CN110387969A - A kind of wooden tension string beam structure one-way movable basin type rubber joint construction method of assembled Long span - Google Patents

A kind of wooden tension string beam structure one-way movable basin type rubber joint construction method of assembled Long span Download PDF

Info

Publication number
CN110387969A
CN110387969A CN201910520308.1A CN201910520308A CN110387969A CN 110387969 A CN110387969 A CN 110387969A CN 201910520308 A CN201910520308 A CN 201910520308A CN 110387969 A CN110387969 A CN 110387969A
Authority
CN
China
Prior art keywords
ribbed stiffener
wooden
way movable
type rubber
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910520308.1A
Other languages
Chinese (zh)
Other versions
CN110387969B (en
Inventor
程骥
金睿
袁震
沈西华
尤可坚
张霞军
张少君
方承宗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Construction Engineering Group Co Ltd
Original Assignee
Zhejiang Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Construction Engineering Group Co Ltd filed Critical Zhejiang Construction Engineering Group Co Ltd
Priority to CN201910520308.1A priority Critical patent/CN110387969B/en
Publication of CN110387969A publication Critical patent/CN110387969A/en
Application granted granted Critical
Publication of CN110387969B publication Critical patent/CN110387969B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/36Bearings or like supports allowing movement

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The present invention relates to a kind of wooden tension string beam structure one-way movable basin type rubber joint construction methods of assembled Long span, comprising the following steps: step 1: support bracket reinforcing bar is bound simultaneously with main structure column reinforcing bar;Step 2: the measurement and positioning of embedded board, the production of embedded board, embedded board are fixed temporarily;Step 3: support bracket supporting module;Pour bracket concrete;Demoulding and embedded board removing surface;Step 4: installation one-way movable basin type rubber;Make gusset plate and ribbed stiffener;Welding node plate and ribbed stiffener are whole;Compared with prior art, construction method of the invention can effectively ensure that the construction quality of the wooden tension string beam structure one-way movable basin type rubber node of assembled Long span, multiple steps, which can synchronize progress, can intert progress, effectively save duration, improve the construction efficiency of construction enterprises, prefabricated construction is realized, there is stronger application to engineering practice prospect and economic benefit.

Description

A kind of wooden tension string beam structure one-way movable basin type rubber section of assembled Long span Point construction method
Technical field
The invention belongs to architecture production technical fields, and in particular to a kind of wooden tension string beam structure of assembled Long span is unidirectional Movable pot rubber bearing joint construction method.
Background technique
The wooden tension string beam structure of assembled Long span is by the wooden beam string of Long span as load-bearing skeleton, the cloth on skeleton The membrane material being tensioned by design requirement is set, membrane material, which mainly rises, to be gone along with sb. to guard him and decoration function.The wooden tension string beam structure of assembled Long span is logical It is often supported on main structure object, the assembled Long span wood under external loads (such as dead load, live load, wind load) effect Biggish vertical load and horizontal loading would generally be generated on matter tension string beam structure, stress is larger at support node, joint structure It is complicated.Meanwhile being supported on main structure object and can also generate biggish deformation and internal force under external load action, in load action Under how main structure object and the wooden tension string beam structure of assembled Long span to be reliably constructed into as difficult point and key point, it is special It is not to select suitable construction requiring to participate in coordinating the deformation at both ends on main structure object and vibrating generated action effect Method is extremely important.
In view of the above technical problems, it therefore needs to improve.
Summary of the invention
Object of the present invention is to solve prior art difficult point and to provide a kind of wooden tension string beam structure of assembled Long span unidirectional Movable pot rubber bearing joint construction method meets the wooden tension string beam structure Project design requirement of assembled Long span.
In order to reach the goals above, the technical scheme adopted by the invention is that:
A kind of wooden tension string beam structure one-way movable basin type rubber joint construction method of assembled Long span, including with Lower step:
Step 1, support bracket reinforcing bar are bound simultaneously with main structure column reinforcing bar, are referred to according to construction drawing and specification mark The longitudinally, laterally reinforcing bar and longitudinal reinforcement, moment reinforcement and stirrup at bracket of the synchronous constructions concrete column such as quasi- atlas;
Step 2, the measurement and positioning of embedded board are referred to and are released in embedded board installation using total station or theodolite Heart line and plan-position, with steel tape or the elevation control of level measurement embedded board plate face;
Step 3, the production of embedded board refer to that the steel plate of production standard rectangular cross-section steel material, steel plate pass through with dowel Perforation plug welding is connected as entirety;
Step 4, embedded board are fixed temporarily;
Step 5, support bracket supporting module mainly use glued board according to the support bracket shape in design drawing Supporting module;
Step 6 pours bracket concrete, refers to support bracket supporting module, the production of embedded board and positioning by checking After examination, casting concrete simultaneously is reinforced vibrating, and smoothes out and wait concrete to complete final set knot after pouring;
Step 7, demoulding and embedded board removing surface are to clear up laitance, spot etc. at the embedded board plate face to bracket to make it Surfacing is cleaned and carries out finished product protection;
Step 8 installs one-way movable basin type rubber, be will install the bottom basin of one-way movable basin type rubber with Embedded board is an entirety by fillet weld weld all around;
Step 9 makes gusset plate and ribbed stiffener, mainly according to drawing requirement, completes the system of gusset plate and ribbed stiffener Make;
Step 10, welding node plate and ribbed stiffener are entirety, mainly according to the position while welding and weld seam indicated in drawing Gusset plate and ribbed stiffener are whole by fillet weld seam by grade;
Step 11, welding one-way movable basin type rubber and gusset plate, ribbed stiffener are entirety, mainly by step (10) it is an entirety that integral node plate and ribbed stiffener and one-way movable basin type rubber top plate in, which pass through fillet weld weld all around,;
Step 12 makes assembling type wooden beam string section, mainly make same material, same strong according to drawing Spend the assembling type wooden beam string section of the combination laminated wood composition of grade;
Step 13 makes connecting plate and ribbed stiffener, mainly according to drawing requirement, completes the system of connecting plate and ribbed stiffener Make;
Step 14, welded connecting plate and ribbed stiffener are entirety, mainly according to the position while welding and weldering indicated in drawing It is whole by fillet weld seam that grade, which is stitched, by connecting plate and ribbed stiffener;
Step 15, plain bolt is fixed temporarily assembling type wooden beam string section and connecting plate and ribbed stiffener is whole, master Refer to and completes plain bolt to be fixed temporarily assembling type wooden beam string section with connecting plate and ribbed stiffener to be entirety according to drawing, it is general Logical bolt is completed just to twist;
Step 10 six, lifting assembling type wooden beam string section and connecting plate and ribbed stiffener refer to that the reasonable lifting of selection is set Standby lifting forms whole wooden beam string section and connecting plate and ribbed stiffener, completes interim lifting;
Step 10 seven, the wooden beam string section of pin shaft fixing assembling formula and support refer to pin shaft fixing assembling formula wooden String beam section is attached with bottom production, is fixed together by pin shaft, is completed the construction at support.
The beneficial effects of the present invention are:
Compared with prior art, construction method of the invention can effectively ensure that the wooden tension string beam structure list of assembled Long span To the construction quality of movable pot rubber bearing node, multiple steps, which can synchronize progress, can intert progress, effectively save duration, The construction efficiency of construction enterprises is improved, prefabricated construction is realized, there is stronger application to engineering practice prospect and economic effect Benefit.
Detailed description of the invention
Fig. 1 is overall structure diagram of the embodiment of the present invention;
Fig. 2 is construction process figure of the embodiment of the present invention;
Fig. 3 is node structure schematic diagram of the embodiment of the present invention;
Fig. 4 is connection detail of the embodiment of the present invention;
Fig. 5 is A-A structure sectional view of the embodiment of the present invention;
Fig. 6 is B-B structure sectional view of the embodiment of the present invention;
Fig. 7 is one-way movable basin type rubber structural schematic diagram of the embodiment of the present invention;
Fig. 8 is connecting board structure schematic diagram of the embodiment of the present invention;
Fig. 9 is bracket structure schematic diagram of the embodiment of the present invention;
Figure 10 is C-C structure sectional view of the embodiment of the present invention;
Appended drawing reference in figure: support base 1, beam string section 2, connecting plate 3, drag-line 4, bracket 5, concrete column 6 support pin shaft 7, first plus through rib 8, second plus through rib 9, pin shaft 10, bolt 11, one-way movable basin type rubber 17, gusset plate 20, top plate 170, middle steel plate 171, rubber slab 172, bottom basin 173, the second chimb 174, lateral steel bar 175, tetrafluoro draw runner 176, first is convex Side 177, stainless steel slide plate 178, tetrafluoro plate 179.
Specific embodiment
It elaborates with reference to the accompanying drawing to the embodiment of the present invention.
Embodiment: such as Fig. 1, shown in 3-10, a kind of wooden tension string beam structure one-way movable basin type rubber of assembled Long span Embedded board 16 is arranged on bracket 5 including the bracket 5 being fixedly arranged on concrete column 6 in support node;List is equipped on embedded board 16 To movable pot rubber bearing 17, support base 1 is connected on one-way movable basin type rubber 17, support base 1 passes through supporting pin Axis 7 and connecting plate 3 are rotatablely connected;Wherein, bracket 5 are reinforced concrete structure brackets, in the pre-buried steel material in the top surface of bracket Embedded board 16;Embedded board 16, is the steel plate of standard rectangular cross-section steel material, and steel plate is connected as with dowel by plug welding of perforating Entirety is mechanical anchoring in bracket;Support base 1 is the steel plate composition for the steel material that middle part position offers pin shaft hole;Branch Pin shaft 7 is supportted, is standardized fastener, support base 1 and connecting plate 3 are connected as entirety, makes to do between its plate opposite Movement, structure are in the hinge connection;Connecting plate 3, section form are the steel plate compositions of the steel material of abnormity.
The present invention passes through the invention kind wooden tension string beam structure one-way movable basin type rubber node of assembled Long span, energy Realize the wooden tension string beam structure of assembled Long span load be reliably delivered to main structure object, play bearing assembled greatly across The wooden tension string beam structure system of diameter, at the same have it is good elasticity with adapt to the wooden beam string end of assembled Long span rotation and With the biggish shear-deformable horizontal displacement to meet superstructure.There is the node safe and reliable, Path of Force Transfer clearly to close Reason, constructing structure is simple and convenient, is easy to implement the advantages that building site realization prefabricated construction, before having stronger application to engineering practice Scape and economic benefit.
It is linked and packed the wooden beam string section 100 of formula on connecting plate 3 by bolt 11, the assembling type wooden beam string section 100 combine beam string section 2 by multistage on an equal basis is formed by connecting, and is used between adjacent beam string section 2 by metal connecting piece and the wooden component Bolt fastening is attached;Wherein Long span assembling type wooden beam string section uses the combination of same material, equality strength grade Laminated wood composition, wherein the girder of the wooden tension string beam structure of assembled Long span uses identical wooden frame section group in varying numbers At along component longitudinal axis, the strong ties mode such as connecting plate and the use of wooden frame end will by plain bolt in timber rift grain direction Wooden frame section and connecting plate are connected as an entirety.
The beam-ends of assembled laminated wood tension string beam structure of the invention is spliced by the wooden beam string beam section, this diagram Every group of beam string beam-ends is composed of the beam-ends of 6 laminated wood tension string beam structures in meaning, realizes the assembly of beam string, thus shape At Long span assembled laminated wood tension string beam structure.
Support base 1 includes 2 pieces of symmetrical gusset plates 20, and support pin shaft 7 passes through 2 pieces of gusset plates, and is rotationally connected with On gusset plate, it is installed with first on the outside of 2 pieces of gusset plates plus through rib 8, first plus rib 8 is provided with 4 pieces, first plus right through rib 8 Title is laid in 1 two sides of support base;It is installed with second on connecting plate 3 plus through rib 9, second plus is butted on assembling type wooden through 9 phase of rib In string beam section 100;Wherein, first plus through rib 8 and second plus through rib 9, section form is the rectangular section steel material of corner cut Steel plate composition.
3 bottom of connecting plate connects drag-line 4 by pin shaft 10;Pin shaft 10 is standardized fastener, by connecting plate 3 and is drawn Rope 4 is connected as entirety, makes to do relative motion between its plate, structure is in the hinge connection.
One-way movable basin type rubber 17 is that have the vertical carrying of transmitting, vertical rotating and single direction slip property Finished product one-way movable basin type rubber;It is one that one-way movable basin type rubber bottom basin and embedded board, which pass through fillet weld weld all around, Whole, one-way movable basin type rubber top plate is one whole by fillet weld weld all around with gusset plate and ribbed stiffener contact site Body;One-way movable basin type rubber 17 includes top plate 170, is provided with middle steel plate 171, middle steel plate 171 below top plate 170 Lower section is provided with rubber slab 172, and bottom basin 173 is provided with below rubber slab 172;First chimb 177 is set above bottom basin 173, the One chimb 177 fits on rubber slab 172, is provided with tetrafluoro draw runner 176 on the outside of the first chimb 177;It is provided with below top plate 170 Second chimb 174 is provided with lateral steel bar 175 on the inside of second chimb 174, and lateral steel bar 175 is in contact with tetrafluoro draw runner 176; Stainless steel slide plate 178 and tetrafluoro plate 179 are provided between middle steel plate 171 and top plate 170, stainless steel slide plate 178 is located at tetrafluoro 179 top of plate.
PE sheath is socketed on the outside of drag-line 4;By adopting the above technical scheme, PE sheath makes drag-line 4 by twist distortion When generate corresponding deformation with reduce PE sheath stress point hardness damage, guarantee PE sheath mechanical damping characteristic while, The bend performance for improving drag-line 4, further increases the working performance of drag-line 4, can protect to a certain extent to drag-line 4 While can also play the role of mechanical damping, final realize guarantees the compact of 4 internal structure of drag-line, improves the bending resistance of drag-line 4 Bent and damage-retardation performance purpose.
As shown in Fig. 2, a kind of wooden tension string beam structure one-way movable basin type rubber node construction of assembled Long span Method, comprising the following steps:
Step 1, support bracket reinforcing bar are bound simultaneously with main structure column reinforcing bar, are referred to according to construction drawing and specification mark The longitudinally, laterally reinforcing bar and longitudinal reinforcement, moment reinforcement and stirrup at bracket of the synchronous constructions concrete column such as quasi- atlas are such as schemed Shown in 9, structure stress is complicated at bracket section, reinforcing bar density is larger, reinforcing bar type is more, and quality requirement is high.Bind bracket steel It should be required to draw large scale joint reinforcing bar layout drawing according to actual size according to bracket construction drawing when muscle, make the sky of each reinforcing bar in order Between position and put sequence, can be by 1:1 setting-out, it is ensured that built-in fitting is smoothly put well.
Step 2, the measurement and positioning of embedded board are referred to and are released in embedded board installation using total station or theodolite Heart line and plan-position, with steel tape or the elevation control of level measurement embedded board plate face;In the bracket of installation embedded board On mark lower pre-embedded steel slab " cross " center line, and " cross " code line corresponding with center line is arranged according to pre-embedded steel slab absolute altitude.
Step 3, the production of embedded board refer to the steel plate of production standard rectangular cross-section steel material, steel as shown in Figure 10 Plate is connected as entirety by plug welding of perforating with dowel.
Step 4, prefabricated board are fixed temporarily.
Step 5, support bracket supporting module mainly use glued board according to the support bracket shape in design drawing Supporting module supports the common lumps of wood, steel pipe and adjustable support, to guarantee bracket any surface finish, smooth, general bracket template selection New glued board.After template is installed, it should clear up the sundries on template surface, be rinsed well with water pressure.
Step 6 pours bracket concrete, refers to support bracket supporting module, the production of embedded board and positioning by checking After examination, casting concrete simultaneously is reinforced vibrating, and smoothes out and wait concrete to complete final set after pouring.To guarantee embedded board The density of lower concrete, embedded board is displaced when avoiding pouring, it should take following measures: settable hopper valve controls coagulation The speed of perfusion of soil, prevents the too fast blocking material mouth of blanking;It is vibrated using high-frequency vibrating head from central opening when pouring, coagulation Soil flows around from center, and gas is from stomata and surrounding opening discharge in concrete, when concrete is full full, slurry along Stomata and surrounding opening up emit, and at this moment stop blanking, centre vibrating head are extracted out, then vibrate along surrounding opening, between vibrating a little Away from control between 30~40cm.In process of vibrating, vibrating time cannot be too long, and a spacing of vibrating can not be too small, otherwise holds Concrete disintegration is easily caused, or leads to inject more air in concrete and causes concrete leakiness even hole.
Step 7, demoulding and embedded board removing surface are to clear up laitance, spot etc. at the embedded board plate face to bracket to make it Surfacing is cleaned and carries out finished product protection.
Step 8 installs one-way movable basin type rubber, be will install the bottom basin of one-way movable basin type rubber with Embedded board is an entirety by fillet weld weld all around.Before installation starts, after bracket concrete intensity reaches the 75% of intensity One-way movable basin type rubber installation can be carried out, positioning repetition measurement is carried out before installation and is recorded, repetition measurement content includes built-in fitting mark High, center and flatness.Repetition measurement can carry out one-way movable basin type rubber installation after meeting the requirements, and should incite somebody to action before installation Embedded board is cleaned out;One-way movable basin type rubber is filled, lifting fortune is generally carried out using truck crane or construction site tower crane Transport to installation position.The center of the center of one-way movable basin type rubber and embedded board is consistent, is passed through After checking and checking and accepting, as shown in figure 4, it is an entirety that bottom basin and embedded board, which are passed through fillet weld weld all around,.
Step 9 makes gusset plate and ribbed stiffener, mainly according to drawing requirement, completes the system of gusset plate and ribbed stiffener Make;
Step 10, welding node plate and ribbed stiffener are entirety, mainly according to the position while welding and weld seam indicated in drawing Gusset plate and ribbed stiffener are whole by fillet weld seam by grade.
Step 11, welding one-way movable basin type rubber and gusset plate, ribbed stiffener are entirety, mainly by step 10 In integral node plate and ribbed stiffener and one-way movable basin type rubber top plate by fillet weld weld all around be an entirety;It is applying Before weldering, it should whole gusset plate will be welded as, ribbed stiffener is reviewed and is checked, especially positioning and absolute altitude will be infused especially Meaning;
Step 12 makes assembling type wooden beam string section, mainly make same material, same strong according to drawing Spend the assembling type wooden beam string section of the combination laminated wood composition of grade.
Step 13 makes connecting plate and ribbed stiffener, mainly according to drawing requirement, completes the system of connecting plate and ribbed stiffener Make;
Step 14, welded connecting plate and ribbed stiffener are entirety, mainly according to the position while welding and weldering indicated in drawing It is whole by fillet weld seam that grade, which is stitched, by connecting plate and ribbed stiffener.
Step 15, plain bolt are fixed temporarily assembling type wooden beam string section and connecting plate and ribbed stiffener to be whole, such as Shown in Fig. 1 and Fig. 8, be primarily referred to as completing according to drawing plain bolt be fixed temporarily assembling type wooden beam string section and connecting plate and Ribbed stiffener is entirety, and plain bolt is completed just to twist.
Step 10 six, lifting assembling type wooden beam string section and connecting plate and ribbed stiffener refer to that the reasonable lifting of selection is set Standby lifting forms whole wooden beam string section and connecting plate and ribbed stiffener, completes interim lifting.
Step 10 seven, the wooden beam string section of pin shaft fixing assembling formula and support refer to pin shaft fixing assembling formula wooden String beam section is attached with bottom production, is fixed together by pin shaft, is completed the construction at support.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention;Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.
Although appended drawing reference in figure is used more herein: support base 1, beam string section 2, connecting plate 3, drag-line 4, bracket 5, concrete column 6 supports pin shaft 7, and first plus through rib 8, second plus through rib 9, pin shaft 10, bolt 11, one-way movable basin type rubber Support 17, gusset plate 20, top plate 170, middle steel plate 171, rubber slab 172, bottom basin 173, the second chimb 174, lateral steel bar 175, tetrafluoro draw runner 176, the first chimb 177, stainless steel slide plate 178, the equal terms of tetrafluoro plate 179, but be not precluded using other A possibility that term;The use of these items is only for be more convenient to describe and explain essence of the invention;They are explained It at any additional limitation is disagreed with spirit of that invention.

Claims (10)

1. a kind of wooden tension string beam structure one-way movable basin type rubber joint construction method of assembled Long span, feature exist In: the following steps are included:
Step 1: support bracket reinforcing bar is bound simultaneously with main structure column reinforcing bar;
Step 2: the measurement and positioning of embedded board, the production of embedded board, embedded board are fixed temporarily;
Step 3: support bracket supporting module;Pour bracket concrete;Demoulding and embedded board removing surface;
Step 4: installation one-way movable basin type rubber;Make gusset plate and ribbed stiffener;Welding node plate is whole with ribbed stiffener Body;
Step 5: welding one-way movable basin type rubber is whole with gusset plate, ribbed stiffener;
Step 6: production assembling type wooden beam string section;Make connecting plate and ribbed stiffener;Welded connecting plate is whole with ribbed stiffener Body;
Step 7: it is whole that plain bolt, which is fixed temporarily assembling type wooden beam string section and connecting plate and ribbed stiffener,;
Step 8: lifting assembling type wooden beam string section and connecting plate and ribbed stiffener;
Step 9: the wooden beam string section of pin shaft fixing assembling formula and support.
2. the wooden tension string beam structure one-way movable basin type rubber section of a kind of assembled Long span according to claim 1 Point construction method, it is characterised in that: in step 1, support bracket reinforcing bar is bound simultaneously with main structure column reinforcing bar to be referred to according to applying The longitudinally, laterally reinforcing bar and the longitudinal reinforcement at bracket of the synchronous constructions concrete column such as work drawing and codes and standards atlas, bending Reinforcing bar and stirrup.
3. the wooden tension string beam structure one-way movable basin type rubber section of a kind of assembled Long span according to claim 1 Point construction method, it is characterised in that: in step 2, the measurement and positioning of embedded board are referred to and put using total station or theodolite The center line of embedded board installation and plan-position out, with steel tape or the elevation control of level measurement embedded board plate face;In advance The production of buried plate refers to that the steel plate of production standard rectangular cross-section steel material, steel plate are connected as with dowel by plug welding of perforating whole Body.
4. the wooden tension string beam structure one-way movable basin type rubber section of a kind of assembled Long span according to claim 1 Point construction method, it is characterised in that: in step 3, support bracket supporting module, mainly according to the support ox in design drawing Leg shape uses glued board supporting module;Bracket concrete is poured, refers to support bracket supporting module, the production of embedded board and fixed Position smoothes out and waits concrete to complete final set knot by checking that casting concrete is simultaneously reinforced vibrating with after examination after pouring; Demoulding and embedded board removing surface are to clear up laitance, spot etc. at the embedded board plate face to bracket to make its surfacing cleaning simultaneously Carry out finished product protection.
5. the wooden tension string beam structure one-way movable basin type rubber section of a kind of assembled Long span according to claim 1 Point construction method, it is characterised in that: in step 4, install one-way movable basin type rubber, be that will install one-way movable benzvalene form The bottom basin and embedded board of rubber support are an entirety by fillet weld weld all around;Make gusset plate and ribbed stiffener, mainly according to Drawing requirement completes the production of gusset plate and ribbed stiffener;Welding node plate and ribbed stiffener be it is whole, mainly according to being infused in drawing Gusset plate and ribbed stiffener are whole by fillet weld seam by bright position while welding and weld seam grade.
6. the wooden tension string beam structure one-way movable basin type rubber section of a kind of assembled Long span according to claim 1 Point construction method, it is characterised in that: in step 5, welding one-way movable basin type rubber and gusset plate, ribbed stiffener are entirety, The integral node plate in step 4 is mainly passed through into fillet weld weld all around with ribbed stiffener and one-way movable basin type rubber top plate For an entirety.
7. the wooden tension string beam structure one-way movable basin type rubber section of a kind of assembled Long span according to claim 1 Point construction method, it is characterised in that: in step 6, make assembling type wooden beam string section, mainly made according to drawing The assembling type wooden beam string section of the combination laminated wood composition of same material, equality strength grade;Connecting plate and ribbed stiffener are made, Mainly according to drawing requirement, the production of connecting plate and ribbed stiffener is completed;Welded connecting plate and ribbed stiffener are entirety, are mainly pressed It is whole that connecting plate and ribbed stiffener, which are passed through fillet weld seam, according to the position while welding and weld seam grade indicated in drawing.
8. the wooden tension string beam structure one-way movable basin type rubber section of a kind of assembled Long span according to claim 1 Point construction method, it is characterised in that: in step 7, plain bolt is fixed temporarily assembling type wooden beam string section and connecting plate and adds Strength rib is entirety, is primarily referred to as being fixed temporarily assembling type wooden beam string section and connecting plate according to drawing completion plain bolt and add Strength rib is entirety, and plain bolt is completed just to twist.
9. the wooden tension string beam structure one-way movable basin type rubber section of a kind of assembled Long span according to claim 1 Point construction method, it is characterised in that: in step 8, lifting assembling type wooden beam string section and connecting plate and ribbed stiffener refer to choosing It is lifted to form whole wooden beam string section and connecting plate and ribbed stiffener with reasonable hanging device, completes interim lifting.
10. the wooden tension string beam structure one-way movable basin type rubber of a kind of assembled Long span according to claim 1 Joint construction method, it is characterised in that: in step 9, the wooden beam string section of pin shaft fixing assembling formula and support refer to pin shaft The wooden beam string section of fixing assembling formula is attached with bottom production, is fixed together, is completed at support by pin shaft Construction.
CN201910520308.1A 2019-06-17 2019-06-17 Construction method for one-way movable pot type rubber support joint of assembled long-span wood beam string structure Active CN110387969B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910520308.1A CN110387969B (en) 2019-06-17 2019-06-17 Construction method for one-way movable pot type rubber support joint of assembled long-span wood beam string structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910520308.1A CN110387969B (en) 2019-06-17 2019-06-17 Construction method for one-way movable pot type rubber support joint of assembled long-span wood beam string structure

Publications (2)

Publication Number Publication Date
CN110387969A true CN110387969A (en) 2019-10-29
CN110387969B CN110387969B (en) 2021-07-02

Family

ID=68285402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910520308.1A Active CN110387969B (en) 2019-06-17 2019-06-17 Construction method for one-way movable pot type rubber support joint of assembled long-span wood beam string structure

Country Status (1)

Country Link
CN (1) CN110387969B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11227912A (en) * 1998-02-13 1999-08-24 Mitsubishi Steel Mfg Co Ltd Base isolation device foe rack
CN105544762A (en) * 2015-12-21 2016-05-04 广州机施建设集团有限公司 Method for installing seismic isolation layer
CN206289992U (en) * 2016-12-16 2017-06-30 中国建筑第八工程局有限公司 The erecting device of large span arch form truss

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11227912A (en) * 1998-02-13 1999-08-24 Mitsubishi Steel Mfg Co Ltd Base isolation device foe rack
CN105544762A (en) * 2015-12-21 2016-05-04 广州机施建设集团有限公司 Method for installing seismic isolation layer
CN206289992U (en) * 2016-12-16 2017-06-30 中国建筑第八工程局有限公司 The erecting device of large span arch form truss

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丁生根: "南京会展中心主展厅屋架结构设计", 《空间结构》 *
黄明鑫: "《大型张弦梁结构的设计与施工》", 31 March 2005, 山东科学技术出版社 *

Also Published As

Publication number Publication date
CN110387969B (en) 2021-07-02

Similar Documents

Publication Publication Date Title
WO2017045223A1 (en) Prefabricated pier column member with steel-concrete composite structure
CN107090925A (en) Reinforced precast reinforced concrete shear wall, structural system and its construction method
CN107938504A (en) A kind of wet seam construction of floorings using T reinforcing bars and its construction method
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN204252345U (en) The connecting structure of a kind of precast concrete plank and girder steel
CN105133791A (en) Construction method for prefabricated thick plate steel rib concrete column variable cross-section transformation node structure
CN108755963A (en) A kind of partial precast assembled steel reinforced concrete giant frame structure and construction method
CN101922254B (en) Assembled square-barrel multi-layer concrete underground garage and manufacturing method thereof
CN106436732B (en) A kind of strip footing is replaced as the reinforcement means and ruggedized construction of raft foundation
CN107447901A (en) Anti-seismic prefabricated floor and floor antidetonation splicing construction
CN109113245A (en) A kind of construction method and device of reinforced concrete double plate
CN109339229A (en) A kind of perforation slurry prefabricated assembled concrete-filled steel tubular frame structure of anchor
CN106906841B (en) One kind being used for lateral wall form bracing system construction
CN105926427A (en) Pier and beam transitional connecting structure
CN103174098A (en) Strengthening method for stress on single plate by using steel reinforced concrete
CN207017484U (en) Reinforced precast reinforced concrete shear wall and structural system
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN209211748U (en) A kind of structure node of assembled ceiling radiating system
CN207686092U (en) A kind of assembled overlapped hollow floor system
CN109578011A (en) Supporting construction and its construction method in a kind of municipal tunnel
CN109594581A (en) Cross a river segment pipe structure and its installation method
CN107366355A (en) Add the bean column node and its construction method of new beam on existing reinforced concrete frame column
CN208472958U (en) A kind of partial precast assembled steel reinforced concrete giant frame structure
CN110387969A (en) A kind of wooden tension string beam structure one-way movable basin type rubber joint construction method of assembled Long span
CN208105474U (en) A kind of assembly node of upper and lower interior wall and floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant