CN110424480A CN201910760260.1A CN201910760260A CN110424480A CN 110424480 A CN110424480 A CN 110424480A CN 201910760260 A CN201910760260 A CN 201910760260A CN 110424480 A CN110424480 A CN 110424480A
Authority
CN
China
Prior art keywords
pile foundation
deformed steel
steel flats
pile
buildings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910760260.1A
Other languages
Chinese (zh)
Inventor
吴胜忠
李科
肖博
廖峻
皮小强
方林
吴梦军
刘罡
江星宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Original Assignee
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Chongqing Communications Research and Design Institute Co Ltd filed Critical China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority to CN201910760260.1A priority Critical patent/CN110424480A/en
Publication of CN110424480A publication Critical patent/CN110424480A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of buildings pile guard methods, comprising the following steps: tunnel excavation uses hand excavation close at buildings pile, exposes existing pile foundation part of the surface;After pile foundation surface discloses, according to Pile Foundations Design deformed steel flats, it is ensured that deformed steel flats is bonded pile foundation surface;Anchor hole is drilled on deformed steel flats;Deformed steel flats is installed in pile foundation, and carries out position correction, slip casting is filled between deformed steel flats and pile foundation;Anchor cable is installed in maintenance in anchor hole after expiring, carry out prestressed stretch-draw;From top to bottom layering cuts the outer ground of pile foundation step by step, and installs deformed steel flats, stretch-draw anchor step by step according to abovementioned steps.Above-mentioned buildings pile guard method; it does not destroy and existing invades limit building pile foundation; ensure pile foundation top-out structure safety; using deformed steel flats Prestressing anchor cable; simple structure, stress is clear, and it is convenient to construct; using step by step when excavating by the way of supporting, structure is avoided to be in unfavorable stress in the construction process.

Description

Buildings pile guard method
Technical field
The present invention relates to technical field of tunnel construction, and in particular to a kind of buildings pile guard method.
Background technique
Extensional mode, centrifugal extensive mode, urban land use intensive degree are continued to use in China's urban development for many years It is lower.With sharply increasing for urban population, automobile is increasingly becoming the popular vehicles, so occur space it is crowded, hand over A series of "urban disease"s such as pass blocking plug and environmental degradation.Pedestrian environment twin cities are built, " under traffic, also green in the people " is exhaled Sound is higher and higher.And with urban resource growing tension, city space three-dimensional, intensive and high-density development are also general trend of events institute Become.Especially in some Downtowns, completed region of the city, urban streets construction can be dug without much potentiality, it has to from Look for solving the long-acting plan of "urban disease" in urban underground space.
China lacks perspective overall planning to urban underground space and utilizes for a long time, and Impacts Evaluation of Urban Tunnel is built not It can avoid undergrounds buildings or structures such as ground and existing underground space structure, rail traffic, building basement and pile foundation etc. to occur Conflict is utilized to the underground space, design and construction bring greatly inconvenient and security risk.City tunnel planning construction and existing building Pile foundation clashes case and can be found everywhere both at home and abroad, for invading the existing building pile foundation in tunnel construction space, mainly uses stake Base underpinning technique, the technology destroy existing pile foundation structure, change building Path of Force Transfer, construction coordination is difficult, complex procedures.
Summary of the invention
Based on this, it is necessary to for the existing building pile foundation in intrusion tunnel construction space, Pile Underpinning Technology is mainly used, The problem of technology destroys existing pile foundation structure, changes building Path of Force Transfer, and construction coordination is difficult, complex procedures, provides one kind Buildings pile guard method.
A kind of buildings pile guard method, comprising the following steps:
Tunnel excavation uses hand excavation close at buildings pile, exposes existing pile foundation part of the surface;
After pile foundation surface discloses, deformed steel flats is designed according to the apparent size of pile foundation, it is ensured that the deformed steel flats is bonded stake Primary surface;
Anchor hole is drilled on the deformed steel flats;
Deformed steel flats is installed in pile foundation, and carries out position correction, slip casting is filled between deformed steel flats and pile foundation;
Anchor cable is installed in maintenance in anchor hole after expiring, carry out prestressed stretch-draw;
From top to bottom layering cuts the outer ground of pile foundation step by step, and installs deformed steel flats, tensioning anchor step by step according to abovementioned steps Rope.
In one of the embodiments, when pile foundation bottom is arrived in construction, pile foundation bottom country rock is not excavated, directly on country rock Deformed steel flats is installed.
The deformed steel flats includes the interconnecting piece of main body and main body two sides in one of the embodiments, and the main body is used In fitting in pile foundation, the anchor hole is opened on the interconnecting piece.
The both ends of the deformed steel flats are bent to form the connection by opposite twice in one of the embodiments, Portion.
In one of the embodiments, the step of being drilled with anchor hole on the deformed steel flats specifically:
Anchorage point is demarcated, anchor hole is drilled with using drilled dry, and clear up anchor hole.
In one of the embodiments, maintenance expire after in anchor hole prestressed anchor cable, carry out prestressed stretch-draw Step specifically:
Anchor cable is installed in maintenance in anchor hole after expiring, first pre- tensioning, then integral tension is tight.
The deformed steel flats is equipped with floor far from the side of pile foundation in one of the embodiments,.
Deformed steel flats is installed in pile foundation in one of the embodiments, and carries out position correction, in deformed steel flats and After the step of filling slip casting between pile foundation further include:
In surface sprayed fire proofing coating of the deformed steel flats far from pile foundation.
Above-mentioned buildings pile guard method, do not destroy it is existing invade limit building pile foundation, maintain the original stress of pile foundation, really Pile foundation upper body structural safety is protected, using deformed steel flats Prestressing anchor cable, the guard method novel form, construction letter Single, stress is clear, and it is convenient to construct, and using step by step when excavating by the way of supporting, structure is avoided to be in unfavorable in the construction process Stress.
Detailed description of the invention
Fig. 1 is the flow chart of buildings pile guard method in an embodiment;
Fig. 2 is the schematic diagram of deformed steel flats supporting pile foundation;
Fig. 3 is the schematic diagram for successively installing deformed steel flats and stretch-draw anchor step by step downwards.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing to the present invention Specific embodiment be described in detail.Many details are explained in the following description in order to fully understand this hair It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not Similar improvement is done in the case where violating intension of the present invention, because the invention is not limited by following public specific implementation.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", " right side " and similar statement for illustrative purposes only, are not meant to be the only embodiment.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.
Please refer to Fig.1 to Fig.3, the buildings pile guard method in an embodiment, for road tunnel construction in When the pile foundation 10 of existing building clashes, the pile foundation 10 of existing building is protected.Specifically, the buildings pile protection side Method includes the following steps:
Step S110: tunnel excavation uses hand excavation close at buildings pile 10, exposes 10 part table of existing pile foundation Face.
Specifically, tunnel excavation face close to existing building pile foundation 10 when take manual work, control is excavated drilling depth, is kept away Exempt to be damaged to pile foundation 10.It from top to bottom excavates gradually, until disclosing 10 part of the surface of existing pile foundation.In present embodiment, first Stage cutting depth is 18cm, after the pile foundation 10 wait appear applies protection, then applies protection when excavating step by step, avoids pile foundation 10 It is in unfavorable stress in the construction process.
Step S120: after 10 surface of pile foundation discloses, deformed steel flats 100 is designed according to the apparent size of pile foundation 10, it is ensured that different Shape steel plate 100 is bonded 10 surface of pile foundation.
Specifically, deformed steel flats 100 includes the interconnecting piece 120 of 110 two sides of main body 110 and main body, and main body 110 is for being bonded Onto pile foundation 10, interconnecting piece 120 is for installing anchor cable 200.Deformed steel flats 100, which is equipped with floor far from the side of pile foundation 10, (schemes not Show), floor is used to reinforce the rigidity of deformed steel flats 100, and 100 stress of deformed steel flats is avoided to be bent.In present embodiment, profile iron The both ends of plate 100 are bent to form interconnecting piece 120, after 100 first time of deformed steel flats bends inwards, profile iron by opposite twice Plate 100 is U-shaped, so that deformed steel flats 100 is bonded 10 surface of pile foundation, second of the outward bending of deformed steel flats 100 forms interconnecting piece 120, to facilitate the installation of subsequent anchor cable 200.The width of deformed steel flats 100 is 40cm, and the length of interconnecting piece 120 is 26cm.
Step S130: anchor hole is drilled on deformed steel flats 100.
Specifically, anchor hole is opened on interconnecting piece 120.In present embodiment, anchorage point is demarcated on interconnecting piece 120, Then anchor hole is drilled with using drilled dry, and clears up anchor hole, use the modes such as casing follow-up when necessary, in order to avoid hole wall collapse or bit freezing, Borehole cleaning is blown off using high-pressure blast after being drilled.
Step S140: deformed steel flats 100 is installed in pile foundation 10, and carries out aligning, in deformed steel flats 100 and stake Slip casting is filled between base 10.
Specifically, after deformed steel flats 100 being installed in pile foundation 10, the position of deformed steel flats 100 is corrected, is guaranteed Deformed steel flats 100 is bonded 10 surface of pile foundation, and M30 mortar is then filled between deformed steel flats 100 and pile foundation 10, avoids deformed steel flats There is gap between 100 and pile foundation 10.It, can be separate in deformed steel flats 100 after filling mortar between deformed steel flats 100 and pile foundation 10 The surface sprayed fire proofing coating of pile foundation 10, avoids pile foundation 10 from being burned out in a fire.
Step S150: maintenance installs anchor cable 200 after expiring in anchor hole, carries out prestressed stretch-draw.
Specifically, when carrying out 200 tensioning of prestress anchorage cable after maintenance expires, first pre- tensioning, then integral tension are tight.
Step S160: from top to bottom layering cuts the outer ground of pile foundation 10 step by step, and installs abnormity step by step according to abovementioned steps Steel plate 100, stretch-draw anchor 200.
Specifically, after the completion of the installation of the deformed steel flats of upper level 100 and tensioning, next stage pile foundation 10 is successively cut downwards Outer ground installs next stage deformed steel flats 100 and stretch-draw anchor 200, realizes the mode of the supporting when excavating step by step, avoids structure It is in unfavorable stress in the construction process.
In present embodiment, when 10 bottom of pile foundation is arrived in construction, 10 bottom country rock of pile foundation is not excavated, and directly pacifies on country rock Fill deformed steel flats 100, and stretch-draw anchor 200.If pile foundation 10 is not invaded limit, then do not have to disclose pile foundation 10, directly on country rock Carry out 100 supporting of deformed steel flats.
Above-mentioned 10 guard method of buildings pile does not destroy existing invade and limits building pile foundation 10, maintains the original stress of pile foundation 10 State, it is ensured that 10 upper body of pile foundation, 110 structural safety, using 100 Prestressing anchor cable 200 of deformed steel flats, the protection Method form is novel, and simple structure, stress is clear, and it is convenient to construct, and using step by step when excavating by the way of supporting, structure is avoided to exist Unfavorable stress is in work progress.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (8)

1. a kind of buildings pile guard method, which comprises the following steps:
Tunnel excavation uses hand excavation close at buildings pile, exposes existing pile foundation part of the surface;
After pile foundation surface discloses, deformed steel flats is designed according to the apparent size of pile foundation, it is ensured that the deformed steel flats is bonded pile foundation table Face;
Anchor hole is drilled on the deformed steel flats;
Deformed steel flats is installed in pile foundation, and carries out position correction, slip casting is filled between deformed steel flats and pile foundation;
Anchor cable is installed in maintenance in anchor hole after expiring, carry out prestressed stretch-draw;
From top to bottom layering cuts the outer ground of pile foundation step by step, and installs deformed steel flats, stretch-draw anchor step by step according to abovementioned steps.
2. buildings pile guard method according to claim 1, which is characterized in that when pile foundation bottom is arrived in construction, stake Basal part country rock does not excavate, and deformed steel flats is directly installed on country rock.
3. buildings pile guard method according to claim 1, which is characterized in that the deformed steel flats include main body and The interconnecting piece of main body two sides, for fitting to pile foundation, the anchor hole is opened on the interconnecting piece main body.
4. buildings pile guard method according to claim 3, which is characterized in that the both ends of the deformed steel flats are passed through Opposite twice is bent to form the interconnecting piece.
5. buildings pile guard method according to claim 1, which is characterized in that be drilled with anchor on the deformed steel flats The step of hole specifically:
Anchorage point is demarcated, anchor hole is drilled with using drilled dry, and clear up anchor hole.
6. buildings pile guard method according to claim 1, which is characterized in that maintenance is installed in anchor hole after expiring The step of prestress anchorage cable, progress prestressed stretch-draw specifically:
Anchor cable is installed in maintenance in anchor hole after expiring, first pre- tensioning, then integral tension is tight.
7. buildings pile guard method according to claim 1, which is characterized in that the deformed steel flats is far from pile foundation Side is equipped with floor.
8. buildings pile guard method according to claim 1, which is characterized in that deformed steel flats is installed to pile foundation On, and after the step of carrying out position correction, slip casting is filled between deformed steel flats and pile foundation further include:
In surface sprayed fire proofing coating of the deformed steel flats far from pile foundation.
CN201910760260.1A 2019-08-16 2019-08-16 Buildings pile guard method Pending CN110424480A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910760260.1A CN110424480A (en) 2019-08-16 2019-08-16 Buildings pile guard method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910760260.1A CN110424480A (en) 2019-08-16 2019-08-16 Buildings pile guard method

Publications (1)

Publication Number Publication Date
CN110424480A true CN110424480A (en) 2019-11-08

Family

ID=68415069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910760260.1A Pending CN110424480A (en) 2019-08-16 2019-08-16 Buildings pile guard method

Country Status (1)

Country Link
CN (1) CN110424480A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10252062A (en) * 1997-03-07 1998-09-22 Atsugi Technos:Kk Method for protecting pile supporting structure
CN2923824Y (en) * 2006-07-20 2007-07-18 中国京冶建设工程承包公司 Inlaid section-steel waist-beam
CN102493459A (en) * 2011-11-24 2012-06-13 天津二十冶建设有限公司 Building isolation support construction method for constructing deep foundation in narrow environment
CN103147443A (en) * 2013-03-18 2013-06-12 中国建筑第八工程局有限公司 Foundation pit supporting structure and construction method thereof
CN103266604A (en) * 2013-05-03 2013-08-28 中冶集团武汉勘察研究院有限公司 Hoop-type circular-section anchor-rod slide-resistant pile and construction method thereof
CN203307804U (en) * 2013-06-09 2013-11-27 湖北省交通规划设计院 Hoop structure for connecting round antiskid pile and anchor rod
CN203808065U (en) * 2014-03-17 2014-09-03 中冶集团武汉勘察研究院有限公司 Omega-shaped structure for lapping round anti-skid pile and anchor cables

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10252062A (en) * 1997-03-07 1998-09-22 Atsugi Technos:Kk Method for protecting pile supporting structure
CN2923824Y (en) * 2006-07-20 2007-07-18 中国京冶建设工程承包公司 Inlaid section-steel waist-beam
CN102493459A (en) * 2011-11-24 2012-06-13 天津二十冶建设有限公司 Building isolation support construction method for constructing deep foundation in narrow environment
CN103147443A (en) * 2013-03-18 2013-06-12 中国建筑第八工程局有限公司 Foundation pit supporting structure and construction method thereof
CN103266604A (en) * 2013-05-03 2013-08-28 中冶集团武汉勘察研究院有限公司 Hoop-type circular-section anchor-rod slide-resistant pile and construction method thereof
CN203307804U (en) * 2013-06-09 2013-11-27 湖北省交通规划设计院 Hoop structure for connecting round antiskid pile and anchor rod
CN203808065U (en) * 2014-03-17 2014-09-03 中冶集团武汉勘察研究院有限公司 Omega-shaped structure for lapping round anti-skid pile and anchor cables

Similar Documents

Publication Publication Date Title
KR101834847B1 (en) Echo-environmental construction method of tunnel portal area using mini pipe-roof
KR100957599B1 (en) Basement-structure construction method to use temporary earth retaining structure
CN203361033U (en) Protective device for intercepting falling rocks of through cut
CN103410152B (en) A kind of construction method for long and narrow deep foundation pit earthwork digging
CN205822220U (en) A kind of assembled open caisson
CN108547628B (en) Quick construction method for pipe-jacking working well in upper-soft and lower-hard stratum
JP2009174178A (en) Method of constructing underground structure
CN110424480A (en) Buildings pile guard method
KR20090011442A (en) Tunnel boring method using sheet pile and tunnel structure therof
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
KR102267676B1 (en) A method of construction for temporary retaining wall and sheating work cup using its method
CN104746530A (en) Novel construction method for closing traffic in short time
KR100476839B1 (en) Construction method for installing concrete underground structures
JP2001317217A (en) Base isolation building construction under foundation of exiting building
KR100701885B1 (en) Non-open cut pipe installation method
KR100432782B1 (en) Supporting structure for tunnel and underground tunnel construction method using the same
JPH11247195A (en) Temporary earth retaining wall structure and temporary earth retaining wall execution method
CN108678755B (en) Quick construction method for soft rock stratum pipe jacking working well
KR20200003488A (en) Underground road using self-supporting pile wall with temporary wall and its construction method
KR20200088659A (en) Top-down type underground structure construction method using earth support plate
CN108661651B (en) Rapid construction method for hard rock stratum pipe jacking working well
KR102325548B1 (en) Sheating work cup using method of construction for temporary retaining wall
KR200222445Y1 (en) The ground reinforcement structure used soil nailing
Koliji et al. Extending the urban underground utility network capacity–A long drive large diameter pipe-jacking tunnel
KR20100134374A (en) Structure for slope protection using stone and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191108