用いることにより、安全に効率よく鉄塔10の解体を行うことができる。   According to the steel tower dismantling method of this embodiment, it is not necessary to take many places around the existing steel tower 10, and the dismantling cost can be significantly reduced. Moreover, the dismantling of the tower 10 can be performed safely and efficiently by using dismantling jigs such as the annular member 20, the positioning member 22, the support member 34, and the connecting jig 50.

なお、この発明のヘリコプタによる鉄塔解体方法及び作業用治具は、上記実施形態に限定されるものではなく、環状部材や支持部材、連結治具は適宜形状を設定可能なものであり、保持部材もピン以外の部材を用いても良い。   Note that the steel tower dismantling method and work jig by the helicopter of the present invention are not limited to the above embodiment, and the annular member, the support member, and the connecting jig can be appropriately set in shape, and the holding member Also, members other than pins may be used.

この発明の一実施形態のヘリコプタによる鉄塔解体方法の一工程を示す概略図である。It is the schematic which shows 1 process of the steel tower dismantling method by the helicopter of one Embodiment of this invention. この発明の一実施形態のヘリコプタによる鉄塔解体方法の次の工程を示す概略図である。It is the schematic which shows the next process of the tower demolition method by the helicopter of one Embodiment of this invention. この発明の一実施形態のヘリコプタによる鉄塔解体方法の次の工程を示す概略図である。It is the schematic which shows the next process of the tower demolition method by the helicopter of one Embodiment of this invention. この発明の一実施形態のヘリコプタによる鉄塔解体方法の次の工程を示す概略図である。It is the schematic which shows the next process of the tower demolition method by the helicopter of one Embodiment of this invention. この発明の一実施形態のヘリコプタによる鉄塔解体方法の次の工程を示す概略図である。It is the schematic which shows the next process of the tower demolition method by the helicopter of one Embodiment of this invention. この発明の一実施形態のヘリコプタによる鉄塔解体方法に用いる支持部材を示す正面図である。It is a front view which shows the support member used for the steel tower dismantling method by the helicopter of one Embodiment of this invention. この発明の一実施形態の支持部材の正面図(A)と側面図(B)である。It is the front view (A) and side view (B) of the support member of one Embodiment of this invention. この発明の一実施形態の支持部材と連結治具を主柱材に取り付けた状態の部分正面図である。It is a partial front view of the state which attached the support member and connecting jig of one Embodiment of this invention to the main pillar material. この発明の一実施形態の連結治具の構造を示す概略図(A)〜(D)である。It is the schematic (A)-(D) which shows the structure of the connection jig | tool of one Embodiment of this invention. この発明の一実施形態の連結治具の動作を示す概略図(A)、(B)である。It is the schematic (A) and (B) which show the operation | movement of the connection jig | tool of one Embodiment of this invention. この発明の一実施形態のヘリコプタによる鉄塔組立工法に用いる位置決め部材の正面図である。It is a front view of the positioning member used for the steel tower assembly method by the helicopter of one Embodiment of this invention. この発明の一実施形態の位置決め部材に環状部材を取り付けた状態の正面図である。It is a front view of the state which attached the annular member to the positioning member of one Embodiment of this invention. この発明の一実施形態の環状部材の正面図である。It is a front view of the annular member of one embodiment of this invention.

符号の説明Explanation of symbols

10 鉄塔
20 環状部材
22 位置決め部材
26 鉄塔構成部材
30 ワイヤ
34 支持部材
40 ヘリコプタ
44 フック
50 連結治具
52 軸部材
54 ピン
64 紐
10 steel tower 20 annular member 22 positioning member 26 steel tower constituting member 30 wire 34 support member 40 helicopter 44 hook 50 connecting jig 52 shaft member 54 pin 64 string

Claims (4)

既設の鉄塔の鉄塔構成部材の上部で上方に向かって取り外し自在に保持されていると共に、ヘリコプタに設けられたフックにより上空から上記ヘリコプタにより係合可能に設けられ、上記ヘリコプタにより上記鉄塔構成部材を吊り下げるための環状部材を取り付け、上記環状部材と上記鉄塔構成部材を連結部材により連結して上記環状部材から上記鉄塔構成部材を吊り下げ可能にし、既設の鉄塔構成部材のうち上記ヘリコプタにより搬送する部分と残る部分との連結を解除すると共に、この部分の仮設の連結を、連結治具とこの連結治具を上記鉄塔構成部材に保持させる保持部材とで行い、この保持部材を地上側で解除可能とし、上記ヘリコプタを上記環状部材の上方に位置させ上記フックを上記環状部材に係合させて吊り下げが可能となった状態の後、地上側で上記保持部材を解除し、上記鉄塔構成部材の連結治具をその鉄塔構成部材から除去し、上記環状部材に連結された上記鉄塔構成部材を上記ヘリコプタにより吊り下げて搬送することを特徴とするヘリコプタによる鉄塔解体方法。 At the top of the steel tower component of the existing steel tower, it is detachably held upward, and is provided so as to be engageable by the helicopter from above by a hook provided on the helicopter. An annular member for suspending is attached, the annular member and the steel tower constituent member are connected by a connecting member so that the steel tower constituent member can be suspended from the annular member, and is transported by the helicopter among the existing steel tower constituent members. The connection between the part and the remaining part is released, and this part is temporarily connected with a connecting jig and a holding member that holds the connecting jig on the steel tower component, and the holding member is released on the ground side. It is possible to suspend the helicopter by positioning the helicopter above the annular member and engaging the hook with the annular member. After the state, the holding member is released on the ground side, the connecting jig of the steel tower constituent member is removed from the steel tower constituent member, and the steel tower constituent member connected to the annular member is suspended and transported by the helicopter A method for dismantling a steel tower using a helicopter. 既設の鉄塔の鉄塔構成部材を解体する際に、上記鉄塔構成部材のうち上記ヘリコプタにより搬送する部分と残る部分の少なくともいずれかに取り付けられ、雄ねじ部材とナット部材により構成され、解体により搬送される部分の上記鉄塔構成部材を、それより下方の鉄塔構成部材に対してわずかに持ち上げる支持部材を設け、上記ナット部材の回動により搬送される上記鉄塔構成部材を僅かに持ち上げた後、解体搬送する部分と残る部分との連結を解除することを特徴とする請求項1記載のヘリコプタによる鉄塔解体方法。   When dismantling the steel tower component of the existing steel tower, it is attached to at least one of the part transported by the helicopter and the remaining part of the steel tower constituent member, is constituted by a male screw member and a nut member, and is transported by dismantling A support member that slightly lifts the steel tower constituent member of the part relative to the steel tower constituent member below is provided, and the steel tower constituent member that is conveyed by the rotation of the nut member is slightly lifted and then disassembled and conveyed. The method of disassembling a tower using a helicopter according to claim 1, wherein the connection between the portion and the remaining portion is released. 上記環状部材を上記既設の鉄塔構成部材に対して垂直状態で位置決めさせ、上記ヘリコプタのフックに係合可能に保持する位置決め部材を設け、上記位置決め部材に保持された上記環状部材を上記ヘリコプタのフックにより係合し、解体される上記鉄塔構成部材を上記連結部材を介して上記ヘリコプタにより吊り下げて搬送することを特徴とする請求項1記載のヘリコプタによる鉄塔解体方法。   The annular member is positioned in a vertical state with respect to the existing steel tower constituent member, and a positioning member is provided to hold the helicopter so as to be engageable with the hook of the helicopter, and the annular member held by the positioning member is attached to the helicopter hook. The tower dismantling method by a helicopter according to claim 1, wherein the steel tower constituting member engaged and disassembled is suspended and conveyed by the helicopter via the connecting member. 既設の鉄塔の鉄塔構成部材を解体する際に、上記鉄塔構成部材のうち上記ヘリコプタにより搬送する部分と残る部分の少なくともいずれかに取り付けられ、雄ねじ部材とナット部材により構成され、解体により搬送される部分の上記鉄塔構成部材を、それより下方の鉄塔構成部材に対してわずかに持ち上げる支持部材と、上記ヘリコプタにより搬送する部分と残る部分との連結を解除した後に上記既設の鉄塔構成部材のうち上記ヘリコプタにより搬送する部分と残る部分との連結を仮に保つための連結治具とを備え、この連結治具は紐により上記支持部材と繋がっているとともに、上記連結治具は、上記ヘリコプタにより搬送する部分と残る部分とに挿通される軸部材と、上記支持部材により上記鉄塔構成部材が支持された状態で、上記連結治具の軸部材を上記鉄塔構成部材から外す弾性部材とから成り、上記軸部材を上記弾性部材の付勢力に抗して上記鉄塔構成部材に保持させる保持部材と、上記保持部材を地上から除去して上記弾性部材により上記連結治具を上記鉄塔構成部材から外すための除去部材を備えたことを特徴とするヘリコプタによる鉄塔解体作業治具。 When dismantling the steel tower component of the existing steel tower, it is attached to at least one of the part transported by the helicopter and the remaining part of the steel tower constituent member, is constituted by a male screw member and a nut member, and is transported by dismantling The support member that slightly lifts the steel tower constituent member of the part relative to the steel tower constituent member below it, and the connection between the part transported by the helicopter and the remaining part, and then the above-described existing steel tower constituent member A connection jig for temporarily maintaining the connection between the portion transported by the helicopter and the remaining portion; the connection jig is connected to the support member by a string; and the connection jig is transported by the helicopter In the state in which the tower member is supported by the shaft member inserted into the part and the remaining part, and the support member, the connection And a holding member for holding the shaft member against the biasing force of the elastic member and removing the holding member from the ground. A steel tower dismantling work jig using a helicopter, comprising a removal member for removing the connecting jig from the steel tower constituting member by the elastic member.
JP2003373896A 2003-11-04 2003-11-04 Steel tower dismantling method and work jig by helicopter Expired - Lifetime JP3717911B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003373896A JP3717911B2 (en) 2003-11-04 2003-11-04 Steel tower dismantling method and work jig by helicopter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003373896A JP3717911B2 (en) 2003-11-04 2003-11-04 Steel tower dismantling method and work jig by helicopter

Publications (2)

Publication Number Publication Date
JP2005139608A JP2005139608A (en) 2005-06-02
JP3717911B2 true JP3717911B2 (en) 2005-11-16

Family

ID=34685780

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003373896A Expired - Lifetime JP3717911B2 (en) 2003-11-04 2003-11-04 Steel tower dismantling method and work jig by helicopter

Country Status (1)

Country Link
JP (1) JP3717911B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4695475B2 (en) * 2005-09-22 2011-06-08 株式会社エフテック Work jig for steel tower dismantling
JP5730674B2 (en) * 2011-06-01 2015-06-10 中国電力株式会社 Steel tower maintenance work
KR200483581Y1 (en) * 2015-12-16 2017-06-15 한국가스공사 Stack Structure for Gas Heater

Also Published As

Publication number Publication date
JP2005139608A (en) 2005-06-02

Similar Documents

Publication Publication Date Title
JP3716316B2 (en) Demolition and removal method of arch bridge
KR101215356B1 (en) Device for sling pile
JP3717911B2 (en) Steel tower dismantling method and work jig by helicopter
JP3144708U (en) Reinforcing bar temporary fixing device
CN113620154B (en) Screw propeller auxiliary turning device, mounting method and dismounting method
JP6166870B2 (en) Pillar standing method and pillar
JP2010047995A (en) Leader changing method of pile driver
JP3947542B2 (en) Steel tower lifting and dismantling method and tower receiving bracket for the method
JP4755479B2 (en) Tower dismantling method by helicopter
JP6223874B2 (en) Lifting device and method of attaching and removing pole using the same
JP4695475B2 (en) Work jig for steel tower dismantling
JP6046337B2 (en) Lifting method of outer wall panel
CN204569127U (en) Steel upright post hoisting jig
JP7249892B2 (en) Pole suspension jig and wire fixture
JP5737571B2 (en) Dismantling method
JP2010001649A (en) Demolition method of steel pipe single pole steel tower for power transmission
JP2009227419A (en) Suspension stand
JP3418346B2 (en) Detachable support device for heavy objects
JP7240959B2 (en) Hanging jig and steel tower dismantling method
JP3717910B2 (en) Steel tower assembly method by helicopter
JP4421421B2 (en) Columnar structure construction method and suspension jig
JP7404861B2 (en) Pipe material lowering device and pipe material connection method
CN220505051U (en) Arch frame installation device for undercut tunnel
JP7236401B2 (en) Lifting jig for removing and transferring gas turbine combustor and method for removing and transferring.
JP2013199776A (en) Fastening device for damper and mounting method for damper using the same device

Legal Events

Date Code Title Description
A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20050308

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050316

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050516

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050622

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050721

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050824

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050831

R150 Certificate of patent or registration of utility model

Ref document number: 3717911

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080909

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090909

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100909

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100909

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110909

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120909

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120909

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130909

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250