CN105926427A - Pier and beam transitional connecting structure - Google Patents

Pier and beam transitional connecting structure Download PDF

Info

Publication number
CN105926427A
CN105926427A CN201610280654.3A CN201610280654A CN105926427A CN 105926427 A CN105926427 A CN 105926427A CN 201610280654 A CN201610280654 A CN 201610280654A CN 105926427 A CN105926427 A CN 105926427A
Authority
CN
China
Prior art keywords
bent cap
steel pipe
pier
anchor
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610280654.3A
Other languages
Chinese (zh)
Other versions
CN105926427B (en
Inventor
范碧琨
牟廷敏
汪洋
孙才志
康玲
古锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Original Assignee
Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute filed Critical Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority to CN201610280654.3A priority Critical patent/CN105926427B/en
Publication of CN105926427A publication Critical patent/CN105926427A/en
Application granted granted Critical
Publication of CN105926427B publication Critical patent/CN105926427B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a pier and beam transitional connecting structure which comprises a pier column and a cover beam. The pier column comprises a steel pipe and concrete arranged in the steel pipe. The cover beam comprises a cover beam top board and a cover beam bottom board. The lower surface of the cover beam bottom board is connected with multiple anchor boards. Each anchor board is provided with multiple holes. The cover beam bottom board is fixed to the top of the steel pipe of the pier column. The anchor boards are embedded in the concrete in the steel pipe. By the adoption of the pier and beam transitional connecting structure, the multiple anchor boards are arranged on the cover beam bottom board of the cover beam, and each anchor board is provided with the multiple holes, so that when the cover beam and the pier column are connected with each other, the anchor boards are directly inserted in the steel pipe of the pier column, the anchor boards are embedded in the concrete in a sleeved manner when the concrete in the steel pipe is poured, the holes in the anchor boards serve as shearing force holes to interact with the concrete, and anchoring connection between the pier column and the cover beam is achieved. The pier and beam transitional connecting structure is simple, convenient to operate, short in construction period and more stable and effective in connection.

Description

Pier beam transition connecting construction
Technical field
The present invention relates to a kind of composite bridge field, particularly a kind of pier beam transition connecting construction.
Background technology
Modern Highway Construction in Mountainous Area, limits for fear of narrow terrain, place, is typically all and uses beam bridge knot Structure.And the concrete simply supported beam of existing employing, owing to girder construction weight is big, labour intensity is high, its sand Stone material consumption is big, environment-friendly type is poor, and the manufacture craft of this beams of concrete, needs formwork erection to pour, The cycle of its construction technology is longer, needs health, easily produces mass defect;Owing to its mountain area is set up Bridge pier is the highest, increases the difficulty of construction set a roof beam in place, and the geological disaster in mountain area is serious simultaneously, coagulation Soil load bearing beam ability and anti-seismic performance are not enough.When existing concrete bridge pier is connected with bent cap, general employing is pre-buried Bar-mat reinforcement is secured the two together by concrete, and operation is complex, construction period is longer for it, and It is the most firm to connect.
Summary of the invention
The goal of the invention of the present invention is: for the existing concrete bridge pier existing for prior art with bent cap even When connecing, the two is linked together by general employing embedded bar net, and the operation brought is complex, construction week Phase is longer, connect and illusive problem, it is provided that a kind of pier beam transition connecting construction.
To achieve these goals, the technical solution used in the present invention is:
A kind of pier beam transition connecting construction, including pier stud and bent cap, described pier stud includes steel pipe and is located at steel Concrete in pipe, described bent cap includes bent cap top board and bent cap base plate, and described bent cap base plate lower surface connects There are several anchor slabs, each described anchor slab offers several holes;Described bent cap base plate is fixed on described pier The steel pipe top of post, described anchor slab embeds in the concrete in described steel pipe.
This pier beam transition connecting construction, by being provided with several anchor slabs, anchor slab on the bent cap base plate of bent cap It is provided with several holes, when bent cap is connected with each other with pier stud, directly anchor slab is inserted in the steel pipe of pier stud, Being nested in concrete by anchor slab during concreting in steel pipe, the hole on bent cap base plate lower surface anchor slab is made Interact with concrete for shearing hole, it is achieved pier stud and the anchor connection of bent cap.Relative to existing concrete Pier stud is connected by bar-mat reinforcement with bent cap, the attachment structure of its pier beam transition connecting construction is simple and convenient to operate, Short construction period, connects more firm effective.
Preferably, all described anchor slabs are all vertically welded on described bent cap base plate lower surface, weld more square Just.
Preferably, all described anchor slabs comprise the two groups of anchor slabs being arranged in a mutually vertical manner, and often group anchor slab includes at least Two anchor slabs being parallel to each other.
Two groups of anchor slabs on bent cap base plate are arranged to mutually orthogonal direction, it is possible to solve bent cap or pier stud is being subject to During the Moment of different directions, strengthen the shear connections effect of anchor slab and concrete, increase bent cap and pier stud Connective stability.
Preferably, described anchor slab is symmetrically distributed on described bent cap base plate.
Preferably, several hole sizes on each described anchor slab are identical and are evenly distributed.
Preferably, described bent cap base plate is welded on the steel pipe top of described pier stud.
Preferably, it is connected between the outer wall of steel pipe of described pier stud with described bent cap base plate lower surface and has several to add Strength rib.
The steel-pipe welding area of bent cap base plate and pier stud can be increased, be effectively improved the company of bent cap base plate and pier stud Connect intensity.
Preferably, all described ribbed stiffeners are uniformly connected to outside described steel pipe.
Preferably, if the bent cap top board of described bent cap, being longitudinally connected with along pier stud between bent cap base plate and steel pipe Dry stiffener one.
By stiffener one, bent cap top board, bent cap base plate and steel pipe are interconnected, coordinate ribbed stiffener, Increase bent cap and the bonding strength of pier stud further.
Preferably, described steel pipe inner wall is provided with a circle stiffening ring, and described stiffening ring is positioned at below described anchor slab, And be filled in described concrete.
Stiffening ring is set at steel pipe inner wall, it is possible to increase the steel pipe walls local stiffness of pier stud, it is to avoid stress occurs Concentrate, effectively reduce peak stress, improve the bonding strength of pier beam transition connecting construction.
In sum, owing to have employed technique scheme, the invention has the beneficial effects as follows:
1, pier beam transition connecting construction of the present invention, by being provided with several on the bent cap base plate of bent cap Anchor slab, anchor slab is provided with several holes, when bent cap is connected with each other with pier stud, directly anchor slab is inserted pier stud Steel pipe in, during concreting in steel pipe, anchor slab is nested in concrete, bent cap base plate lower surface anchor Hole on plate interacts with concrete as shearing hole, it is achieved pier stud and the anchor connection of bent cap.Relative to Existing concrete pier stud is connected by bar-mat reinforcement with bent cap, the attachment structure of its pier beam transition connecting construction is simple, Easy to operate, short construction period, connects more firm effective;
2, pier beam transition connecting construction of the present invention, uses two groups of anchor slabs on bent cap base plate and is arranged to phase The most vertical direction, it is possible to solve bent cap or pier stud when by the Moment of different directions, strengthen anchor slab with The shear connections effect of concrete, increases bent cap and the connective stability of pier stud;
3, pier beam transition connecting construction of the present invention, the outer wall of steel pipe of pier stud and described bent cap base plate lower surface Between connect and have several ribbed stiffeners, it is possible to increase the steel-pipe welding area of bent cap base plate and pier stud, effectively carry High bent cap base plate and the bonding strength of pier stud;
4, pier beam transition connecting construction of the present invention, arranges stiffening ring at steel pipe inner wall, it is possible to increase pier stud Steel pipe walls local stiffness, it is to avoid occur that stress is concentrated, effectively reduce peak stress, improve pier beam transition even Connect the bonding strength of structure.
Accompanying drawing explanation
Fig. 1 is the inside structural representation of pier beam transition connecting construction of the present invention;
Fig. 2 is the structural representation of A-A in Fig. 1;
Fig. 3 is the B-B structural representation in Fig. 1;
Fig. 4 is C-C structural representation in Fig. 1;
Fig. 5 is D-D structural representation in Fig. 1.
Figure marks:
1, pier stud, 11, steel pipe, 12, concrete, 2, bearing lower steel plate, 3, bent cap, 31, bent cap top Plate, 32, bent cap base plate, 33, stiffener one, 34, stiffener two, 4, anchor slab, 5, hole, 6, put more energy into Ring, 7, ribbed stiffener.
Detailed description of the invention
Below in conjunction with the accompanying drawings, the present invention is described in detail.
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing and reality Execute example, the present invention is further elaborated.Only should be appreciated that specific embodiment described herein In order to explain the present invention, it is not intended to limit the present invention.
As Figure 1-5, a kind of pier beam transition connecting construction, including pier stud 1 and bent cap 3, described pier stud 1 Including steel pipe 11 and the concrete 12 be located in steel pipe 11, described bent cap 3 includes bent cap top board 31 and lid Beam base plate 32, described bent cap base plate 32 lower surface connects several anchor slabs 4, and each described anchor slab 4 is opened It is provided with several holes 5;Described bent cap base plate 32 is fixed on steel pipe 11 top of described pier stud 1, described anchor slab 4 embed in the concrete 12 in described steel pipe 11.
Above-mentioned all anchor slabs 4 are all vertically welded on bent cap base plate 32 lower surface, and by all anchor slabs 4 points For the two groups of anchor slabs 4 being arranged in a mutually vertical manner, often group anchor slab 4 includes the anchor slab 4 that at least two is parallel to each other.As Described in figure, steel pipe 11 join domain bottom bent cap arranges two horizontal anchor slabs 4 as one group, two Laterally outside anchor slab 4, two longitudinal anchor slabs 4 are respectively set as another group;Become the bent cap of mutually orthogonal direction Two groups of anchor slabs 4 on base plate 32, it is possible to solve bent cap 3 or pier stud 1 when by the Moment of different directions, The shear connections effect of anchor slab 4 and concrete 12 be can effectively strengthen, bent cap 3 and the connection of pier stud 1 increased Stability.In order to make the shearing resistance on anchor slab 4 uniform, each anchor slab 4 is symmetrically distributed on bent cap base plate 32, And hole 5 size on each anchor slab 4 is identical and is evenly distributed, in order to strengthen the anchoring strength of anchor slab 4, also Reinforcing bar can be set up in hole 5.
Above-mentioned bent cap base plate 32 is fixed on steel pipe 11 top of pier stud 1 by the way of welding, in order to enable Enough increase steel pipe 11 bonding area of bent cap base plate 32 and pier stud 1, be effectively improved bent cap base plate 32 and pier stud The bonding strength of 1, is connected between steel pipe 11 outer wall and bent cap base plate 32 lower surface of pier stud 1 and has several Ribbed stiffener 7, all ribbed stiffeners 7 are uniformly connected to outside described steel pipe 11.It addition, the bent cap top of bent cap 3 It is longitudinally connected with several along pier stud 1 between plate 31, bent cap web, bent cap base plate 32 and steel pipe 11 to put more energy into Plate 1, is welded with several stiffeners 2 34 between bent cap top board 31 and bent cap base plate 32.By putting more energy into Bent cap top board 31, bent cap base plate 32 and steel pipe 11 are interconnected by plate 1, coordinate ribbed stiffener 7, Bent cap 3 and the bonding strength of pier stud 1 can be increased further.
The line that contacts of above-mentioned ribbed stiffener 7 and bent cap base plate 32, and stiffener 1, stiffener 2 34 Contact line with bent cap top board 31, bent cap base plate 32, bent cap web and pier stud 1 steel pipe 11, and be portion Dividing penetration weld, penetration rate is more than 90%, and should offer groove;This ribbed stiffener 7 and the groove of bent cap base plate 32 Weld seam, should use the DC welder multilayer welding that welding rod that diameter is less, electric current are relatively low, and that improves welding can Bent cap 3 inner concrete 12 and steel Shu Zaocheng is damaged with avoiding welding by property;The assembling sequence of each component answers root It is determined according to installation requirement and engineer testing.
It addition, be also provided with a circle or multi-turn stiffening ring 6 at steel pipe 11 inwall, this stiffening ring 6 is located at anchor Below plate 4 and corresponding with steel pipe 11 position at place, ribbed stiffener 7 end, and it is filled in described concrete In 12.By arranging stiffening ring 6 at steel pipe 11 inwall, it is possible to increase the steel pipe 11 wall local of pier stud 1 is just Degree, it is to avoid occur that stress is concentrated, effectively reduces peak stress, and the connection improving pier beam transition connecting construction is strong Degree.
This pier beam transition connecting construction, by being provided with several anchor slabs 4 on the bent cap base plate 32 of bent cap 3, Anchor slab 4 is provided with several holes 5, when bent cap 3 is connected with each other with pier stud 1, directly anchor slab 4 is inserted pier In the steel pipe 11 of post 1, when the concrete 12 in steel pipe 11 pours, anchor slab 4 is nested in concrete 12, Hole 5 on bent cap base plate 32 lower surface anchor slab 4 interacts with concrete 12 as shearing hole 5, it is achieved Pier stud 1 and the anchor connection of bent cap 3.Bar-mat reinforcement is passed through relative to existing concrete 12 pier stud 1 and bent cap 3 Connecting, its pier beam transition connecting construction passes through triple anchoring systems, its attachment structure is simple and convenient to operate, Short construction period, connects more firm effective.Again bearing lower steel plate 2 is welded to each other with bent cap top board 31, Can conveniently realize bearing, bent cap 3 and the integrated connection of pier stud 1, be effectively improved bridge and assemble efficiency of construction.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all at this Any amendment, equivalent and the improvement etc. made within bright spirit and principle, should be included in the present invention Protection domain within.

Claims (10)

1. a pier beam transition connecting construction, including pier stud (1) and bent cap (3), described pier stud (1) includes steel pipe (11) And the concrete (12) being located in steel pipe (11), described bent cap (3) includes bent cap top board (31) and bent cap base plate (32), it is characterised in that described bent cap base plate (32) lower surface connects several anchor slabs (4), each described anchor Several holes (5) are offered on plate (4);Described bent cap base plate (32) is fixed on steel pipe (11) top of described pier stud (1) Portion, described anchor slab (4) embeds in the concrete (12) in described steel pipe (11).
Pier beam transition connecting construction the most according to claim 1, it is characterised in that all described anchor slabs (4) All it is vertically welded on described bent cap base plate (32) lower surface.
Pier beam transition connecting construction the most according to claim 2, it is characterised in that all described anchor slabs (4) Comprise the two groups of anchor slabs (4) being arranged in a mutually vertical manner, often organize anchor slab (4) and include the anchor slab that at least two is parallel to each other (4)。
Pier beam transition connecting construction the most according to claim 1, it is characterised in that symmetrical point of described anchor slab (4) Cloth is on described bent cap base plate (32).
Pier beam transition connecting construction the most according to claim 1, it is characterised in that each described anchor slab (4) On several holes (5) size identical and be evenly distributed.
6. according to the arbitrary described pier beam transition connecting construction of claim 1-5, it is characterised in that at the bottom of described bent cap Plate (32) is welded on steel pipe (11) top of described pier stud (1).
Pier beam transition connecting construction the most according to claim 6, it is characterised in that the steel pipe of described pier stud (1) (11) it is connected between outer wall with described bent cap base plate (32) lower surface and has several ribbed stiffeners (7).
Pier beam transition connecting construction the most according to claim 7, it is characterised in that all described ribbed stiffeners (7) Uniformly it is connected to described steel pipe (11) outside.
Pier beam transition connecting construction the most according to claim 6, it is characterised in that the bent cap of described bent cap (3) It is longitudinally connected with several stiffeners one along pier stud (1) between top board (31), bent cap base plate (32) and steel pipe (11) (33)。
Pier beam transition connecting construction the most according to claim 6, it is characterised in that described steel pipe (11) inwall Being provided with a circle stiffening ring (6), described stiffening ring (6) is positioned at described anchor slab (4) lower section, and is filled in described concrete (12) in.
CN201610280654.3A 2016-04-28 2016-04-28 Pier beam transition connecting construction Active CN105926427B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610280654.3A CN105926427B (en) 2016-04-28 2016-04-28 Pier beam transition connecting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610280654.3A CN105926427B (en) 2016-04-28 2016-04-28 Pier beam transition connecting construction

Publications (2)

Publication Number Publication Date
CN105926427A true CN105926427A (en) 2016-09-07
CN105926427B CN105926427B (en) 2018-06-19

Family

ID=56837845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610280654.3A Active CN105926427B (en) 2016-04-28 2016-04-28 Pier beam transition connecting construction

Country Status (1)

Country Link
CN (1) CN105926427B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360366A (en) * 2018-01-23 2018-08-03 安徽省交通控股集团有限公司 A kind of prefabricated pier, plate cross Crossing brace connection structure
CN108532448A (en) * 2018-07-04 2018-09-14 深圳市市政设计研究院有限公司 A kind of concrete circular stub consolidates connecting structure with girder steel
CN110396915A (en) * 2019-07-11 2019-11-01 重庆大学 U-shaped Steel Thin-Wall-prestress reinforcement Combined concrete bent cap and thin wall steel tube concrete pier stud joint structure and construction technology
CN111622083A (en) * 2020-05-21 2020-09-04 大连理工大学 Device and method for solidifying steel box girder and concrete bridge pier
CN113026794A (en) * 2019-12-24 2021-06-25 新疆金风科技股份有限公司 Combined anchor plate, anchor bolt cage and tower foundation
CN113279323A (en) * 2021-06-24 2021-08-20 中交第一公路勘察设计研究院有限公司 Thin-wall open steel box-prestressed reinforced concrete combined capping beam and construction method
CN113832840A (en) * 2021-08-26 2021-12-24 广州市公用事业规划设计院有限责任公司 Double-wall hollow pier column top support connecting node and construction method
CN114592436A (en) * 2022-03-18 2022-06-07 四川省公路规划勘察设计研究院有限公司 Pier capping beam lower support system and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818478A (en) * 2010-03-09 2010-09-01 河海大学 Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam
CN101906754A (en) * 2010-07-09 2010-12-08 清华大学 Rigid connection method for steel beam and concrete pier
CN201686929U (en) * 2010-06-11 2010-12-29 天津二十冶建设有限公司 Pier column for bent cap construction
CN203429551U (en) * 2013-09-13 2014-02-12 上海市城市建设设计研究总院 Cast-in-situ reverse T-shaped bent cap and bridge pier
CN204370296U (en) * 2014-12-24 2015-06-03 福州大学 A kind of bridge pier-bent cap structure improving beam bridge Horizontal Seismic performance
KR20160026213A (en) * 2014-08-29 2016-03-09 청원엔지니어링(주) Pedestrian bridge design and construction method using ready made h-beam with prestressed forces on column inside connection

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818478A (en) * 2010-03-09 2010-09-01 河海大学 Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam
CN201686929U (en) * 2010-06-11 2010-12-29 天津二十冶建设有限公司 Pier column for bent cap construction
CN101906754A (en) * 2010-07-09 2010-12-08 清华大学 Rigid connection method for steel beam and concrete pier
CN203429551U (en) * 2013-09-13 2014-02-12 上海市城市建设设计研究总院 Cast-in-situ reverse T-shaped bent cap and bridge pier
KR20160026213A (en) * 2014-08-29 2016-03-09 청원엔지니어링(주) Pedestrian bridge design and construction method using ready made h-beam with prestressed forces on column inside connection
CN204370296U (en) * 2014-12-24 2015-06-03 福州大学 A kind of bridge pier-bent cap structure improving beam bridge Horizontal Seismic performance

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360366A (en) * 2018-01-23 2018-08-03 安徽省交通控股集团有限公司 A kind of prefabricated pier, plate cross Crossing brace connection structure
CN108360366B (en) * 2018-01-23 2024-02-23 安徽省交通控股集团有限公司 Prefabricated pier and plate cross shear support connection structure
CN108532448A (en) * 2018-07-04 2018-09-14 深圳市市政设计研究院有限公司 A kind of concrete circular stub consolidates connecting structure with girder steel
CN110396915A (en) * 2019-07-11 2019-11-01 重庆大学 U-shaped Steel Thin-Wall-prestress reinforcement Combined concrete bent cap and thin wall steel tube concrete pier stud joint structure and construction technology
CN113026794A (en) * 2019-12-24 2021-06-25 新疆金风科技股份有限公司 Combined anchor plate, anchor bolt cage and tower foundation
CN111622083A (en) * 2020-05-21 2020-09-04 大连理工大学 Device and method for solidifying steel box girder and concrete bridge pier
CN113279323A (en) * 2021-06-24 2021-08-20 中交第一公路勘察设计研究院有限公司 Thin-wall open steel box-prestressed reinforced concrete combined capping beam and construction method
CN113832840A (en) * 2021-08-26 2021-12-24 广州市公用事业规划设计院有限责任公司 Double-wall hollow pier column top support connecting node and construction method
CN113832840B (en) * 2021-08-26 2023-08-22 广州市城建规划设计院有限公司 Double-wall hollow pier column top support connecting node and construction method
CN114592436A (en) * 2022-03-18 2022-06-07 四川省公路规划勘察设计研究院有限公司 Pier capping beam lower support system and construction method thereof

Also Published As

Publication number Publication date
CN105926427B (en) 2018-06-19

Similar Documents

Publication Publication Date Title
CN105926427A (en) Pier and beam transitional connecting structure
CN106869316B (en) The beam column edge of a wing is the group frame system and construction method of concrete filled steel tube
CN101818478B (en) Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam
CN207194146U (en) Prestressing force assembly concrete frame joint attachment structure
CN106567458B (en) Assembled steel-is mixed to combine Beam-post Frame Structure system
CN105649202B (en) Prestressing force assembling frame node structure and its construction method
CN106381925A (en) Prefabricated reinforced concrete column and column splice joint with sleeves
CN105604182B (en) The through round steel pipe constraint reinforced column steel girder frame node of girder steel
CN208792508U (en) A kind of square steel tube constrains the node structure of combined steel and concrete column and girder steel
CN106545088A (en) The switching node and implementation of a kind of upper strata concrete column and lower floor's steel core concrete column
CN106906736B (en) A kind of clad steel case performance of concrete column confined and girder steel rigid connection structural form and construction method
CN107447858A (en) PC fabricated construction dry type column foot connecting structures
CN105803939A (en) Open steel tube and reinforced-concrete combined girder bridge structure
CN108086531B (en) Horizontal joint connection method for double-steel-plate shear wall
CN207620108U (en) PC fabricated construction dry type column foot connecting structures
CN106869317B (en) The beam column edge of a wing is the group frame system and construction method of concrete-filled rectangular steel tube
CN105544742A (en) Side column node connection structure of fabricated circular steel tube concrete special-shaped column and construction method of side column node connection structure
CN105986621A (en) Prefabricated building concrete beam column profile steel connection node structure and method
CN109578011A (en) Supporting construction and its construction method in a kind of municipal tunnel
CN206737123U (en) A kind of switching node of upper strata concrete column and lower floor's steel core concrete column
CN207829932U (en) A kind of supporting arrangement for Tunnel structure
CN203403402U (en) Upright pile
CN106121055B (en) A kind of steel box column and beams of concrete connecting node and its construction method
CN110541352A (en) Reinforced connecting unit of large-span pier stud and bridge floor
CN203924115U (en) A kind of subway twin columns overhead station steel reinforced concrete transformational structure reinforcing bar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant